Drainage system and construction method for ballastless track cutting slope

By designing drainage systems for side grooves, sinks and drainage channels on the slopes of ballless track road cuttings, the problem of drainage difficulty in ballless track road cuttings is solved, the project cost and maintenance difficulty are reduced, and the roadbed stability is improved. It is suitable for Expanded soil roadbed.

CN111622327BActive Publication Date: 2024-11-05CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010597010.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-06-28
Publication Date
2024-11-05
Estimated Expiration
2040-06-28

AI Technical Summary

Technical Problem

When setting up ball-free tracks on excavated road cuttings with a length of more than 400m, the water collection volume of road cutting slopes is large and drainage is difficult. Especially in areas where ball-free tracks pass through the tunnel, it is difficult to maintain the pump well equipment and it is difficult to pump and drain the water collection in time, which is easy to easily Water accumulation causes diseases, resulting in high project costs and difficult maintenance.

Method used

A drainage system for the slope of the ballastless track road cutting is designed, including side ditch, sink pool and drainage channel. The side ditch extends along the slope of the cutting slope, the sink pool is connected to the side ditch, the drainage channel is connected to the sink, and the water guide tank is located at Below the rail structure or the surface of the roadbed, the sinkhole is divided into a total pool and a sub-pool. Sedimentation pits and natural trenches are used to assist in drainage. The construction methods include excavating side trenches, sinkholes and drainage channels foundation pits, pouring concrete to form side trenches and sinks. The water tank and drainage channel are connected to the sink to realize the collection and discharge of liquids.

Benefits of technology

Effectively avoid the retention of liquid volume of road cutting slopes and ball-free tracks, reduce the cost of engineering, reduce the difficulty of increasing tunnel sections and maintaining difficulties, improve the stability of the roadbed, and avoid diseases caused by untimely drainage. It is especially suitable for expansive soil Roadbed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111622327B_ABST
    Figure CN111622327B_ABST
Patent Text Reader

Abstract

The embodiment of the present application provides a drainage system for a ballastless track cutting slope, comprising side ditches, a sump and a drainage channel, wherein the side ditches are located on both sides of the ballastless track, and the side ditches extend along the toe of the cutting slope. The sump is connected to the side ditches, and the sump is used to collect liquid in the side ditches. The drainage channel is connected to the sump, and the drainage channel is used to discharge liquid from the sump, thereby solving the problem of difficult drainage of the ballastless track cutting slope. The embodiment of the present application also provides a construction method for the above-mentioned drainage system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of ballastless track drainage, and in particular to a drainage system for a ballastless track cutting slope and a construction method thereof. Background Art

[0002] When setting up ballastless track on a cut road with a length of more than 400m, the slope of the road cut has the problem of large water collection and great difficulty in drainage. Especially in the section where the ballastless track passes through a tunnel, pumping and drainage facilities such as pumping wells are usually set up at the junction of the tunnel and the road cut for drainage. The project cost is high, and the maintenance of equipment such as pumping wells is difficult. It is difficult to ensure timely drainage of collected water, and it is very easy for water to accumulate and cause diseases. Summary of the invention

[0003] In view of this, the embodiment of the present application hopes to provide a drainage system for the cutting slope of a ballastless track and a construction method thereof, so as to solve the technical problem of the difficulty in drainage of the cutting slope of a ballastless track in the prior art. To solve the above technical problem, the technical solution of the embodiment of the present application is implemented as follows:

[0004] On the one hand, an embodiment of the present application provides a drainage system for a ballastless track cutting slope, comprising:

[0005] Side ditches are located on both sides of the ballastless track and extend along the toe of the cutting slope;

[0006] a water collection tank, connected to the side ditch, for collecting liquid in the side ditch; and

[0007] A drainage channel is communicated with the water collection pool and is used to discharge the liquid in the water collection pool.

[0008] Furthermore, the drainage system comprises:

[0009] The water guide trough is located below the track structure of the ballastless track and is connected to the water collection pools located on both sides of the ballastless track.

