A three-dimensional greening brick set for street reconstruction in old urban areas
Through the three-dimensional greening brick system, combined with greening bricks, road covers and water-guided curbs, the problems of narrow lanes and insufficient greening in the old city are solved, and the rainwater is introduced into the underground and green plants is nourished, improving the aesthetics of the street and pedestrian safety. sex.
Patent Information
- Application Number
- CN202010598249.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-06-28
- Publication Date
- 2024-11-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Due to narrow lanes and insufficient greening in the old city, pedestrians are inconvenient to traffic, and the tree pit water collection function is lost. The existing solutions such as tree pit covers and tree pit brick molds cannot level the tree pit and retain water collection at the same time, and the tree There are hidden dangers in the pond stones, making it difficult to quickly standardize mass production.
Design a three-dimensional greening brick system, including greening bricks, road covers and water-guided curbs. The greening bricks are combined with tree pits through road covers and tree covers. The water-guided curbs guide the lane to accumulate water into the underground, forming a sponge sidewalk, realizing Rainwater is introduced into the ground and nourishes green plants.
Without occupying the sidewalk space, the streets are fully greened, the aesthetics and humanistic value are enhanced, the tree pits gather water, the tree pits are able to reduce the risk of pedestrians being tripped, the streets are improved integrity and flexibility, and the problem of water accumulation is effectively solved.
Smart Images

Figure CN111622042B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of municipal construction, and in particular to a three-dimensional greening brick set designed based on the sponge city theory, which is used to improve the street conditions in old urban areas. Background Art
[0002] Due to the large volume of traffic and narrow lanes in the old city, the width of the original lanes often cannot meet the current requirements, resulting in traffic jams. Due to historical issues, the old city cannot be rebuilt on a large scale immediately, and the government can only expand the existing lanes in the old city. However, this expansion method will occupy the original green belts and pedestrian paths, and even directly remove the green belts and leave only the trees that are not allowed to be removed. This will bring the following problems: 1. The sidewalks will become more crowded when there are more pedestrians. 2. When the street tree pits are close to the pedestrian walking area, it will cause inconvenience to the pedestrians. In addition, some tree fence bricks are higher than the road surface and may cause pedestrians to trip. 3. The large number of shared bicycles parked will make the sidewalks more crowded and the available space more tense. 4. The large reduction of green plants has reduced the air quality of the streets in the old city. 5. Only paying attention to the width of the lane will affect the integrity and aesthetics of the street. In response to the above problem 2, there are tree pit covers, tree pit brick molds and tree pool stones on the market, but these have obvious defects. For example, the tree pit cover and the tree pit brick mold can indeed level the tree pit to make it flush with the road surface, thereby reducing the probability of pedestrians tripping. However, after the tree pit soil is compacted and leveled, the original tree pit water collection function will be lost, making it easy for water to accumulate on the sidewalk, causing inconvenience to pedestrians. This is actually putting the cart before the horse. In addition, the above two have obvious defects. Due to the different thicknesses of tree trunks, the different positions of tree pits where the trunks are located, and the irregular shapes of tree pits at some corners, it is impossible for the tree pit cover and the tree pit brick mold to be applicable to the above situations at the same time. The poor flexibility of the two makes it impossible for the structures of the two to be quickly standardized and mass-produced. Although the placement of tree pool stones will not affect the water collection function of the tree pit, the irregularity and smoothness of the stones still pose a hidden danger to pedestrians. Based on the sponge city theory and the above-mentioned street problems, the old city area where the lanes have been expanded is renovated. The renovation points are as follows: 1. Let the accumulated water on both sides of the lanes easily seep into the ground. 2. Make the sidewalk and the tree pit level without affecting the water collection function of the tree pit. 3. Implement effective greening schemes on the basis of maximizing the sidewalk space. 4. Allow more rainwater on the sidewalk surface to be directed underground, rather than letting rainwater evaporate on its surface to form a sponge sidewalk. The present invention is designed based on the above 4 points. Summary of the invention
[0003] In order to solve the above technical problems, the present invention provides a three-dimensional greening brick set for the reconstruction of streets in old urban areas, including greening bricks, road covers, tree covers and water-conducting curbs, the road covers are located on the upper part of the greening bricks, the tree covers are laid in tree pits and some corners, and the water-conducting curbs are located on the lane side of the road cover; the greening bricks include road cover grooves, fixed cones, lower chassis, upper chassis, circular groove holes, bottom bricks, bottom patterns and side wall grids; the lower chassis is used to carry the bottom bricks, which are perforated bricks made by mixing fertilizers and firing, the upper chassis is located on the lower chassis and is used to carry greening brick soil, the side wall grid is located on the upper side wall of the upper chassis, and is a perforated mesh structure; the side wall below the upper chassis and the end of the bottom brick are provided with bottom patterns; the lower chassis, the upper chassis, and the bottom bricks are located in the same vertical direction and are provided with circular groove holes correspondingly; the fixed cones are located at the four corners below the lower chassis and are downwardly tapered; the top of the greening brick is open, and the four corners are provided with road cover grooves.
