A new type of thrust stop device for ultra-wide front support rope hanging basket

By designing a new type of ultra-wide front fulcrum cable hanging basket thrust device, and using the combined structure of the support block, fixed bearing and movable bearing, the problem of insufficient thrust force of the hanging basket walking structure on the ultra-wide bridge deck is solved, and the realization of It provides efficient thrust and unlocking, improving construction stability and safety.

CN111576250BActive Publication Date: 2025-01-24ANHUI HIGHWAY BRIDGE ENG CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010500041.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-06-04
Publication Date
2025-01-24
Estimated Expiration
2040-06-04

AI Technical Summary

Technical Problem

When the front fulcrum cable hanging basket is constructed on the ultra-wide bridge deck, the prior art is difficult to effectively support the hanging basket walking structure of multiple tracks in parallel, resulting in insufficient thrust force of the thrust device, affecting construction stability and safety.

Method used

Design a new type of ultra -width front fulcrum for the hanging basket, including support blocks, fixed branches, and mobile supports. By running through the combined structure of the horizontal rod and horizontal steel column, the positive and reverse gliding of the walking mechanism uses the walking mechanism Realize clutch locking and enhance the thrust.

Benefits of technology

This device realizes efficient stop and unlocking through a simple U -type structure lock and the bending torque running through the crossbar, which improves the stability and construction efficiency of walking and stop push.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111576250B_ABST
    Figure CN111576250B_ABST
Patent Text Reader

Abstract

The present invention discloses a novel thrust stop device for a super-wide front fulcrum cable hanging basket, comprising a support block, a fixed support and a movable support, wherein the support block is provided with a through cross bar, a horizontal square steel column, a first fixed steel bar and a first support leg; the fixed support comprises an anti-slip plate, an L-shaped support plate and a lock frame, wherein the rectangular groove of the bottom plate of the lock frame is riveted with a female lock; the rectangular groove of the top plate of the movable support is riveted with a male lock, the U-shaped plate of the female lock is clamped together with the U-shaped plate of the male lock to form a rectangular frame structure, and the horizontal square steel column is movably sleeved in the rectangular frame structure; the present invention also provides a corresponding method of use. The present invention adopts a female lock and a male lock of a simple U-shaped frame structure, and the clutch locking and unlocking can be realized only by the forward and reverse sliding of the walking mechanism, that is, the entire walking-thrusting-unloading work is completed, and the installation, fixing and disassembly process is simple and clear, which greatly reduces the laying process of the cable hanging basket embedded parts and increases the speed of the hanging basket casting construction of the cable-stayed bridge.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge construction, and in particular to a novel ultra-wide front support point guy rope hanging basket thrust stop device. Background Art

[0002] The front support cable hanging basket construction is widely used in the construction technology of cable-stayed bridges. For bridge decks with smaller widths, a double C hanging ear type walking structure can be used. However, due to the requirements of the throughput rate of modern traffic, the width of the bridge deck is required to be wider and wider. At this time, the double C hanging ear type walking structure may not be able to support the hanging basket, so it is necessary to lay a special walking track on the already cast beam section.

[0003] During the construction of the front support cable-stayed basket for extra-wide bridge decks, it is generally necessary to lay more than four special walking tracks on the already cast beam section. When the basket is moving, a stronger hanging leg mechanism and walking counter-pressure mechanism are required to balance the forward tilting force of the basket, which also places high requirements on the thrust force of the thrust device.

[0004] Based on this, for a hanging basket traveling structure with multiple parallel tracks, the present invention attempts to propose a new type of thrust stop device to improve the stability and safety of the thrust stop action. Summary of the invention

[0005] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a novel super-wide front fulcrum rope hanging basket thrust device.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions:

