A rapid drilling and pipe laying device and method for grouting original fine sand layer
By using a fast drilling downpipe device driven by high-pressure wind-blowing and supporting components in tunnel engineering, the problem of poor hole collapse and grouting effect of fine sand formation is solved, and efficient drilling and grouting is achieved. Improve construction efficiency and porogenicity.
Patent Information
- Application Number
- CN202010908651.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-09-02
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2040-09-02
AI Technical Summary
In tunnel projects, the original powder sand layer has small and dense soil particles, which makes it easy to collapse when the drilling depth exceeds 2m, the construction efficiency and pore formation rate are low, and the grouting effect is poor.
A quick drilling down-tube device is adopted, including a grouting pipe, connecting core pipe and high-pressure blowing head, forming grouting holes through high-pressure wind blowing, and using support members to drive the grouting pipe into the grouting hole to reduce hole collapse phenomenon , improve the pore formation and grouting effect.
It improves the efficiency of drilling and grouting, reduces the phenomenon of hole collapse, enhances the grouting effect, is convenient to operate and reduces the risk of mechanical injury accidents.
Smart Images

Figure CN111911199B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel engineering grouting, and in particular relates to a rapid drilling and pipe laying device and method for grouting an original fine sand layer. Background Art
[0002] In the field of tunnel engineering, it is often necessary to carry out radial drilling and grouting of the tunnel after the support structure is completed to deal with local soft strata or water leakage. The drilling depth is 3~5m. The traditional operation method is to set up scaffolding and manually use a small pneumatic drill to perform drilling operations. However, in strata such as original fine sand and original fine soil, the soil particles are small and dense, and the self-stabilization ability is limited. After being vibrated and cut by the pneumatic drill bit and drill rod, it is very easy to collapse the hole. When the drilling depth exceeds 2m, the collapsed soil will hold the drill rod, causing the drill to get stuck, resulting in low construction efficiency and low hole formation rate.
[0003] If grouting is carried out after the hole is formed, it is easy to trigger the hole collapse, and the slurry cannot spread within the predetermined depth range; if a grouting pipe is inserted, it is also easy to trigger the hole collapse, and it is difficult to insert it to the designed depth, and the grouting effect is poor. Summary of the invention
[0004] The purpose of the present invention is to provide a rapid drilling pipe lowering device and method for grouting an original fine sand layer, which is not prone to collapse during the drilling process and is not prone to triggering hole collapse during hole grouting, thereby improving the radial grouting effect.
[0005] The present invention adopts the following technical scheme: a fast drilling and pipe lowering device for grouting an original fine sand layer, comprising: a grouting pipe, which is used to be placed in a grouting hole for grouting, and the front end is located at the bottom of the grouting hole during grouting; a plurality of grouting holes are provided on the grouting pipe, the part located in the grouting hole and the front end at intervals; the open end of the grouting pipe is used to be connected to a slurry supply device.
[0006] The supporting member comprises:
[0007] Multiple connecting core tubes, each of which is a tube body with open ends, can be detachably connected in sequence and interconnected, and the length after connection is not less than the length of the grouting pipe; the multiple connecting core tubes are axially sleeved in the grouting pipe and can be pulled out in the grouting pipe; during the process of drilling the grouting hole, the grouting pipe is driven into the grouting hole; the end of the rear end connecting core tube is used to be connected to the high-pressure air supply device.
[0008] The high-pressure blowing head is installed at the end of the connecting core tube at the front end and is used for the outflow of high-pressure wind. The outflowing high-pressure wind is used to erode the fine sand surrounding rock to form grouting holes by wind erosion.
[0009] Furthermore, the high-pressure blowing head is a conical shell with two open ends, and the tip of the cone faces forward and is connected to each of the connecting core tubes;
[0010] Furthermore, a tail rod is connected between the high-pressure air supply device and the connecting core tube at the rear end, and the tail rod is a tube body and communicates with the connecting core tube.
