A beam type hanging device and operation method

By designing a beam-type hanging device with rotatable lifting hook and equipment hanging ring, combining electric hoist and driving hanging, the safety and efficiency problems of heavy equipment lifting in narrow areas of the metallurgical industry are solved, and the different Efficient lifting in the area.

CN111747287BActive Publication Date: 2024-12-10SGIS SONGSHAN CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202010524013.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-06-10
Publication Date
2024-12-10
Estimated Expiration
2040-06-10

AI Technical Summary

Technical Problem

The existing technology cannot meet the lifting needs of heavy equipment in narrow areas of the metallurgical industry, and the existing lifting equipment is complex and not suitable for the metallurgical industry, and cannot meet the requirements of safety and lifting multiple equipment at the same time.

Method used

A cross-beam type hanging device is designed, including the main beam and the hanging device. The lifting hook and loop is provided at the middle point of the upper upper part of the main beam. The hanging device can rotate 360°, and equipment hanging rings are provided on both sides, passing through a linear type The main beam and hanging ring achieve precise lifting, combined with electric hoist hanging and driving hanging device, it is suitable for equipment lifting in narrow and spacious areas.

Benefits of technology

It has achieved safe, reliable and efficient lifting of single or multiple equipment in a narrow and spacious area of ​​the metallurgy industry, saving time, improving work efficiency, and meeting the lifting needs of the metallurgy industry.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111747287B_ABST
    Figure CN111747287B_ABST
Patent Text Reader

Abstract

The present invention discloses a cross-beam hanging device, including a main beam and a hanging device, wherein a lifting hook ring is provided at the upper midpoint of the main beam, and equipment hanging rings are provided at the bottom of the main beam on both sides of the lifting hook ring, respectively, and the lifting hook ring is connected to the hanging device, and the lifting hook ring can rotate 360° around the hanging device, and the hanging device is an electric hoist hanging device or a crane hanging device. The cross-beam hanging device and the operation method of the present invention realize safe, reliable and efficient hanging of the hoisted equipment, and meet the demand for lifting equipment in narrow sites of the metallurgical industry.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a beam type hanging device and an operating method. Background Art

[0002] In the metallurgical area, there are many heavy equipment such as large motors installed in some narrow indoor places. Indoor places (such as hydraulic stations) are generally equipped with electric hoists with fixed path beams on the roof to dismantle or install equipment on the ground. The manual operation of the electric hoist button box can hang the electric hoist on the fixed beam and move it above the equipment. Then, the hook on the electric hoist is lowered to the equipment through operation, and the wire rope sling is put on the equipment to lift the equipment, and then it is lifted to the hand-pushed flatbed truck through the fixed beam. However, some equipment is not directly below the fixed beam of the electric hoist. If it is lifted, it will be tilted and tilted, which is not allowed according to safety requirements. This method of lifting equipment, especially lifting heavy equipment, will cause damage to surrounding equipment or personnel due to the swing inertia of the equipment during the lifting process. Serious safety accidents will occur.

[0003] We need a hanging device that can safely dismantle heavy equipment in narrow areas of the factory. At the same time, the device can also use a crane to lift the equipment in a spacious factory, not limited to narrow areas.

[0004] The prior art discloses two types of lifting devices:

[0005] 1. A hanging device (CN201611114994.5): This invention relates to the field of aviation assembly. The hanging device connects products in a zero-gravity adjustment system to realize the final assembly of products in a zero-gravity environment and corresponding testing devices. It belongs to a device for tightly installing and debugging equipment in the aviation field. The device is complex to manufacture and is not suitable for the requirements of lifting equipment in narrow areas of the metallurgical industry.

[0006] 2. A spring crossbeam hanging assembly (CN201520571617.9): This invention relates to a spring crossbeam hanging assembly, which belongs to the field of aircraft assembly. The hanging device is usually composed of a hanging chain, a crossbeam, a secondary beam hanging chain, a secondary beam and a lifting belt, etc., which are used to tie up the aircraft fuselage. Due to the different structures of different models or the different diameters of different fuselage parts, the crossbeam sizes of the hanging devices to be used are also different. If a fixed-size crossbeam is used, different hanging devices are often required when hanging fuselages of different specifications. This device is not suitable for the requirements of lifting equipment in narrow areas of the metallurgical industry.

[0007] Conclusion: ①. Both of the above patents belong to large-scale precision equipment assembly and debugging devices in the aviation field. They are complex to manufacture and are not suitable for use in the metallurgical industry; ②. The above two patents are not suitable for use in narrow areas of metallurgical factories; ③. Both of the above patents cannot meet the safety requirements for lifting equipment; ④. The above two patents cannot lift two sets of equipment at the same time.

[0008] None of the above solutions can meet the needs of lifting equipment in narrow sites in the metallurgical industry. Summary of the invention

[0009] In order to overcome the deficiencies of the prior art, the purpose of the present invention is to provide a beam-type hanging device and an operating method for hanging equipment safely, reliably and efficiently to meet the narrow on-site hanging equipment requirements of the metallurgical industry.