[0010] Furthermore, the water channel is a reinforced concrete structure with a hollow interior;

[0011] And / or, the water channel is located on the surface layer of the roadbed of the ballastless track;

[0012] and / or, the water channel has a transverse slope greater than or equal to 0.8%;

[0013] And / or, the corners of the water guide groove are rounded.

[0014] Furthermore, the water collection pool includes a main pool and a sub-pool, the main pool and the sub-pool are located on both sides of the ballastless track, the drainage channel is located on the side where the main pool is located, the drainage channel is connected to the main pool, and the water guide trough guides the liquid in the sub-pool to the main pool.

[0015] Furthermore, the drainage system comprises a sedimentation pit connecting the drainage channel and the water collection pool, and the bottom wall of the sedimentation pit is lower than the bottom wall of the water collection pool.

[0016] Furthermore, the bottom wall of the water collection pool and the bottom wall of the sedimentation pit are connected by a slope, and the slope ratio of the slope is 1:2.

[0017] Furthermore, the drainage system includes a caisson connecting the drainage channel and the natural ditch.

[0018] Furthermore, the drainage channel has a transverse slope greater than or equal to 2%.

[0019] Furthermore, the drainage system includes a cover plate covering the water collection pool;

[0020] And / or, the drainage channel is a drainage pipe or a drainage ditch.

[0021] Another aspect of the present application provides a method for constructing a drainage system for a ballastless track cutting slope, comprising:

[0022] Excavating side ditch foundation pits on both sides of the ballastless track, the side ditch foundation pits extending along the toe of the cutting slope, arranging first inner molds on the side walls and bottom walls of the side ditch foundation pits, and pouring concrete on the first inner molds to form side ditch;

[0023] Excavating a water collection pool foundation pit, setting a second inner mold on the side wall and the bottom wall of the water collection pool foundation pit, pouring concrete on the second inner mold to form a water collection pool, and the water collection pool is connected to the side ditch;

[0024] A drainage channel foundation pit is excavated and concrete is poured to form the drainage channel, or a drainage pipe is pushed into the base bed to form the drainage channel; the drainage channel is connected to the water collection pool.

[0025] In the drainage system provided by the embodiment of the present application, the liquid collected by the side ditch enters the water collection pool, and the drainage channel is used to discharge the liquid in the water collection pool. The liquid in the water collection pool can be collected together and then discharged from the drainage channel. In this way, it can be avoided that the liquid on the side slope of the road cut and the liquid on the ballastless track cannot be discharged and accumulates on the ballastless track, affecting the structural stability of the ballastless track. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 A schematic diagram of the structure of a drainage system for a ballastless track cutting slope provided in an embodiment of the present application;

[0027] Figure 2 for Figure 1 A cross-sectional view of the drainage system in the middle, where the road cutting slope is not shown;

[0028] Figure 3 A flow chart of a construction method for a drainage system for a ballastless track cutting slope provided in an embodiment of the present application.

[0029] Description of Reference Numerals

[0030] Ballastless track 100; track structure 110; cutting slope 200; slope foot 210; tunnel entrance 300; roadbed surface 400; side ditch 10; water collection pool 20; main pool 21; sub-pool 22; drainage channel 30; water guide channel 40; sedimentation pit 50; slope 60; natural ditch 70; caisson 80; cover plate 90. DETAILED DESCRIPTION

[0031] It should be noted that, in the absence of conflict, the embodiments and technical features in the embodiments of the present application can be combined with each other, and the detailed description in the specific implementation method should be understood as an explanation of the purpose of the present application and should not be regarded as an improper limitation on the present application.

[0032] The present application is further described in detail below in conjunction with the accompanying drawings and specific embodiments. In the description of the present application, the directions or positional relationships of "upper", "lower", "top", "bottom", "lateral", and "longitudinal" are directions or positional relationships based on the normal use of the drainage system, wherein the longitudinal direction refers to the extension direction of the ballastless track, and the transverse direction refers to the direction intersecting the longitudinal direction, such as the attached Figure 1 and attached Figure 2 It should be understood that these directional terms are only used to facilitate the description of the present application and simplify the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it should not be understood as a limitation on the present application.

