A prefabricated retaining structure for foundation pit and construction method thereof

By setting support brackets and steel purlin sections on the side walls of the foundation pit, leaving a gap to fill with concrete, and pre-embedding static blasting pipes in the second gap, the problems of low unloading efficiency and high labor intensity of the existing foundation pit enclosure structure are solved. problem, achieving efficient demolition and improved stability, in line with the concept of green and environmentally friendly construction.

CN111794243BActive Publication Date: 2024-10-22SHANGHAI MECHANIZED CONSTR GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010615110.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-06-30
Publication Date
2024-10-22
Estimated Expiration
2040-06-30

AI Technical Summary

Technical Problem

During the construction of deep foundation pits and soft soil areas, the existing foundation pit enclosure structure has low unloading efficiency and high labor intensity. In addition, the structure supported by cast-in-place concrete is not turnable, has numerous construction procedures, and is not environmentally friendly. It is difficult to meet the concept of green and environmentally friendly construction. .

Method used

Adopt a prefabricated enclosure structure, set up support brackets on the side walls of the foundation pit, set up steel purlin sections and reserve the first and second gaps, fill them with concrete, and embed static blasting pipes in the second gap to improve unloading efficiency and labor efficiency, and improve the mechanical performance through concrete-filled steel tube supports and box-type steel purlins.

Benefits of technology

It improves the unloading efficiency of the foundation pit enclosure structure, reduces the labor intensity of the staff, enables the reciprocating use of the structure, and improves the stability and stress performance of the enclosure structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111794243B_ABST
    Figure CN111794243B_ABST
Patent Text Reader

Abstract

The present invention discloses an assembled retaining structure for foundation pits, and relates to the technical field of retaining technology for foundation pits, which comprises a support bracket fixedly arranged on the side wall of the foundation pit, wherein the support bracket is arranged in a plurality of groups on the side wall of the foundation pit at intervals around the circumference of the foundation pit, and a steel purlin section is set on the support bracket, and a steel support is arranged between the steel purlin sections at the opposite side walls of the foundation pit or the steel purlin sections at the adjacent side walls of the foundation pit, and a first gap is reserved between any of the steel purlin sections and the side wall of the foundation pit, and a second gap is reserved between any two adjacent joints of the steel purlin sections, and the second gap and the second gap are filled with concrete. The present invention has the advantages of facilitating the dismantling operation of the retaining structure of the foundation pit by the workers, improving the efficiency of the unloading operation of the retaining structure of the foundation pit, and helping to reduce the labor intensity of the workers.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of foundation pit enclosures, and in particular to an assembled enclosure structure for a foundation pit and a construction method thereof. Background Art

[0002] Foundation pit refers to the space below the ground excavated for the construction of the foundation and basement of a building (including structures). It is a temporary project whose function is to provide a space so that the foundation masonry work can be carried out in the position specified in the design.

[0003] The existing Chinese patent with announcement number CN201649104U discloses a steel purlin set and steel purlin for subway foundation pit support, including: a steel purlin and a supporting bracket (corbel) supporting the steel purlin, the steel purlin includes at least two I-beams of the same specification, at least two steel gussets, at least two inner reinforcement plates, at least two outer reinforcement ribs and a pair of hooks, the steel gusset plates are welded to the legs of the I-beams, the inner reinforcement plates are welded to the inner sides of the columns of the I-beams, the outer reinforcement ribs are welded to the outer sides of the columns of the I-beams, and the hooks are welded to the outer reinforcement ribs.

[0004] When using the above solution, during installation, holes are drilled on the concrete piles around the subway foundation pit, and the support brackets (corbels) are fixed with expansion bolts. The steel purlin sections are sequentially suspended on the support brackets (corbels) for connection to form a complete circle of continuous beams. Finally, the steel supports are installed on the corresponding continuous beams for support by a crane. The steel purlins supported by steel supports are used to support the foundation pit ground wall (the foundation pit side wall is called underground continuous wall in the industry, or ground wall for short) to prevent the ground wall from collapsing into the foundation pit. However, for some deeper foundation pits, due to the influence of depth, soil quality, environment, etc., the ground wall can easily deform and squeeze the continuous beam into the foundation pit; when the foundation pit construction is completed, the staff needs to first unload the steel supports and then unload the steel purlins section by section. This method of unloading the foundation pit purlins has low unloading efficiency and increases the labor intensity of the staff.

