A rubber core insertion device and connector assembly equipment

By using a combination of pre-insert assembly and press assembly components in the connector assembly equipment and combining the pulling mechanism, the problem of low insertion accuracy of the rubber core is solved, and the yield and insertion accuracy of the connector assembly equipment are significantly improved.

CN111987567BActive Publication Date: 2024-11-19DONGGUAN YI CHENG AUTOMATIC EQUIP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010910694.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-02
Publication Date
2024-11-19
Estimated Expiration
2040-09-02

AI Technical Summary

Technical Problem

In existing connector assembly equipment, the glue core insertion accuracy is low, resulting in high connector defect rate.

Method used

A rubber core insertion device is designed, including a pre-insert assembly and a press assembly. The rubber core is pre-supported into the connector body through the first pusher and the first clip pickup, and the insertion is completed by the press assembly to improve the Insert accuracy. The device also includes a pulling mechanism for transferring the connector body from the station of the pre-insert assembly to the station of the press assembly, ensuring that the core is fully inserted.

Benefits of technology

It improves the accuracy of rubber core insertion, reduces the defect rate of connector assembly equipment, and enhances the reliability and efficiency of the plug-in process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111987567B_ABST
    Figure CN111987567B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of connector assembly equipment, and discloses a rubber core insertion device, including a bracket, an insertion mechanism and a pulling mechanism, the insertion mechanism includes a pre-insertion component and a press-fit component, the pre-insertion component includes a first pusher and a first clamping component, the first pusher is installed on the bracket, the first clamping component is connected to the execution end of the first pusher, and the press-fit component is installed on the bracket and is located downstream of the pre-insertion component; a connector assembly device is also disclosed, including a main body feeding mechanism, a workpiece feeding mechanism, a material transfer mechanism and the above-mentioned rubber core insertion device. The main body feeding mechanism is used to provide a connector body, the workpiece feeding mechanism is used to provide a rubber core, the first pusher can pre-push the rubber core clamped by the first clamping component into the connector body, and further, the press-fit component can completely insert the rubber core into the connector body to form a connector, which improves the insertion accuracy of the rubber core insertion device, thereby improving the yield rate of the connector assembly equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of connector assembly equipment, and in particular to a rubber core insertion device and connector assembly equipment. Background Art

[0002] Electronic connectors are also often called circuit connectors or electrical connectors. They are conductor devices used to bridge two conductors on a loop so that current or signals can flow from one conductor to another. An electronic connector is a motor system that can provide a separable interface to connect two sub-electronic systems. Simply put, the components used to complete the electrical connection between circuits or electronic machines are called connectors, which are the bridge between the two. They are widely used in consumer electronics, automobiles, aerospace and other fields. The connector assembly process is an essential step in the connector manufacturing process. In existing assembly equipment, workpieces such as plug-in terminals or rubber cores are directly inserted at one time, which cannot guarantee the accuracy of the insertion and may even cause damage to the workpiece and the connector body, which in turn causes an increase in the connector defect rate.

[0003] Based on the above situation, it is urgent for us to design a rubber core insertion device to solve the above problems. Summary of the invention

[0004] An object of the present invention is to provide a rubber core insertion device to solve the problem of low insertion accuracy of the rubber core.

[0005] Another object of the present invention is to provide a connector assembly device to solve the problem of low insertion accuracy of the rubber core insertion device, thereby improving the problem of high defect rate of the connector assembly device.

[0006] To achieve this object, the present invention adopts the following technical solutions:

[0007] In one aspect, a rubber core insertion device is disclosed, comprising:

[0008] Bracket;

[0009] The insertion mechanism comprises a pre-insertion component and a press-fit component, wherein the pre-insertion component comprises a first pusher and a first clamping component, wherein the first pusher is mounted on the bracket, and the first clamping component is connected to the execution end of the first pusher, and the press-fit component is mounted on the bracket and is located downstream of the pre-insertion component, wherein the first pusher can pre-push the rubber core clamped by the first clamping component into the connector body, and the press-fit component can completely insert the rubber core pre-pushed into the connector body into the connector body to form a connector;

[0010] The material pulling mechanism is installed on the bracket and is located on one side of the insertion mechanism. The material pulling mechanism can transfer the connector body from the station of the pre-insertion component to the station of the press-fitting component.