[0004] Preferably, the road cover comprises a road cover slot, a road cover hole, a road cover plug and a road cover clip; the road cover clip comprises an upper clip and a lower clip, and the upper clip and the lower clip are plugged into each other; the road cover is provided with a road cover hole, and the four corners at the bottom of the road cover are provided with road cover plugs nested with the road cover slots; the side of the road cover is provided with a road cover slot, and the road cover slot and the road cover clip are nested, so that adjacent road covers can be connected to form a whole.
[0005] Preferably, the tree cover comprises a tree cover groove, a tree cover cone and a tree cover clip. Corresponding tree cover grooves are provided on the upper and lower parts of the tree cover. The tree cover clip is H-shaped, and the tree cover clip is nested in the tree cover groove. A tree cover cone is provided at the lower part of the tree cover to play a fixing role.
[0006] Preferably, the water-conducting curb comprises a bottom waterproof layer, an upper waterproof layer, a side water-conducting net, a pavement water-conducting groove, a bottom water-conducting groove and a water-conducting part; the pavement water-conducting groove is the inlet for accumulated water, the bottom water-conducting groove is the outlet for accumulated water, and the water-conducting part is the path through which accumulated water can pass smoothly; side water-conducting nets are provided at the lower parts of both ends of the water-conducting curb.
[0007] Preferably, the greening bricks are divided into two categories due to different bottom patterns, and the bottom patterns of the two categories match each other.
[0008] Preferably, the plane where the tree cover is located is slightly higher than the plane where the road cover is located.
[0009] Preferably, the material of the greening bricks except the base bricks is corrosion-resistant and sun-resistant plastic, and the material of the road cover and the tree cover is corrosion-resistant and sun-resistant plastic.
[0010] Preferably, the water-conducting curb is a structure formed by using steel bars as a skeleton, covered with cement, and containing a large number of pebbles inside.
[0011] The laying of greening bricks, road covers and tree covers all adopts the traditional mosaic structure principle, which makes the invention more integral, stable and flexible. The materials of the three are all corrosion-resistant and sun-resistant plastics (except the bottom bricks of the greening bricks).
[0012] Green bricks are the core components of three-dimensional greening. The purpose is to allow shade-loving green plants to be planted under the sidewalk, saving ground space while completing street greening. Green bricks can also replace green plants according to the greening needs of festivals and seasons. For example, the green plants in the green bricks can be replaced with chrysanthemums during the Mid-Autumn Festival. While improving the local appearance of the old city, its aesthetic and cultural value is increased. Green bricks are divided into two categories due to different bottom patterns, but the bottom patterns of the two are mutually compatible, which is conducive to making the structure formed between bricks more stable when laying green bricks. The bottom brick is a perforated brick made by mixing fertilizers and firing. It increases the weight of the green brick and reduces the center of gravity of the green brick, making the green brick structure more stable. In addition, the nutrients in the bottom brick can be slowly decomposed and utilized by green plants, which is conducive to the good development of green plants in the green brick. The circular slot hole is the key part connecting the green brick soil, green plant roots, upper chassis, bottom brick, lower chassis and aquifer. It connects the underground and the ground, forming a good sponge structure, allowing more rainwater to be directed into the underground. At the same time, the roots of the green plants in the green bricks can also absorb the water and nutrients at the bottom. The upper chassis plays the role of supporting the green brick soil. The lower chassis plays the role of supporting the bottom bricks. The side wall grid can hold the green brick soil and strengthen the connection between each green brick soil. The fixing cone plays the role of fixing the green bricks. The road cover groove plays the role of nesting the road cover.
