Electricity spot day-ahead market clearing method, system, device and readable storage medium
By obtaining the multi-state operation status of the power grid equipment and optimizing the clearing based on the future state network model, the problem of poor accuracy of the power spot day-ahead market clearing results is solved, and more accurate grid boundary conditions and clearing results are achieved.
Patent Information
- Application Number
- CN202010851292.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-21
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2040-08-21
AI Technical Summary
During the day-ahead market clearing process of existing power spot, the accuracy of the declaration information and grid operation boundary conditions was insufficient, resulting in poor accuracy and rationality of the clearing results.
By obtaining the operating status of each power grid equipment on the next day, the maximum declared power generation capacity is determined, the base state is cleared based on the future state network model, the section limit and operating boundary conditions are corrected, and multi-state division and AC and DC iterative verification are used to optimize the clearing result.
It improves the accuracy and rationality of power spot day-ahead market clearing results, ensures the accuracy of grid operation boundary conditions, avoids equipment over-limits, and improves the security and economy of market clearing results.
Smart Images

Figure CN111950800B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of electricity market, and relates to a method, system, device and readable storage medium for clearing the electricity spot day-ahead market. Background Art
[0002] The clearing of the electricity spot market is based on the information reported by market members and the boundary conditions of power grid operation. It uses the combination of safety-constrained equipment and the safety-constrained economic dispatch program to optimize the calculation and clear the day-ahead spot market transaction results. Therefore, the validity of market members' reports and the accuracy of power grid operation boundary conditions are the key to the rationality and accuracy of the day-ahead market clearing results.
[0003] However, the current clearing process of the electricity spot day-ahead market is often based on the declared data that is simply verified to meet the declaration rules and the network model that is not sophisticated enough, which fails to truly and reliably reflect the actual clearing results of the electricity spot day-ahead market. In addition, the section limit information needs to be used when determining the boundary conditions of the power grid operation. At present, the section limit generally adopts a fixed limit or inherits the limit result of the previous day. However, the operation mode of the power grid is changeable, and the section limit changes greatly with the power grid topology and power flow. This method cannot guarantee the accuracy of the section limit and the safety of the power grid, resulting in inaccurate boundary conditions of the power grid operation, which in turn leads to poor accuracy and rationality of the clearing results of the electricity spot day-ahead market. Summary of the invention
[0004] The purpose of the present invention is to overcome the shortcomings of the above-mentioned prior art in that the accuracy and rationality of the day-ahead market clearing results of the electricity spot are relatively poor, and to provide a day-ahead market clearing method, system, device and readable storage medium for electricity spot.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] In a first aspect of the present invention, a method for clearing a spot electricity market on the day before includes the following steps:
[0007] Obtain the declared information and operating boundary conditions of the power grid;
[0008] Obtain the operating status of each device in the power grid one day later, determine the maximum declared power generation capacity of the power grid based on the operating status of each device in the power grid one day later, and verify the declared information of the power grid based on the maximum declared power generation capacity;
[0009] Based on the future state network model of the power grid, according to the verified declared information and the operating boundary conditions of the power grid, the base state clearing of the day-ahead market is carried out with the minimization of power generation cost as the optimization goal, and the base state clearing result is obtained;
[0010] The future state network model is modified according to the base state clearing result, and the future state section limit of the power grid is obtained according to the base state clearing result, and the operation boundary conditions of the power grid are modified according to the future state section limit;
[0011] Based on the revised future state network model, according to the verified declared information and the revised operating boundary conditions, the day-ahead market clearing is carried out with the minimization of power generation cost as the optimization goal, and the clearing result is obtained.
[0012] The method for clearing the electricity spot market before the day of the present invention is further improved in that:
[0013] The operating status of each device in the power grid one day after is obtained in the following manner: obtaining the operating data of the power grid and the current operating status of each device in the power grid; wherein the operating data includes equipment commissioning plan, equipment retirement plan, equipment power outage and maintenance plan, and bus connection method; constructing a network topology according to the operating data, and determining the operating status of each device one day after based on the logical relationship of the network topology and the current operating status of each device; wherein the operating status includes maintenance, failure, failure-related shutdown, maintenance-related shutdown, available, and islanded available.
[0014] The specific method of determining the maximum declared power generation capacity of the power grid according to the operating status of each device in the power grid one day after, and verifying the declared information of the power grid according to the maximum declared power generation capacity is as follows: determining the operating status of each device in the power grid according to the operating status of each device one day after; determining the maximum output of each device according to the operating status of each device, and superimposing the maximum outputs of all devices to obtain the maximum declared power generation capacity of the power grid; when the maximum value of the power generation capacity of the power grid in the declared information is not greater than the maximum declared power generation capacity, the declared information verification passes; otherwise, the declared information verification fails.