[0010] The purpose of the present invention is achieved by the following technical solutions:

[0011] A beam-type hanging device comprises a main beam and a hanging device, wherein a lifting hook ring is provided at the upper midpoint of the main beam, and equipment hanging rings are provided at the bottom of the main beam on both sides of the lifting hook ring, respectively. The lifting hook ring is connected to the hanging device, and the lifting hook ring can rotate 360° around the hanging device. The hanging device is an electric hoist hanging device or a crane hanging device.

[0012] The above-mentioned beam-type hanging device has a lifting hook ring at the upper midpoint of the main beam, the lifting hook ring is connected to the hanging device, the lifting hook ring can rotate 360° around the hanging device, and equipment hanging rings are respectively provided at the bottom of the main beam on both sides of the lifting hook ring. Through the straight main beam and the equipment hanging rings on both sides of the main beam, the purpose of accurately lifting single or multiple equipment in the narrow site of the metallurgical industry can be achieved.

[0013] In one embodiment, the equipment hanging ring includes a first outer equipment hanging ring and a first inner equipment hanging ring arranged at the bottom of the main beam on one side of the lifting hook ring, and a second outer equipment hanging ring and a second inner equipment hanging ring arranged at the bottom of the main beam on the other side of the lifting hook ring. The purpose of setting four equipment hanging rings is to select equipment according to different placement distances. According to calculations, a single equipment hanging ring on the outer side of a hoist with a lifting load of 3 tons can lift equipment weighing 1 ton, and a single equipment hanging ring on the inner side can lift equipment weighing 1.4 tons.

[0014] In one embodiment, the first outer equipment hanging ring and the second outer equipment hanging ring are respectively arranged at two ends of the bottom of the main beam, and the first inner equipment hanging ring and the second inner equipment hanging ring are respectively 1 meter away from the first outer equipment hanging ring and the second outer equipment hanging ring. This arrangement allows for more stable hanging of equipment.

[0015] In one embodiment, a manual hoist device is further included, the manual hoist device includes a hand-pulled hoist, a hand-pulled chain, a hand-pulled wire rope and a hand-pulled hoist hook, the hand-pulled hoist is connected to the equipment hanging ring on one side of the lifting hook ring, the hand-pulled hoist hook is connected to a ground fixing point, and the equipment hanging ring on the other side of the lifting hook ring is connected to the equipment. In this setting, the hand-pulled hoist is used to maintain the balance of the beam-type hanging device.

[0016] In one embodiment, the first outer device hanging ring or the first outer device hanging ring and the first inner device hanging ring, and the second outer device hanging ring or the second outer device hanging ring and the second inner device hanging ring are balanced and hung with equipment;

[0017] Or; the first inner equipment hanging ring or the first inner equipment hanging ring and the first outer equipment hanging ring, and the second inner equipment hanging ring or the second inner equipment hanging ring and the second outer equipment hanging ring are balanced to hang equipment. This setting can more stably hang equipment on both sides of the main beam.

[0018] In one embodiment, the electric hoist hanging device comprises an electric hoist hanging beam, an electric hoist, an electric hoist hanging wire rope and an electric hoist hanging hook connected in sequence from top to bottom, and the electric hoist hanging hook is connected to the lifting hook ring. This arrangement is convenient for hanging the hoisted equipment in a narrow site. The electric hoist hanging hook can freely rotate 360° along the center point of the electric hoist hanging wire rope. Setting the electric hoist hanging device makes it more convenient, accurate and quick to hang the equipment.

[0019] In one embodiment, the crane hanging device includes a crane, a crane wire rope and a crane hook connected in sequence from top to bottom, and the crane hook is connected to the lifting hook ring. This arrangement facilitates hanging the hoisted equipment in a spacious area. The crane hook can freely rotate 360 ​​degrees along the center point of the crane wire rope. Setting the crane hanging device makes it more convenient, accurate and quick to hang the equipment.

[0020] An operating method of a beam type hanging device comprises the following steps:

[0021] Step 1: The operator operates the electric hoist to move the electric hoist beam along the fixed path to the top of the equipment, lowers the electric hoist hook to a suitable height through operation, and installs the lifting hook ring of the main beam onto the electric hoist hook;

[0022] Step 2: Rotate the electric hoist hook and the installed main beam around the center point of the electric hoist wire rope to a certain angle, and move the equipment hanging ring at the appropriate position to the top of the equipment;

[0023] Step 3: Connect the hand chain hoist to the equipment hanging ring on one side of the lifting hook ring. Connect the hand chain hoist hook to the ground fixing point, and connect the equipment hanging ring on the other side of the lifting hook ring to the equipment;

[0024] Step 4: The hook of the electric hoist is slowly raised by jogging. At the same time, the operator gradually loosens the hand chain according to the lifting height of the main beam, extends the length of the wire rope of the hand hoist, and gradually loosens the length of the wire rope of the hand hoist according to the height of the main beam. With repeated operations, the equipment is gradually raised to a certain height;