[0013] The road cover and the road cover clip are located on the upper part of the greening brick, and the two are laid on the top of the greening brick to form a flat layer on the top of the greening brick. This plane is firm and flush with the sidewalk surface, and can be used for pedestrians to walk or park bicycles. The road cover plug is nested with the road cover groove, so that the greening brick and the road cover are connected to form a whole. The road cover slot and the road cover clip are nested, so that adjacent road covers can be connected to form a whole. The road cover hole allows the green plants to absorb sunlight and ventilation. The road cover clip can be disassembled into two parts, which is to facilitate the later maintenance of the present invention. If the road cover clip is disassembled, the damaged parts of the present invention can be easily removed, the green brick soil and bottom bricks with reduced fertility can be replaced, the green plants that are not currently needed can be replaced, and the garbage can be removed and the objects dropped by pedestrians can be picked up.
[0014] The tree cover and the tree cover clip are the most flexible and splicable parts of the present invention. They are laid at the tree pit and some corners and can be nested with the road cover. It is worth noting that the greening bricks and road covers near the tree trunk can replace the tree surrounding bricks to form a tree pit to collect water. The tree cover and the tree cover clip are flexibly laid according to the size of the inner part of the formed tree pit and the position of the tree trunk. The plane paving of the tree pit is completed without filling the tree pit. There is a tree cover groove on the upper part of the tree cover, which can be nested with the tree cover clip. There is a tree cover cone on the lower part of the tree cover to fix it. Because the upper thickness of the tree cover clip is slightly higher than the thickness of the road cover, the plane formed by the tree cover and the tree cover clip is slightly higher than the plane formed by the road cover and the road cover clip, but this higher thickness is conducive to the laying and disassembly of the tree cover and the tree cover clip, and this higher thickness is not enough to affect pedestrians.
[0015] Water-conducting curbs can successfully guide the accumulated water on both sides of the driveway after rain into the aquifer under the sidewalk. The aquifer can temporarily store water for the growth and development of green plants in the green bricks. Finally, the rainwater seeps into the bottom soil layer. The upper waterproof layer and the bottom waterproof layer of the water-conducting curb play a guiding role in the accumulated water on both sides of the driveway, with the purpose of successfully guiding the accumulated water into the aquifer. The pavement water guide groove of the water-conducting curb is the entrance for the accumulated water, and the bottom water guide groove of the water-conducting curb is the outlet for the accumulated water. The water-conducting part of the water-conducting curb is the path through which the accumulated water can pass smoothly. The side water guide network of the water-conducting curb makes the water-conducting curbs form a whole and enhances the connectivity between them.
[0016] The present invention has the following advantages: 1. Greening bricks can complete the greening of streets without using the ground space. At the same time, greening bricks can also replace green plants according to the greening needs of festivals and seasons, and increase their aesthetic and humanistic value while optimizing the city appearance. Greening bricks communicate the ground and the underground, forming a good sponge structure as a whole, so that more rainwater can be introduced into the underground. Greening bricks can replace tree surrounding bricks to form tree pits to play a water collection role. 2. The disassembly of the road cover clip makes the present invention more convenient for later maintenance. 3. The tree cover and the tree cover clip have flexible splicing when facing complex road conditions. While retaining the water collection function of the tree pit, the plane laying of the tree pit is completed, and the possibility of pedestrians being tripped is reduced on the basis of increasing the plane space of the sidewalk. 4. The structure of the water-conducting curb can successfully introduce the accumulated water on both sides of the lane into the bottom of the sidewalk, and form a sponge sidewalk together with other components while playing the role of nourishing green plants. 5. The laying of greening bricks, road covers and tree covers all adopts the traditional mosaic structure principle, which makes the present invention more holistic, stable and flexible. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The present invention will be described in further detail below in conjunction with the accompanying drawings.
[0018] Figure 1It is a partial effect diagram of a three-dimensional greening brick set for street reconstruction in an old urban area according to an embodiment of the present invention.
[0019] Figure 2 This is a diagram of the greening brick structure.
[0020] Figure 3 This is a diagram of the road cover structure.
[0021] Figure 4 It is a tree cover structure diagram.
[0022] Figure 5 This is the structural diagram of the water diversion curb.
[0023] Figure 6 It is a plan view of a three-dimensional greening brick set for reconstruction of streets in an old urban area according to an embodiment of the present invention.