[0011] Specifically, the first pushing member of the pre-insertion component first pushes the rubber core clamped by the first clamping member into the connector body. Furthermore, the pressing assembly located downstream of the pre-insertion component pushes the rubber core to make it fully inserted into the connector body to form a connector, thereby improving the insertion accuracy of the rubber core.

[0012] As a preferred solution, the material pulling mechanism includes:

[0013] A material drawing plate, comprising a lifting plate, wherein the lifting plate is provided with material drawing grooves at intervals, and the connector body can be placed in the material drawing grooves;

[0014] The second pusher, the lifting plate is installed at the execution end of the second pusher, and the second pusher can move back and forth with the lifting plate along the direction from the station of the pre-insertion component to the station of the press-fitting component.

[0015] Specifically, the execution end of the second pusher can drive the connector body in the drawing groove to move back and forth by driving the drawing plate, thereby realizing the station conversion from the pre-insertion component to the press-fitting component, and the structure is simple.

[0016] As a preferred solution, the material pulling mechanism further includes a first lifting member, the lifting plate is connected to the execution end of the first lifting member, and the lifting plate is installed on the second pushing member through the first lifting member;

[0017] The pulling plate also includes a positioning plate, which is fixed on the bracket. The lifting plate is slidably connected to the positioning plate along a direction perpendicular to the propulsion direction of the second propulsion member. The connector body is placed on the positioning plate. The first lifting member can drive the lifting plate to rise and fall along the direction of the sliding connection with the positioning plate, and make the lifting plate support or detach from the connector body.

[0018] Specifically, the lifting plate is installed at the execution end of the first lifting member, and the first lifting member is installed at the execution end of the second pushing member. The first lifting member pushes the lifting plate to support the connector body, and the second pushing member then moves the lifting plate along the direction of the pre-insertion component station to the press-fit component station. The first lifting member pulls back the lifting plate to disengage from the connector body, thereby changing the position of the connector body and improving reliability.

[0019] As a preferred solution, a protruding positioning platform is provided at one end of the positioning plate away from the first pushing member, and the positioning platform abuts against the end of the connector body.

[0020] Specifically, when the insertion mechanism inserts the rubber core into the connector body, the positioning platform abuts against the end of the connector body away from the insertion mechanism, thereby balancing the force on the connector body.

[0021] On the other hand, a connector assembly device is also disclosed, including a main body loading mechanism, a workpiece loading mechanism, a material transfer mechanism and the above-mentioned rubber core insertion device, the main body loading mechanism is arranged upstream of the pulling mechanism, the workpiece loading mechanism is arranged upstream of the pre-insertion component, the material transfer mechanism is arranged downstream of the insertion mechanism, and the material transfer mechanism can transfer the connector with the rubber core inserted to the next workstation.

[0022] Specifically, the main body feeding mechanism and the workpiece feeding mechanism can provide the connector main body and the rubber core respectively, the rubber core inserting device can insert the rubber core into the connector main body to form a connector, and the material transfer mechanism then transfers the connector to the next workstation.

[0023] As a preferred solution, the feeding tracks of the main body feeding mechanism and the workpiece feeding mechanism are vertically arranged, the main body feeding mechanism can convey the connector body to the pulling mechanism, and the workpiece feeding mechanism can convey the rubber core to the pre-insertion component.

[0024] Specifically, the feeding tracks of the main body feeding mechanism and the workpiece feeding mechanism can respectively transport the connector body and the rubber core to the rubber core insertion device along two mutually perpendicular transport directions, and the structure is compact.

[0025] As a preferred solution, a second lifting member is provided at the discharge port of the workpiece feeding mechanism, and the second lifting member includes a lifting member and a power source, the lifting member is connected to the output end of the power source, and the power source is installed on the bracket, and the power source can drive the lifting member to lift the rubber core to the first clamping member, and at the same time, the lifting member can block the discharge port of the workpiece feeding mechanism;

[0026] Alternatively, the first propulsion member is connected to the execution end of the second lifting member and is installed on the bracket through the second lifting member, and the second lifting member can drive the first clamping member that clamps the rubber core to rise, and at the same time, the side wall of the first clamping member can block the discharge port of the workpiece loading mechanism.