[0025] Step 5: Inching the electric hoist hook of the electric hoist, while the operator operates the hand chain. At this time, the main beam can be rotated around the center point of the electric hoist wire rope to a certain angle and the equipment can be turned to the top of the open space;

[0026] Step six: The hook of the electric hoist is slowly lowered by jogging operation. At the same time, the operator gradually tightens the hand chain according to the lowering height of the main beam, shortens the length of the wire rope of the hand hoist, and gradually tightens the length of the wire rope of the hand hoist according to the height. With repeated operations, the equipment is gradually lowered to a certain height, and finally the lifting equipment is lowered to a hand-pushed flatbed truck parked on the ground, and the wire rope is removed and transported away for maintenance.

[0027] The method of the invention achieves the purpose of safely, reliably and efficiently hanging equipment by operating an electric hoist hanging device and a manual hoist device to stably hoist a single or multiple equipment in a narrow area.

[0028] An operating method of a beam type hanging device comprises the following steps:

[0029] Step 1: Dismantle and prepare two devices at close distances on the ground;

[0030] Step 2: The operator operates the electric hoist to move the electric hoist beam along the fixed path above the two devices, lowers the electric hoist hook to a suitable height through operation, and installs the lifting hook ring of the main beam onto the electric hoist hook;

[0031] Step 3: Pass the steel wire ropes fixing the two devices through the two symmetrical equipment hanging rings selected on the main beam, and prepare to lift the two devices after fixing them;

[0032] Step 4: The hook of the electric hoist crane is slowly raised by jogging, and the two devices hanging on the main beam also slowly rise to the allowed height;

[0033] Step 5: Manually operate the two devices with an electric hoist and move them along the electric hoist beam on a fixed path to above an open area. Through operation, the electric hoist hook drives the main beam down to a certain height. Finally, the two devices are lowered to a hand-pushed flatbed truck parked on the ground, and the wire rope is removed and transported away for maintenance.

[0034] The method of the invention achieves the purpose of safely, reliably and efficiently hanging the equipment by operating the electric hoist hanging device to stably hang two or more equipment in a narrow area.

[0035] An operating method of a beam type hanging device comprises the following steps:

[0036] Step 1: Dismantle and prepare two devices at close distances on the ground;

[0037] Step 2: The operator moves the crane to the top of the two devices and slowly lowers the crane hook;

[0038] Step 3: Install the lifting and hanging ring of the main beam onto the crane hook of the crane;

[0039] Step 4: Pass the steel wire ropes fixing the two devices through the two symmetrical equipment hanging rings selected on the main beam, fix the two devices and prepare to lift them up;

[0040] Step 5: The operator operates the crane hook 223 to slowly rise along with the crane wire rope, and the two devices 30 hanging on the main beam also slowly rise to the allowed height;

[0041] Step 6: Operate the crane to move the two devices to the top of the maintenance site. Through operation, the crane hook drives the beam-type hanging device down to a certain height. Finally, the two devices land on the ground in the maintenance area, and the wire ropes are removed and transported away for maintenance.

[0042] The method of the invention achieves the purpose of safely, reliably and efficiently hanging the equipment by operating the traveling hanging device to stably hang two or more equipment in a spacious area.

[0043] The beneficial effects of the present invention are:

[0044] 1. The present invention provides a lifting hook ring at the upper midpoint of the main beam, the lifting hook ring is connected to the hanging device, the lifting hook ring can rotate 360 ​​degrees around the hanging device, and equipment hanging rings are respectively provided at the bottom of the main beam on both sides of the lifting hook ring. The purpose of accurately lifting single or multiple equipment in a narrow site or a spacious area in the metallurgical industry can be achieved through the straight main beam and the equipment hanging rings on both sides of the main beam.

[0045] 2. The present invention can simultaneously and balancedly hang multiple equipment in a narrow site or spacious area of ​​the metallurgical industry through an outer equipment hanging ring and an inner equipment hanging ring, which can save a lot of time and greatly improve work efficiency.

[0046] 3. The present invention achieves the purpose of safely, reliably and efficiently hanging equipment by operating an electric hoist hanging device and a manual hoist device to stably lift a single or multiple equipment in a narrow area.

[0047] 4. The present invention achieves the purpose of safely, reliably and efficiently hanging equipment by operating the electric hoist hanging device to stably lift two or more equipment in a narrow area.