[0005] In addition, for the support system in ultra-deep foundation pits in soft soil areas, cast-in-place concrete supports and concrete purlins with greater rigidity are mainly selected, which are safe and reliable. Ordinary steel supports are generally only used in shallow foundation pits due to their small bearing capacity and poor rigidity. The concrete supports for ultra-deep foundation pits have the following main shortcomings:

[0006] 1. After the structure is constructed, it can only be removed and cannot be used in a turnover manner, which is inconsistent with the current green and environmentally friendly construction concept;

[0007] 2. Cast-in-place concrete supports require pouring cushion layers, tying steel bars, supporting formwork and maintaining. There are many construction processes and the cycle is relatively long, which is especially not conducive to rushing the construction period when the temperature is low;

[0008] 3. For some buildings that are many stories high, some supports will be left in place until the superstructure is completed, which makes it difficult to remove them later. Summary of the invention

[0009] In view of the above technical problems, the purpose of the present invention is to propose an assembled retaining structure for foundation pit, which adopts steel tube concrete support and steel purlin, and by filling the first gap and the second gap with concrete, it is convenient for workers to dismantle the foundation pit retaining structure, improve the efficiency of unloading operations of the foundation pit retaining structure, help reduce the labor intensity of workers, and realize the reciprocating use of the foundation pit retaining structure.

[0010] The above technical objectives of the present invention are achieved through the following technical solutions:

[0011] A prefabricated retaining structure for a foundation pit, comprising a supporting bracket fixedly arranged on a side wall of the foundation pit, wherein a plurality of supporting brackets are arranged on the side wall of the foundation pit at intervals around the circumference of the foundation pit, and steel purlin sections are erected on the supporting brackets. Steel supports are arranged between the steel purlin sections at the opposite side walls of the foundation pit or between the steel purlin sections at the adjacent side walls of the foundation pit. The steel supports are characterized in that the steel supports are steel tube concrete support beams, a first gap is reserved between any of the steel purlin sections and the side wall of the foundation pit, a second gap is reserved between any two adjacent joints of the steel purlin sections, and the second gap and the second gap are filled with concrete.

[0012] By adopting the above technical scheme, when dismantling the foundation pit retaining structure, the workers can damage the concrete, thereby facilitating the workers' dismantling of the foundation pit retaining structure, improving the efficiency of the unloading operation of the foundation pit retaining structure, and helping to reduce the labor intensity of the workers; and setting the steel support as a steel tube concrete support beam helps to improve the stress performance of the foundation pit retaining structure and realize the reciprocating use of the foundation pit retaining structure.

[0013] The present invention is further configured such that a static blasting pipe is pre-buried in the concrete filled in the second gap.

[0014] By adopting the above technical solution, in actual work, the staff can use the static blasting pipe to destroy the concrete in the second gap, thereby further facilitating the staff's demolition work on the foundation pit retaining structure.

[0015] Another object of the present invention is to propose a construction method for an assembled retaining structure for a foundation pit, which improves the efficiency of workers' unloading operations on the foundation pit retaining structure by filling concrete in the first gap and the second gap, and helps reduce the labor intensity of the workers.

[0016] The above technical objectives of the present invention are achieved through the following technical solutions:

[0017] A method for constructing an assembled retaining structure for a foundation pit, characterized in that it comprises the following steps: S1, installation of support members, embedded members are arranged around the perimeter of the foundation pit on the ground wall at the same height of the foundation pit, and support brackets are fixedly installed on the ground wall through the embedded members, and a plurality of support brackets are arranged at intervals on the ground wall around the perimeter of the foundation pit, and the upper side of the support brackets is arranged horizontally; S2, splicing of hoisting units, assembling steel purlin sections and steel supports into a plurality of hoisting units by means of lifting equipment; S3, installation of purlins, installing the hoisting units in sequence with the aid of hoisting equipment, so that the hoisting units are stably erected on a plurality of support brackets, and a first gap is reserved between any steel purlin section and the ground wall, and a second gap is reserved between any two adjacent joints of the steel purlin sections; S4, gap filling, filling the first gap and the second gap with concrete; S5, purlin molding, and finally, the concrete in the first gap and the second gap is solidified to form a stable retaining structure.