[0027] As a preferred solution, the rubber core insertion device further comprises a detection mechanism, which is mounted on the bracket and located downstream of the press-fit assembly, and the detection mechanism is electrically connected to the material transfer mechanism.

[0028] Optionally, the detection mechanism is an image sensor.

[0029] Specifically, the detection mechanism detects the connectors that have been installed with the rubber core, and controls the material transfer mechanism to distinguish and place the good connectors from the defective ones according to the information of the connectors obtained.

[0030] As a preferred embodiment, the material transfer mechanism includes a rotating material transfer component and a good material transfer component. A waste bucket is provided downstream of the rotating material transfer component. The good material transfer component is provided downstream of the rotating material transfer component. The rotating material transfer component includes a rotating clamping piece. The good material transfer component and the waste bucket are at the same distance from the rotation center of the rotating clamping piece.

[0031] Specifically, the rotating clamping member can clamp the connector that has been inspected by the inspection mechanism, and then rotatably transfer the good connector to the good transfer component and transfer the defective connector to the waste barrel. The transfer mechanism has a compact structure.

[0032] As a preferred solution, the good product transfer mechanism includes a second clamping member, a third clamping member, a transfer rack and a clamping block, the clamping block is installed on the transfer rack and is located between the second clamping member and the third clamping member, the second clamping member and the third clamping member are both slidably connected to the transfer rack, the third clamping member is arranged downstream of the second clamping member, and the clamping block can realize the transfer of the connector between the second clamping member and the third clamping member.

[0033] Specifically, the second clamping member clamps the good connector on the rotating material transfer assembly and places it on the clamping block, and the third clamping member clamps the connector on the clamping block and transfers it to the next workstation. The second clamping member and the third clamping member work synchronously, thereby improving work efficiency.

[0034] The beneficial effects of the present invention are as follows: a rubber core insertion device is provided, the insertion mechanism includes a pre-insertion component and a press-fitting component, the press-fitting component is located downstream of the pre-insertion component, the pre-insertion component can pre-push the rubber core into the connector body, and the press-fitting mechanism can completely insert the rubber core pre-pushed into the connector body into the connector body to form a connector, thereby improving the accuracy of rubber core insertion; a connector assembly device is also provided, including a main body feeding mechanism, a workpiece feeding mechanism, a material transfer mechanism and the above-mentioned rubber core insertion device, the main body feeding mechanism is used to provide a connector body, the workpiece feeding mechanism is used to provide a rubber core, and the material transfer mechanism can transfer the connector with a rubber core inserted manufactured by the rubber core insertion device to the next workstation, the rubber core insertion device has high accuracy in inserting the rubber core, thereby improving the yield rate of the connector assembly equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] The present invention is further described in detail below based on the accompanying drawings and embodiments.

[0036] Figure 1 It is a structural schematic diagram of the rubber core insertion device;

[0037] Figure 2 It is a structural schematic diagram of the material pulling mechanism from the first perspective (disassembling the positioning table);

[0038] Figure 3 It is a structural schematic diagram of the material pulling mechanism from a second perspective (positioning plate before removal);

[0039] Figure 4 A schematic diagram of the structure of the connector assembly device;

[0040] Figure 5 It is a schematic diagram of the structure of the assembly of the workpiece feeding mechanism and the pre-insertion component;

[0041] Figure 6 for Figure 5 A partial enlarged view of point A shown;

[0042] Figure 7 It is a structural schematic diagram of the material transfer mechanism.

[0043] Figures 1 to 7 middle:

[0044] 100. Rubber core insertion device;

[0045] 1. Bracket;

[0046] 2. Insertion mechanism; 21. Pre-insertion assembly; 211. First pusher; 212. First clamping member; 22. Press-fit assembly;

[0047] 3. Material pulling mechanism; 31. Material pulling plate; 311. Lifting plate; 3111. Material pulling trough; 312. Positioning plate; 3121. Positioning platform; 32. Second pushing member; 33. First lifting member;

[0048] 4. Testing agency;

[0049] 200. Main body feeding mechanism;

[0050] 300. Workpiece feeding mechanism;

[0051] 5. Second lifting member; 51. Lifting member; 52. Power source;

[0052] 6. Loading track;