[0011] Furthermore, a blowout prevention plate is annularly sleeved between the tail rod and the connecting core tube at the rear end to block high-speed wind and sand ejected during wind erosion.
[0012] Furthermore, the inner wall of the grouting pipe fits with the outer wall of the connecting core pipe.
[0013] The present invention also discloses a rapid drilling and pipe laying method for grouting an original fine sand layer, and the pipe laying method is as follows:
[0014] Set up the grouting device and place the high-pressure blowing head in the pre-buried grouting hole pipe on the inner wall of the tunnel, close to the fine sand surrounding rock;
[0015] The high-pressure air supply device continuously supplies high-pressure air, which passes through the tail rod and each connecting core tube in turn, flows out from the high-pressure blowing head, and erodes the surrounding fine sand surrounding rock, forming wind erosion holes. During the wind erosion process, the supporting structure and the grouting pipe are continuously moved forward until they reach the designed depth to form a grouting hole, and then the air supply is stopped.
[0016] The supporting member is pulled out from the grouting pipe, and then grout is injected into the grouting pipe, and flows out from each grouting hole to be grouted into the surrounding rock.
[0017] Furthermore, before setting up the grouting device, the following operation is performed: a grouting orifice pipe is installed at the location of the tunnel wind erosion grouting hole to be anchored and fixed to the tunnel support structure.
[0018] The present invention also discloses a rapid drilling and pipe grouting method for grouting an original fine sand layer, which adopts the rapid drilling and pipe grouting device for grouting an original fine sand layer. The grouting method is as follows:
[0019] The grouting device is set up, and the high-pressure blowing head is placed in the grouting hole pipe pre-buried on the inner wall of the tunnel and close to the fine sand surrounding rock;
[0020] The high-pressure air supply device continuously supplies high-pressure air, which passes through the tail rod and each connecting core tube in turn, flows out from the high-pressure blowing head, and erodes the surrounding fine sand surrounding rock to form wind erosion holes; during the wind erosion process, the support member and the grouting pipe are continuously moved forward until they reach the designed depth to form a grouting hole, and then the air supply is stopped;
[0021] The supporting member is pulled out backward from the grouting pipe, and then the grouting device injects grout into the grouting pipe, and the grout flows out from each grouting hole and is injected into the surrounding rock.
[0022] Furthermore, before setting up the grouting device, the following operation is performed: a grouting orifice pipe is installed at the location of the tunnel wind erosion grouting hole to be anchored and fixed to the tunnel support structure.
[0023] The beneficial effects of the present invention are as follows: 1. The hole is formed by high-pressure wind erosion, the hole forming speed is fast, the surrounding rock disturbance is small, and the hole collapse phenomenon is greatly reduced. 2. The grouting pipe is sleeved outside the connecting core pipe, and during the process of wind erosion drilling, the grouting pipe is driven into the grouting hole, and the pipe is lowered while the hole is formed, thereby improving the success rate of pipe lowering. 3. The operation is convenient, and mechanical injury accidents are basically eliminated. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a structural schematic diagram of a grouting device for grouting an original fine sand layer;
[0025] Figure 2 It is a left view of a grouting device for grouting an original fine sand layer (aa);
[0026] Figure 3 A schematic diagram of a tunnel radial grouting rapid drilling pipe laying process;
[0027] Figure 4 This is a schematic diagram of grouting after drilling and pipe laying;
[0028] Among them: 1 high-pressure blowing head; 2 connecting core pipe; 3 blowout preventer; 4 tail rod; 5 quick connector; 6 ball valve switch; 7 grouting pipe. DETAILED DESCRIPTION
[0029] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0030] The present invention discloses a grouting device for grouting an original fine sand layer, such as Figure 1 As shown, it includes: a grouting pipe 7, which is placed in the grouting hole for grouting, and the front end is located at the bottom of the grouting hole during grouting; a plurality of grouting holes are arranged on the grouting pipe 7, the part located in the grouting hole and the front end at intervals; the open end of the grouting pipe 7 is used to connect with the slurry supply device. The plurality of slurry outlet holes are arranged in a plum blossom shape. The grouting pipe 7 is a standard PVC pipe.