[0048] 5. The present invention achieves the purpose of safely, reliably and efficiently hanging equipment by operating the crane hanging device to stably hang two or more equipment in a spacious area. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] Figure 1 The present invention provides a structure of a beam type hanging device and an operation method Figure 1 ;

[0050] Figure 2 The present invention provides a structure of a beam type hanging device and an operation method Figure 2 ;

[0051] Figure 3 The present invention provides a structure of a beam type hanging device and an operation method Figure 3 ;

[0052] Among them: 10-main beam; 11-lifting hook ring; 12-equipment hanging ring, 121-first outer equipment hanging ring; 122-first inner equipment hanging ring; 123-second outer equipment hanging ring; 124-second inner equipment hanging ring; 20-hanging device; 21-electric hoist hanging device; 211-electric hoist hanging beam; 212-electric hoist; 213-electric hoist wire rope; 214-electric hoist hook; 22-crane hanging device; 221-crane; 222-crane wire rope; 223-crane hook; 30-equipment; 40-manual hoist device; 41-hand chain hoist; 42-hand chain chain; 43-hand chain wire rope; 44-hand chain hoist hook; 45-ground fixing point; 46-operator. DETAILED DESCRIPTION

[0053] The present invention is further described below in conjunction with the drawings in the specification. It should be noted that, under the premise of no conflict, the various technical features described below can be arbitrarily combined to form a new embodiment.

[0054] Embodiment 1:

[0055] A beam-type hanging device comprises a main beam 10 and a hanging device 20. In Example 1, a section of 100 mm wide channel steel with a length of 3 meters is used as the main beam 10 of the beam-type hanging device. A lifting hook ring 11 is provided at the upper midpoint of the main beam 10. Preferably, an elliptical lifting hook ring 11 is welded on the upper part of the midpoint of the main beam 10. Equipment hanging rings 12 are respectively provided at the bottom of the main beam 10 on both sides of the lifting hook ring 11. Several equipment hanging rings 12 can be provided according to the length of the main beam 10. The lifting hook ring 11 is connected to the hanging device 20. The lifting hook ring 11 can rotate 360° around the hanging device 20. The hanging device 20 is an electric hoist hanging device 21 or a crane hanging device 22. In the present invention, a lifting hook ring 11 is provided at the upper midpoint of the main beam 10, and the lifting hook ring 11 is connected to the hanging device 20. The lifting hook ring 11 can rotate 360° around the hanging device 20. Equipment hanging rings 12 are respectively provided at the bottom of the main beam 10 on both sides of the lifting hook ring 11. Through the straight main beam 10 and the equipment hanging rings 12 on both sides of the main beam 10, the purpose of accurately lifting single or multiple equipment 30 in a narrow site or a spacious area in the metallurgical industry can be achieved.

[0056] The bottom of the main beam 10 on one side of the lifting hook ring 11 ( Figure 1 The left side is shown in the figure) and the bottom of the main beam 10 on the other side of the lifting hook ring 11 ( Figure 1 The right side is shown in the figure) is provided with an equipment hanging ring 12, and the number and distance of the equipment hanging rings 12 on both sides of the lifting hook ring 11 can be consistent or inconsistent, so as to achieve balanced hanging of the equipment 30.

[0057] Preferably, the equipment hanging ring 12 includes a first outer equipment hanging ring 121 and a first inner equipment hanging ring 122 arranged at the bottom of the main beam 10 on one side of the lifting hook ring 11, and a second outer equipment hanging ring 123 and a second inner equipment hanging ring 124 arranged at the bottom of the main beam 10 on the other side of the lifting hook ring 11. That is, preferably, four equipment hanging rings 12 are provided, but not limited to four. The four equipment hanging rings 12 are arranged on the same horizontal straight line of the main beam 10. The purpose of setting four equipment hanging rings 12 is to select according to different placement distances of the equipment 30. In this embodiment, the place close to the lifting hook ring 11 is called the inner side, and the place far away from the lifting hook ring 11 is called the outer side, that is, the outer equipment hanging ring and the inner equipment hanging ring. According to calculations, a single equipment hanging ring 12 on the outer side of a hoist with a lifting load of 3 tons can lift a 1-ton equipment 30, and a single equipment hanging ring 12 on the inner side can lift a 1.4-ton equipment 30. The purpose is to facilitate flexible and balanced hanging of equipment 30 of different weights.

[0058] The present invention uses the outer equipment hanging ring 12 and the inner equipment hanging ring 12 to simultaneously and balancedly hang multiple equipment 30, which can save a lot of time and greatly improve work efficiency.

[0059] Further preferably, the first outer equipment hanging ring 121 is arranged at one end of the bottom of the main beam 10, the second outer equipment hanging ring 123 is arranged at the other end of the bottom of the main beam 10, the first inner equipment hanging ring 122 is 1 meter away from the first outer equipment hanging ring 121, and the second inner equipment hanging ring 124 is 1 meter away from the second outer equipment hanging ring 123. In this arrangement, the first outer equipment hanging ring 121 and the second outer equipment hanging ring 123 are symmetrically arranged with the lifting hook ring 11 as the symmetrical point. The first inner equipment hanging ring 122 and the second inner equipment hanging ring 124 are symmetrically arranged with the lifting hook ring 11 as the symmetrical point, which is convenient for balancing the hanging device 30, safely, reliably and efficiently hanging the device 30, and does not damage the main beam 10.