[0015] It also includes a base state clearing safety verification step: according to the future state network model of the power grid, the base state sensitivity matrix of the power grid is obtained; when the base state power flow data in the base state clearing result exceeds the preset base state power flow margin range, the output of each device in the power grid is adjusted according to the base state sensitivity matrix, the operating boundary conditions of the power grid are updated according to the output of each device, and the day-ahead market base state clearing is performed again to update the current base state clearing result; otherwise, the base state clearing result is output; it also includes a clearing safety verification step: according to the revised future state network model, the sensitivity matrix of the power grid is obtained; when the power flow data in the clearing result exceeds the preset power flow margin range, the output of each device in the power grid is adjusted according to the sensitivity matrix, the revised operating boundary conditions are updated according to the output of each device, and the day-ahead market clearing is performed again to update the current clearing result; otherwise, the clearing result is output.
[0016] The specific method for obtaining the future state section limit of the power grid according to the base state clearing result is: obtaining the base state flow data of each device in the power grid according to the base state clearing result; based on the revised future state network model, obtaining the equipment contained in each section of the power grid, superimposing the base state flow data of the equipment contained in each section to obtain the section limit of each section, and combining the section limits of all sections together to obtain the future state section limit of the power grid.
[0017] The specific method for correcting the operating boundary conditions of the power grid according to the future state section limit is: based on the corrected future state network model, the future state bus load forecast and the future state interconnection line plan of the power grid are calculated according to the future state section limit; the future state section limit is used to replace the section limit in the operating boundary conditions, the future state bus load forecast is used to replace the bus load forecast in the operating boundary conditions, and the future state interconnection line plan is used to replace the interconnection line plan in the operating boundary conditions, so as to obtain the corrected operating boundary conditions.
[0018] It also includes an AC power flow safety verification step: based on the revised future state network model, the AC power flow data of the power grid is calculated according to the revised operating boundary conditions. When the AC power flow data exceeds the preset AC power flow margin range, the output of each device in the power grid is adjusted, and the revised future state network topology model, future state section limit and revised operating boundary conditions are updated according to the output of each device. Then, based on the revised future state network model, according to the verified declared information and the revised operating boundary conditions of the power grid, the day-ahead market base state clearing is performed with the minimization of power generation cost as the optimization goal, and the base state clearing result is updated; otherwise, based on the revised future state network model, according to the verified declared information and the revised operating boundary conditions, the day-ahead market clearing is performed with the minimization of power generation cost as the optimization goal, and the clearing result is obtained.
[0019] A second aspect of the present invention is a power spot day-ahead market clearing system, comprising:
[0020] Information acquisition module, used to obtain the declared information and operating boundary conditions of the power grid;
[0021] The declared information verification module is used to obtain the operating status of each device in the power grid one day later, determine the maximum declared power generation capacity of the power grid according to the operating status of each device in the power grid one day later, and verify the declared information of the power grid according to the maximum declared power generation capacity;
[0022] The base state clearing module is used to perform base state clearing of the day-ahead market based on the future state network model of the power grid, according to the verified declared information and the operating boundary conditions of the power grid, with the minimization of power generation cost as the optimization goal, and obtain the base state clearing result;
[0023] An operation boundary condition correction module, used to correct the future state network model according to the base state clearing result, obtain the future state section limit of the power grid according to the base state clearing result, and correct the operation boundary condition of the power grid according to the future state section limit; and
[0024] The clearing module is used to perform day-ahead market clearing based on the revised future network model, verified declared information and revised operating boundary conditions, with the minimization of power generation costs as the optimization goal, and obtain the clearing result.
[0025] A third aspect of the present invention is a terminal device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned method for clearing the electricity spot day-ahead market when executing the computer program.
[0026] A fourth aspect of the present invention is a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the above-mentioned electricity spot day-ahead market clearing method are implemented.
[0027] Compared with the prior art, the present invention has the following beneficial effects:
[0028] The power spot day-ahead market clearing method of the present invention can more accurately determine the operation status of the equipment and obtain the accurate output status of each equipment by obtaining the operation status of each device in the power grid one day later, compared with the existing two states of operation and shutdown, and then obtain the accurate maximum declared power generation capacity of the power grid, realize more accurate declared power generation capacity constraints, and provide more accurate safety constraint boundaries for power spot day-ahead market clearing; at the same time, based on the division of multiple states, it greatly improves the accuracy of judging the operation status of each device one day later, and improves the refinement level of the future state network model of the power grid. At the same time, by performing base state clearing based on the future state network model of the power grid, the declared information and the operating boundary conditions, the base state clearing result is obtained, and then the future state network topology model of the power grid is corrected by using the base state clearing result, and then the future state section limit is determined according to the corrected future state network topology model and the base state clearing result, and the operating boundary conditions are corrected by the future state section limit to improve the accuracy of the operating boundary conditions. Furthermore, based on the revised future-state network model, the day-ahead market clearing calculation is performed according to the verified declaration information and the revised operating boundary conditions to obtain the final clearing result, which effectively improves the accuracy and rationality of the day-ahead market clearing result.
[0029] Furthermore, the operating status of each device in the power grid is divided into detailed categories, including maintenance, fault, fault-related shutdown, maintenance-related shutdown, available and islanded available. This provides a way to divide operating statuses, and based on the multi-state division, the accuracy of the output of each device is further improved, resulting in a more accurate maximum reported power generation capacity.