[0024] In the figure: 1 is a driveway; 2 is a tree trunk; 3 is green brick soil; 4 is an aquifer; 5 is a bottom soil layer; 6 is a green brick; 7 is a road cover groove of a green brick; 8 is a fixed cone of a green brick; 9 is a lower chassis of a green brick; 10 is an upper chassis of a green brick; 11 is a circular groove hole of a green brick; 12 is a bottom brick of a green brick; 13 is a bottom pattern of a green brick; 14 is a side wall grid of a green brick; 15 is a road cover; 16 is a road cover slot of a road cover; 17 is a road cover hole of a road cover; 18 is a road cover plug of a road cover; 19 is a road cover 20 is the upper clip of the road cover clip; 21 is the lower clip of the road cover clip; 22 is the tree cover; 23 is the tree cover groove of the tree cover; 24 is the tree cover cone of the tree cover; 25 is the tree cover clip of the tree cover; 26 is the water-conducting curb; 27 is the bottom waterproof layer of the water-conducting curb; 28 is the upper waterproof layer of the water-conducting curb; 29 is the side water-conducting net of the water-conducting curb; 30 is the road surface water-conducting groove of the water-conducting curb; 31 is the bottom water-conducting groove of the water-conducting curb; 32 is the water-conducting part of the water-conducting curb. 33 is the blind path; 34 is the walking area. DETAILED DESCRIPTION
[0025] like Figure 1-6 As shown, the present invention discloses a three-dimensional greening brick set for street reconstruction in an old urban area, comprising a greening brick 6, a road cover 15, a tree cover 22 and a water-conducting curb 26.
[0026] The materials of the greening brick 6, the road cover 15 and the tree cover 22 are all corrosion-resistant and sun-resistant plastics (except the bottom brick 12 of the greening brick 6). The water-conducting road curb 26 is a structure formed by using steel bars as a framework, cement as an outer layer, and containing a large number of pebbles inside.
[0027] Corrosion-resistant and sun-resistant plastics can be made of ASA plastics that are UV-resistant, do not fade in the wind or sun, and are resistant to aging.
[0028] The greening brick 6 includes: a road cover groove 7, a fixed cone 8, a lower chassis 9, an upper chassis 10, a circular groove hole 11, a bottom brick 12, a bottom pattern 13 and a side wall grid 14. The greening brick 6 is the core component of the three-dimensional greening. It is divided into two categories due to the difference in the bottom pattern 13, but the bottom patterns 13 of the two are mutually matched, which is conducive to making the structure formed between bricks more stable when laying the greening brick 6. The bottom brick 12 is a perforated brick made by mixing fertilizer and firing. It increases the weight of the greening brick 6 and lowers the center of gravity of the greening brick 6, thereby making the structure of the greening brick 6 more stable. In addition, the nutrients in the bottom brick 12 can be slowly decomposed and utilized by green plants, which is conducive to the good development of green plants in the greening brick 6. The circular groove hole 11 is a key part connecting the greening brick soil 3, the root system of green plants, the upper chassis 10, the bottom brick 12, the lower chassis 9 and the aquifer 4. It connects the underground and the ground, forming a good sponge structure, allowing more rainwater to be introduced into the underground. At the same time, the roots of the green plants in the greening bricks 6 can also absorb the water and nutrients at the bottom. The upper chassis 10 plays the role of supporting the greening brick soil 3. The lower chassis 9 plays the role of supporting the bottom bricks 12. The side wall grid 14 plays the role of strengthening the connection between the greening brick soil 3 on the basis of being able to hold the greening brick soil 3. The fixing cone 8 plays the role of fixing the greening brick 6. The road cover groove 7 plays the role of nesting the road cover 15.
[0029] The road cover 15 includes: a road cover slot 16, a road cover hole 17, a road cover plug 18 and a road cover clip 19. The road cover clip 19 is divided into an upper clip 20 and a lower clip 21. The road cover 15 and the road cover clip 19 are located on the upper part of the greening brick 6, and the laying of the two on the top of the greening brick 6 forms a plane layer on the top of the greening brick 6. This plane is firm and flush with the sidewalk surface, and can be used for pedestrians to walk or park bicycles. The road cover plug 18 is nested with the road cover slot 7, so that the greening brick 6 and the road cover 15 are connected to form a whole. The road cover slot 16 and the road cover clip 19 are nested, so that adjacent road covers 15 can be connected to form a whole. The road cover hole 17 allows green plants to absorb sunlight and ventilation. The road cover clip 19 can be disassembled into two parts, which is to facilitate the later maintenance of the present invention. For example, by disassembling the road cover clip 19, the damaged parts of the present invention can be easily taken out, the green brick soil with reduced fertility can be replaced, the green plants that are currently not needed can be replaced, and the garbage can be taken out and the objects dropped by pedestrians can be picked up.