[0060] like Figure 1 As shown, Example 2: A beam-type hanging device also includes a manual hoist device 40, and the hanging device 20 is an electric hoist hanging device 21 or a crane hanging device 22. The electric hoist hanging device 21 lifts a single or multiple devices 30 in a narrow area, and the crane hanging device 22 lifts a single or multiple devices 30 in a spacious area using a factory crane 221.

[0061] Based on Example 1, the manual hoist device 40 includes a hand hoist 41, a hand chain 42, a hand wire rope 43 and a hand hoist hook 44. The hand hoist 41 is connected to the equipment hanging ring 12 on one side of the lifting hook ring 11, the hand hoist hook 44 is connected to the ground fixed point 45, and the equipment hanging ring 12 on the other side of the lifting hook ring 11 is connected to the equipment 30.

[0062] Preferably, the hand hoist 41 is hung on the first outer equipment hanging ring 121, the hand hoist hook 44 is connected to the ground fixed point 45 located on the same vertical line as the first outer equipment hanging ring 121, and the equipment 30 is hung on the second outer equipment hanging ring 123 or the second outer equipment hanging ring 123 and the second inner equipment hanging ring 124.

[0063] That is, it includes scheme 1: the hand chain hoist 41 is hung on the first outer equipment hanging ring 121, the hand chain hoist hook 44 is connected to the ground fixing point 45 located on the same vertical line as the first outer equipment hanging ring 121, the equipment 30 is hung on the second outer equipment hanging ring 123, and the manual hoist device 40 is symmetrically arranged with the equipment 30. The operator 46 operates the hand chain 42 to balance the hanging of the equipment 30 on the first outer equipment hanging ring 121.

[0064] That is, it includes the second solution: the hand chain hoist 41 is hung on the first outer equipment hanging ring 121, the hand chain hoist hook 44 is connected to the ground fixing point 45 located on the same vertical line as the first outer equipment hanging ring 121, and the second outer equipment hanging ring 123 and the second inner equipment hanging ring 124 are both hung with equipment 30. The operator 46 operates the hand chain 42 to balance the hanging of the equipment 30 on the second outer equipment hanging ring 123 and the second inner equipment hanging ring 124.

[0065] Or; the manual hoist device 40 is hung on the first inner equipment hanging ring 122, and the equipment 30 is hung on the second inner equipment hanging ring 124 or the second outer equipment hanging ring 123 and the second inner equipment hanging ring 124.

[0066] That is, it includes scheme 3: the manual hoist device 40 is hung on the first inner equipment hanging ring 122, the hand chain hoist hook 44 is connected to the ground fixing point 45 located on the same vertical line as the first inner equipment hanging ring 122, and the equipment 30 is hung on the second inner equipment hanging ring 124. The operator 46 operates the hand chain 42 to balance the equipment 30 on the first inner equipment hanging ring 122.

[0067] That is, it includes scheme 4: the manual hoist device 40 is hung on the first inner equipment hanging ring 122, the hand chain hoist hook 44 is connected to the ground fixing point 45 located on the same vertical line as the first inner equipment hanging ring 122, and the equipment 30 is hung on the second outer equipment hanging ring 123 and the second inner equipment hanging ring 124. The operator 46 operates the hand chain 42 to balance the hanging of the equipment 30 on the second outer equipment hanging ring 123 and the second inner equipment hanging ring 124.

[0068] In Example 2, an electric hoist hanging device 21 and a manual hoist device 40 are provided, which can smoothly hoist a single or multiple devices 30 in a narrow area, thereby achieving the purpose of safely, reliably and efficiently hanging the devices 30.

[0069] like Figure 2 , 3 As shown, embodiment: 3: the hanging device 20 is an electric hoist hanging device 21 or a crane hanging device 22. The electric hoist hanging device 21 lifts two or more devices 30 in a narrow area, and the crane hanging device 22 uses a factory crane 221 to lift two or more devices 30 at the same time in a spacious area.

[0070] On the basis of Example 1: the first outer device hanging ring 121 or the first outer device hanging ring 121 and the first inner device hanging ring 122, and the second outer device hanging ring 123 or the second outer device hanging ring 123 and the second inner device hanging ring 124 are balancedly hung with equipment 30.

[0071] That is, it includes plan 1: the first outer equipment hanging ring 121 hangs the hanging equipment 30, and the second outer equipment hanging ring 123 hangs the equipment 30; the first outer equipment hanging ring 121 and the second outer equipment hanging ring 123 are symmetrically arranged, and the weight of the equipment 30 hung by the first outer equipment hanging ring 121 is consistent with the weight of the equipment 30 hung by the second outer equipment hanging ring 123.