[0033] See also Figure 1 and Figure 2The embodiment of the present application provides a drainage system for a ballastless track cutting slope, and the drainage system for the ballastless track cutting slope includes a side ditch 10, a water collection pool 20, and a drainage channel 30. The side ditch 10 is located on both sides of the ballastless track 100, and the side ditch 10 extends along the slope foot 210 of the cutting slope 200. That is, the side ditch 10 is located on both sides of the ballastless track 100 in the lateral direction, and the side ditch 10 extends in the longitudinal direction. The side ditch 10 is used to collect liquid from the cutting slope 200 and the ballastless track 100. The water collection pool 20 is connected to the side ditch 10, and the water collection pool 20 is used to collect liquid in the side ditch 10. That is, the liquid collected by the side ditch 10 enters the water collection pool 20. The water collection pool 20 can also slow down the flow rate of the liquid in the side ditch 10 and play a buffering role. In the tunnel section of the ballastless track 100, the water collection pool 20 can be set outside the tunnel. In this way, it is convenient to set up and construct the water collection pool 20, and avoid the water collection pool 20 occupying the space in the tunnel. Specifically, the water collection pool 20 can be set at the tunnel entrance 300. In this way, it is convenient for the liquid in the tunnel to be collected into the water collection pool 20 along the side ditch 10. The drainage channel 30 is connected to the water collection pool 20, and the drainage channel 30 is used to discharge the liquid in the water collection pool 20. The liquid in the water collection pool 20 can be collected together and then discharged from the drainage channel 30. In this way, it can be avoided that the liquid in the cutting slope 200 and the liquid in the ballastless track 100 cannot be discharged, and accumulates on the ballastless track 100, affecting the structural stability of the ballastless track 100.

[0034] The drainage system provided in the embodiment of the present application is particularly suitable for expansive soil roadbed. Since expansive soil has the characteristics of strong shrinkage when losing water and strong expansion when absorbing water, the expansive soil roadbed is easily damaged by water or the drainage is not timely. Therefore, the ballastless track 100 is set on the expansive soil cutting, and the drainage requirements are particularly high, especially the ballastless track 100 in the tunnel section. Compared with the pumping well or discharging into the tunnel in the prior art, the drainage system provided in the embodiment of the present application is more economical and safe. Since the liquid can be discharged to the outside of the ballastless track 100 outside the tunnel, there is no need to increase the tunnel section and set a deeper tunnel drainage channel 30, the engineering cost is low, and the occurrence of tunnel leakage and other diseases is avoided.

[0035] It should be noted that the liquid in the embodiment of the present application includes but is not limited to water, grease, etc. The transverse slope refers to the transverse slope of each structure on the road width and the roadside strip.

[0036] When the drainage system of the embodiment of the present application is set in a tunnel section, since the length from the tunnel to the tunnel entrance 300 is short and the water collection volume is small, the top elevation of the side ditch 10 is kept unchanged along the slope, while the bottom plate of the side ditch 10 is raised and the depth of the side ditch 10 is reduced to achieve reverse drainage.

[0037] In some embodiments, the sidewalls and bottom walls of the water collection pool 20 are thicker than the side ditch 10 by not less than 0.1 m, so as to enhance the ability to resist the scouring of the collected water. The water collection pool 20 and the side ditch 10 may be connected with rounded corners, so as to further enhance the ability of the water collection pool 20 to resist scouring.

[0038] In one embodiment, see Figure 1 and Figure 2 , the drainage system includes a water channel 40. The water channel 40 is located below the track structure 110 of the ballastless track 100. In this way, the water channel 40 is prevented from affecting the stability of the track structure 110. For example, the water channel 40 can be arranged below the supporting layer of the track structure 110, and the water channel 40 can also be arranged below the base plate of the track structure 110. The water channel 40 is connected to the water collection pool 20 located on both sides of the ballastless track 100. By using the water channel 40 to collect the liquid in the water collection pool 20 together, it is possible to avoid setting drainage channels 30 on both sides of the ballastless track 100, reduce the number of drainage channels 30, and reduce the amount of engineering work.