[0030] The tree cover 22 includes: a tree cover groove 23, a tree cover cone 24 and a tree cover clip 25. The tree cover 22 and the tree cover clip 25 are the most flexible and splicable components of the present invention. They are laid at the tree pit and some corners and can be nested with the road cover 15. It is worth noting that the greening bricks 6 and the road cover 15 on the near side around the trunk 2 can replace the tree surrounding bricks to form a tree pit to play a water gathering role. The tree cover 22 and the tree cover clip 25 are flexibly laid according to the size of the inner part of the formed tree pit and the position of the trunk 2. The plane paving of the tree pit is completed without filling the tree pit. There is a tree cover groove 23 on the upper part of the tree cover 22, which can be nested with the tree cover clip 25. There is a tree cover cone 24 on the lower part of the tree cover 22 to play a fixing role. Since the upper thickness of the tree cover clip 25 is slightly higher than the thickness of the road cover 15, the plane formed by the tree cover 22 and the tree cover clip 25 is slightly higher than the plane formed by the road cover 15 and the road cover clip 19, but this extra thickness is beneficial to the laying and disassembly of the tree cover 22 and the tree cover clip, and this extra thickness is not enough to affect pedestrians.
[0031] The water-guiding curb 26 includes: a bottom waterproof layer 27, an upper waterproof layer 28, a side water-guiding net 29, a road surface water-guiding groove 30, a bottom water-guiding groove 31 and a water-guiding part 32. The water-guiding curb 26 can successfully guide the accumulated water on both sides of the lane 1 after rain into the aquifer 4 under the sidewalk. The aquifer 4 can temporarily store water for the growth and development of green plants in the greening bricks 6, and finally the rainwater infiltrates into the bottom soil layer 5. The upper waterproof layer 28 and the bottom waterproof layer 27 of the water-guiding curb 26 play a guiding role in the accumulated water on both sides of the lane 1, with the purpose of successfully guiding the accumulated water into the aquifer 4. The road surface water-guiding groove 30 of the water-guiding curb 26 is the entrance of the accumulated water, and the bottom water-guiding groove 31 of the water-guiding curb 26 is the outlet of the accumulated water. The water-guiding part 32 of the water-guiding curb 26 is the path through which the accumulated water can pass smoothly. The side water guide nets 29 of the water guide curbs 26 enable the water guide curbs 26 to form a whole and enhance the connectivity between them.
[0032] In the actual laying of the present invention, the staff is required to complete the following preliminary work:
[0033] Determine the laying range of green bricks 6, road covers 15 and tree covers 22 required in the old city. Figure 6 It can be seen that the tree cover 22 is mainly laid in the tree pit, and the green bricks 6 and road cover 15 are mainly laid near the water guide curb 26 and between the tree pits. In the principle of not affecting the main walking space of pedestrians, try to choose places with low pedestrian activity for laying. Figure 6 For general situations, tree covers 22 can be used for paving at some corners and irregular tree pits.
[0034] The laying method of the present invention is as follows:
[0035] First, the original curbs, sidewalk bricks, blind bricks and tree bricks are excavated and cleaned, and both sides of the lane are trimmed so that the water-conducting curbs 26 can be placed in the original place in a regular manner and the road surface water channel 30 of the water-conducting curbs 26 is flush with the lane. Then, the bottom soil layer is excavated so that the bottom of the water-conducting curbs 26 is flush with the bottom soil layer 5. After that, the bottom soil layer 5 is compacted and leveled. The water storage layer 4 is laid on the top of the bottom soil layer 5, and the water storage layer 4 is mixed with a certain proportion of pebbles, sand, clay and humus. The laying thickness of the water storage layer 4 is the same as the height of the water channel 31 at the bottom of the water-conducting curb 26. After the water storage layer 4 is laid, it needs to be compacted and leveled. Before starting to lay the green bricks 6, it is necessary to put the bottom bricks 12, green brick soil 3 and shade-loving grass seeds into the corresponding parts of the green bricks 6. Two types of green bricks 6 need to be inlaid and laid, and the road cover 15 is buckled on them. At the same time, the road covers 15 are connected by inlaying with road cover clips 19. When paving to the tree pit, the tree cover 22 and the tree cover clip 25 are used to inlay and connect. The tree cover 22 can be used for paving at some corners and irregular tree pits. Then, the blind bricks and sidewalk bricks are re-laid to be flush with the road cover 15. Finally, the rebuilt sidewalk is sprinkled with water.
