A port electric vehicle charging method and system

By obtaining and analyzing the data of port electric vehicles, charging piles and operation dispatching equipment, and determining the target charging plan, the problem of centralized charging of port electric vehicles is solved, and charging efficiency and battery life are improved.

CN111546933BActive Publication Date: 2025-03-11HOITUNGINNOTEK SHENZHEN CO LTD +2
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010402348.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-13
Publication Date
2025-03-11
Estimated Expiration
2040-05-13

AI Technical Summary

Technical Problem

The centralized charging of electric vehicles in ports leads to congestion in the site, prolonged charging time, and low utilization rate of charging piles, affecting operating efficiency and shortening the service life of rechargeable batteries.

Method used

By obtaining the battery capacity data of the port electric vehicle, the charging status data of the charging pile and the pending operation data of the operation scheduling equipment, the target charging plan is determined, the charging time of the port electric vehicle is controlled, the centralized charging is avoided, and the utilization rate of the charging pile is improved.

Benefits of technology

It effectively avoids centralized charging, improves the utilization rate of charging piles, reduces the impact on port operations, and extends the service life of rechargeable batteries.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111546933B_ABST
    Figure CN111546933B_ABST
Patent Text Reader

Abstract

The embodiment of the present invention discloses a port electric vehicle charging method and system. The method is applied to a port electric vehicle charging system, and the system includes: a port electric vehicle, a charging pile, and an operation scheduling device. The port electric vehicle is used for port operations, the charging pile is used to charge the port electric vehicle, and the operation scheduling device is used to schedule the port electric vehicle to perform port operations; the method includes: obtaining the battery power data of the port electric vehicle; obtaining the charging status data of the charging pile; obtaining the pending operation data of the operation scheduling device; determining a target charging plan based on the battery power data, the charging status data, and the pending operation data, and the target charging plan is used to control the charging of the port electric vehicle. The present invention is conducive to avoiding centralized charging, improving the utilization rate of charging piles, avoiding affecting operation efficiency, and extending the service life of rechargeable batteries.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric vehicle charging, and in particular to a port electric vehicle charging method and system. Background Art

[0002] In the early stage of port construction in my country, due to the limitations of electric vehicle technology at that time, all ports did not design and reserve charging sites for port electric vehicles. With the maturity of electric technology in recent years, the national energy-saving and environmental protection policy orientation and the urgent need for energy conservation and emission reduction by enterprises themselves, ports have gradually introduced port electric vehicles to replace traditional fuel vehicles. The existing available sites in ports can no longer meet the charging needs of traditional fuel vehicles after replacing pure electric vehicles. The limitations of sites and the number of charging piles have begun to limit the application and promotion of new energy port electric vehicles in ports.

[0003] Although the existing technology can confirm the remaining power of the rechargeable battery and determine the charging time through the dashboard of the port electric vehicle, the problem of limited number of charging sites and charging piles still exists, and the driver will only passively charge when the remaining power warning is given, which causes most port electric vehicles to charge in one time period, while other time periods are idle; at the same time, centralized charging brings problems such as congestion and queuing in the site, which prolongs the charging time of port electric vehicles and reduces the utilization rate of charging piles. In addition, port electric vehicles are all cyclically operated, and some port electric vehicles exit the operation sequence to charge, which will affect the operation efficiency of the entire operation line. This leads to the operation time and operation efficiency of new energy port electric vehicles in the port being shorter than traditional fuel vehicles, affecting the overall production operation efficiency of port users; at the same time, the driver of the port electric vehicle cannot intuitively judge the operation task, and each time the charging is passively charged after reaching the limit, the rechargeable battery is often used under extreme conditions, which greatly reduces the life of the rechargeable battery of the port electric vehicle.

[0004] Therefore, it is particularly important to propose a port electric vehicle charging method that avoids centralized charging, improves the utilization rate of charging piles, avoids affecting operating efficiency, and prolongs the service life of rechargeable batteries. Summary of the invention

[0005] Based on this, it is necessary to propose a port electric vehicle charging method and system to address the above problems.

[0006] In a first aspect, the present invention proposes a port electric vehicle charging method, which is applied to a port electric vehicle charging system. The system includes: a port electric vehicle, a charging pile, and an operation scheduling device. The port electric vehicle is used for port operations, the charging pile is used to charge the port electric vehicle, and the operation scheduling device is used to schedule the port electric vehicle to perform port operations. The method includes:

[0007] Obtaining battery power data of the electric vehicle at the port;

[0008] Acquiring charging status data of the charging pile;

[0009] Acquire the job data to be processed of the job scheduling device;

[0010] A target charging plan is determined according to the battery power data, the charging status data and the pending operation data, and the target charging plan is used to control the charging of the port electric vehicle.

[0011] In one embodiment, determining a target charging plan according to the battery power data, the charging status data and the pending operation data includes:

[0012] Determine the required number of jobs to be processed according to the job data to be processed;

[0013] Determine the chargeable quantity according to the battery power data, the first battery power threshold, and the required quantity of the to-be-processed jobs;

[0014] The target charging plan is determined according to the charging status data, the chargeable quantity and the battery power data.

[0015] In one embodiment, determining the required number of jobs to be processed according to the job data to be processed includes:

[0016] The required number of jobs to be processed is determined according to the job data to be processed and the interval duration list.

[0017] In one embodiment, determining the required number of jobs to be processed according to the job data to be processed and the interval duration list includes:

[0018] Determine the required quantity of the first operation according to the to-be-processed operation data and the interval duration list;

[0019] Acquire historical operation data of the operation scheduling device;

[0020] Determine the required quantity of the second operation according to the historical operation data, the to-be-processed operation data, and the interval duration list;

[0021] The required number of jobs to be processed is determined according to the required number of the first jobs and the required number of the second jobs.

[0022] In one embodiment, determining the chargeable quantity according to the battery power data, the first battery power threshold, and the required quantity of the pending jobs includes:

[0023] Determining a first battery safety quantity according to the battery power data and the first battery power threshold;

[0024] Comparing the required number of pending operations with the first battery safety number;

[0025] When the number of pending job requirements is less than or equal to the first battery safety number, the number of the port electric vehicles whose battery power data is less than the first battery power threshold is used as the chargeable number;

[0026] When the required number of the to-be-processed jobs is greater than the first safe number of batteries, determining a second safe number of batteries according to the battery power data and a second battery power threshold;

[0027] Comparing the required number of pending operations with the second battery safety number;

[0028] When the number of pending operations required is less than or equal to the second battery safety number, the total number of the port electric vehicles is obtained, and the number of pending operations required is subtracted from the total number of the port electric vehicles to obtain the chargeable number;

[0029] When the required number of jobs to be processed is greater than the second safe number of batteries, determining a third safe number of batteries according to the battery power data and a third battery power threshold;

[0030] Comparing the required number of pending operations with the third battery safety number;

[0031] When the number of pending operations required is less than or equal to the third battery safety number, the total number of the port electric vehicles is obtained, and the number of pending operations required is subtracted from the total number of the port electric vehicles to obtain the chargeable number;

[0032] When the number of pending operations required is greater than the third battery safety number, the number of the port electric vehicles whose battery power data is less than the third battery power threshold is used as the chargeable number, and an operation over-limit signal is sent to the operation scheduling device;

[0033] The first battery power threshold is greater than the second battery power threshold, and the second battery power threshold is greater than the third battery power threshold.