[0039] In one embodiment, see Figure 2 The water collection pool 20 includes a main pool 21 and a sub-pool 22, the main pool 21 and the sub-pool 22 are located on both sides of the ballastless track 100, the drainage channel 30 is located on the side where the main pool 21 is located, the drainage channel 30 is connected with the main pool 21, and the water guide 40 guides the liquid in the sub-pool 22 to the main pool 21. In this way, the liquid in the sub-pool 22 is collected into the main pool 21 by the water guide 40, and then discharged through the drainage channel 30 connected with the main pool 21.

[0040] Specifically, the volume of the main pool 21 is greater than the volume of the sub-pool 22. In this way, the main pool 21 can collect more liquid. Exemplarily, the length of the sub-pool 22 is greater than or equal to 2m, the width is greater than or equal to 1m, and the depth is greater than or equal to 0.8m. In this way, the sub-pool 22 has a larger volume. Of course, in areas with a large amount of water, such as the southern region with a large amount of precipitation, the volume of the sub-pool 22 can be increased. The length of the main pool 21 is greater than or equal to 4m, the width is greater than or equal to 2m, and the depth is greater than or equal to 0.8m. In this way, it is convenient to collect liquid from the side ditch 10 on the same side and liquid from the water guide trough 40.

[0041] In some embodiments, the sidewalls and bottom walls of the main pool 21 are thicker than the side ditch 10 by no less than 0.1 m to enhance the ability to resist the scouring of the collected water. The main pool 21 and the side ditch 10 are connected by rounded corners.

[0042] Specifically, the height of the bottom wall of the sub-tank 22 is higher than the height of the bottom wall of the main tank 21. In this way, the liquid in the sub-tank 22 can enter the main tank 21 under the action of gravity, so that the liquid can be concentrated to the lower main tank 21 for discharge.

[0043] In another embodiment, drainage channels 30 may also be provided on both sides of the ballastless track 100 .

[0044] In one embodiment, see Figure 2 The water channel 40 is a reinforced concrete structure with a hollow interior. In this way, the hollow interior is used as a circulation channel for the liquid. The reinforced concrete structure of the water channel 40 can ensure that the water channel 40 has a large internal space for the circulation of liquid while ensuring the structural strength, ensuring smooth lateral drainage and the safety of the upper track facilities supported.

[0045] Specifically, the cross section of the water channel 40 can be circular, elliptical or polygonal. The polygonal shape includes but is not limited to a triangle, a quadrilateral, a pentagon or a hexagon, etc. In a preferred embodiment, the cross section of the water channel 40 is a quadrilateral.

[0046] In one embodiment, see Figure 2 The water channel 40 is located on the roadbed surface layer 400 of the ballastless track 100. In this way, the water channel 40 is prevented from being buried too deep, thereby reducing the difficulty of construction.

[0047] In one embodiment, see Figure 2 , the water channel 40 has a transverse slope greater than or equal to 0.8%. Specifically, the bottom wall of the water channel 40 has a transverse slope greater than or equal to 0.8%. Exemplarily, the water channel 40 has a transverse slope of 0.8%, the water channel 40 has a transverse slope of 1%, and so on. In this way, it is convenient to collect the liquid in the water collection pool 20 on one side into the water collection pool 20 on the other side. Specifically, the end of the water channel 40 connected to the main pool 21 is higher than the end of the water channel 40 connected to the sub-pool 22.

[0048] In one embodiment, see Figure 1 and Figure 2 The corners of the water channel 40 are rounded. In this way, stress concentration at the corners of the water channel 40 is avoided, and the problem of the corners being easily damaged due to repeated flushing of the liquid at the corners of the water channel 40 is avoided.

[0049] In a specific embodiment, the water collection pool 20 is located on the side of the side ditch 10 away from the ballastless track 100. In this way, it is convenient to set the water collection pool 20 in a relatively open area.

[0050] In one embodiment, see Figure 2 The drainage system includes a sedimentation pit 50 connecting the drainage channel 30 and the water collection pool 20, and the bottom wall of the sedimentation pit 50 is lower than the bottom wall of the water collection pool 20. The sedimentation pit 50 is used to intercept and drain debris such as leaves and branches in the liquid of the water collection pool 20 to prevent the drainage channel 30 from being blocked by the leaves, branches and other debris.