[0030] Furthermore, after correcting the operating boundary conditions, the AC power flow data of the power grid is calculated according to the corrected operating boundary conditions based on the future network topology model. When the AC power flow data exceeds the preset AC power flow margin range, the output of each device in the power grid is adjusted, and the future section limit is re-determined and the operating boundary conditions are corrected. Through AC and DC iterative correction, the accuracy of the operating boundary conditions is further improved, the equipment over-limit situation is eliminated as much as possible, and the accuracy of the day-ahead market clearing results is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a flowchart of a method for clearing the electricity spot market in one embodiment of the present invention;
[0032] Figure 2 It is a detailed flowchart of a method for clearing the electricity spot market in one embodiment of the present invention;
[0033] Figure 3 It is a flowchart of a method for clearing the electricity spot day-ahead market in yet another embodiment of the present invention;
[0034] Figure 4 It is a flowchart of a method for clearing the electricity spot day-ahead market in yet another embodiment of the present invention;
[0035] Figure 5 This is a structural block diagram of a power spot day-ahead market clearing system in yet another embodiment of the present invention. DETAILED DESCRIPTION
[0036] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0037] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0038] First, the terms involved in the present invention are explained.
[0039] Day-ahead market: An electric energy trading market that determines the equipment combination status and power generation plan on the operating day (D-day) one day in advance of the operating day (D-1).
[0040] Market declaration: Market entities shall declare various data and information within the specified time frame in accordance with the requirements of the spot market, including static attribute registration data, operating technical parameters and economic parameters.
[0041] Market clearing: The electricity market determines transaction volume and price through competitive pricing according to market rules.
[0042] Safety-constrained equipment combination: Under the condition of meeting the safety constraints of the power system, formulate a multi-period equipment start and shutdown plan with the optimization goal of maximizing social welfare or minimizing the total power supply cost of the system.
[0043] Safety-constrained economic dispatch: Under the condition of satisfying the safety constraints of the power system, multi-period equipment power generation plans are formulated with the optimization goals of maximizing social welfare or minimizing the total power supply cost of the system.
[0044] Safety verification: The process of analyzing the safety of maintenance plans, power generation plans, market clearing results, and grid operation from the perspective of power system operation safety. Analysis methods include static safety analysis, transient stability analysis, dynamic stability analysis, and voltage stability analysis.
[0045] The present invention is further described in detail below in conjunction with the accompanying drawings:
[0046] See also Figure 1 and 2In one embodiment of the present invention, a method for clearing the day-ahead electricity spot market is provided. The operation status of each device in the power grid is divided into maintenance, fault, failure with shutdown, maintenance with shutdown, available and island available, and then the maximum declared power generation capacity of the power grid is determined according to the operation status of each device in the power grid one day later, so as to realize the constraint on the power generation capacity declared by the power plant and provide the network topology for the DC sensitivity calculation. Based on the future state network model of the power grid and the base state clearing result provided by the first optimization clearing, the future state network model is corrected, and the future state section limit is determined by interaction with the intelligent section. The operation boundary conditions of the power grid are corrected based on the AC power flow correction model, and more accurate operation boundary conditions are provided for the day-ahead electricity spot market clearing. A corrected future state network model and more accurate operation boundary conditions that can better reflect the real situation of the power grid are provided for the day-ahead electricity spot market clearing, which is helpful to obtain more reasonable and accurate day-ahead electricity spot market clearing results and provide technical support for the deepening reform of the power market. Specifically, the day-ahead electricity spot market clearing method includes the following steps.
[0047] S1: Obtain the declared information and operating boundary conditions of the power grid.
[0048] Specifically, in order to analyze and process the power grid, it is necessary to first obtain various data of the power grid. At present, various data of the power grid are generally obtained directly through dispatching agencies and trading agencies, such as the D5000 platform for data acquisition. The D5000 platform is a power grid dispatching technical support system, which is used for real-time monitoring of power grid operation, online stability analysis, dispatching business management and other functions. The data of the power grid can be directly obtained through the platform.
[0049] Among them, the power grid's declared information is the information that the power grid needs to declare when participating in the spot market. General power market rules stipulate that when participating in the spot market, the power grid must declare its maximum output and quantity and price information, that is, each output level has a corresponding price. At the same time, the maximum output declared by the power grid should not exceed its maximum declared power generation capacity to ensure that it can achieve the declared output.
[0050] The operating boundary conditions of the power grid are generally obtained through dispatching agencies and trading agencies, including system load forecasts, bus load forecasts, interconnection line plans, medium- and long-term plans, transmission plans, section limits, and fixed output plans, etc., which are required for market clearing. These provide a data basis for subsequent market clearing optimization calculations and DC power flow data calculations.
[0051] S2: Obtain the operating status of each device in the power grid one day after the last day, determine the maximum declared power generation capacity of the power grid according to the operating status of each device in the power grid one day after the last day, and verify the declared information of the power grid according to the maximum declared power generation capacity; wherein the operating status includes maintenance, fault, failure accompanying shutdown, maintenance accompanying shutdown, available and island available.