[0034] In one embodiment, determining the target charging plan according to the charging state data, the chargeable quantity and the battery power data includes:

[0035] Determining the number of available charging piles according to the charging status data;

[0036] Comparing the number of available charging posts with the number of chargeable posts;

[0037] When the number of available charging piles is greater than or equal to the number of chargeable piles, determining the target charging plan according to the number of chargeable piles and the battery power data;

[0038] When the number of available charging piles is less than the chargeable number, the target charging plan is determined according to the number of available charging piles and the battery power data.

[0039] In one embodiment, determining a target charging plan according to the battery power data, the charging status data and the pending operation data further includes:

[0040] Obtaining the charging speed of the charging pile;

[0041] A target charging plan is determined according to the battery power data, the charging status data, the charging speed and the pending operation data.

[0042] In one embodiment, after determining the target charging plan according to the battery power data, the charging status data and the to-be-processed operation data, the method further includes:

[0043] Sending an exit operation instruction to the operation scheduling device according to the target charging plan, wherein the exit operation instruction is used to instruct the operation scheduling device to exit the port electric vehicle corresponding to the exit operation instruction from the operation vehicle list;

[0044] A charging instruction is sent to the operating terminal device on the port electric vehicle according to the target charging plan, the charging instruction carries the charging pile location data, and the charging instruction is used to instruct the driver of the port electric vehicle to drive the port electric vehicle to the charging pile corresponding to the charging pile location data for charging.

[0045] In one embodiment, the method further comprises:

[0046] Sending an identification of a vehicle to be charged to the charging pile according to the target charging plan;

[0047] The charging pile obtains a charging request, obtains a target vehicle identification of the port electric vehicle according to the charging request, compares the target vehicle identification with the vehicle identification to be charged, and charges the port electric vehicle corresponding to the target vehicle identification when the comparison result is the same.

[0048] In a second aspect, the present invention further proposes a port electric vehicle charging system, comprising: a port electric vehicle, a charging pile, an operation scheduling device, and a charging management device, wherein the port electric vehicle is used for port operations, the charging pile is used to charge the port electric vehicle, the operation scheduling device is used to schedule the port electric vehicle to perform port operations, and the charging management device is used to manage the charging of the port electric vehicle;

[0049] The charging management device is in communication connection with the port electric vehicle, the charging pile, and the operation scheduling device;

[0050] Wherein, the charging management device is provided with a charging management program module, and when the charging management program module is executed, the port electric vehicle charging method described in any one of the first aspects is implemented.

[0051] In one embodiment, the system further comprises: an operation terminal device;

[0052] The operation terminal equipment is installed on the port electric vehicle;

[0053] The job scheduling device is communicatively connected with the job terminal device and is used to send an enter job instruction or an exit job instruction to the job terminal device.

[0054] In one embodiment, the operation scheduling device is in communication connection with the port electric vehicle, and is used to send the entry operation instruction or the exit operation instruction to the port electric vehicle;

[0055] The port electric vehicle is communicatively connected to the operation terminal device, and is used to send the entry operation instruction or the exit operation instruction to the operation terminal device.

[0056] In one embodiment, the operation terminal device includes: a terminal controller, a voice playing component;

[0057] The terminal controller is in communication connection with the voice playing component and the job scheduling device, and is used for sending a voice playing signal to the voice playing component.

[0058] In one embodiment, the operation terminal device further includes: a first wireless communication component for wireless communication;

[0059] The terminal controller is electrically connected to the first wireless communication component, and is used for communicating with the charging management device through the first wireless communication component.

[0060] In one embodiment, the port electric vehicle comprises a vehicle controller, a battery detection component, a rechargeable battery, and a second wireless communication component;

[0061] The battery detection component is electrically connected to the rechargeable battery and is used to detect the power data of the rechargeable battery;

[0062] The vehicle controller is electrically connected to the battery detection component and the second wireless communication component, and is used for communicating with the charging management device through the second wireless communication component.

[0063] In one embodiment, the port electric vehicle further comprises: a warning light;

[0064] The automobile controller is electrically connected to the warning light and is used to send an alarm driving signal to the warning light.

[0065] In one embodiment, the port electric vehicle further comprises: a display component;

[0066] The vehicle controller is electrically connected to the display component.

[0067] In one embodiment, the charging pile includes a charging controller, a charging component, and a third wireless communication component;

[0068] The charging controller is electrically connected to the charging component and the third wireless communication component, and is used to communicate with the charging management device through the third wireless communication component and send a charging signal to the charging component.

[0069] In one embodiment, the charging pile further comprises: an identification component for identifying a vehicle identification of the port electric vehicle;

[0070] The charging controller is electrically connected to the identification component.

[0071] In summary, the method of the present invention determines a target charging plan based on the battery power data of the port electric vehicle, the charging status data of the charging pile and the pending job data of the job scheduling equipment. The target charging plan is used to control the charging of the port electric vehicle, so that the target charging plan is associated with the battery power data, the charging status data and the pending job data. When the charging of the port electric vehicle is controlled according to the target charging plan, it will be beneficial to avoid centralized charging, improve the utilization rate of the charging pile, avoid affecting the operation efficiency and extend the service life of the rechargeable battery.

[0072] The charging management device of the system of the present invention is communicatively connected with the port electric vehicle, the charging pile and the operation scheduling device, and is used to manage the charging of the port electric vehicle, so that the charging of the port electric vehicle fully considers the data of the port electric vehicle, the charging pile and the operation scheduling device, which will be beneficial to avoid centralized charging, improve the utilization rate of the charging pile, avoid affecting the operation efficiency, and extend the service life of the rechargeable battery. BRIEF DESCRIPTION OF THE DRAWINGS

[0073] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0074] in:

[0075] Figure 1 A flowchart of a method for charging electric vehicles in a port in one embodiment;

[0076] Figure 2 for Figure 1 A flow chart of a target charging plan for determining a method for charging electric vehicles in ports;

[0077] Figure 3 for Figure 1 A flow chart of determining the number of pending operation requirements for a method of charging electric vehicles in a port;

[0078] Figure 4 for Figure 1 A flow chart of determining the chargeable quantity of a port electric vehicle charging method;

[0079] Figure 5 for Figure 2 A flow chart of a target charging plan for determining a method for charging electric vehicles in ports;

[0080] Figure 6 It is a schematic diagram of the structure of a port electric vehicle charging system in one embodiment;

[0081] Figure 7 for Figure 6 Detailed structural diagram of the port electric vehicle charging system. DETAILED DESCRIPTION

[0082] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0083] Implementation Method 1

[0084] In order to solve the technical problems of centralized charging, low utilization of charging piles, affecting operation efficiency, and affecting the service life of rechargeable batteries, this embodiment proposes a port electric vehicle charging method, which can be applied to port operations and other operation scenarios, such as warehousing operations and factory processing and handling operations. The method determines a target charging plan based on the battery power data, the charging status data, and the pending operation data. The target charging plan is used to control the charging of the port electric vehicle, which is conducive to avoiding centralized charging, improving the utilization rate of charging piles, avoiding affecting operation efficiency, and extending the service life of rechargeable batteries.