[0053] 400, material transfer mechanism;

[0054] 7. Rotating material transfer assembly; 71. Rotating clamping member; 72. Rotating disk;

[0055] 8. Good product transfer assembly; 81. Second clamping member; 82. Third clamping member; 83. Transfer rack; 84. Clamping block;

[0056] 9. Waste bin. DETAILED DESCRIPTION

[0057] In order to make the technical problems solved by the present invention, the technical solutions adopted and the technical effects achieved clearer, the technical solutions of the embodiments of the present invention will be further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0058] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0059] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0060] The technical solution of the present invention is further described below with reference to the accompanying drawings and through specific implementation methods.

[0061] Embodiment 1:

[0062] like Figure 1As shown, this embodiment provides a rubber core insertion device, including a bracket 1, an insertion mechanism 2 and a pulling mechanism 3, the insertion mechanism 2 includes a pre-insertion component 21 and a press-fitting component 22, the pre-insertion component 21 includes a first pusher 211 and a first clamping component 212, the first pusher 211 is installed on the bracket 1, the first clamping component 212 is connected to the execution end of the first pusher 211, the press-fitting component 22 is installed on the bracket 1 and is located downstream of the pre-insertion component 21, the first pusher 211 can pre-push the rubber core clamped by the first clamping component 212 into the connector body, and the press-fitting component 22 can completely insert the rubber core pre-pushed into the connector body into the connector body to form a connector; the pulling mechanism 3 is installed on the bracket 1 and is located on one side of the insertion mechanism 2, and the pulling mechanism 3 can transfer the connector body from the pre-insertion component 21 station to the press-fitting component 22 station. In this embodiment, the first pushing member 211 is configured as a cylinder push rod, the first clamping member 212 is configured as a cylinder clamp, the cylinder of the cylinder push rod is installed on the bracket 1, the actuator end push rod of the cylinder push rod is connected to a slider slidably connected to the bracket 1, the cylinder clamp is fixed on the slider, and the press-fitting assembly 22 is also configured as a cylinder push rod. The press-fitting assembly 22 is installed on the bracket 1 and is located downstream of the pre-insertion assembly 21. The pulling mechanism 3 is fixed on the bracket 1 and is located on one side of the actuator end of the insertion mechanism 2. The first clamping member 212 clamps the rubber core, and the first pushing member 211 drives the first clamping member 212 to move toward the pulling mechanism 3, and then the first clamping member 212 pre-pushes the rubber core into the connector body on the pulling mechanism 3. The pulling mechanism 3 transfers the connector body from the pre-insertion component 21 station to the press-fitting component 22 station. The push rod of the press-fitting component 22 pushes the pre-inserted rubber core and fully inserts it into the connector body to form a connector. The pre-insertion component 21 and the press-fitting component 22 of the insertion mechanism 2 are respectively fixed on the bracket 1, and the pre-pushing and press-fitting processes are performed, thereby improving the accuracy of the rubber core insertion.

[0063] like Figure 2 As shown, the material pulling mechanism 3 includes a material pulling plate 31 and a second pusher 32. The material pulling plate 31 includes a lifting plate 311. The lifting plate 311 is provided with material pulling grooves 3111 at intervals. The connector body can be placed in the material pulling grooves 3111. The lifting plate 311 is installed at the execution end of the second pusher 32. The second pusher 32 can move back and forth with the lifting plate 311 along the direction from the station of the pre-insertion component 21 to the station of the press-fitting component 22. The connector body is placed in the material pulling groove 3111 of the material pulling plate 31. The second pusher 32 is configured as a cylinder push rod. The material pulling plate 31 is connected to one end of the push rod away from the cylinder. The second pusher 32 drives the material pulling plate 31 to move back and forth along the direction from the station of the pre-insertion component 21 to the station of the press-fitting component 22, thereby converting the connector body or the station of the connector in the material pulling groove 3111. The structure is simple.