[0052] Specifically, we must first obtain the operating status of each device in the power grid one day later. In this implementation, the following method is used to determine: obtain the operating data of the power grid and the current operating status of each device in the power grid; build a network topology based on the operating data, and determine the operating status of each device one day later based on the logical relationship of the network topology and the current operating status of each device. Among them, the operating data referred to here includes equipment commissioning plan, equipment retirement plan, equipment power outage maintenance plan, and bus connection method; these data are related to the operating status and future operating status of each device in the power grid. These data are combined to build a network topology. The network topology is the energized state of all equipment in the power grid, such as the open and close state of switches and switches, the commissioning, withdrawal, and charging state of lines, the operation, withdrawal, parallel, and separate operation of buses, equipment grid-connected power generation, shutdown, transformer operation, withdrawal, no-load, etc. Furthermore, combined with the current operating status of each device in the power grid, based on the logical relationship of the network topology, the operating status of each device, bus, transformer, etc. in the power grid one day later is determined.
[0053] Moreover, in this embodiment, the operating status is divided into maintenance, fault, failure with shutdown, maintenance with shutdown, available state and island available, so as to realize the multi-state division of the equipment status. The advantage of this is that the operating status of each device can be accurately determined, and the accuracy of judging the operating status of each device the next day can be improved. Compared with the current network model, the status of equipment, lines, transformers and other equipment is only in the operating and shutdown states, and the status description is single, which cannot meet the accurate description of the status of each device, and cannot control the reasons for the shutdown of the equipment. In the future state, the available state of the equipment cannot be determined; the present invention can accurately determine the operating status of the equipment through multi-state division, and then accurately determine the output of each device, and at the same time, it can also build a more refined future state network model to obtain more accurate market clearing results.
[0054] Furthermore, the maximum declared power generation capacity of the power grid is determined according to the operating status of each device in the power grid one day later, and the operating status of each device in the power grid is determined according to the operating status of each device one day later; the maximum output of each device is determined according to the operating status of each device, and the maximum output of all devices is superimposed to obtain the maximum declared power generation capacity of the power grid. Specifically, according to the operating status of each device one day later, by knowing how to obtain the status of each device, it is possible to know what the maximum output of the power grid is at this time. If a planning unit contains three devices A, B and C, and A is under maintenance, B is faulty, and C is available, then the maximum output of the power grid is determined by C, and the maximum output exceeding C cannot be declared. The maximum output of C is the maximum declared power generation capacity of the power grid.
[0055] It should be noted here that, unlike the existing two states of operation and shutdown, the operating status includes maintenance, fault, failure-related shutdown, maintenance-related shutdown, available and island available. Each state corresponds to different output conditions. Through the detailed division of the operating status, the output condition and maximum output of the power generation equipment can be obtained more accurately, and then the accurate maximum declared power generation capacity of the power grid can be obtained.
[0056] Finally, the declared information of the power grid is verified according to the maximum declared power generation capacity to determine whether the maximum output declared by the power grid is consistent with the actual status of each device in the power grid. If the verification passes, it will be regarded as valid declared information, that is, the declared information that meets the following formula will be regarded as valid declared information:
[0057] p m,t ≤P m,t
[0058] Among them, p m,t represents the power generation capacity declared by power plant m at time t; P m,t It represents the maximum declared power generation capacity of power plant m at time t calculated in the above way.
[0059] That is, when the maximum value of the grid output in the declared information is not greater than the maximum declared power generation capacity, the declared information verification passes; otherwise, the declared information verification fails, and the grid needs to modify the maximum value of the declared grid output according to the maximum declared power generation capacity, which cannot exceed the maximum declared power generation capacity.
[0060] Here, the declared information is the information reported by the power grid to the dispatching agency. The dispatching agency is only responsible for obtaining and verifying the declared information, and then using the verified declared information for the optimization calculation of market clearing.
[0061] S3: Based on the future state network model of the power grid, according to the verified declared information and the operating boundary conditions of the power grid, the base state clearing of the day-ahead market is carried out with the minimization of power generation cost as the optimization goal to obtain the base state clearing result.
[0062] Among them, the future state network model of the power grid can be directly obtained through the D5000 platform, or it can be established by itself. In this embodiment, the following method is adopted to establish it by itself: according to the operation data of the power grid, combined with the operation status of each device in the next day, the future state network model of the power grid is constructed. The future state network model constructed here is constructed based on the above-mentioned multi-state operation status. The biggest difference between it and the network model constructed in the existing method is that the status of each device is divided more finely. The future state network model accurately determines the future state of each device to ensure that the clearing result calculated based on the future state network model is more accurate and more in line with the actual situation.
[0063] Furthermore, according to the verified declared information and the operating boundary conditions of the power grid, with the minimization of power generation cost as the optimization goal, the security constrained equipment combination (SCUC) method and the security constrained economic dispatch (SCED) method are used to carry out the base state clearing of the day-ahead market and obtain the base state clearing result.
[0064] Among them, the security-constrained equipment combination (SCUC) method and the security-constrained economic dispatch (SCED) method are mature market clearing optimization calculation methods in the power grid field. For details, please refer to the Guangdong Power Market Rules. This method only needs to integrate the future state network model, the grid operation boundary conditions, and the verified declaration information, and determine the objective function of the optimization calculation, and then build a day-ahead market clearing model. The day-ahead market clearing model can be solved by the above two methods, and then the equipment start-up and shutdown plan, equipment power generation plan and market clearing price of the power grid can be obtained.