[0072] That is, it includes the second scheme: the first outer device hanging ring 121 hangs the device 30, the second outer device hanging ring 123 and the second inner device hanging ring 124 both hang the device 30, and the weight of the device 30 hung by the first outer device hanging ring 121 is balanced with the weight of the device 30 hung by the second outer device hanging ring 123 and the second inner device hanging ring 124;

[0073] That is, it includes plan three: the first outer equipment hanging ring 121 and the first inner equipment hanging ring 122 both hang equipment 30, the second outer equipment hanging ring 123 hangs equipment 30, and the weight of the equipment 30 hung by the first outer equipment hanging ring 121 and the first inner equipment hanging ring 122 is balanced with the weight of the equipment 30 hung by the second outer equipment hanging ring 123.

[0074] That is, it includes scheme four: the first outer equipment hanging ring 121 and the first inner equipment hanging ring 122 both hang equipment 30, the second outer equipment hanging ring 123 and the second inner equipment hanging ring 124 hang equipment 30, and the weight of the equipment 30 hung by the first outer equipment hanging ring 121 and the first inner equipment hanging ring 122 is balanced with the weight of the equipment 30 hung by the second outer equipment hanging ring 123 and the second inner equipment hanging ring 124.

[0075] Or; the first inner device hanging ring 122 or the first inner device hanging ring 122 and the first outer device hanging ring 121, and the second inner device hanging ring 124 or the second inner device hanging ring 124 and the second outer device hanging ring 123 balance hanging equipment 30.

[0076] That is, it includes plan five: the first inner equipment hanging ring 122 hangs the equipment 30, and the second inner equipment hanging ring 124 hangs the equipment 30; the first inner equipment hanging ring 122 and the second inner equipment hanging ring 124 are symmetrically arranged, and the weight of the equipment 30 hung by the first inner equipment hanging ring 122 is consistent with the weight of the equipment 30 hung by the second inner equipment hanging ring 124.

[0077] That is, it includes scheme six: the first inner equipment hanging ring 122 hangs the equipment 30, the second inner equipment hanging ring 124 and the second outer equipment hanging ring 123 both hang the equipment 30, and the weight of the equipment 30 hung by the first inner equipment hanging ring 122 is balanced with the weight of the equipment 30 hung by the second inner equipment hanging ring 124 and the second outer equipment hanging ring 123.

[0078] That is, it includes scheme seven: the first inner equipment hanging ring 122 and the first outer equipment hanging ring 121 both hang equipment 30, the second inner equipment hanging ring 124 hangs equipment 30, and the weight of the equipment 30 hung by the first inner equipment hanging ring 122 and the first outer equipment hanging ring 121 is balanced with the weight of the equipment 30 hung by the second inner equipment hanging ring 124.

[0079] That is, it includes Plan Eight: the first inner equipment hanging ring 122 and the first outer equipment hanging ring 121 both hang equipment 30, the second inner equipment hanging ring 124 and the second outer equipment hanging ring 123 hang equipment 30, and the weight of the equipment 30 hung by the first inner equipment hanging ring 122 and the first outer equipment hanging ring 121 is balanced with the weight of the equipment 30 hung by the second inner equipment hanging ring 124 and the second outer equipment hanging ring 123.

[0080] In Example 3, multiple devices 30 are balanced and hung simultaneously by using the outer device hanging ring 12 and the inner device hanging ring 12, which can save a lot of time and greatly improve work efficiency.

[0081] In the above-mentioned embodiments 1 to 3, preferably, the electric hoist hanging device 21 includes an electric hoist hanging beam 211, an electric hoist 212, an electric hoist hanging wire rope 213 and an electric hoist hanging hook 214 connected in sequence from top to bottom, and the electric hoist hanging hook 214 is connected to the lifting hook ring 11, and the electric hoist hanging hook 214 can freely rotate 360° along the center point of the electric hoist hanging wire rope 213.

[0082] In the above-mentioned embodiments 1 to 3, preferably, the crane hanging device 22 includes a crane 221, a crane wire rope 222 and a crane hook 223 connected in sequence from top to bottom, the crane hook 223 is connected to the lifting hook ring 11, and the crane hook 223 can freely rotate 360° along the center point of the crane wire rope 222.

[0083] like Figure 1 As shown, a method for operating a beam type hanging device comprises the following steps:

[0084] Step 1: The operator 46 operates the electric hoist 212 to move the electric hoist beam 211 along the fixed path to the vicinity of the equipment 30, and lowers the electric hoist hook 214 to a suitable height by operation, and installs the lifting hook ring 11 of the main beam 10 onto the electric hoist hook 214;

[0085] Step 2: Rotate the electric hoist hook 214 and the installed main beam 10 around the center point of the electric hoist wire rope 213 by a certain angle, and turn the equipment hanging ring 12 at a suitable position to the top of the equipment 30;

[0086] Step 3: The hand chain hoist 41 is connected to the equipment hanging ring 12 on one side of the lifting hook ring 11 (in this embodiment, the hand chain hoist 41 is connected to the first outer equipment hanging ring 121), the hand chain hoist hook 44 is connected to the ground fixing point 45 on this side (in this embodiment, the hand chain hoist 41 is connected to the first outer equipment hanging ring 121), and the equipment hanging ring 12 on the other side of the lifting hook ring 11 is connected to the equipment 30;