[0007] A novel ultra-wide front fulcrum cable hanging basket thrust device comprises support blocks arranged at the guardrails on both sides of the cast bridge deck, a fixed support arranged at one side of the end of the hanging basket walking track, and a movable support arranged at one side of the walking mechanism. The support block is specifically a rectangular parallelepiped, and two groups of through-cross bars and a horizontal square steel column are interspersed on the two side surfaces of the support block in a direction perpendicular to the bridge body cross beam. A first fixed steel bar is also interspersed on the top surface of the support block. The first fixed steel bar is vertically arranged and passes through the horizontal square steel column and is inserted into the reserved hole on the cast bridge deck. Any group of through-cross bars is erected by two groups of symmetrical support blocks, and end nuts are provided at both ends of the through-cross bars. The first support legs are symmetrically provided at the bottom of the two side surfaces of the support block in a direction parallel to the bridge body cross beam. The first support leg is welded by a bottom plate and two right-angle plates arranged at both ends of the upper surface of the bottom plate. The first support leg and the support block are integrally formed, and the bottom plate of the first support leg is inserted into another reserved hole on the cast bridge deck through a second fixed steel bar.

[0008] The fixed support mainly includes an anti-slip plate, an L-shaped support plate and a locking frame. The anti-slip plate is placed flat on one side at the end of the hanging basket walking track, and the side wall of the anti-slip plate is in contact with the outer side wall of the hanging basket walking track. The bottom plate and the middle part of the side plate of the L-shaped support plate are welded by another right-angled plate. The bottom plate of the L-shaped support plate and the anti-slip plate are inserted into the third group of reserved holes on the cast bridge deck through the third fixing steel bars. The side plate of the L-shaped support plate and the anti-slip plate form a right-angled chute, and the back and bottom of the locking frame are in contact with the right-angled chute;

[0009] The locking frame is specifically an inverted "卩"-shaped frame body composed of a top plate, a bottom plate and a special-shaped block between the top plate and the bottom plate. The length of the top plate of the locking frame is less than the length of the bottom plate. Smooth through holes sleeved with through cross bars are provided at the top and bottom of both sides of the special-shaped block. A rectangular groove is provided on the upper surface of the bottom plate of the locking frame. The two side walls of the rectangular groove are provided with female head locks through two pin shafts. The female head lock is composed of an upper U-shaped plate and a hinge chain arranged in the middle of the bottom surface of the U-shaped plate. The two ends of the hinge chain are respectively riveted to the inner side wall of the rectangular groove through pin shafts. One side of the bottom surface of the U-shaped plate of the female head lock close to the special-shaped block of the female head lock is fixed to the special-shaped block of the female head lock through a spring. The initial state of the U-shaped plate of the female head lock is that the opening is obliquely upward, and there is a gap between the upturned end of the U-shaped plate and the top plate of the locking frame in the initial state;

[0010] The movable support is also specifically an inverted "卩"-shaped frame body composed of a top plate, a bottom plate and a special-shaped block between the top plate and the bottom plate. The movable support and the locking frame are of the same structure arranged symmetrically. The length of the top plate of the movable support is greater than the length of the bottom plate. Fixed bolts are inserted through the top and bottom of both sides of the special-shaped block of the movable support. The movable support is fixedly connected to one side of the walking mechanism through two groups of fixed bolts, and sealing nuts are also provided at both ends of the fixed bolts;

[0011] A rectangular groove is also opened on the bottom surface of the top plate of the movable support. A male head lock is arranged on the rectangular groove of the movable support through a pin shaft. The male head lock is composed of a lower U-shaped plate and a hinge chain arranged in the middle of the top surface of the U-shaped plate. One side of the U-shaped plate of the male head lock close to the special-shaped block of the male head lock is fixed to the special-shaped block of the male head lock through a spring. The initial state of the U-shaped plate of the male head lock is that the opening is obliquely downward, and there is a gap between the drooping end of the U-shaped plate and the bottom plate of the movable support in the initial state;

[0012] The height of the top plate of the movable support is located at the gap position between the top plate of the locking frame and the U-shaped plate of the female head lock. The height of the bottom plate of the locking frame is located at the gap position between the bottom plate of the movable support and the U-shaped plate of the male head lock. The U-shaped plate of the female head lock and the U-shaped plate of the male head lock are clamped together to form a rectangular frame structure, and the horizontal square steel column is movably sleeved in the rectangular frame structure.