[0065] S4: According to the base state clearing results, the future state network model is modified, and the future state section limit of the power grid is obtained according to the base state clearing results, and the operation boundary conditions of the power grid are modified according to the future state section limit.
[0066] Specifically, the base-state clearing results generally include base-state flow data, base-state power grid generation plan and base-state clearing price. The base-state power grid generation plan gives the start-up, shutdown and operation status of each device in the power grid in the future state, and the base-state flow data gives the flow size of each device in the power grid in the future state. By combining these two data information, the future operation mode of the power grid can be determined, and then the future network model can be corrected according to the operation mode.
[0067] Next, it is necessary to obtain the future state section limit of the power grid through the base state clearing result. Specifically, based on the revised future state network model, obtain the equipment contained in each section of the power grid, and superimpose the base state flow data of the power grid equipment contained in each section to obtain the section limit of each section. The section limits of all sections are combined to obtain the future state section limit of the power grid. The future state section limit of the power grid is a large set of section limits of all sections, and its internal elements are the section limits of each section. Here, the existing fixed section limit method is converted to a dynamic or intelligent section limit, which is based on the base state flow data obtained by the base state clearing calculation to determine the specific section limit. Compared with the existing method of directly using fixed section limits or inheriting the section limits of the previous day, it effectively solves the problem that the section limit changes greatly with the operation mode of the power grid, thereby causing inaccurate section limits.
[0068] Then, the operation boundary conditions of the power grid are corrected according to the future state section limit. Specifically, since the previously determined operation boundary conditions are determined under the conditions of the current section limit, they cannot accurately describe the operation boundary, so it is necessary to correct the operation boundary conditions through the future state section limit. Therefore, the future state bus load forecast and future state tie line plan of the power grid are calculated according to the future state section limit. The future state tie line plan is the future state tie line flow data of the power grid. Specifically, the AC flow calculation is performed by replacing the previous section limit with the future state section limit, because the DC flow calculation cannot obtain the bus voltage and tie line flow data, while the AC flow can obtain the bus voltage and tie line flow, and then obtain the latest future state bus load forecast and future state tie line plan. Then, the future state section limit is used to replace the section limit in the operation boundary conditions, the future state bus load forecast is used to replace the bus load forecast in the operation boundary conditions, and the future state tie line plan is used to replace the tie line plan in the operation boundary conditions to obtain the corrected operation boundary conditions.
[0069] S5: Based on the revised future network model, according to the verified declared information and the revised operating boundary conditions, the day-ahead market is cleared with the minimization of power generation cost as the optimization goal, and the clearing result is obtained. Among them, when clearing the day-ahead market, the security constrained equipment combination (SCUC) method and the security constrained economic dispatch (SCED) method are still used for day-ahead market clearing.
[0070] See also Figure 3 In yet another embodiment of the present invention, a method for clearing the electricity spot day-ahead market is provided. In addition to all the contents in the previous embodiment, the method for clearing the electricity spot day-ahead market also includes at least a base state clearing safety verification step and a clearing safety verification step.
[0071] Among them, the base state clearing safety verification step is specifically as follows: according to the future state network model of the power grid, the base state sensitivity matrix of the power grid is obtained; when the base state power flow data in the base state clearing result exceeds the preset base state power flow margin range, the output of each device in the power grid is adjusted according to the base state sensitivity matrix, the operating boundary conditions of the power grid are updated according to the output of each device, and the base state clearing of the day-ahead market is performed again to update the current base state clearing result; otherwise, the base state clearing result is output.
[0072] Among them, the base state sensitivity matrix includes the sensitivity of the power flow of each line of the power grid to the active output of each node. Specifically, the base state sensitivity matrix of the power grid is obtained in the following way: according to the future state network model of the power grid, the impedance of the equipment on both sides of each node of the power grid and the impedance of each line in the corresponding period are obtained, and according to the impedance of the equipment on both sides of the power grid node and the impedance of the line, the sensitivity of the power flow of each line to the active output of each node is calculated by the following formula, and then the sensitivity matrix is obtained by combination:
[0073] s ki =(x pi -x qi ) / x k
[0074] Among them, s ki represents the sensitivity of the line flow of the kth line to the active output of the ith node, x pi and x qi Respectively represent the impedance values of the devices on both sides of node i, x k Represents the impedance of line k.
[0075] Since each device will have a preset power flow margin range based on its own characteristics, the base state clearing safety check is to compare the calculated power flow data with these preset power flow margin ranges. The safety check is to check whether the power flow results meet the adequacy requirements, such as whether the line, transformer, or section is overloaded, and then adjust the output of the corresponding equipment according to the sensitivity. Transformers, lines, sections, and equipment will have their own reasonable voltage and current margin ranges. The calculated power flow is reasonable if it is within the range. If it exceeds the limit, it will fail the safety check, and the equipment over-limit situation must be adjusted. When adjusting the over-limit situation, determine which power generation equipment to adjust based on the sensitivity and how much to adjust so that the section does not exceed the limit and can pass the safety check.