[0087] Step 4: The electric hoist hook 214 of the electric hoist 212 is slowly raised by jogging, and at the same time, the operator 46 gradually loosens the hand chain 42 according to the lifting height of the main beam 10, extends the length of the wire rope of the hand hoist 41, and gradually loosens the length of the wire rope of the hand hoist 41 according to the height of the main beam 10. With repeated operations, the equipment 30 is gradually raised to a certain height;

[0088] Step 5: The electric hoist hook 214 of the electric hoist 212 is operated by jogging, and at the same time, the operator 46 operates the hand chain 42, and the main beam 10 can be rotated around the center point of the electric hoist wire rope 213 by a certain angle, and the equipment 30 is turned to the top of the open space;

[0089] Step six: operate the electric hoist hook 214 of the electric hoist 212 to slowly descend, and at the same time, the operator 46 gradually tightens the hand chain 42 according to the descending height of the main beam 10, shortens the length of the wire rope of the hand hoist 41, and continuously tightens the length of the wire rope of the hand hoist 41 according to the height. With repeated operations, the equipment 30 is gradually lowered to a certain height, and finally the lifting equipment 30 is lowered to a hand-pushed flatbed truck parked on the ground, and the wire rope is removed and transported away for maintenance.

[0090] The method of the present invention achieves the purpose of safely, reliably and efficiently hanging the equipment 30 by operating the electric hoist hanging device 21 and the manual hoist device 40 to stably hoist a single or multiple equipments 30 in a narrow area.

[0091] like Figure 2 As shown, a method for operating a beam type hanging device comprises the following steps:

[0092] Step 1: disassemble and prepare two devices 30 at a close distance on the ground (in this embodiment, the distance between them is no more than 3 meters, and the weight of a single device 30 is no more than 700 kilograms);

[0093] Step 2: The operator 46 operates the electric hoist 212 to move the electric hoist beam 211 along the fixed path to above the two devices, and lowers the electric hoist hook 214 to a suitable height through operation, and installs the lifting hook ring 11 of the main beam 10 onto the electric hoist hook 214;

[0094] Step 3: Pass the steel wire ropes fixing the two devices through the two symmetrical device hanging rings 12 selected on the main beam 10, fix the two devices 30 and prepare to lift them up;

[0095] Step 4: The electric hoist hook 214 of the electric hoist 212 is operated to rise slowly, and the main beam 10 hanging two devices 30 also rises slowly to the allowed height;

[0096] Step 5: Manually operate the two devices 30 using the electric hoist 212 along the electric hoist beam 211 of the fixed path to the top of the open space, and operate the electric hoist hook 214 to drive the main beam 10 down to a certain height. Finally, the two devices 30 are lowered to the hand-pushed flatbed truck parked on the ground, and the wire ropes are removed and transported away for maintenance.

[0097] The method of the present invention achieves the purpose of safely, reliably and efficiently hanging the equipment 30 by operating the electric hoist hanging device 21 to stably hang two or more equipment 30 in a narrow area.

[0098] like Figure 3 As shown, a method for operating a beam type hanging device comprises the following steps:

[0099] Step 1: disassemble and prepare two devices 30 at a close distance on the ground (in this embodiment, the distance between them is no more than 3 meters, and the weight of a single device 30 is no more than 700 kilograms);

[0100] Step 2: The operator 46 moves the crane 221 to the top of the two devices 30, and slowly lowers the crane hook 223 of the crane 221;

[0101] Step 3: Install the lifting and hanging ring of the main beam 10 onto the crane hook 223 of the crane 221;

[0102] Step 4: Pass the steel wire ropes for fixing the two devices 30 through the two symmetrical device hanging rings 12 selected on the main beam 10 respectively, and prepare to lift the two devices 30 after fixing them;

[0103] Step 5: The operator 46 operates the crane hook 223 of the crane 221 to slowly rise along with the crane wire rope 222, and the main beam 10 hanging the two devices 30 also slowly rises to the allowed height;

[0104] Step 6: Operate the crane 221 to move the two devices to the top of the maintenance site, and operate the crane hook 223 to drive the beam-type hanging device 20 to a certain height. Finally, the two devices 30 fall to the ground in the maintenance area, and the wire ropes are removed and transported away for maintenance.

[0105] The method of the present invention achieves the purpose of safely, reliably and efficiently hanging the equipment 30 by operating the traveling hanging device 22 to stably hang two or more equipment 30 in a spacious area.

[0106] The technical features in the claims and / or the specification of the present invention may be combined, and the combination is not limited to the combination obtained by reference in the claims. The technical solution obtained by combining the technical features in the claims and / or the specification is also within the protection scope of the present invention.

[0107] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification, equivalent change and modification made to the above embodiment according to the technical essence of the present invention still falls within the scope of the technical solution of the present invention.