[0013] Preferably, the upper parts of the first fixed steel bar, the second fixed steel bar and the third fixed steel bar are respectively capped by straight threaded steel bar joints, and the straight threaded steel bar joints are used to facilitate the installation and disassembly of the support block and the fixed support.

[0014] One use environment of the present invention is that the support block, the hanging basket walking track, the fixed support, the walking mechanism and the movable support are all arranged on the upper surface of the cast bridge deck. The thrust device of the present invention can be installed on the upper surface of the bridge and is suitable for the walking mechanism of the upper sliding track. The thrust device of this walking mode needs to have a reserved hole on the bridge deck, and can also directly set the first fixed steel bar, the second fixed steel bar and the third fixed steel bar embedded in the guardrail. The first fixed steel bar and the second fixed steel bar embedded in the guardrail can be used as guardrail reinforcement parts later, and the third fixed steel bar in the middle of the road surface needs to be cut and roughened.

[0015] Another use environment of the present invention is that the support block, the hanging basket walking track, the fixed support, the walking mechanism and the movable support are all arranged on the lower surface of the cast bridge deck. The thrust device of the present invention can be installed on the lower surface of the bridge, and is suitable for the walking mechanism of the lower sliding track. The thrust device of this walking mode has few restrictions, and the reserved hole can be filled by additional pouring; if the embedded steel bar method is adopted, the embedded steel bar can be roughened and additionally poured, and can also be used for steel bar binding of expansion joints; but when it is arranged on the lower surface of the bridge, it is necessary to fix the lock frame on the L-shaped support plate and the anti-slip plate by bolting and welding to form a non-detachable fixed support.

[0016] According to the aforementioned structure, the present invention further proposes a method for using a novel ultra-wide front fulcrum guy rope hanging basket thrust stop device, comprising the following steps:

[0017] a. According to the specific walking mode of the cable hanging basket, a novel ultra-wide front fulcrum cable hanging basket thrust device of the present invention is arranged on the upper surface or lower surface of the bridge, and the hanging basket walking track is pre-laid and the walking mechanism is pulled and fixed, the support block is fixed to the guardrails on both sides of the cast bridge deck through the second fixed steel bar, the fixed support is installed on one side of the end of the hanging basket walking track through the third fixed steel bar, the mobile support is arranged on one side of the walking mechanism through the fixing bolt, and the mobile support and the lock frame are located on the straight line of the same track and the openings are arranged oppositely, and the openings of the male lock U-shaped plate and the female lock U-shaped plate are also arranged oppositely;

[0018] b. Multiple sets of fixed supports are mounted on two sets of symmetrical support blocks through two sets of through-cross bars, and the through-cross bars are sealed;

[0019] c. The walking mechanism is controlled to slide on the walking track of the hanging basket through the traction device. When the top plate of the mobile support touches the U-shaped plate of the female lock buckle, the U-shaped plate of the female lock buckle and the U-shaped plate of the male lock buckle are clamped together under the impact force to form a rectangular frame structure. At this time, another traction and towing device is used to insert the horizontal square steel column into the support block and multiple groups of rectangular frame structures in sequence, and then the horizontal square steel column is pinned by the first fixed steel bar, so that the support block, the fixed support and the mobile support are locked and fixed together to complete the thrust work;

[0020] d. When the operation on the guy wire hanging basket is completed and a new casting surface is formed, continue to lay new support blocks, hanging basket walking tracks and fixed supports, and make the new hanging basket walking tracks dock with the previous hanging basket walking tracks, retain the previous support blocks as a suspension or support structure, remove the previous horizontal square steel column, control the walking mechanism to slide in the opposite direction through the traction device, pull the U-shaped plate of the male lock buckle to the right, causing the U-shaped plates of the male lock buckle and the female lock buckle to tilt up respectively, continue to slide for a distance, then the male lock buckle will be smoothly separated from the female lock buckle, and then fix the walking mechanism, and then remove the previous through cross bar and fixed supports to complete a section of unloading work;