[0051] Specifically, the depth of the sedimentation pit 50 is greater than or equal to 0.8 m.

[0052] In some embodiments, when constructing the water collection pool 20 , the sedimentation pit 50 is also constructed at the same time.

[0053] In one embodiment, see Figure 2 The bottom wall of the water collection pool 20 is connected to the bottom wall of the sedimentation pit 50 by a slope 60, and the slope ratio of the slope 60 is 1:2. The slope ratio refers to the ratio of the vertical height to the horizontal width of the slope. In other words, the ratio of the vertical height to the horizontal width of the slope 60 is 1:2. In this way, it is used to speed up the drainage speed and flow rate.

[0054] In one embodiment, see Figure 1 and Figure 2 The drainage system includes a caisson 80 connecting the drainage channel 30 and the natural ditch 70. The caisson 80 is used to store liquid from the drainage channel 30. It can prevent the liquid flow into the natural ditch 70 from being too large and too fast. The caisson 80 and the natural ditch 70 can be connected through a ditch or a water pipe.

[0055] Specifically, the caisson 80 may be a cylindrical body with a diameter of not less than 5 m.

[0056] In one embodiment, see Figure 2 The drainage system includes a shielding plate covering the caisson 80. In this way, people or objects are prevented from falling into the caisson 80.

[0057] Specifically, the caisson 80 is located downstream of the sedimentation pit 50. That is, the sedimentation pit 50 is located between the caisson 80 and the sump 20. The drainage channel 30 communicates the caisson 80 and the sedimentation pit 50.

[0058] In one embodiment, see Figure 2 , the drainage channel 30 presents a transverse slope greater than or equal to 2%. In this way, the liquid in the drainage channel 30 is easily discharged.

[0059] In one embodiment, see Figure 1 and Figure 2 The drainage system includes a cover plate 90 covering the water collection pool 20. In this way, not only can people or objects be prevented from falling into the water collection pool 20, but also it is convenient for people to pass.

[0060] In one embodiment, see Figure 1 and Figure 2 , the drainage channel 30 is a drainage pipe or a drainage ditch.

[0061] Specifically, the drainage channel 30 is a drainage pipe. The length of the drainage pipe may be 3m to 5m, for example, the length of the drainage pipe may be 3m, 3.5m, 4m or 5m, etc.

[0062] See also Figure 3The present application also provides a method for constructing a drainage system for a ballastless track cutting slope, the method comprising:

[0063] S110: excavating side ditch foundation pits on both sides of the ballastless track, wherein the side ditch foundation pits extend along the toe of the cutting slope, setting a first inner mold on the side wall and the bottom wall of the side ditch foundation pit, and pouring concrete on the first inner mold to form a side ditch.

[0064] For details, see Figure 1 , a side ditch foundation pit is formed by vertically excavating on both sides of the ballastless track 100, and side ditch steel bars are tied. The vertical soil and foundation on both sides of the side ditch foundation pit are used as templates and a removable first inner mold is set by using a bracket, and concrete is poured on the first inner mold to form a side ditch 10. In other words, the poured concrete fills the space between the first inner mold and the side wall of the side ditch foundation pit, and fills the space between the first inner mold and the bottom wall of the side ditch foundation pit. When the concrete reaches a removable mold strength, the first inner mold is removed to form the side ditch 10. The side ditch steel bars are used to improve the structural strength of the side ditch 10, that is, the side ditch 10 can be a plain concrete structure, or the side ditch 10 can be a reinforced concrete structure.

[0065] The water flow slope of the side ditch 10 is set according to the road cutting slope 200. When the drainage system of the embodiment of the present application is set in the tunnel section, since the length from the tunnel to the tunnel entrance 300 is short and the water collection volume is small, the top elevation of the side ditch 10 is kept unchanged along the slope, and the bottom plate of the side ditch 10 is raised to reduce the depth of the side ditch 10 to achieve reverse drainage.