[0064] like Figure 3As shown, the material pulling mechanism 3 also includes a first lifting member 33, a lifting plate 311 is connected to the execution end of the first lifting member 33, and the lifting plate 311 is installed on the second pushing member 32 through the first lifting member 33; the material pulling plate 31 also includes a positioning plate 312, the positioning plate 312 is fixed on the bracket 1, the lifting plate 311 and the positioning plate 312 are slidably connected along the direction perpendicular to the pushing direction of the second pushing member 32, the connector body is placed on the positioning plate 312, and the first lifting member 33 can drive the lifting plate 311 to rise and fall along the direction of the sliding connection with the positioning plate 312, and make the lifting plate 311 support or detach from the connector body. In this embodiment, a protruding positioning platform 3121 is provided at one end of the positioning plate 312 away from the first pushing member 211, and the positioning platform 3121 abuts against the end of the connector body. The first lifting member 33 is fixed to the execution end of the second propulsion member 32. The first lifting member 33 is a cylinder push rod. The cylinder is fixed to the execution end of the second propulsion member 32. The push rod is connected to the lifting plate 311. The positioning plate 312 includes a front positioning plate and a rear positioning plate. The rear positioning plate is located on the side of the front positioning plate away from the insertion mechanism 2 and is parallel to the front positioning plate. The lifting plate 311 passes through the middle channel between the front positioning plate and the rear positioning plate and is slidably connected to the positioning plate 312. The connector body is placed on the front positioning plate and the rear positioning plate. The rear positioning plate is provided with a raised positioning platform 3121. The positioning platform 3121 abuts against the end of the connector body. The pulling groove 3111 limits the two sides of the connector body. The pre-insertion component 21 pre-pushes the rubber core into the connector body. The first lifting member 33 drives the lifting plate 311 to rise, and then the lifting plate 311 can support the connector body and make the connector body separate from the positioning plate 312. The second pushing member 32 drives the lifting plate 311 to move from the station of the pre-insertion component 21 to the station of the press-fitting component 22. The part 33 pulls the lifting plate 311 to move towards the direction close to the positioning plate 312, and the connector body with the pre-inserted rubber core is re-mounted on the positioning plate 312 of the station of the press-fitting component 22, and the press-fitting component 22 completely inserts the rubber core into the connector body to form a connector; the second pushing member 32 drives the lifting plate 311 to move from the station of the press-fitting component 22 to the station of the pre-insertion component 21, and the pulling mechanism 3 is reset, which improves reliability, and the pulling mechanism 3 only needs to move back and forth between the two stations to drive the transfer of the connector body in the entire process flow, thereby improving work efficiency.

[0065] Embodiment 2:

[0066] like Figure 4As shown, this embodiment provides a connector assembly device, including a main body feeding mechanism 200, a workpiece feeding mechanism 300, a transfer mechanism 400 and the rubber core insertion device 100 described in the first embodiment, the main body feeding mechanism 200 is arranged upstream of the pulling mechanism 3, the workpiece feeding mechanism 300 is arranged upstream of the pre-insertion component 21, and the transfer mechanism 400 is arranged downstream of the insertion mechanism 2, and the transfer mechanism 400 can transfer the connector with the rubber core inserted to the next station. In this embodiment, the feeding tracks 6 of the main body feeding mechanism 200 and the workpiece feeding mechanism 300 are arranged vertically, the main body feeding mechanism 200 can convey the connector body to the pulling mechanism 3, and the workpiece feeding mechanism 300 can convey the rubber core to the pre-insertion component 21. The main body feeding mechanism 200 and the workpiece feeding mechanism 300 are both installed on the bracket 1, and the feeding tracks 6 of the main body feeding mechanism 200 and the workpiece feeding mechanism 300 are vertically arranged. The main body feeding mechanism 200 can provide the connector body on the pulling mechanism 3, and the workpiece feeding mechanism 300 can provide the rubber core on the pre-insertion component 21. The rubber core insertion device 100 inserts the rubber core into the connector body to form a connector, and the transfer mechanism 400 transfers the connector to the next workstation. The rubber core insertion device 100 improves the accuracy of the rubber core insertion, and then the connector assembly equipment improves the yield rate of connector manufacturing.