[0021] e. Push the walking mechanism to slide forward and enter the newly laid hanging basket walking track, and repeat the operations of steps ad to complete the entire walking-thrusting and unloading work.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] 1. The present invention adopts a female lock buckle and a male lock buckle of a simple U-shaped frame structure, wherein the female lock buckle is arranged on a fixed support, and the male lock buckle is arranged on a movable support. The male lock buckle of the movable support is driven by a walking mechanism to impact the female lock buckle, and the two are locked to form a rectangular frame structure, and then a horizontal square steel column is connected in the rectangular frame to form a new clutch locking structure, which can realize clutch locking and unlocking only by the forward and reverse sliding of the walking mechanism, and is convenient to use;

[0024] 2. In addition to its own fixing function, the fixed support of the present invention is also fixed to the support blocks at both ends by penetrating the crossbar and the horizontal square steel column. It has a strong thrust force and converts part of the impact force into a bending moment penetrating the crossbar and the horizontal square steel column. The thrust force has a buffering effect, which improves the stability of the walking thrust.

[0025] 3. The method for using a novel ultra-wide front fulcrum cable hanging basket thrust device proposed in the present invention completes the entire walking-thrusting-unloading work only through the forward and reverse sliding of the walking mechanism, and the installation, fixing and disassembly process is simple and clear, which greatly reduces the laying process of the cable hanging basket embedded parts and speeds up the hanging basket casting construction of the cable-stayed bridge. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is a structural schematic diagram of a novel ultra-wide front fulcrum guy rope hanging basket thrust device proposed by the present invention;

[0027] Figure 2 This is a structural schematic diagram of a support block in a novel ultra-wide front fulcrum guy rope hanging basket thrust device proposed by the present invention;

[0028] Figure 3 This is a structural schematic diagram of a fixed support in a novel ultra-wide front fulcrum guy rope hanging basket thrust device proposed by the present invention;

[0029] Figure 4 This is a structural schematic diagram of a movable support in a novel ultra-wide front fulcrum guy rope hanging basket thrust device proposed by the present invention;

[0030] Figure 5 A schematic diagram of the clutch structure of a female lock buckle and a male lock buckle in a novel ultra-wide front fulcrum guy rope hanging basket thrust device proposed by the present invention;

[0031] In the figure: the cast bridge deck 1, the support block 2, the through cross bar 201, the horizontal square steel column 202, the first fixed steel bar 203, the first support leg 204, the second fixed steel bar 205, the hanging basket walking track 3, the fixed support 4, the anti-skid plate 401, the L-shaped support plate 402, the locking frame 403, the third fixed steel bar 404, the rectangular groove 405, the pin 406, the female lock 407, the walking mechanism 5, the movable support 6, the fixing bolt 601, the male lock 602, and the end nut 7. DETAILED DESCRIPTION

[0032] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0033] Embodiment 1:

[0034] A novel ultra-wide front fulcrum cable hanging basket thrust device of the present invention is installed on the upper surface of the bridge, which is suitable for the walking mechanism of the upper sliding track. The thrust device of this walking mode needs to have a reserved hole on the bridge deck, and can also directly set the pre-embedded first fixed steel bar 203, second fixed steel bar 205 and third fixed steel bar 404. The first fixed steel bar 203 and the second fixed steel bar 205 pre-embedded at the guardrail can be used as guardrail reinforcement parts later, and the third fixed steel bar 404 in the middle of the road surface needs to be cut and roughened.

[0035] The specific structure is as follows:

[0036] Reference Figure 1-5, a new type of ultra-wide front fulcrum cable-stayed hanging basket thrust stopping device, including support blocks 2 arranged at both sides of the guardrails of the cast-in-place bridge deck 1, a fixed support 4 arranged at one side position at the end of the hanging basket traveling track 3, and a movable support 6 arranged at one side position of the traveling mechanism 5. The support block 2 is specifically a cuboid. Two groups of through crossbars 201 and a horizontal square steel column 202 are inserted into the two side surfaces of the support block 2 perpendicular to the bridge body crossbeam. A first fixing steel bar 203 is also inserted into the top surface of the support block 2. The first fixing steel bar 203 is vertically arranged, passes through the horizontal square steel column 202, and is inserted into the reserved hole on the cast-in-place bridge deck 1. Any group of through crossbars 201 is erected by two groups of symmetric support blocks 2, and sealing end nuts 7 are provided at both ends of the through crossbar 201. At the bottom of the two side surfaces of the support block 2 parallel to the bridge body crossbeam, first feet 204 are symmetrically provided. The first feet 204 are welded by a bottom plate and two right-angle plates arranged at both ends of the upper surface of the bottom plate. The first feet 204 and the support block 2 are integrally formed. The bottom plate of the first feet 204 is inserted into another reserved hole on the cast-in-place bridge deck 1 through a second fixing steel bar 205; The fixed support 4 mainly includes an anti-slip plate 401, an L-shaped support plate 402, and a lock frame 403. The anti-slip plate 401 is placed flat at one side position at the end of the hanging basket traveling track 3, and the side wall of the anti-slip plate 401 contacts the outer side wall of the hanging basket traveling track 3. The bottom plate and the middle part of the side plate of the L-shaped support plate 402 are welded by another right-angle plate. The bottom plate of the L-shaped support plate 402 and the anti-slip plate 401 are inserted into the third group of reserved holes on the cast-in-place bridge deck 1 through a third fixing steel bar 404. The side plate of the L-shaped support plate 402 and the anti-slip plate 401 form a right-angle chute, and the back and bottom of the lock frame 403 contact the right-angle chute; The lock frame 403 is specifically an inverted "卩"-shaped frame body composed of a top plate, a bottom plate, and a special-shaped block between the top plate and the bottom plate. The length of the top plate of the lock frame 403 is less than the length of the bottom plate. Smooth through holes sleeved with the through crossbar 201 are provided at the top and bottom of both side surfaces of the special-shaped block. A rectangular groove 405 is provided on the upper surface of the bottom plate of the lock frame 403. A female head lock 407 is erected on both side walls of the rectangular groove 405 through two pin shafts 406. The female head lock 407 is composed of an upper U-shaped plate and a hinge chain arranged in the middle of the bottom surface of the U-shaped plate. Both ends of the hinge chain are riveted to the inner side wall of the rectangular groove 405 through the pin shafts 406. One side of the bottom surface of the U-shaped plate of the female head lock 407 close to the special-shaped block of the female head lock 407 is fixed to the special-shaped block of the female head lock 407 through a spring 408. The initial state of the U-shaped plate of the female head lock 407 is obliquely upward with an opening, and there is a gap between the upturned end of the U-shaped plate and the top plate of the lock frame 403 in the initial state;The movable support 6 is specifically an inverted "卩"-shaped frame body composed of a top plate, a bottom plate and a special-shaped block between the top plate and the bottom plate. The movable support 6 and the locking frame 403 are of the same structure arranged symmetrically. The length of the top plate of the movable support 6 is greater than the length of the bottom plate. Fixing bolts 601 are inserted through the top and bottom of both sides of the special-shaped block of the movable support 6. The movable support 6 is fixedly connected to one side of the traveling mechanism 5 by two groups of fixing bolts 601. Sealing end nuts 7 are respectively provided at both ends of the fixing bolts 601; a rectangular groove 405 is also opened on the bottom surface of the top plate of the movable support 6. A male locking buckle 602 is mounted on the rectangular groove 405 of the movable support 6 through a pin shaft 406. The male locking buckle 602 is composed of a lower U-shaped plate and a hinge chain provided in the middle of the top surface of the U-shaped plate. One side of the U-shaped plate of the male locking buckle 602 close to the special-shaped block of the male locking buckle 602 is fixed on the special-shaped block of the male locking buckle 602 through a spring 408. The initial state of the U-shaped plate of the male locking buckle 602 is that the opening is obliquely downward, and there is a gap between the drooping end of the U-shaped plate in the initial state and the bottom plate of the movable support 6; the height of the top plate of the movable support 6 is located at the gap position between the top plate of the locking frame 403 and the U-shaped plate of the female locking buckle 407. The height of the bottom plate of the locking frame 403 is located at the gap position between the bottom plate of the movable support 6 and the U-shaped plate of the male locking buckle 602. The U-shaped plate of the female locking buckle 407 is clamped with the U-shaped plate of the male locking buckle 602 to form a rectangular frame structure, and the horizontal square steel column 202 is movably sleeved in the rectangular frame structure.;

[0037] Referring to Figure 1-5 , the upper parts of the first fixing steel bar 203, the second fixing steel bar 205 and the third fixing steel bar 404 are respectively sealed by straight thread steel bar joints. The straight thread steel bar joints are used to facilitate the installation and disassembly of the support block 2 and the fixed support 4.