[0036] Post-management:
[0037] The road cover clip 19 can be disassembled into two parts, which is to facilitate the later maintenance of the present invention. For example, by disassembling the road cover clip 19, the damaged parts of the present invention can be easily taken out, the greening brick soil 3 and the bottom brick 12 with reduced fertility can be replaced, the green plants that are currently not needed can be replaced, and the garbage can be taken out and the items dropped by pedestrians can be picked up. When the green plants in the greening bricks 6 are too high above the road surface, they need to be trimmed regularly, and trampling-resistant grass seeds can also be planted in the greening bricks 6 to reduce the management intensity. Greening bricks 6 can also be transplanted with green plants according to the greening needs of festivals and seasons. For example, chrysanthemums can be transplanted into greening bricks 6 during the Mid-Autumn Festival. While improving the local appearance of the old city, its aesthetic and humanistic value is increased.
[0038] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A three-dimensional greening brick set for street reconstruction in old urban areas, characterized by: It includes greening bricks, road covers, tree covers and water-conducting curbs. The road covers are located on the upper part of the greening bricks, the tree covers are laid in tree pits and some corners, and the water-conducting curbs are located on the lane side of the road cover; the greening bricks include road cover grooves, fixed cones, lower chassis, upper chassis, circular groove holes, bottom bricks, bottom patterns and side wall grids; the lower chassis is used to carry the bottom bricks, which are perforated bricks fired with fertilizers mixed in them; the upper chassis is located on the lower chassis and is used to carry greening brick soil; the side wall grid is located on the side wall above the upper chassis and is a perforated mesh structure; the lower chassis, upper chassis and bottom bricks are located in the same vertical direction and have corresponding circular groove holes; the fixed cones are located at the four corners below the lower chassis and are downward tapered; the top of the greening brick is open and has road cover grooves at the four corners.
2. The three-dimensional greening brick set for street reconstruction in old urban areas according to claim 1 is characterized in that: The road cover comprises a road cover slot, a road cover hole, a road cover plug and a road cover clip; The road cover clip comprises an upper clip and a lower clip, which are plugged into each other; a road cover hole is provided on the road cover, four corners of the bottom of the road cover are provided with road cover plugs nested in the road cover groove, and a road cover slot is provided on the side of the road cover, which is nested with the road cover clip, so that adjacent road covers can be connected to form a whole.
3. The three-dimensional greening brick set for street reconstruction in old urban areas according to claim 1 is characterized in that: The tree cover comprises a tree cover groove, a tree cover cone and a tree cover clip. Corresponding tree cover grooves are arranged on the upper and lower sides of the tree cover. The tree cover clip is H-shaped, and the tree cover clip is nested with the tree cover groove. A tree cover cone is arranged at the lower part of the tree cover to play a fixing role.
4. The three-dimensional greening brick set for street reconstruction in old urban areas according to claim 1 is characterized in that: The water-guiding curb comprises a bottom waterproof layer, an upper waterproof layer, a side water-guiding net, a road surface water-guiding groove, a bottom water-guiding groove and a water-guiding part; the road surface water-guiding groove is the inlet for accumulated water, the bottom water-guiding groove is the outlet for accumulated water, and the water-guiding part is the path through which accumulated water can pass smoothly; side water-guiding nets are provided at the lower parts of both ends of the water-guiding curb.
5. The three-dimensional greening brick set for street reconstruction in old urban areas according to claim 1 is characterized in that: The lower side wall of the upper chassis and the end of the bottom brick are provided with bottom patterns.
6. The three-dimensional greening brick set for street reconstruction in old urban areas according to claim 5 is characterized in that: Greening bricks are divided into two categories due to the different bottom patterns, and the bottom patterns of the two types match each other.
7. The three-dimensional greening brick set for street reconstruction in old urban areas according to claim 1 is characterized in that: The plane where the tree cover is located is slightly higher than the plane where the road cover is located.
8. The three-dimensional greening brick set for street reconstruction in old urban areas according to claim 1 is characterized in that: The material of greening bricks except the base bricks is corrosion-resistant and sun-resistant plastic, and the material of road covers and tree covers is corrosion-resistant and sun-resistant plastic.
9. The three-dimensional greening brick set for street reconstruction in old urban areas according to claim 1 is characterized in that: The water-conducting curb is a structure formed by using steel bars as a framework, being covered with cement, and containing a large number of pebbles inside.
Citation Information
Patent Citations
Gather formula municipal afforestation brick
CN207259896U
Ceramsite filter plate
CN209500941U
Municipal greening brick
CN210287997U
Three-dimensional greening sleeve brick for street transformation in old urban areas
CN212452149U
Pavement structure having water permeability, water holding property and draining performance, and brick block used therefor
JP2008156866A