Claims

1. An operating method of a beam-type hanging device, the beam-type hanging device comprising a main beam (10) and a hanging device (20), a lifting hook ring (11) is provided at the upper midpoint of the main beam (10), equipment hanging rings (12) are provided at the bottom of the main beam (10) on both sides of the lifting hook ring (11), the lifting hook ring (11) is connected to the hanging device (20), the lifting hook ring (11) can rotate 360° around the hanging device (20), and the hanging device (20) is an electric hoist hanging device (21); The equipment hanging ring (12) comprises a first outer equipment hanging ring (121) and a first inner equipment hanging ring (122) arranged at the bottom of the main beam (10) on one side of the lifting hook ring (11), and a second outer equipment hanging ring (123) and a second inner equipment hanging ring (124) arranged at the bottom of the main beam (10) on the other side of the lifting hook ring (11); The first outer equipment hanging ring (121) and the second outer equipment hanging ring (123) are respectively arranged at two ends of the bottom of the main beam (10); the first inner equipment hanging ring (122) and the second inner equipment hanging ring (124) are respectively 1 meter away from the first outer equipment hanging ring (121) and the second outer equipment hanging ring (123); It also includes a manual hoist device (40), the manual hoist device (40) includes a hand-pulled hoist (41), a hand-pulled chain (42), a hand-pulled steel wire rope (43) and a hand-pulled hoist hook (44), the hand-pulled hoist (41) is connected to the equipment hanging ring (12) on one side of the lifting hook ring (11), the hand-pulled hoist hook (44) is connected to a ground fixing point (45), and the equipment hanging ring (12) on the other side of the lifting hook ring (11) is connected to the equipment (30); The first outer equipment hanging ring (121) or the first outer equipment hanging ring (121) and the first inner equipment hanging ring (122) and the second outer equipment hanging ring (123) or the second outer equipment hanging ring (123) and the second inner equipment hanging ring (124) are balanced to hang equipment (30); or the first inner equipment hanging ring (122) or the first inner equipment hanging ring (122) and the first outer equipment hanging ring (121), and the second inner equipment hanging ring (124) or the second inner equipment hanging ring (124) and the second outer equipment hanging ring (123) are balanced to hang equipment (30); The electric hoist hanging device (21) comprises an electric hoist hanging beam (211), an electric hoist (212), an electric hoist hanging wire rope (213) and an electric hoist hanging hook (214) which are connected in sequence from top to bottom, the electric hoist hanging hook (214) being connected to the lifting hook ring (11), and the electric hoist hanging hook (214) being able to freely rotate 360° along the center point of the electric hoist hanging wire rope (213); The operation method comprises the following steps: Step 1: The operator (46) operates the electric hoist (212) to move along the electric hoist beam (211) of the fixed path to the vicinity of the equipment (30), and lowers the electric hoist hook (214) to a suitable height by operating the electric hoist hook, and installs the lifting hook ring (11) of the main beam (10) onto the electric hoist hook (214); Step 2: Rotate the electric hoist hook (214) and the installed main beam (10) together around the center point of the electric hoist wire rope (213) by a certain angle, and move the equipment hanging ring (12) at a suitable position to the top of the equipment (30); Step 3: The hand chain hoist (41) is connected to the equipment hanging ring (12) on one side of the lifting hook ring (11), the hand chain hoist hook (44) is connected to the ground fixing point (45), and the equipment hanging ring (12) on the other side of the lifting hook ring (11) is connected to the equipment (30); Step 4: The electric hoist hook (214) of the electric hoist (212) is slowly raised by jogging, and at the same time, the operator (46) gradually loosens the hand chain (42) according to the lifting height of the main beam (10), extends the length of the wire rope of the hand hoist (41), and gradually loosens the length of the wire rope of the hand hoist (41) according to the height of the main beam (10). With repeated operations, the equipment (30) is gradually raised to a certain height; Step 5: The electric hoist hook (214) of the electric hoist (212) is operated by jogging, and at the same time, the operator (46) operates the hand chain (42), so that the main beam (10) can be rotated around the center point of the electric hoist wire rope (213) by a certain angle, and the equipment (30) can be turned to the top of the open space; Step 6: The electric hoist hook (214) of the electric hoist (212) is slowly lowered by jogging, and at the same time, the operator (46) gradually tightens the hand chain (42) according to the lowering height of the main beam (10), shortens the length of the wire rope of the hand hoist (41), and gradually tightens the length of the wire rope of the hand hoist (41) according to the height. With repeated operations, the equipment (30) is gradually lowered to a certain height, and finally the equipment (30) is lowered to a hand-pushed flatbed truck parked on the ground, and the wire rope is removed and transported away for maintenance.

Citation Information

Patent Citations

  • A hanging device

    CN108163231B

  • Combination is hung to spring crossbeam

    CN204980829U

  • Cross beam type hanging device

    CN212450254U