[0085] like Figure 1 As shown, in one embodiment, a port electric vehicle charging method is proposed, which is applied to a port electric vehicle charging system. The system includes: a port electric vehicle, a charging pile, and an operation scheduling device. The port electric vehicle is used for port operations, the charging pile is used to charge the port electric vehicle, and the operation scheduling device is used to schedule the port electric vehicle to perform port operations. The method includes:

[0086] S102, obtaining battery power data of the port electric vehicle;

[0087] The battery power data may be actively sent by the port electric vehicle, or may be sent by the port electric vehicle in response to an electric vehicle data upload instruction.

[0088] The electric vehicle data upload instruction is sent to the port electric vehicle by a program module that executes the port electric vehicle charging method.

[0089] Optionally, the battery power data includes: electric vehicle identification, detection time, and battery power measurement value.

[0090] The electric vehicle identification may be an identification such as an ID or a name that uniquely identifies a port electric vehicle.

[0091] The detection time is a specific time point.

[0092] The battery power measurement value refers to the power of the battery of the port electric vehicle at the detection time.

[0093] Optionally, the battery power data also includes: total battery power capacity.

[0094] The total battery capacity refers to the amount of power when the battery of the port electric vehicle is fully charged.

[0095] Optionally, the total battery capacity of different port electric vehicles may be the same or different.

[0096] Optionally, the battery power data may be data of all port electric vehicles in the port.

[0097] Optionally, the battery power data may be data of all electric vehicles in the port that are not being charged.

[0098] S104, obtaining charging status data of the charging pile;

[0099] The charging status data may be actively sent by the charging pile, or may be sent by the charging pile in response to a charging pile data upload instruction.

[0100] The charging pile data upload instruction is sent to the charging pile by a program module that executes the port electric vehicle charging method.

[0101] The charging status data includes: charging pile identification, detection time, and charging status.

[0102] The charging pile identifier may be an identifier such as an ID or a name that uniquely identifies a charging pile.

[0103] The charging state includes a charging state and an idle state.

[0104] S106, obtaining the job data to be processed of the job scheduling device;

[0105] The pending job data may be actively sent by the job scheduling device, or may be sent by the job scheduling device in response to an instruction to upload the pending scheduling data.

[0106] The to-be-processed scheduling data upload instruction is sent to the operation scheduling device by a program module that executes the port electric vehicle charging method.

[0107] The pending job data includes: sending time, expected start time of the pending job, expected end time of the pending job, and workload of the pending job.

[0108] The sending time is used to express the time when the to-be-processed job data is sent, and is a specific time point.

[0109] The workload of pending operations is used to express the number of port electric vehicles required for pending operations.

[0110] It is understandable that the pending job data may be data of all pending jobs, or data of pending jobs within a preset time after the sending time. For example, if the sending time is 11:00, the pending job data may be data of pending jobs between 11:00 and 12:00.

[0111] S108. Determine a target charging plan according to the battery power data, the charging status data and the pending operation data, wherein the target charging plan is used to control the charging of the port electric vehicle.

[0112] Wherein, the chargeable quantity is determined according to the pending job data and the battery power data; and the target charging plan is determined according to the charging state data, the chargeable quantity and the battery power data.

[0113] It is understandable that the determined target charging plan needs to satisfy the pending operation data, not affect the battery life of the electric vehicles in the port, and cannot exceed the number of available charging piles.

[0114] The target charging plan includes: electric vehicle identification, charging pile identification, and charging pile location data.

[0115] Optionally, the target charging plan further includes: an estimated charging time. The estimated charging time can be used to predict the time when the port electric vehicle in the target charging plan can be put into operation again.

[0116] Optionally, the target charging plan may be data for one batch of batteries that need to be charged, or may be data for multiple batches of batteries that need to be charged.

[0117] The one batch refers to the same time of sending charging instructions to the operating terminal equipment on the port electric vehicles.

[0118] The multiple batches refer to the time when the charging instruction is sent to the operation terminal device on the port electric vehicle. By determining that the target charging plan contains multiple batches of data that need to be charged at one time, the number of times the target charging plan is determined can be reduced.

[0119] Optionally, in the same target charging plan, the same electric vehicle identifier may have one charging plan or multiple charging plans.

[0120] It can be understood that the first implementation mode is described by taking the target charging plan as an example in which only one batch of data requiring charging is included.

[0121] It is understandable that, when the target charging plan contains data for multiple batches that need to be charged, the target charging plan can be confirmed in multiple times, with only one batch of data that needs to be charged being confirmed each time.

[0122] The method of this embodiment determines a target charging plan based on the battery power data of the port electric vehicles, the charging status data of the charging piles, and the pending job data of the job scheduling equipment. The target charging plan is used to control the charging of the port electric vehicles, thereby associating the target charging plan with the battery power data, the charging status data, and the pending job data. When controlling the charging of the port electric vehicles according to the target charging plan, it will be beneficial to avoid centralized charging, improve the utilization rate of the charging piles, avoid affecting the operating efficiency, and extend the service life of the rechargeable batteries.

[0123] like Figure 2 As shown, in one embodiment, determining a target charging plan according to the battery power data, the charging status data and the pending operation data includes:

[0124] S202, determining the required number of jobs to be processed according to the job data to be processed;

[0125] Wherein, the required number of jobs to be processed is determined according to the data of the jobs to be processed and preset rules.

[0126] The number of pending job demands is the number of job demands that need to be met to determine the target charging plan.

[0127] It can be understood that the required number of jobs to be processed may be the total required number of jobs of the job data to be processed, or may be the partial required number of jobs of the job data to be processed.

[0128] The operation demand quantity refers to the quantity of the port electric vehicles required for port operations.