[0038] Embodiment 2:

[0039] Install the thrust device of the novel ultra-wide front fulcrum cable-stayed hanging basket of the present invention on the lower surface of the bridge, which is suitable for the traveling mechanism of the sliding track. There are not many restrictions on the thrust device of this traveling method, and the reserved holes can be filled by supplementary pouring; if the method of embedded steel bars is adopted, the embedded steel bars can be treated by chiseling and supplementary pouring, and can also be used for the steel bar binding of the expansion joint;

[0040] The slight difference in structure between this embodiment and Embodiment 1 is that when it is provided on the lower surface of the bridge, the locking frame 403 needs to be fixed on the L-shaped support plate 402 and the anti-slip plate 401 by bolts and full welding to form a non-removable fixed support 4.

[0041] According to the specific structures of Embodiments 1-2, the present invention also proposes a usage method of the thrust device of the novel ultra-wide front fulcrum cable-stayed hanging basket, including the following steps:

[0042] a. According to the specific walking mode of the cable hanging basket, a new type of ultra-wide front fulcrum cable hanging basket thrust device of the present invention is arranged on the upper surface or lower surface of the bridge, and the hanging basket walking track 3 is pre-laid and the walking mechanism 5 is pulled and fixed, the support block 2 is fixed to the guardrails on both sides of the cast bridge deck 1 through the second fixed steel bar 205, the fixed support 4 is installed on one side of the end of the hanging basket walking track 3 through the third fixed steel bar 404, the mobile support 6 is arranged on one side of the walking mechanism 5 through the fixing bolt 601, and the mobile support 6 and the lock frame 403 are located on the straight line of the same track and the openings are arranged oppositely, and the openings of the male head lock 602 U-type plate and the female head lock 407 U-type plate are also arranged oppositely;

[0043] b. The plurality of fixed supports 4 are mounted on two sets of symmetrical support blocks 2 through two sets of cross bars 201, and the cross bars 201 are sealed;

[0044] c. The walking mechanism 5 is controlled to slide on the walking track 3 of the hanging basket by the traction device. When the top plate of the mobile support 6 touches the U-shaped plate of the female lock buckle 407, the U-shaped plate of the female lock buckle 407 and the U-shaped plate of the male lock buckle 602 are clamped together under the impact force to form a rectangular frame structure. At this time, another traction and towing device is used to sequentially insert the horizontal square steel column 202 into the support block 2 and multiple groups of rectangular frame structures, and then the horizontal square steel column 202 is pinned by the first fixed steel bar 203, so that the support block 2, the fixed support 4 and the mobile support 6 are locked and fixed together to complete the thrust work;

[0045] d. When the operation on the guy wire hanging basket is completed and a new casting surface is formed, continue to lay new support blocks 2, hanging basket walking tracks 3 and fixed supports 4, and make the new hanging basket walking tracks 3 dock with the previous hanging basket walking tracks 3, retain the previous support blocks 2 as a suspension or support structure, remove the previous horizontal square steel column 202, control the walking mechanism 5 to slide in the opposite direction through the traction device, pull the U-shaped plate of the male lock buckle 602 to the right, causing the U-shaped plates of the male lock buckle 602 and the female lock buckle 407 to tilt up respectively, and continue to slide for a distance, so that the male lock buckle 602 is successfully separated from the female lock buckle 407, and then fix the walking mechanism 5, and then remove the previous through cross bar 201 and fixed support 4, and complete a section of unloading work;

[0046] e. Push the walking mechanism 5 to slide forward and enter the newly laid hanging basket walking track 3, and repeat the operation of steps ad to complete the entire walking-thrusting and unloading work.