[0076] For the base state clearing results that pass the base state clearing safety check, the final base state clearing results can be determined. For the base state clearing results that do not pass the safety check, it is necessary to adjust the output of the equipment, and then update the operating boundary conditions of the power grid. The safety constrained unit combination method and the safety constrained economic dispatch method are used again to perform the optimization calculation of the electricity spot day-ahead market clearing to obtain a new base state clearing result, and the base state clearing safety check is performed again until the base state clearing safety check is passed.
[0077] The clearing safety verification step is specifically as follows: according to the revised future state network model, the sensitivity matrix of the power grid is obtained; when the power flow data in the clearing result exceeds the preset power flow margin range, the output of each device in the power grid is adjusted according to the sensitivity matrix, and the revised operating boundary conditions are updated according to the output of each device, and the day-ahead market clearing is performed again to update the current clearing result; otherwise, the clearing result is output.
[0078] Specifically, compared with the above-mentioned base state clearing safety verification step, the difference in this clearing safety verification step is that a modified future state network model is used to calculate the sensitivity matrix of the power grid, and the subsequent verification is similar to the above-mentioned base state clearing safety verification.
[0079] See also Figure 4In another embodiment of the present invention, a method for clearing the day-ahead spot electricity market is provided. In addition to including all the contents of any of the above embodiments, the method for clearing the day-ahead spot electricity market also includes at least an AC power flow safety verification step: based on the revised future state network model, the AC power flow data of the power grid is calculated according to the revised operating boundary conditions. When the AC power flow data exceeds the preset AC power flow margin range, the output of each device in the power grid is adjusted, and the revised future state network topology model and the revised operating boundary conditions are updated according to the output of each device. Then, based on the revised future state network model, according to the verified declared information and the revised operating boundary conditions of the power grid, the day-ahead market base state clearing is performed with the minimization of power generation cost as the optimization goal, and the base state clearing result is updated; otherwise, based on the revised future state network model, according to the verified declared information and the revised operating boundary conditions, the day-ahead market clearing is performed with the minimization of power generation cost as the optimization goal, and the clearing result is obtained.
[0080] In actual work, the inventors found that DC power flow is widely used in the power market and economic dispatch field due to its linear expression and rapidity. The error of DC power flow results is closely related to the operating boundary conditions of the power grid. A large error in DC power flow results will directly lead to inaccurate operating boundary conditions, and the accuracy of operating boundary conditions is the key to the rationality and accuracy of the day-ahead market clearing results.
[0081] At the same time, facing the access of AC / DC power grid and a large number of new energy sources, the power grid is transforming into a new form of AC / DC interconnection. New energy units are usually connected to the power grid by power electronic equipment. How to consider the coupling of reactive power and active power in market clearing is an urgent problem to be solved. It is precisely because of the new form of AC / DC interconnection and the large-scale access of new energy sources that the coupling of active power and reactive power in the power grid is becoming closer, and the DC feed-in and the fluctuation of new energy output have put forward higher requirements on the safety of power grid voltage and reactive power. However, the traditional DC power flow model cannot consider reactive power and voltage. Therefore, in this case, the error of DC power flow results is relatively large, and the traditional DC power flow model has been difficult to ensure the safety and economy of market clearing results. For this reason, it is urgent to study the clearing method of spot market considering active and reactive power coupling, to achieve the connection between market clearing and actual power grid operation more safely and efficiently, to improve the refinement level of power grid operation boundary, and to improve the accuracy of future state power flow calculation.
[0082] Based on the above problems, the AC power flow safety verification steps are proposed. Based on the future network topology model, the AC power flow data of the power grid is calculated according to the revised operating boundary conditions. Power flow calculation is the most basic calculation of the power grid. The so-called power flow calculation is to calculate the bus voltage, branch current and power and network loss of the steady-state operation of the power grid when the wiring mode, parameters and operating conditions of the power grid are known. Through power flow calculation, a basis can be provided for selecting power supply schemes and electrical equipment.
[0083] Then, a safety check is performed on each device in the power grid based on the AC power flow data. Since each AC device will have a preset AC power flow margin range based on its own characteristics, the safety check is to compare the calculated AC power flow data with these preset AC power flow margin ranges to check whether the AC power flow data meets the adequacy requirements. When the AC power flow data exceeds the preset AC power flow margin range, it is judged as failing the safety check; when the AC power flow data does not exceed the preset AC power flow margin range, it is judged as passing the safety check.
[0084] When the safety check fails, the output of each device in the power grid needs to be adjusted. After adjusting the output of each device in the power grid, the output parameter data of each device in the revised future state network topology model and the output parameter data of each device in the revised operating boundary conditions need to be updated accordingly, and the revised future state network topology model and the revised operating boundary conditions are updated. Then, based on the revised future state network model, according to the verified declaration information and the revised power grid operating boundary conditions, the day-ahead market base state clearing is performed with the minimization of power generation cost as the optimization goal, the base state clearing result is updated, and the subsequent steps are repeated to iteratively optimize the AC power flow and future state section limit to obtain a reasonable future state section limit. When the safety check passes, the current revised operating boundary conditions not only meet the DC power flow results, but also meet the AC power flow results. Based on the revised future state network model, according to the verified declaration information and the revised operating boundary conditions, the day-ahead market clearing is performed with the minimization of power generation cost as the optimization goal, the accuracy and rationality of the day-ahead market clearing results of the power spot market are improved, and market trading behavior is reasonably guided.