[0066] S120: excavating a foundation pit for a water collection pool, setting a second inner mold on the side wall and the bottom wall of the foundation pit for the water collection pool, pouring concrete on the second inner mold to form a water collection pool, and the water collection pool is connected to the side ditch.

[0067] For details, see Figure 2 , vertically excavate the base bed to form a water collection pool foundation pit, tie the water collection pool steel bars, use the vertical soil and foundation on both sides of the water collection pool foundation pit as a template and set a removable second inner mold, and pour concrete on the second inner mold to form the water collection pool 20. Furthermore, concrete can be poured first to form the bottom plate of the water collection pool, and then concrete can be poured to form the side plate of the water collection pool. The water collection pool steel bars are used to improve the structural strength of the water collection pool 20, that is, the water collection pool 20 can be a plain concrete structure, and the water collection pool 20 can also be a reinforced concrete structure.

[0068] In one embodiment, see Figure 2 The water collection pool 20 includes a main pool 21 and a sub-pool 22.

[0069] In one embodiment, the construction method S121 of the main pool 21 is as follows: widen the platform of the side ditch, set the main pool 21 outside the platform of the side ditch, vertically excavate the base bed to form the main pool foundation pit, tie the main pool steel bars, the main pool steel bars include bottom plate steel bars and reserved side plate steel bars, set a third inner mold on the side wall and bottom wall of the main pool foundation pit, and pour concrete on the third inner mold to form the main pool 21. Specifically, the vertical soil and foundation on both sides of the main pool foundation pit are used as templates, and a removable third inner mold is set. If the drainage channel 30 uses a drainage pipe, a hole for the drainage pipe to pass through can be reserved on the side wall of the main pool 21 close to the drainage channel 30.

[0070] S130: excavating a drainage channel foundation pit and pouring concrete to form a drainage channel, or pushing a drainage pipe into the base bed to form the drainage channel; the drainage channel is connected to the water collection pool.

[0071] The steps of excavating a drainage channel foundation pit and pouring concrete to form a drainage channel specifically include: vertically excavating a base bed to form a drainage channel foundation pit, tying drainage channel steel bars, using the vertical soil and foundation on both sides of the drainage channel foundation pit as a template and setting a removable fourth inner mold, and pouring concrete on the fourth inner mold to form a drainage channel 30.

[0072] If a drainage pipe is used for the drainage channel 30 , a hole for the drainage pipe to pass through may be reserved on the side wall of the sump 20 close to the drainage channel 30 .

[0073] The step of pushing the drainage pipe into the base bed to form a drainage channel specifically includes: using a jack device to push the drainage pipe forward through the reserved hole on the side wall of the water collection pool according to the designed slope by using the soil digging and pushing method, and the drainage pipe is constructed by pushing and extending section by section. One end of the drainage pipe close to the ballastless track 100 is connected to the reserved hole on the side wall of the water collection pool 20 to introduce water from the ballastless track 100.

[0074] In one embodiment, the drainage system includes a water channel 40, and the construction method S140 of the water channel 40 includes: vertically excavating the base bed to form a water channel foundation pit, tying the water channel steel cage, the water channel steel cage includes bottom steel bars, side wall steel bars and top steel bars, using the vertical soil, foundation and top steel bars on both sides of the water channel foundation pit as templates and setting up five removable inner molds, pouring concrete on the fifth inner mold to form the water channel. The water channel 40 adopts a reinforced concrete structure with a rectangular cross-section, and the structural strength meets the upper load bearing requirements. The water channel 40 is provided with a rectangular cavity that meets the water flow requirements, and the corners of the water channel 40 are rounded, that is, the water channel 40 is rounded at the junction with the side ditch 10 or the water collection pool 20. The lateral water flow slope of the water channel 40 is not less than 8‰ to facilitate rapid and smooth drainage. The water channel 40 ensures smooth lateral drainage and the safety of the upper track facilities supported.