[0047] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A novel ultra-wide front fulcrum guy-cable hanging basket thrust device, comprising support blocks (2) arranged at the guardrails on both sides of the cast bridge deck (1), a fixed support (4) arranged at one side of the end of the hanging basket walking track (3), and a movable support (6) arranged at one side of the walking mechanism (5), characterized in that: The support block (2) is specifically a cuboid. Two groups of through cross bars (201) and a horizontal square steel column (202) are inserted through the two side faces of the support block (2) perpendicular to the bridge girder. A first fixing steel bar (203) is also inserted through the top surface of the support block (2). The first fixing steel bar (203) is vertically arranged, passes through the horizontal square steel column (202) and is inserted into a reserved hole in the already poured bridge deck (1). Any group of the through cross bars (201) is erected by two symmetric support blocks (2), and sealing end nuts (7) are provided at both ends of the through cross bar (201). At the bottom of the two side faces of the support block (2) parallel to the bridge girder, first feet (204) are symmetrically provided. The first feet (204) are formed by welding a bottom plate and two right-angle plates provided at both ends of the upper surface of the bottom plate. The first feet (204) and the support block (2) are integrally formed. The bottom plate of the first feet (204) is inserted into another reserved hole in the already poured bridge deck (1) through a second fixing steel bar (205). The fixed support (4) mainly includes an anti-slip plate (401), an L-shaped support plate (402) and a lock frame (403). The anti-slip plate (401) is placed flat on one side at the end of the hanging basket walking track (3), and the side wall of the anti-slip plate (401) is in contact with the outer side wall of the hanging basket walking track (3). The bottom plate and the middle part of the side plate of the L-shaped support plate (402) are welded by another right-angle plate. The bottom plate of the L-shaped support plate (402) and the anti-slip plate (401) are inserted into the third group of reserved holes in the already poured bridge deck (1) through a third fixing steel bar (404). The side plate of the L-shaped support plate (402) and the anti-slip plate (401) form a right-angle chute, and the back and bottom of the lock frame (403) are in contact with the right-angle chute. The lock frame (403) is specifically an inverted "卩"-shaped frame body composed of a top plate, a bottom plate and a special-shaped block between the top plate and the bottom plate. The length of the top plate of the lock frame (403) is less than the length of the bottom plate. Smooth through holes sleeved with the through cross bar (201) are provided at the top and bottom of the two side faces of the special-shaped block. A rectangular groove (405) is provided on the upper surface of the bottom plate of the lock frame (403). A female head lock (407) is erected on both side walls of the rectangular groove (405) through two pin shafts (406). The female head lock (407) is composed of an upper U-shaped plate and a hinge chain provided in the middle of the bottom surface of the U-shaped plate. Both ends of the hinge chain are riveted to the inner side wall of the rectangular groove (405) through the pin shafts (406). One side of the bottom surface of the U-shaped plate of the female head lock (407) close to the special-shaped block of the female head lock (407) is fixed to the special-shaped block of the female head lock (407) through a spring (408). The initial state of the U-shaped plate of the female head lock (407) is obliquely upward with an opening, and there is a gap between the upturned end of the U-shaped plate and the top plate of the lock frame (403) in the initial state. The movable support (6) is specifically also an inverted "P"-shaped frame body composed of a top plate, a bottom plate and a special-shaped block between the top plate and the bottom plate. The movable support (6) and the lock frame (403) have the same structure and are symmetrically arranged. The length of the top plate of the movable support (6) is greater than the length of the bottom plate. Fixing bolts (601) are inserted through the top and bottom of both sides of the special-shaped block of the movable support (6). The movable support (6) is fixedly connected to one side of the traveling mechanism (5) by two groups of fixing bolts (601). Sealing end nuts (7) are respectively provided at both ends of the fixing bolts (601). A rectangular groove (405) is also formed on the bottom surface of the top plate of the movable support (6). A male lock (602) is mounted on the rectangular groove (405) of the movable support (6) through a pin shaft (406). The male lock (602) is composed of a lower U-shaped plate and a hinge chain provided in the middle of the top surface of the U-shaped plate. One side of the U-shaped plate of the male lock (602) close to the special-shaped block of the male lock (602) is fixed to the special-shaped block of the male lock (602) by a spring (408). The initial state of the U-shaped plate of the male lock (602) is that the opening is obliquely downward, and there is a gap between the hanging end of the U-shaped plate and the bottom plate of the movable support (6) in the initial state. The height of the top plate of the movable support (6) is located at the gap between the top plate of the lock frame (403) and the U-shaped plate of the female lock (407). The height of the bottom plate of the lock frame (403) is located at the gap between the bottom plate of the movable support (6) and the U-shaped plate of the male lock (602). The U-shaped plate of the female lock (407) and the U-shaped plate of the male lock (602) are clamped together to form a rectangular frame structure. The horizontal square steel column (202) is movably sleeved in the rectangular frame structure. The upper parts of the first fixing steel bar (203), the second fixing steel bar (205) and the third fixing steel bar (404) are respectively sealed by straight thread steel bar joints. The support block (2), the hanging basket traveling track (3), the fixed support (4), the traveling mechanism (5) and the movable support (6) are all arranged on the upper surface or the lower surface of the cast-in-place bridge deck (1).