[0085] See also Figure 5 In another embodiment of the present invention, a power spot day-ahead market clearing system is provided, and the power spot day-ahead market clearing system can be used to implement the power spot day-ahead market clearing method provided in any of the above embodiments. Specifically, the power spot day-ahead market clearing system includes: an information acquisition module, a declaration information verification module, a base state clearing module, an operation boundary condition correction module, and a clearing module.
[0086] Among them, the information acquisition module is used to obtain the declared information and operating boundary conditions of the power grid. The declared information verification module is used to obtain the operating status of each device in the power grid one day later, and determine the maximum declared power generation capacity of the power grid according to the operating status of each device in the power grid one day later, and verify the declared information of the power grid according to the maximum declared power generation capacity. The base state clearing module is used to perform the base state clearing of the day-ahead market based on the future state network model of the power grid, according to the verified declared information and the operating boundary conditions of the power grid, with the minimization of power generation cost as the optimization goal, and obtain the base state clearing result. The operating boundary condition correction module is used to correct the future state network model according to the base state clearing result, and obtain the future state section limit of the power grid according to the base state clearing result, and correct the operating boundary conditions of the power grid according to the future state section limit. The clearing module is used to perform the day-ahead market clearing based on the corrected future state network model, according to the verified declared information and the corrected operating boundary conditions, with the minimization of power generation cost as the optimization goal, and obtain the clearing result.
[0087] In another embodiment of the present invention, a terminal device is provided, the terminal device includes a processor and a memory, the memory is used to store a computer program, the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, which is suitable for implementing one or more instructions, and is specifically suitable for loading and executing one or more instructions to implement the corresponding method flow or corresponding function; the processor described in the embodiment of the present invention can be used for the operation of the day-ahead market clearing method of the power spot, including: obtaining the declared information and operating boundary conditions of the power grid; determining the maximum declared power generation capacity of the power grid according to the operating status of each device in the power grid one day later, and verifying the declared information of the power grid according to the maximum declared power generation capacity; wherein, the operating status The states include maintenance, fault, failure-related outage, maintenance-related outage, available and island available; based on the future-state network model of the power grid, according to the verified declared information and the operating boundary conditions of the power grid, the day-ahead market base state clearing is carried out with the minimization of power generation cost as the optimization goal, and the base state clearing result is obtained; according to the base state clearing result, the future-state network model is revised, and according to the base state clearing result, the future-state section limit of the power grid is obtained, and the operating boundary conditions of the power grid are revised according to the future-state section limit; based on the revised future-state network model, according to the verified declared information and the revised operating boundary conditions, the day-ahead market clearing is carried out with the minimization of power generation cost as the optimization goal, and the clearing result is obtained.
[0088] In another embodiment, the present invention further provides a computer-readable storage medium (Memory), which is a memory device in a terminal device for storing programs and data. It is understandable that the computer-readable storage medium here can include both the built-in storage medium in the terminal device and the extended storage medium supported by the terminal device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by the processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory.
[0089] One or more instructions stored in a computer-readable storage medium can be loaded and executed by a processor to implement the corresponding steps of the method for clearing the spot power market on the day before in the above-mentioned embodiment; one or more instructions in the computer-readable storage medium are loaded by the processor and the following steps are executed: obtaining the declared information and operating boundary conditions of the power grid; determining the maximum declared power generation capacity of the power grid according to the operating status of each device in the power grid one day after, and verifying the declared information of the power grid according to the maximum declared power generation capacity; based on the future state network model of the power grid, according to the verified declared information and the operating boundary conditions of the power grid, performing the base state clearing of the day before the market with minimization of power generation cost as the optimization goal, and obtaining the base state clearing result; correcting the future state network model according to the base state clearing result, and obtaining the future state section limit of the power grid according to the base state clearing result, and correcting the operating boundary conditions of the power grid according to the future state section limit; based on the revised future state network model, according to the verified declared information and the revised operating boundary conditions, performing the day before the market clearing with minimization of power generation cost as the optimization goal, and obtaining the clearing result.
[0090] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0091] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0092] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0093] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0094] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A method for clearing the day-ahead spot electricity market, characterized in that: The following steps are involved: Obtain the declared information and operating boundary conditions of the power grid; Obtain the operating status of each device in the power grid one day later, determine the maximum declared power generation capacity of the power grid based on the operating status of each device in the power grid one day later, and verify the declared information of the power grid based on the maximum declared power generation capacity; Based on the future state network model of the power grid, according to the verified declared information and the operating boundary conditions of the power grid, the base state clearing of the day-ahead market is carried out with the minimization of power generation cost as the optimization goal, and the base state clearing result is obtained; The future state network model is modified according to the base state clearing result, and the future state section limit of the power grid is obtained according to the base state clearing result, and the operation boundary conditions of the power grid are modified according to the future state section limit; Based on the revised future network model, according to the verified declared information and the revised operating boundary conditions, the day-ahead market is cleared with the minimization of power generation cost as the optimization goal, and the clearing result is obtained; The specific method for obtaining the future state section limit of the power grid according to the base state clearing result is: The base state flow data of each device in the power grid is obtained according to the base state clearing result; based on the revised future state network model, the devices contained in each section of the power grid are obtained, and the base state flow data of the devices contained in each section are superimposed to obtain the section limit of each section, and the section limits of all sections are combined to obtain the future state section limit of the power grid; The specific method for correcting the operating boundary conditions of the power grid according to the future state section limit is: Based on the revised future state network model, the future state bus load forecast and future state interconnection line plan of the power grid are calculated according to the future state section limit; The future state section limit is used to replace the section limit in the operation boundary conditions, the future state bus load forecast is used to replace the bus load forecast in the operation boundary conditions, and the future state interconnection line plan is used to replace the interconnection line plan in the operation boundary conditions to obtain the revised operation boundary conditions.