[0031] The supporting member comprises: a plurality of connecting core tubes 2, each of which is a tube body with open ends, and the plurality of connecting core tubes 2 are detachably connected in sequence and interconnected, and the length after connection is not less than the length of the grouting pipe 7; when drilling the grouting hole, the plurality of connecting core tubes 2 are axially sleeved in the grouting pipe 7 to drive the grouting pipe 7 into the grouting hole; and the end of the connecting core tube 2 at the rear end is used to communicate with the high-pressure air supply device; after drilling the grouting hole, the grouting pipe 7 is located in the grouting hole, and the plurality of connecting core tubes 2 are pulled out from the grouting pipe 7. . The connecting core tube 2 is made of aluminum alloy, has high strength and light weight, and has an external thread at one end and an internal thread at the other end.
[0032] A high-pressure blowing head 1 is installed at the end of the front connecting core tube 2 for high-pressure wind to flow out. The outflowing high-pressure wind is used to blow away the fine sand surrounding rock to form a grouting hole by wind erosion. The high-pressure blowing head 1 is made of stainless steel metal, and the cavity cross-sectional area is continuously reduced toward the front blowing port end, which is used to continuously increase the wind speed and accelerate the wind erosion hole forming speed. The rear end of the high-pressure blowing head 1 is internally threaded and connected to the connecting core tube 2.
[0033] The high-pressure blowing head 1 is a conical shell with two open ends, and the tip of the cone faces forward and is connected to each connecting core tube 2. After the high-pressure wind is blown out by the high-pressure blowing head 1, the wind pressure is greater.
[0034] A tail rod 4 is connected between the high-pressure air supply device and the rear connection core tube 2, which is a tube body and is connected to the connection core tube 2. The tail rod 4 is made of metal and is about half a meter long, which is convenient for both hands to hold and exert force. One end of the tail rod 4 is externally threaded and the other end is connected to a quick connector 5. The rear end pipeline is connected to the slurry source, and a ball valve switch is installed on the pipeline.
[0035] A blowout prevention plate 3 is annularly sleeved between the tail rod 4 and the connecting core tube 2 at the rear end to block the high-speed wind and sand ejected during wind erosion. Figure 2 As shown, the blowout preventer 3 is a hard thin disk with a diameter of about half a meter, which is used to block the high-speed gravel and soil powder sprayed out of the hole for the drilling personnel. The blowout preventer 3 is an annular disk with a circular hole in the center, which can be nested on the external thread of the tail rod 4.
[0036] The inner wall of the grouting pipe 7 fits the outer wall of the connecting core pipe 2. The outer diameter of the connecting core pipe 2 is 0.5 mm smaller than the inner diameter of the grouting pipe 7, so that it can smoothly penetrate the grouting pipe 7, and the gap between the connecting core pipe 2 and the grouting pipe 7 is tiny, and large particles will not enter the wall.
[0037] The present invention also discloses a method for rapid drilling and pipe laying for grouting of an original fine sand layer, and adopts the device for rapid drilling and pipe laying for grouting of an original fine sand layer. The pipe laying method is as follows:
[0038] The grouting device is set up, and the high-pressure blowing head 1 is placed in the grouting hole pipe pre-buried on the inner wall of the tunnel, and close to the fine sand surrounding rock;
[0039] The high-pressure wind is continuously supplied by the high-pressure wind supply device, and the high-pressure wind passes through the tail rod 4 and each connecting core tube 2 in turn, and flows out from the high-pressure blowing head 1, eroding the surrounding fine sand surrounding rock; forming wind erosion holes; during the wind erosion process, the supporting member and the grouting pipe 7 are continuously moved forward until they reach the designed depth to form a grouting hole, and then the air supply is stopped; the supporting member is pulled out backward from the grouting pipe 7.