2. The method for using the novel super-wide front fulcrum guy rope hanging basket thrust device according to claim 1 is characterized in that: Including the following steps: a. According to the traveling mode of the specific cable-stayed hanging basket, a novel ultra-wide front fulcrum cable-stayed hanging basket thrust device of the present invention is arranged on the upper surface or the lower surface of the bridge, and the hanging basket traveling track (3) is pre-laid and the traveling mechanism (5) is牵引固定好 (traction-fixed). The support block (2) is fixed at both sides of the guardrail of the cast-in-place bridge deck (1) through the second fixing steel bar (205). The fixed support (4) is installed at one side position at the end of the hanging basket traveling track (3) through the third fixing steel bar (404). The movable support (6) is arranged at one side position of the traveling mechanism (5) through the fixing bolt (601), and the movable support (6) and the lock frame (403) are located on the same straight line of the track and are arranged with openings opposite to each other. The openings of the U-shaped plates of the male lock (602) and the female lock (407) are also arranged opposite to each other. b. The plurality of fixed supports (4) are mounted on two sets of symmetrical support blocks (2) through two sets of through-cross bars (201), and the through-cross bars (201) are sealed; c. The walking mechanism (5) is controlled to slide on the walking track (3) of the hanging basket by means of a traction device. When the top plate of the movable support (6) touches the U-shaped plate of the female lock buckle (407), the U-shaped plate of the female lock buckle (407) and the U-shaped plate of the male lock buckle (602) are clamped together under the action of the impact force to form a rectangular frame structure. At this time, another traction and towing device is used to sequentially insert the horizontal square steel column (202) into the support block (2) and the plurality of rectangular frame structures. The horizontal square steel column (202) is then pinned by means of the first fixed steel bar (203), thereby locking and fixing the support block (2), the fixed support (4) and the movable support (6) together to complete the thrust stop work. d. When the operation on the guy wire hanging basket is completed and a new casting surface is formed, continue to lay new support blocks (2), hanging basket walking tracks (3) and fixed supports (4), and make the new hanging basket walking tracks (3) dock with the previous hanging basket walking tracks (3), retain the previous support blocks (2) as a suspension or support structure, remove the previous horizontal square steel column (202), control the walking mechanism (5) to slide in the opposite direction through the traction device, pull the U-shaped plate of the male lock buckle (602) to the right, causing the U-shaped plates of the male lock buckle (602) and the female lock buckle (407) to tilt up respectively, continue to slide for a distance, then the male lock buckle (602) is successfully separated from the female lock buckle (407), and then fix the walking mechanism (5), and then remove the previous through cross bar (201) and fixed supports (4) to complete a section of unloading work; e. Push the walking mechanism (5) to slide forward and enter the newly laid hanging basket walking track (3), and repeat the operation of steps ad to complete the entire walking-thrusting and unloading work.

Citation Information

Patent Citations

  • Novel ultra-wide front fulcrum guy cable hanging basket thrust device

    CN212358040U