[0129] S204, determining the chargeable quantity according to the battery power data, the first battery power threshold, and the required quantity of the to-be-processed jobs;

[0130] Optionally, the battery power data is compared with a first battery power threshold, and the number of the port electric vehicles whose battery power data is greater than or equal to the first battery power threshold is used as the first battery safety number; when the number of pending operation requirements is less than or equal to the first battery safety number, the number of the port electric vehicles whose battery power data is less than the first battery power threshold is used as the rechargeable number; when the number of pending operation requirements is greater than the first battery safety number, the first battery safety number is subtracted from the number of pending operation requirements to obtain the number of unsatisfied operation requirements, and the number of unsatisfied operation requirements is updated to the unsatisfied operation list. This achieves maximum protection of the battery life of the port electric vehicle.

[0131] Optionally, the battery power data is compared with a first battery power threshold, and the number of the port electric vehicles whose battery power data is greater than or equal to the first battery power threshold is taken as the first battery safety number; when the number of pending job demands is less than or equal to the first battery safety number, the number of the port electric vehicles whose battery power data is less than the first battery power threshold is taken as the rechargeable number; when the number of pending job demands is greater than the first battery safety number, the second battery safety number is determined according to the battery power data and the second battery power threshold; the number of pending job demands is compared with the second battery safety number; when the number of pending job demands is less than or equal to the second battery safety number, the total number of the port electric vehicles is obtained, and the number of pending job demands is subtracted from the total number of the port electric vehicles to obtain the rechargeable number; when the number of pending job demands is greater than the second battery safety number, the number of pending job demands is subtracted from the second battery safety number to obtain the number of unsatisfied job demands, and the number of unsatisfied job demands is updated to the unsatisfied job list; wherein, the first battery power threshold is greater than the second battery power threshold. By having the first battery power threshold and the second battery power threshold being larger, the life of the battery of the port electric vehicle is protected while the number of operations to be processed is met as much as possible, which is conducive to improving the port operation efficiency.

[0132] Optionally, the first battery power thresholds corresponding to different port electric vehicles may be the same or different.

[0133] S206: Determine the target charging plan according to the charging status data, the chargeable quantity and the battery power data.

[0134] Among them, the target charging quantity is determined according to the charging status data and the chargeable quantity; and the target charging plan is determined according to the target charging quantity and the battery power data.

[0135] The target charging plan is determined according to the target charging quantity and the battery power data, including: finding the same number of port electric vehicles as the target charging quantity as the target charging electric vehicles based on the minimum value of the battery power measurement value of the battery power data, and using the electric vehicle identifiers corresponding to the target charging electric vehicles as the electric vehicle identifiers of the target charging plan; finding the same number of charging piles as the target charging quantity from idle charging piles as the target charging piles, using the charging pile identifiers corresponding to the target charging pile vehicles as the charging pile identifiers of the target charging plan, and using the charging pile location data corresponding to the target charging pile vehicles as the charging pile location data of the target charging plan.

[0136] This embodiment determines a target charging plan based on the battery power data, the charging status data, the first battery power threshold, and the pending job data, and associates the target charging plan with the battery power data, the charging status data, the first battery power threshold, and the pending job data, thereby protecting the battery life of the port electric vehicle while satisfying the pending job data.

[0137] In one embodiment, determining the required number of jobs to be processed based on the job data to be processed includes: determining the required number of jobs to be processed based on the job data to be processed and an interval duration list.

[0138] The time in the interval duration list may be equal intervals or unequal intervals. For example, when the time in the interval duration list is equal intervals, it may be 8:00-9:00, 9:00-10:00, 10:00-11:00, 11:00-12:00, 12:00-13:00, 13:00-14:00, 14:00-15:00, 15:00-16:00, 16:00-17:00; when the time in the interval duration list is unequal intervals, it may be 8:00-10:00, 10:00-11:00, 11:00-12:00, 12:00-13:00, 13:00-14:00, 14:00-15:00, 15:00-17:00, and no specific limitation is given in this example.

[0139] Optionally, the number of job requirements at a single time point in each time period of the interval duration list is determined from the pending job data, and the maximum number of job requirements at a single time point in each time period is used as the pending job requirements corresponding to each time period. For example, the time period of the interval duration list is 11:00-12:00, the number of job requirements at a single time point (any time point between 11:00-12:00) between 11:00-12:00 is determined from the pending job data, and the maximum number of job requirements at a single time point between 11:00-12:00 is used as the pending job requirements corresponding to 11:00-12:00, and no specific limitation is made in this example.

[0140] Optionally, the time in the interval duration list can be designed according to the busyness of the port operation. When the port operation is busy, the interval duration of the time in the interval duration list is set short, and when the port operation is idle, the interval duration of the time in the interval duration list is set long (which means the interval duration is long relative to when the port operation is busy).

[0141] This embodiment determines the number of pending job demands based on the pending job data and the interval duration list, fully considering the number of pending job demands in each time period, avoiding the impact on port operation efficiency due to inaccurate number of pending job demands, and reducing the frequency of determining the target charging plan.

[0142] like Figure 3 As shown, in one embodiment, determining the required number of jobs to be processed according to the job data to be processed and the interval duration list includes:

[0143] S302, determining the required quantity of the first operation according to the to-be-processed operation data and the interval duration list;

[0144] Optionally, the number of job requirements at a single time point in each time period of the interval duration list is determined from the pending job data, and the maximum number of job requirements at a single time point in each time period is taken as the first job requirement corresponding to each time period.

[0145] S304, obtaining historical operation data of the operation scheduling device;

[0146] The historical job data may be actively sent by the job scheduling device, or may be sent by the job scheduling device in response to a historical scheduling data upload instruction.

[0147] The historical scheduling data upload instruction is sent to the operation scheduling device by a program module that executes the port electric vehicle charging method.

[0148] The historical operation data includes: operation time, operation start time, operation end time, and operation workload.

[0149] The operational workload refers to the number of port electric vehicles used for the operation.

[0150] S306, determining the required quantity of the second operation according to the historical operation data, the to-be-processed operation data, and the interval duration list;

[0151] Among them, the mean calculation is performed based on the historical operation data and the preset number of days to obtain the historical operation average data; when the historical operation average data is greater than the operation data to be processed, the operation demand difference is obtained by subtracting the operation data to be processed from the historical operation average data, and the second operation demand quantity is determined according to the operation demand difference; when the historical operation average data is less than the operation data to be processed, the preset value is used as the second operation demand quantity.

[0152] The method of performing mean calculation based on the historical operation data and the preset number of days to obtain the historical operation average data includes: taking the operation data of the preset number of days as the operation data to be calculated based on the historical operation data, and performing mean calculation on the operation workload at the same time point every day for the operation data to be calculated to obtain the historical operation average data. For example, performing mean calculation on the operation workload at 10 o'clock every day in the operation data to be calculated to obtain the historical operation average data corresponding to 10 o'clock, which is not specifically limited in this example.