[0040] Before setting up the grouting device, the following operations are performed: install the orifice pipe for grouting at the location of the tunnel where the wind erosion grouting hole is to be located, and anchor it to the tunnel support structure. Specifically, according to the conventional grouting process, prepare the orifice pipe, drill the tunnel support structure, insert the orifice pipe, and then use cement or anchoring agent to consolidate the orifice pipe and the support structure into one, so that the borehole can be quickly closed to prevent the occurrence of water and sand gushing. After the orifice pipe is installed and the cement or anchoring agent is hardened and solid, the wind erosion drilling can be carried out.
[0041] The present invention also discloses a rapid drilling and pipe grouting method for grouting an original fine sand layer, which adopts the rapid drilling and pipe grouting device for grouting an original fine sand layer. The grouting method is as follows:
[0042] The grouting device is set up, and the high-pressure blowing head 1 is placed in the grouting hole pipe pre-buried on the inner wall of the tunnel, and is close to the fine sand surrounding rock; the high-pressure air supply device continuously supplies high-pressure air, and the high-pressure air passes through the tail rod 4 and each connecting core tube 2 in turn, flows out from the high-pressure blowing head 1, and erodes the fine sand surrounding rock around, forming wind erosion holes; during the wind erosion process, the supporting member and the grouting pipe 7 are continuously moved forward until they reach the designed depth to form a grouting hole, and then the air supply is stopped.
[0043] The connected supporting member is pulled out backward from the grouting pipe 7, and then the grouting device injects grout into the grouting pipe 7, and the grout flows out from each of the grouting holes and is injected into the surrounding rock.
[0044] Before setting up the grouting device, the following operations are performed: install the orifice pipe for grouting at the location of the tunnel where the wind erosion grouting hole is to be located, and anchor it to the tunnel support structure. Specifically, according to the conventional grouting process, prepare the orifice pipe, drill the tunnel support structure, insert the orifice pipe, and then use cement or anchoring agent to consolidate the orifice pipe and the support structure into one, so that the borehole can be quickly closed to prevent the occurrence of water and sand gushing. After the orifice pipe is installed and the cement or anchoring agent is hardened and solid, the wind erosion drilling can be carried out.
[0045] The on-site construction process is as follows:
[0046] (1) Processing grouting pipe 7:
[0047] According to the drilling depth of the grouting scheme, a grouting pipe 7 of designed length is cut or connected, and a grout outlet hole is opened at its front end and a section close to the front end.
[0048] (2) Connecting supporting members:
[0049] According to the drilling depth of the grouting scheme, multiple connecting core pipes 2 are connected in sequence, and the total length thereof is greater than or equal to the length of the grouting pipe 7, and one end of the connecting core pipe 2 at the end is connected to the high-pressure blowing head 1;
[0050] The blowout preventer 3 is nested into the external thread of the tail rod 4, and then the external thread is screwed tightly with the internal thread of the connecting core pipe 2 at the rear end to clamp the blowout preventer 3.
[0051] (3) Putting the grouting pipe 7 into the sleeve:
[0052] Insert the connected supporting member into the grouting pipe 7, and let the high-pressure blowing head 1 pass through the slurry outlet hole of the grouting pipe 7. Apply some vaseline or grease to the end gap of the inner and outer pipes, and wrap the slurry outlet hole of the grouting pipe 7 with tape in an annular direction to prevent a large amount of fine powder particles from accumulating in the gap between the inner and outer pipes.
[0053] (4) Provide air blowing holes:
[0054] like Figure 3 , connect the tail rod 4, quick connector 5, and ball valve switch 6 in sequence and turn on the high-pressure air supply device, place the high-pressure blowing head 1 into the pre-buried orifice pipe, and close to the fine sand surrounding rock, open the ball valve 6 switch and start blowing. As the wind erosion hole continues to deepen, the handheld tail rod 4 also continues to penetrate into the surrounding rock. At the same time, according to the hole formation situation, the blowpipe can be twisted and adjusted from time to time to make the wind erosion hole uniform and straight, until it reaches the designed depth to form a grouting hole, and then stop supplying air.