2. The method for clearing the electricity spot market on the day-ahead basis according to claim 1, characterized in that: The operating status of each device in the power grid on the next day is obtained in the following manner: Obtaining the operation data of the power grid and the current operation status of each device in the power grid; wherein the operation data includes equipment commissioning plan, equipment retirement plan, equipment power outage maintenance plan and busbar connection method; A network topology is constructed according to the operation data, and the operation status of each device on the next day is determined based on the logical relationship of the network topology and the current operation status of each device; wherein the operation status includes maintenance, failure, failure accompanying shutdown, maintenance accompanying shutdown, available and island available.
3. The method for clearing the electricity spot market before the day according to claim 1, characterized in that: The specific method of determining the maximum declared power generation capacity of the power grid according to the operating status of each device in the power grid the next day and verifying the declared information of the power grid according to the maximum declared power generation capacity is as follows: Determine the operating status of each device in the power grid based on the operating status of each device the day after. Determine the maximum output of each device based on the operating status of each device, and add up the maximum outputs of all devices to obtain the maximum declared power generation capacity of the power grid. When the maximum value of the power generation capacity of the power grid in the declared information is not greater than the maximum declared power generation capacity, the declared information verification passes; otherwise, the declared information verification fails.
4. The method for clearing the electricity spot market on the day-ahead basis according to claim 1, characterized in that: It also includes the base state clearing safety verification steps: According to the future state network model of the power grid, the base state sensitivity matrix of the power grid is obtained; When the base state power flow data in the base state clearing result exceeds the preset base state power flow margin range, the output of each device in the power grid is adjusted according to the base state sensitivity matrix, the operation boundary conditions of the power grid are updated according to the output of each device, and the base state clearing of the day-ahead market is performed again to update the current base state clearing result; otherwise, the base state clearing result is output; It also includes the following steps for clearing safety checks: According to the revised future state network model, the sensitivity matrix of the power grid is obtained; When the power flow data in the clearing result exceeds the preset power flow margin range, the output of each device in the power grid is adjusted according to the sensitivity matrix, the corrected operating boundary conditions are updated according to the output of each device, and the day-ahead market clearing is performed again to update the current clearing result; otherwise, the clearing result is output.
5. The method for clearing the electricity spot market before the day according to claim 1, characterized in that: It also includes AC power flow safety verification steps: Based on the revised future state network model, the AC power flow data of the power grid is calculated according to the revised operating boundary conditions. When the AC power flow data exceeds the preset AC power flow margin range, the output of each device in the power grid is adjusted, and the revised future state network topology model, future state section limit and revised operating boundary conditions are updated according to the output of each device. Then, based on the revised future state network model, according to the verified declared information and the revised operating boundary conditions of the power grid, the base state clearing of the day-ahead market is carried out with the minimization of power generation cost as the optimization goal, and the base state clearing result is updated; Otherwise, based on the revised future state network model, according to the verified declared information and the revised operating boundary conditions, the day-ahead market clearing is carried out with the minimization of power generation costs as the optimization goal to obtain the clearing result.
6. A power spot day-ahead market clearing system based on the power spot day-ahead market clearing method according to claim 1, characterized in that: include: Information acquisition module, used to obtain the declared information and operating boundary conditions of the power grid; The declared information verification module is used to obtain the operating status of each device in the power grid one day later, determine the maximum declared power generation capacity of the power grid according to the operating status of each device in the power grid one day later, and verify the declared information of the power grid according to the maximum declared power generation capacity; The base state clearing module is used to perform base state clearing of the day-ahead market based on the future state network model of the power grid, according to the verified declared information and the operating boundary conditions of the power grid, with the minimization of power generation cost as the optimization goal, and obtain the base state clearing result; An operation boundary condition correction module is used to correct the future state network model according to the base state clearing result, obtain the future state section limit of the power grid according to the base state clearing result, and correct the operation boundary condition of the power grid according to the future state section limit; as well as The clearing module is used to perform day-ahead market clearing based on the revised future network model, verified declared information and revised operating boundary conditions, with the minimization of power generation costs as the optimization goal, and obtain the clearing result.
7. A terminal device, characterized in that: The method comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the method for clearing the electricity spot day-ahead market as claimed in any one of claims 1 to 5 when executing the computer program.
8. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the method for clearing the electricity spot day-ahead market as claimed in any one of claims 1 to 5 are implemented.