[0153] The same time point every day refers to the same time point every day, for example, 1 o'clock every day, and no specific limitation is given in this example.

[0154] The step of subtracting the to-be-processed job data from the historical job average data to obtain the job demand difference includes: subtracting the to-be-processed job data at the same time point every day from the historical job average data to obtain the job demand difference.

[0155] Determining the second operation requirement quantity according to the operation requirement difference includes: multiplying the operation requirement difference by a preset coefficient to obtain the second operation requirement quantity.

[0156] S308: Determine the required number of jobs to be processed according to the required number of the first jobs and the required number of the second jobs.

[0157] The first job demand quantity and the second job demand quantity are added to obtain the pending job demand quantity. It is understandable that the first job demand quantity and the second job demand quantity are data at the same time point every day.

[0158] This embodiment realizes determining the required number of pending operations based on the pending operation data, the interval duration list, and the historical operation data. When ensuring the clear required operation quantity (the first operation required quantity), the floating operation demand (the second operation required quantity) is determined based on the historical operation data, thereby further ensuring the port operation efficiency.

[0159] like Figure 4 As shown, in one embodiment, determining the chargeable quantity according to the battery power data, the first battery power threshold, and the required quantity of the pending jobs includes:

[0160] S402, determining a first battery safety quantity according to the battery power data and the first battery power threshold;

[0161] The battery power data is compared with a first battery power threshold, and the number of the port electric vehicles whose battery power data is greater than or equal to the first battery power threshold is taken as a first battery safety number.

[0162] S404, comparing the required number of pending operations with the first battery safety number;

[0163] S406: When the number of pending job requirements is less than or equal to the first battery safety number, the number of the port electric vehicles whose battery power data is less than the first battery power threshold is used as the chargeable number;

[0164] For example, if the number of the port electric vehicles whose battery power data is less than the first battery power threshold is 50, 50 is used as the chargeable number.

[0165] S408: When the number of pending job requirements is greater than the first battery safety number, determine a second battery safety number according to the battery power data and a second battery power threshold;

[0166] Among them, when the number of pending job requirements is greater than the first battery safety number, the battery power data is compared with a second battery power threshold, and the number of port electric vehicles whose battery power data is greater than or equal to the second battery power threshold is taken as the second battery safety number.

[0167] S410, comparing the required number of pending operations with the second battery safety number;

[0168] S412: when the number of pending operation requirements is less than or equal to the second battery safety number, obtaining the total number of the port electric vehicles, and subtracting the number of pending operation requirements from the total number of the port electric vehicles to obtain the chargeable number;

[0169] The difference between the total number of the port electric vehicles and the number of operations to be processed is taken as the chargeable number.

[0170] S414, when the number of pending job requirements is greater than the second battery safety number, determining a third battery safety number according to the battery power data and a third battery power threshold;

[0171] Among them, when the number of pending job requirements is greater than the second battery safety number, the battery power data is compared with a third battery power threshold, and the number of port electric vehicles whose battery power data is greater than or equal to the third battery power threshold is taken as the third battery safety number.

[0172] S416, comparing the required number of pending operations with the third battery safety number;

[0173] S418, when the number of pending operation requirements is less than or equal to the third battery safety number, obtaining the total number of the port electric vehicles, subtracting the number of pending operation requirements from the total number of the port electric vehicles, to obtain the chargeable number;

[0174] The difference between the total number of the port electric vehicles and the number of operations to be processed is taken as the chargeable number.

[0175] S420: When the number of pending job requirements is greater than the third battery safety number, the number of the port electric vehicles whose battery power data is less than the third battery power threshold is used as the rechargeable number, and a job overlimit signal is sent to the job scheduling device;

[0176] The operation over-limit signal is used to remind the management personnel of the operation scheduling equipment to adjust the pending operation data in time to avoid the situation where there is no port electric vehicle operation.

[0177] Optionally, the third battery power threshold is greater than a minimum power value for charging protection and is close to the minimum power value for charging protection.

[0178] Charging when the battery power level is lower than the third battery power threshold will seriously affect the battery life of the port electric vehicle. By using the number of the port electric vehicles whose battery power data is lower than the third battery power threshold as the chargeable number, it is possible to avoid seriously affecting the battery life of the port electric vehicle.

[0179] The first battery power threshold is greater than the second battery power threshold, and the second battery power threshold is greater than the third battery power threshold.

[0180] Optionally, the second battery power thresholds corresponding to different port electric vehicles may be the same or different.

[0181] Optionally, the third battery power thresholds corresponding to different port electric vehicles may be the same or different.

[0182] This embodiment sets the first battery power threshold, the second battery power threshold, and the third battery power threshold, so that the port electric vehicle charging method of the present invention is fully applicable to application scenarios with busy operating demands, and the battery life of the port electric vehicle is protected to a minimum.

[0183] like Figure 5As shown, in one embodiment, determining the target charging plan according to the charging state data, the chargeable quantity and the battery power data includes:

[0184] S502, determining the number of available charging piles according to the charging status data;

[0185] The number of charging piles in an idle state is found from the charging state data as the number of available charging piles.

[0186] S504, comparing the number of available charging piles with the number of chargeable piles;

[0187] S506: When the number of available charging piles is greater than or equal to the number of chargeable piles, determine the target charging plan according to the number of chargeable piles and the battery power data;

[0188] When the number of available charging piles is greater than or equal to the chargeable number, the chargeable number is used as the target charging number; and the target charging plan is determined according to the target charging number and the battery power data.

[0189] S508: When the number of available charging piles is less than the chargeable number, determine the target charging plan according to the number of available charging piles and the battery power data.

[0190] When the number of available charging piles is less than the chargeable number, the number of available charging piles is used as the target charging number; and the target charging plan is determined according to the target charging number and the battery power data.

[0191] This embodiment realizes determining, based on the charging status data, the chargeable quantity and the battery power data, whether there are enough charging piles for charging a batch of electric vehicles that need to be charged in the target charging plan, thereby avoiding the occurrence of port electric vehicles that cannot be charged in the target charging plan, thereby improving the accuracy of the port electric vehicle charging method of the present invention.

[0192] In one embodiment, determining the target charging plan based on the battery power data, the charging status data and the pending job data also includes: obtaining the charging speed of the charging pile; determining the target charging plan based on the battery power data, the charging status data, the charging speed and the pending job data.

[0193] The charging speed refers to the amount of electricity charged to the port electric vehicles per unit time.

[0194] Optionally, the required number of jobs to be processed is determined based on the pending job data; the rechargeable number is determined based on the battery power data, the first battery power threshold, and the required number of jobs to be processed; and the target charging plan is determined based on the charging status data, the rechargeable number, the charging speed, and the battery power data.