[0055] (5) Core grouting:
[0056] When the grouting pipe 7 has completely entered the surrounding rock, that is, the designed grouting hole depth has been reached and the pipe has been lowered, the ball valve 6 is closed, the quick connector 5 is disconnected, and after holding the grouting pipe 7, the tail rod 4 and its connected connecting core pipe 2 and high-pressure blowing head 1 are pulled out. Figure 4 As shown, the slurry pipeline is then connected to the rear end of the grouting pipe 7, grout is injected into the grouting pipe 7, and grout flows out from each of the grouting holes to be injected into the surrounding rock.
Claims
1. A construction method for a rapid drilling and pipe laying device for grouting an original fine sand layer, characterized in that: The drilling pipe lowering device comprises: A grouting pipe (7) is used to be placed in a grouting hole for grouting, with its front end located at the bottom of the grouting hole during grouting; a plurality of slurry outlet holes are provided on the grouting pipe (7) at intervals in the portion located in the grouting hole and at the front end; the open end of the grouting pipe (7) is used to be connected to a slurry supply device; The supporting member comprises: A plurality of connecting core pipes (2), each of which is a pipe body with two ends open, and the plurality of connecting core pipes (2) are detachably connected in sequence and are interconnected, and the length after connection is not less than the length of the grouting pipe (7); When drilling a grouting hole, a plurality of the connecting core pipes (2) are axially sleeved in the grouting pipe (7) to drive the grouting pipe (7) into the grouting hole; and the end of the connecting core pipe (2) at the rear end is used to communicate with a high-pressure air supply device; After the grouting hole is drilled, the grouting pipe (7) is located in the grouting hole, and the plurality of connecting core pipes (2) are drawn out from the grouting pipe (7); A high-pressure blowing head (1) is installed at the end of the connecting core tube (2) at the front end and is used for high-pressure wind to flow out. The outflowing high-pressure wind is used to blow away the fine sand surrounding rock to form a grouting hole by wind erosion; The high-pressure blowing head (1) is a conical shell with open ends, the tip of the cone facing forward, and is connected to each of the connecting core tubes (2); A tail rod (4) is connected between the high-pressure air supply device and the connecting core tube (2) at the rear end, and is a tube body and is in communication with the connecting core tube (2); A blowout prevention plate (3) is annularly sleeved between the tail rod (4) and the connecting core tube (2) at the rear end, and is used to block high-speed sand and wind that is ejected during wind erosion; The inner wall of the grouting pipe (7) is in contact with the outer wall of the connecting core pipe (2); The construction method is as follows: A grouting device is set up, wherein the high-pressure blowing head (1) is placed in a grouting hole pipe pre-buried on the inner wall of the tunnel and close to the fine sand surrounding rock; The high-pressure air supply device continuously supplies high-pressure air, and the high-pressure air sequentially passes through the tail rod (4) and each connecting core tube (2), flows out from the high-pressure blowing head (1), and erodes the surrounding fine sand surrounding rock to form a wind erosion hole; during the wind erosion process, the support member and the grouting pipe (7) are continuously moved forward until they reach the designed depth to form a grouting hole, and then the air supply is stopped; The connected supporting member is pulled out backward from the grouting pipe (7); then the grouting device injects grout into the grouting pipe (7), and the grout flows out from each of the grouting holes and is injected into the surrounding rock.
2. The construction method of a rapid drilling and pipe laying device for grouting of an original fine sand layer according to claim 1 is characterized in that: Before setting up the grouting device, the following operations are performed: a grouting orifice pipe is installed at the location of the tunnel wind erosion grouting hole to be anchored and fixed to the tunnel support structure.