[0018] By adopting the above technical solution, on the one hand, the steel purlin sections and steel supports are assembled into several hoisting units, and the hoisting units are hoisted by hoisting equipment, which greatly facilitates the construction of the foundation pit retaining structure by the workers;

[0019] On the other hand, a second gap is reserved between any two adjacent steel purlin joints, and the first gap and the second gap are filled with concrete. When dismantling the foundation pit retaining structure, the workers can damage the concrete, thereby facilitating the workers' dismantling of the foundation pit retaining structure, improving the efficiency of the unloading operation of the foundation pit retaining structure, and helping to reduce the labor intensity of the workers.

[0020] The present invention is further configured as follows: S4.1, pre-embedding a static blasting pipe in the concrete filled in the second gap.

[0021] By adopting the above technical solution, in actual work, the staff can use the static blasting pipe to destroy the concrete in the second gap, thereby further facilitating the staff's demolition work on the foundation pit retaining structure.

[0022] The present invention is further configured as follows: in S3, the width of the first gap is between 400-600 mm.

[0023] By adopting the above technical solution, the width of the first gap is set between 400-600 mm, which helps to facilitate the workers to remove the concrete in the first gap when dismantling the foundation pit retaining structure.

[0024] The present invention is further configured as follows: in S5, a connecting steel beam is provided between any two adjacent steel supports.

[0025] By adopting the above technical solution, connecting steel beams are set between the steel supports to improve the stability of the foundation pit retaining structure.

[0026] The present invention is further configured as follows: the steel perimeter purlin section adopts a box-type steel perimeter purlin.

[0027] By adopting the above technical solution, the box-type steel purlin has a large supporting contact area and good force-bearing capacity, which helps to ensure the stability of the foundation pit retaining structure.

[0028] The present invention is further configured as follows: in S2, the steel support is made of steel pipes, and the steel pipes are filled with concrete.

[0029] By adopting the above technical solution and using steel pipes filled with concrete as steel supports, it helps to improve the stress-bearing performance of the foundation pit retaining structure.

[0030] The present invention is further configured as follows: S6, the retaining structure is dismantled, and the static blasting equipment performs static blasting operations on the concrete filled in the second gap through the static blasting pipe, and destroys the connection between the concrete in the first gap and the steel purlin, so that the concrete in the first gap loosens the steel purlin section; finally, the hoisting unit is hoisted out of the foundation pit by the hoisting equipment.

[0031] By adopting the above technical solution, the static blasting equipment performs static blasting operations on the concrete filled in the second gap through the static blasting pipe, and destroys the connection between the concrete and the steel purlin in the first gap, thereby greatly facilitating the dismantling operation of the hoisting unit in the foundation pit, and greatly facilitating the workers' dismantling operations on the foundation pit retaining structure.

[0032] Compared with the prior art, the present invention has the following beneficial effects:

[0033] (1) By filling the first gap and the second gap with concrete, it is convenient for workers to dismantle the foundation pit retaining structure, improve the efficiency of unloading the foundation pit retaining structure, help reduce the labor intensity of workers, and realize the reciprocating use of the foundation pit retaining structure;

[0034] (2) By pre-embedding a static blasting pipe in the concrete filled in the second gap and setting the width of the first gap between 400-600 mm, it is further convenient for workers to dismantle the foundation pit retaining structure;

[0035] (3) Comprehensively utilize the connecting steel beams set between any two adjacent steel supports, and use the box-shaped steel purlins of the steel purlin sections and steel pipes filled with concrete as steel supports, thereby greatly improving the stability of the foundation pit retaining structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1This is a cross-sectional schematic diagram of the overall structure of the assembled retaining structure for foundation pits mainly embodied in the first embodiment;