[0195] The method of determining the target charging plan according to the charging status data, the chargeable number, the charging speed and the battery power data includes: determining the target charging number according to the charging status data and the chargeable number; finding the same number of port electric vehicles as the target charging number as the target charging electric vehicles based on the minimum value of the battery power measurement value of the battery power data, and using the electric vehicle identifications corresponding to the target charging electric vehicles as the electric vehicle identifications of the target charging plan; finding the same number of charging piles as the target charging number from the charging piles in the idle state as the target charging piles, using the charging pile identifications corresponding to the target charging pile vehicles as the charging pile identifications of the target charging plan, and using the charging pile location data corresponding to the target charging pile vehicles as the charging pile location data of the target charging plan; and determining the estimated charging time of the target charging plan according to the charging speed, the battery power measurement value corresponding to the target charging pile vehicles and the total battery power capacity.

[0196] This embodiment determines the target charging plan according to the battery power data, the charging status data, the charging speed and the pending operation data, thereby maximizing the utilization of charging piles and maximizing the satisfaction of the pending operation data, thereby improving the efficiency of the port electric vehicle charging method of the present invention.

[0197] In one embodiment, after determining the target charging plan according to the battery power data, the charging status data and the pending operation data, it also includes: sending an exit operation instruction to the operation scheduling device according to the target charging plan, and the exit operation instruction is used to instruct the operation scheduling device to exit the port electric vehicle corresponding to the exit operation instruction from the operation vehicle list; sending a charging instruction to the operation terminal device on the port electric vehicle according to the target charging plan, and the charging instruction carries the charging pile location data, and the charging instruction is used to instruct the driver of the port electric vehicle to drive the port electric vehicle to the charging pile corresponding to the charging pile location data for charging.

[0198] Optionally, an exit operation instruction is sent to the operation scheduling device, an exit operation success message sent by the operation scheduling device is received, and then a charging instruction is sent to the operation terminal device on the port electric vehicle according to the exit operation success message.

[0199] Optionally, an exit operation instruction is sent to the operation scheduling device and a charging instruction is sent to the operation terminal device on the port electric vehicle at the same time.

[0200] This embodiment realizes controlling the port electric vehicles to exit operation and charging the port electric vehicles through a target charging plan, thereby avoiding the situation where the port electric vehicles have left the operation but the operation scheduling equipment has not processed the port electric vehicles' exit from operation in time, thereby improving the accuracy of the port electric vehicle charging method of the present invention.

[0201] In one embodiment, the method further includes: sending an identification of a vehicle to be charged to the charging pile according to the target charging plan; wherein the charging pile obtains a charging request, obtains the target vehicle identification of the port electric vehicle according to the charging request, compares the target vehicle identification with the identification of the vehicle to be charged, and charges the port electric vehicle corresponding to the target vehicle identification when the comparison result is the same.

[0202] This embodiment realizes first checking the target vehicle identification and the identification of the vehicle to be charged, avoiding confusion caused by port electric vehicles charging at non-designated charging piles, thereby improving the accuracy of the port electric vehicle charging method of the present invention.

[0203] The charging request may be sent by the driver of the port electric vehicle corresponding to the target vehicle identification triggering a button of the charging pile, or may be actively sent by a program module in the charging pile after the charging pile senses that a port electric vehicle has entered a preset area.

[0204] Optionally, when the comparison result is not the same, the charging pile generates a pairing error signal, and the pairing error signal is used to remind the driver of the port electric vehicle that the pairing is wrong, so that the driver of the port electric vehicle can adjust to the correct charging pile for charging in time.

[0205] Implementation Method 2

[0206] like Figure 6 and Figure 7 As shown, in one embodiment, a port electric vehicle 61 charging system is also proposed, including: a port electric vehicle 61, a charging pile 62, an operation scheduling device 63, and a charging management device 64, wherein the port electric vehicle 61 is used for port operations, the charging pile 62 is used to charge the port electric vehicle 61, the operation scheduling device 63 is used to schedule the port electric vehicle 61 to perform port operations, and the charging management device 64 is used to manage the charging of the port electric vehicle 61;

[0207] The charging management device 64 is in communication connection with the port electric vehicle 61 , the charging pile 62 , and the operation scheduling device 63 .

[0208] The charging management device 64 of the system of this embodiment is communicated with the port electric vehicle 61, the charging pile 62, and the operation scheduling device 63, and is used to manage the charging of the port electric vehicle 61, so that the charging of the port electric vehicle 61 fully considers the data of the port electric vehicle 61, the charging pile 62 and the operation scheduling device 63, which will be beneficial to avoid centralized charging, improve the utilization rate of the charging pile 62, avoid affecting the operation efficiency, and extend the service life of the rechargeable battery 613.

[0209] The port electric vehicle 61 can be selected from the existing technology and can be suitable for port operations, which will not be described in detail here.

[0210] The charging pile 62 can be selected from the prior art and is compatible with the port electric vehicle 61 , which will not be described in detail here.

[0211] The job scheduling device 63 may be a server in which a job scheduling management program module is loaded.

[0212] The operation scheduling management program module is used to schedule the port electric vehicle 61 to perform port operations, which can be selected from the existing technology and will not be described in detail here.

[0213] The charging management device 64 may be a server, in which a charging management program module is loaded. When the charging management program module is executed, the charging method for the port electric vehicle 61 described above is implemented.

[0214] It is understandable that the charging management program module may also be selected from the prior art.

[0215] The communication connection between the charging management device 64 and the port electric vehicle 61 adopts a wireless communication connection.

[0216] The charging management device 64 communicates with the charging pile 62 and the operation scheduling device 63 by wired communication connection and / or wireless communication connection.

[0217] In one embodiment, the system further comprises: an operation terminal device 65;

[0218] The operation terminal device 65 is installed on the port electric vehicle 61;

[0219] The job scheduling device 63 is in communication connection with the job terminal device 65 , and is used to send an enter job instruction or an exit job instruction to the job terminal device 65 .

[0220] It can be understood that the communication connection between the job scheduling device 63 and the job terminal device 65 is a wireless communication connection.

[0221] The entry operation instruction is used to remind the driver of the port electric vehicle 61 to drive the port electric vehicle 61 to the port operation area for operation.

[0222] The exit operation instruction is used to remind the driver of the port electric vehicle 61 to drive the port electric vehicle 61 out of the port operation area.

[0223] The job scheduling device 63 is communicatively connected with the job terminal device 65 , including: the job scheduling device 63 is communicatively connected with the job terminal device 65 , and / or the job scheduling device 63 is indirectly communicatively connected with the job terminal device 65 .