[0075] In one embodiment, the drainage system includes a caisson 80, and the construction method S150 of the caisson 80 is as follows: the caisson 80 is divided into sections of 3 to 5 m in height, the first section of the caisson side wall steel bars are tied on the ground, a formwork is erected to cast the first section of the caisson concrete, and the top surface of the first section of the caisson is sunk to the ground by the excavation and sinking method. According to the above-mentioned operations, the second section of steel bars are tied on the ground, a formwork is erected, concrete is cast, and excavation is performed to sink to the ground. The construction of the caisson side wall is completed section by section and sunk to a predetermined depth in a cycle, the bottom plate steel bars are tied, and the bottom plate concrete is cast to seal the bottom.

[0076] It can be understood by those skilled in the art that the first inner mold, the second inner mold, the third inner mold, the fourth inner mold and the fifth inner mold are all composed of templates. Exemplarily, the first inner mold is formed by a plurality of templates, and the side ditch reinforcement is located in the first inner mold. When setting the template, the side wall soil and foundation of the side ditch foundation pit can be used, so that the amount of templates can be reduced. The second inner mold, the third inner mold, the fourth inner mold and the fifth inner mold are set in the same way as the first inner mold, and will not be repeated here.

[0077] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A drainage system for a ballastless track cutting slope, characterized in that: include: Side ditches are located on both sides of the ballastless track and extend along the toe of the cutting slope; A water collection tank, connected to the side ditch, for collecting the liquid in the side ditch; as well as A drainage channel, connected to the water collection pool, for draining the liquid in the water collection pool; A water guide trough, located below the track structure of the ballastless track and connected to the water collection pools located on both sides of the ballastless track; The water collection pool includes a main pool and a sub-pool, the main pool and the sub-pool are located on both sides of the ballastless track, the drainage channel is located on the side where the main pool is located, the drainage channel is connected with the main pool, and the water guide groove guides the liquid in the sub-pool to the main pool; The volume of the total pool is greater than the volume of the sub-pools.

2. The drainage system according to claim 1, characterized in that: The water channel is a reinforced concrete structure with a hollow interior; And / or, the water channel is located on the surface layer of the roadbed of the ballastless track; and / or, the water channel has a transverse slope greater than or equal to 0.8%; And / or, the corners of the water guide groove are rounded.

3. The drainage system according to any one of claims 1 to 2, characterized in that: The drainage system comprises a sedimentation pit communicating with the drainage channel and the water collection pool, wherein the bottom wall of the sedimentation pit is lower than the bottom wall of the water collection pool.

4. The drainage system according to claim 3, characterized in that: The bottom wall of the water collection pool and the bottom wall of the sedimentation pit are connected by a slope, and the slope ratio of the slope is 1:

2.

5. The drainage system according to any one of claims 1 to 2, characterized in that: The drainage system includes a caisson connecting the drainage channel and the natural ditch.

6. The drainage system according to any one of claims 1 to 2, characterized in that: The drainage channel has a transverse slope greater than or equal to 2%.

7. The drainage system according to any one of claims 1 to 2, characterized in that: The drainage system includes a cover plate covering the water collection pool; And / or, the drainage channel is a drainage pipe or a drainage ditch.

8. A method for constructing a drainage system for a ballastless track cutting slope, characterized in that: include: Excavating side ditch foundation pits on both sides of the ballastless track, the side ditch foundation pits extending along the toe of the cutting slope, arranging first inner molds on the side walls and bottom walls of the side ditch foundation pits, and pouring concrete on the first inner molds to form side ditch; Excavating a water collection pool foundation pit, setting a second inner mold on the side wall and bottom wall of the water collection pool foundation pit, pouring concrete on the second inner mold to form a water collection pool, and the water collection pool is connected with the side ditch; excavating a drainage channel foundation pit and pouring concrete to form a drainage channel, or pushing a drainage pipe into the foundation bed to form the drainage channel; the drainage channel is connected with the water collection pool; A water guide trough, located below the track structure of the ballastless track and connected to the water collection pools located on both sides of the ballastless track; The water collection pool includes a main pool and a sub-pool, the main pool and the sub-pool are located on both sides of the ballastless track, the drainage channel is located on the side where the main pool is located, the drainage channel is connected with the main pool, and the water guide groove guides the liquid in the sub-pool to the main pool; The volume of the total pool is greater than the volume of the sub-pools.