[0037] Figure 2 for Figure 1 The enlarged view of part A mainly shows the first gap structure;

[0038] Figure 3 This is a partial top view of the assembled retaining structure for foundation pit mainly embodied in the first embodiment;

[0039] Figure 4 for Figure 3 The enlarged view of part B mainly shows the structure of the second gap and the static blasting pipeline;

[0040] Figure 5 The second embodiment mainly embodies the flow chart of the construction method of the assembled retaining structure for foundation pit.

[0041] Figure numerals: 1. Support bracket; 2. Steel purlin section; 21. Steel support; 22. Connecting steel beam; 3. First gap; 4. Second gap; 5. Static blasting pipe. DETAILED DESCRIPTION

[0042] The present invention will be further described in detail below in conjunction with embodiments and drawings, but the embodiments of the present invention are not limited thereto.

[0043] Embodiment 1:

[0044] See also Figure 1 and Figure 3 A prefabricated retaining structure for a foundation pit, comprising a support bracket 1 fixedly arranged on the side wall of the foundation pit, the support bracket 1 can be a tripod, the upper side of the support bracket 1 is arranged horizontally, and a plurality of support brackets 1 are arranged on the side wall of the foundation pit at intervals around the circumference of the foundation pit, and a steel purlin section 2 is set on the support bracket 1, and steel supports 21 are arranged between the steel purlin sections 2 on opposite sides of the foundation pit and the steel purlin sections 2 on adjacent sides of the intersection of the two side walls of the foundation pit, and the steel supports 21 are steel tube concrete supports. A first gap 3 is reserved between any steel purlin section 2 and the side wall of the foundation pit (see Figure 2 ), a second gap 4 is reserved between any two adjacent steel purlin sections 2 (see Figure 4 ), and the second gap 4 and the second gap 4 are filled with concrete, and a static blasting pipe 5 is embedded in the concrete filled in the second gap 4.

[0045] When dismantling the foundation pit retaining structure, the workers can use static blasting equipment to perform static blasting operations on the concrete filled in the second gap 4 through the static blasting pipe 5, and destroy the connection between the concrete in the first gap 3 and the steel purlin section 2. Then, the workers can unload the foundation pit retaining structure more easily.

[0046] Embodiment 2:

[0047] See also Figure 5 A method for constructing an assembled retaining structure for a foundation pit comprises the following steps:

[0048] S1. Install the support parts. Set embedded parts on the ground wall at the same height of the foundation pit around the periphery of the foundation pit, and fix the support bracket 1 on the ground wall through the embedded parts. A plurality of support brackets 1 are arranged at intervals on the ground wall around the periphery of the foundation pit, and the upper side of the support bracket 1 is arranged horizontally;

[0049] The embedded part may be a pin, and the supporting bracket 1 may be a triangular bracket.

[0050] S2, assembling the hoisting units, using the lifting equipment to assemble the steel purlin section 2 and the steel support 21 into several hoisting units; the steel support 21 is made of steel pipes, and the steel pipes are filled with concrete;

[0051] The hoisting unit includes a first unit and a second unit. The first unit mainly consists of two parallel and spaced steel purlin sections 2 and a steel support 21 fixedly connected between the two steel purlin sections 2. The second unit mainly consists of two steel purlin sections 2 at a certain angle and a steel support 21 fixedly connected between the two steel purlin sections 2.

[0052] S3. Installation of the perimeter purlin. With the help of the lifting equipment, the lifting units are installed in sequence, so that the lifting units are stably erected on multiple supporting brackets 1, and the steel perimeter purlin sections 2 on the first unit and the second unit are close to each other at the head and tail and are arranged around the side of the foundation pit; then, a first gap 3 is reserved between any steel perimeter purlin section 2 and the ground wall. The width of the first gap 3 is between 400-600mm, and 500mm is preferably selected. A second gap 4 is reserved between the joints of any two adjacent steel perimeter purlin sections 2.