[0224] In one embodiment, the operation scheduling device 63 is in communication connection with the port electric vehicle 61, and is used to send the entry operation instruction or the exit operation instruction to the port electric vehicle 61;

[0225] The port electric vehicle 61 is connected in communication with the operation terminal device 65, and is used to send the entry operation instruction or the exit operation instruction to the operation terminal device 65. The operation scheduling device 63 is connected in communication with the port electric vehicle 61, and then the port electric vehicle 61 is connected in communication with the operation terminal device 65, which is conducive to simplifying the equipment function requirements of the operation terminal device 65 and reducing the manufacturing cost of the operation terminal device 65.

[0226] In one embodiment, the operation terminal device 65 includes: a terminal controller 651, a voice playing component 652;

[0227] The terminal controller 651 is in communication with the voice playing component 652 and the operation scheduling device 63, and is used to send a voice playing signal to the voice playing component 652. The voice playing component 652 plays the sound according to the voice playing signal, which is conducive to quickly reminding the driver and improving the user experience of the operation terminal device 65.

[0228] The terminal controller 651 can select MCU (micro control unit) and / or PLC (programmable logic controller) and / or FPGA (field programmable gate array) from the existing technology, and no specific limitation is made in this example.

[0229] The voice playing component 652 can select a voice playing module from the prior art, which will not be elaborated here.

[0230] In one embodiment, the operation terminal device 65 further includes: a first wireless communication component 653 for wireless communication;

[0231] The terminal controller 651 is electrically connected to the first wireless communication component 653 , and is configured to communicate with the charging management device 64 via the first wireless communication component 653 .

[0232] The first wireless communication component 653 can select at least one of a 2G mobile phone communication module, a 3G mobile phone communication module, a 4G mobile phone communication module, a 5G mobile phone communication module, and a WIFI communication module from the existing technology, and no specific limitation is given here as an example.

[0233] In one embodiment, the port electric vehicle 61 includes a vehicle controller 611, a battery detection component 612, a rechargeable battery 613, and a second wireless communication component 614;

[0234] The battery detection component 612 is electrically connected to the rechargeable battery 613 and is used to detect the power data of the rechargeable battery 613;

[0235] The vehicle controller 611 is electrically connected to the battery detection component 612 and the second wireless communication component 614 , and is configured to communicate with the charging management device 64 via the second wireless communication component 614 .

[0236] The vehicle controller 611 can be selected from the prior art to be suitable for the port electric vehicle 61, which will not be described in detail here.

[0237] The battery detection component 612 can select a battery detector that can detect the power value of the rechargeable battery 613 from the existing technology, which will not be described in detail here.

[0238] The rechargeable battery 613 can be a rechargeable lithium battery selected from the prior art, which will not be described in detail here.

[0239] The second wireless communication component 614 can select at least one of a 2G mobile phone communication module, a 3G mobile phone communication module, a 4G mobile phone communication module, a 5G mobile phone communication module, and a WIFI communication module from the prior art, and no specific limitation is given here as an example.

[0240] In one embodiment, the port electric vehicle 61 further includes: a warning light;

[0241] The vehicle controller 611 is electrically connected to the warning light for sending an alarm driving signal to the warning light. The warning light can facilitate the driver of the port electric vehicle 61 to drive the port electric vehicle 61, thereby improving the user experience of the port electric vehicle 61 and the operating efficiency of the port electric vehicle 61.

[0242] The warning light can be a sound and light combined warning light selected from the prior art, which will not be described in detail here.

[0243] In one embodiment, the port electric vehicle 61 further includes: a display component;

[0244] The vehicle controller 611 is electrically connected to the display component. The display component can display the data and navigation map of the port electric vehicle 61, which is beneficial for the driver of the port electric vehicle 61 to drive the port electric vehicle 61, thereby further improving the user experience of the port electric vehicle 61 and improving the operating efficiency of the port electric vehicle 61.

[0245] The display component can be selected from the prior art as a liquid crystal display screen (only displays information) or a liquid crystal touch display screen (displays information and receives information input by the user), which will not be described in detail here.

[0246] In one embodiment, the charging pile 62 includes a charging controller 621, a charging component 622, and a third wireless communication component 623;

[0247] The charging controller 621 is electrically connected to the charging component 622 and the third wireless communication component 623 , and is used to communicate with the charging management device 64 through the third wireless communication component 623 , and send a charging signal to the charging component 622 .

[0248] The charging controller 621 can select a controller of the charging pile 62 suitable for matching with the port electric vehicle 61 from the existing technology, which will not be described here.

[0249] The charging component 622 can be selected from the prior art and is suitable for the port electric vehicle 61 , and is used to charge the AC power into the rechargeable battery 613 of the port electric vehicle 61 .

[0250] The third wireless communication component 623 can select at least one of a 2G mobile phone communication module, a 3G mobile phone communication module, a 4G mobile phone communication module, a 5G mobile phone communication module, and a WIFI communication module from the prior art, and no specific limitation is given here as an example.

[0251] In one embodiment, the charging pile 62 further includes: an identification component 624 for identifying a vehicle identification of the port electric vehicle 61;

[0252] The charging controller 621 is electrically connected to the identification component 624. The identification component 624 can quickly identify the vehicle identification, and does not require manual input by the driver of the port electric vehicle 61, which can simplify the charging operation process.

[0253] The identification component 624 may be at least one of a camera, a barcode reader, a QR code reader, and a radio frequency identifier.

[0254] The camera is used to shoot graphics, the barcode identifier is used to identify barcodes, the QR code identifier is used to identify QR codes, and the radio frequency identifier is used to identify radio frequency tags.

[0255] It should be noted that the above-mentioned method for charging a port electric vehicle 61 and a charging system for a port electric vehicle 61 belong to a general inventive concept, and the contents in the embodiments of the method for charging a port electric vehicle 61 and a charging system for a port electric vehicle 61 are applicable to each other.

[0256] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0257] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A port electric vehicle charging method, characterized in that: Applied to a port electric vehicle charging system, the system comprises: a port electric vehicle, a charging pile, and an operation scheduling device, the port electric vehicle is used for port operations, the charging pile is used to charge the port electric vehicle, the operation scheduling device is used to schedule the port electric vehicle to perform port operations, and the method comprises: Obtaining battery power data of the electric vehicle at the port; Acquiring charging status data of the charging pile; Acquire the job data to be processed of the job scheduling device; Determine a target charging plan according to the battery power data, the charging status data and the pending operation data, wherein the target charging plan is used to control the charging of the port electric vehicle; The determining a target charging plan according to the battery power data, the charging status data and the pending operation data includes: Obtaining the charging speed of the charging pile; Determine a target charging plan according to the battery power data, the charging status data, the charging speed and the pending operation data; The determining a target charging plan according to the battery power data, the charging status data and the pending operation data includes: Determine the required number of jobs to be processed according to the job data to be processed; Determine the chargeable quantity according to the battery power data, the first battery power threshold, and the required quantity of the to-be-processed jobs; Determining the target charging plan according to the charging state data, the chargeable quantity and the battery power data; Determining the chargeable quantity according to the battery power data, the first battery power threshold, and the required quantity of the pending jobs includes: Determining a first battery safety quantity according to the battery power data and the first battery power threshold; Comparing the required number of pending operations with the first battery safety number; When the number of pending job requirements is less than or equal to the first battery safety number, the number of the port electric vehicles whose battery power data is less than the first battery power threshold is used as the chargeable number; When the required number of the to-be-processed jobs is greater than the first safe number of batteries, determining a second safe number of batteries according to the battery power data and a second battery power threshold; Comparing the required number of pending operations with the second battery safety number; When the number of pending operations required is less than or equal to the second battery safety number, the total number of the port electric vehicles is obtained, and the number of pending operations required is subtracted from the total number of the port electric vehicles to obtain the chargeable number; When the required number of jobs to be processed is greater than the second safe number of batteries, determining a third safe number of batteries according to the battery power data and a third battery power threshold; Comparing the required number of pending operations with the third battery safety number; When the number of pending operations required is less than or equal to the third battery safety number, the total number of the port electric vehicles is obtained, and the number of pending operations required is subtracted from the total number of the port electric vehicles to obtain the chargeable number; When the number of pending operations required is greater than the third battery safety number, the number of the port electric vehicles whose battery power data is less than the third battery power threshold is used as the chargeable number, and an operation over-limit signal is sent to the operation scheduling device; The first battery power threshold is greater than the second battery power threshold, and the second battery power threshold is greater than the third battery power threshold.

2. The port electric vehicle charging method according to claim 1, characterized in that: The step of determining the required number of jobs to be processed according to the job data to be processed includes: The required number of jobs to be processed is determined according to the job data to be processed and the interval duration list.

3. The port electric vehicle charging method according to claim 2, characterized in that: The step of determining the required number of jobs to be processed according to the job data to be processed and the interval duration list includes: Determine the required quantity of the first operation according to the to-be-processed operation data and the interval duration list; Acquire historical operation data of the operation scheduling device; Determine the required quantity of the second operation according to the historical operation data, the to-be-processed operation data, and the interval duration list; The required number of jobs to be processed is determined according to the required number of the first jobs and the required number of the second jobs.

4. The port electric vehicle charging method according to claim 1, characterized in that: The determining the target charging plan according to the charging state data, the chargeable quantity and the battery power data includes: Determining the number of available charging piles according to the charging status data; Comparing the number of available charging posts with the number of chargeable posts; When the number of available charging piles is greater than or equal to the number of chargeable piles, determining the target charging plan according to the number of chargeable piles and the battery power data; When the number of available charging piles is less than the chargeable number, the target charging plan is determined according to the number of available charging piles and the battery power data.

5. The port electric vehicle charging method according to any one of claims 1 to 4, characterized in that: After determining the target charging plan according to the battery power data, the charging state data and the to-be-processed operation data, the method further includes: Sending an exit operation instruction to the operation scheduling device according to the target charging plan, wherein the exit operation instruction is used to instruct the operation scheduling device to exit the port electric vehicle corresponding to the exit operation instruction from the operation vehicle list; According to the target charging plan, a charging instruction is sent to the operating terminal device on the port electric vehicle, the charging instruction carries the charging pile location data, and the charging instruction is used to instruct the driver of the port electric vehicle to drive the port electric vehicle to the charging pile corresponding to the charging pile location data for charging.

6. The port electric vehicle charging method according to any one of claims 1 to 4, characterized in that: The method further comprises: Sending an identification of a vehicle to be charged to the charging pile according to the target charging plan; The charging pile obtains a charging request, obtains a target vehicle identification of the port electric vehicle according to the charging request, compares the target vehicle identification with the vehicle identification to be charged, and charges the port electric vehicle corresponding to the target vehicle identification when the comparison result is the same.

7. A port electric vehicle charging system, characterized in that: include: A port electric vehicle, a charging pile, an operation dispatching device, and a charging management device. The port electric vehicle is used for port operations, the charging pile is used to charge the port electric vehicle, the operation dispatching device is used to dispatch the port electric vehicle to perform port operations, and the charging management device is used to manage the charging of the port electric vehicle; The charging management device is in communication connection with the port electric vehicle, the charging pile, and the operation scheduling device; Wherein, the charging management device is provided with a charging management program module, and when the charging management program module is executed, the port electric vehicle charging method according to any one of claims 1 to 6 is implemented.

8. The port electric vehicle charging system as claimed in claim 7, characterized in that: The system further comprises: an operation terminal device; The operation terminal equipment is installed on the port electric vehicle; The job scheduling device is communicatively connected with the job terminal device and is used to send an enter job instruction or an exit job instruction to the job terminal device.

9. The port electric vehicle charging system as claimed in claim 8, characterized in that: The operation scheduling device is in communication connection with the port electric vehicle, and is used to send the entry operation instruction or the exit operation instruction to the port electric vehicle; The port electric vehicle is communicatively connected to the operation terminal device, and is used to send the entry operation instruction or the exit operation instruction to the operation terminal device.

10. The port electric vehicle charging system according to claim 8, characterized in that: The operation terminal equipment includes: a terminal controller and a voice playing component; The terminal controller is in communication connection with the voice playing component and the job scheduling device, and is used for sending a voice playing signal to the voice playing component.

11. The port electric vehicle charging system according to claim 10, characterized in that: The operation terminal equipment further includes: a first wireless communication component for wireless communication; The terminal controller is electrically connected to the first wireless communication component, and is used for communicating with the charging management device through the first wireless communication component.

12. The port electric vehicle charging system according to claim 7, characterized in that: The port electric vehicle comprises a vehicle controller, a battery detection component, a rechargeable battery, and a second wireless communication component; The battery detection component is electrically connected to the rechargeable battery and is used to detect the power data of the rechargeable battery; The vehicle controller is electrically connected to the battery detection component and the second wireless communication component, and is used for communicating with the charging management device through the second wireless communication component.

13. The port electric vehicle charging system according to claim 12, characterized in that: The port electric vehicle also includes: a warning light; The automobile controller is electrically connected to the warning light and is used to send an alarm driving signal to the warning light.

14. The port electric vehicle charging system according to claim 12, characterized in that: The port electric vehicle further comprises: a display component; The vehicle controller is electrically connected to the display component.

15. The port electric vehicle charging system according to any one of claims 7 to 14, characterized in that: The charging pile includes a charging controller, a charging component, and a third wireless communication component; The charging controller is electrically connected to the charging component and the third wireless communication component, and is used to communicate with the charging management device through the third wireless communication component and send a charging signal to the charging component.

16. The port electric vehicle charging system according to claim 15, characterized in that: The charging pile further comprises: an identification component for identifying a vehicle identification of the port electric vehicle; The charging controller is electrically connected to the identification component.