[0053] S4, gap filling, filling the first gap 3 and the second gap 4 with concrete;

[0054] S4.1, pre-embed a static blasting pipe 5 in the concrete filled in the second gap 4.

[0055] S5, the enclosure is formed. Finally, the concrete in the first gap 3 and the second gap 4 is solidified, and the connecting steel beam 22 is fixedly connected between any two adjacent steel supports 21 to form a stable enclosure structure.

[0056] S6. The retaining structure is dismantled. The static blasting equipment performs static blasting operation on the concrete filled in the second gap 4 through the static blasting pipe 5, and destroys the connection between the concrete in the first gap 3 and the steel purlin section 2, so that the concrete in the first gap 3 loosens the steel purlin section 2; finally, the hoisting unit is hoisted out of the foundation pit by the hoisting equipment.

[0057] The above is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.

Claims

1. An assembled retaining structure for a foundation pit, comprising a support bracket (1) fixedly arranged on a side wall of a foundation pit, wherein a plurality of groups of the support brackets (1) are arranged on the side wall of the foundation pit at intervals around the circumference of the foundation pit, a steel purlin section (2) is mounted on the support bracket (1), and a steel support (21) is arranged between the steel purlin sections (2) at the opposite side walls of the foundation pit or between the steel purlin sections (2) at the adjacent side walls of the foundation pit, characterized in that: The steel support (21) is a steel tube concrete support, a first gap (3) is reserved between any of the steel purlin sections (2) and the side wall of the foundation pit, a second gap (4) is reserved between the joints of any two adjacent steel purlin sections (2), and the space between the second gap (4) and the second gap (4) is filled with concrete; A static blasting pipe (5) is pre-buried in the concrete filled in the second gap (4); The steel purlin section (2) adopts a box-type steel purlin.

2. A construction method for an assembled retaining structure for a foundation pit according to claim 1, characterized in that: The following steps are included: S1. Support component installation: embedded components are arranged on the ground wall at the same height of the foundation pit around the periphery of the foundation pit, and a support bracket (1) is fixedly installed on the ground wall through the embedded components, and a plurality of support brackets (1) are arranged on the ground wall at intervals around the periphery of the foundation pit, and the upper side of the support bracket (1) is arranged horizontally; S2, assembling the hoisting units, using a lifting device to first assemble the steel purlin segments (2) and the steel supports (21) into a plurality of hoisting units; S3, installing the purlin, using the lifting equipment to install the lifting units in sequence, so that the lifting units are stably erected on the multiple support brackets (1), and a first gap (3) is reserved between any steel purlin section (2) and the ground wall, and a second gap (4) is reserved between the joints of any two adjacent steel purlin sections (2); S4, gap filling, filling the first gap (3) and the second gap (4) with concrete; S5, the enclosure purlin is formed, and finally, the concrete in the first gap (3) and the second gap (4) is solidified to form a stable enclosure structure.

3. The construction method of a prefabricated retaining structure for a foundation pit according to claim 2, characterized in that: S4.1, a static blasting pipe (5) is embedded in the concrete filled in the second gap (4).

4. The construction method of a prefabricated retaining structure for a foundation pit according to claim 2, characterized in that: In S3, the width of the first gap (3) is between 400-600 mm.

5. According to the construction method of the prefabricated retaining structure for foundation pits as claimed in claim 2, in S5, a connecting steel beam (22) is provided between any two adjacent steel supports (21).

6. The construction method of a prefabricated retaining structure for a foundation pit according to claim 2, characterized in that: In S2, the steel support (21) is made of steel pipes, and the steel pipes are filled with concrete.

7. The construction method of a prefabricated retaining structure for a foundation pit according to claim 2, characterized in that: S6. The retaining structure is dismantled by using a static blasting device to perform static blasting operations on the concrete filled in the second gap (4) through a static blasting pipe (5), and destroying the connection between the concrete in the first gap (3) and the steel purlin, so that the concrete in the first gap (3) loosens the steel purlin section (2); finally, the hoisting unit is hoisted out of the foundation pit by the hoisting equipment.