[0067] like Figure 5 and Figure 6As shown, a second lifting member 5 is provided at the discharge port of the workpiece feeding mechanism 300, and the second lifting member 5 includes a lifting member 51 and a power source 52, the lifting member 51 is connected to the output end of the power source 52, and the power source 52 is installed on the bracket 1, and the power source 52 can drive the lifting member 51 to hold the rubber core and rise to the first clamping member 212, and at the same time, the lifting member 51 can block the discharge port of the workpiece feeding mechanism 300. The workpiece feeding mechanism 300 delivers the rubber core to the pre-insertion component 21, and then the lifting member 51 at the outlet of the feeding track 6 can lift the rubber core to the first clamping member 212. At the same time, the lifting member 51 can close the outlet of the feeding track 6, which improves reliability. The first clamping member 212 clamps the rubber core, and then the first pushing member 211 can drive the first clamping member 212 to pre-push the rubber core into the connector body; the power source 52 drives the lifting member 51 to move away from the pre-insertion component 21 and moves the lifting surface of the lifting member 51 to a position flush with the track plane of the feeding track 6. In other embodiments, the first pushing member 211 is connected to the execution end of the second lifting member 5 and is installed on the bracket 1 through the second lifting member 5. The second lifting member 5 can drive the first clamping member 212 that clamps the rubber core to rise. At the same time, the side wall of the first clamping member 212 can block the outlet of the workpiece feeding mechanism 300. The main body of the second lifting member 5 is fixed on the bracket 1, and the main body of the first pushing member 211 is fixed to the execution end of the second lifting member 5. The first clamping member 212 connected to the execution end of the first pushing member 211 clamps the rubber core, and then the second lifting member 5 drives the first clamping member 212 to rise in the direction close to the connector body, and the side wall of the first clamping member 212 can close the discharge port of the loading track 6.

[0068] In this embodiment, if Figure 1 As shown, the plastic core insertion device 100 also includes a detection mechanism 4, which is installed on the bracket 1 and located downstream of the press-fit assembly 22, and is electrically connected to the material transfer mechanism 400. The detection mechanism 4 is configured as an image sensor, which is installed on the bracket 1 and located downstream of the press-fit assembly 22. The detection mechanism 4 can detect the connectors conveyed on the material pulling mechanism 3 and judge the quality of the connectors, and then can control the downstream material transfer mechanism 400 to distinguish good connectors from defective connectors and place the connectors conveyed by the material pulling mechanism 3 according to the information of the connectors obtained.

[0069] like Figure 7As shown, the material transfer mechanism 400 includes a rotating material transfer component 7 and a good material transfer component 8. The good material transfer component 8 is arranged downstream of the rotating material transfer component 7. The rotating material transfer component 7 includes a rotating clamping member 71. A waste bucket 9 is arranged downstream of the rotating material transfer component 7. The distances from the good material transfer component 8 and the waste bucket 9 to the rotation center of the rotating clamping member 71 are equal. The rotating clamping member 71 is installed on a rotating disk 72. The rotating clamping member 71 clamps the tested connector on the pulling mechanism 3. The rotating disk 72 drives the rotating clamping member 71 to rotate. When the connector is good, the rotating clamping member 71 transfers the connector to the downstream good material transfer component 8. When the connector is defective, the rotating clamping member 71 puts the connector into the downstream waste bucket 9. The structure is compact.

[0070] In this embodiment, the good material transfer mechanism 400 includes a second clamping member 81, a third clamping member 82, a material transfer rack 83 and a clamping block 84. The clamping block 84 is mounted on the material transfer rack 83 and is located between the second clamping member 81 and the third clamping member 82. The second clamping member 81 and the third clamping member 82 are slidably connected to the material transfer rack 83. The third clamping member 82 is disposed downstream of the second clamping member 81. The clamping block 84 can realize the transfer of the connector between the second clamping member 81 and the third clamping member 82. The clamping block 84 is disposed between the second clamping member 81 and the third clamping member 82. The clamping block 84 is provided with a clamping groove. The second clamping member 81 and the third clamping member 82 are fixed on the mounting plate. The mounting plate and the material transfer rack 83 are slidably connected to the material transfer rack 83 in the direction away from or close to the rotating clamping member 71 and the direction away from or close to the clamping block 84. When the second clamping member 81 clamps a good connector of the rotating clamping member 71, the second clamping member 81 slides away from the rotating clamping member 71 and places the connector in the clamping groove of the clamping block 84, and then the third clamping member 82 slides close to the clamping block 84 and clamps the connector in the clamping groove, and then transfers the connector to the next workstation. The clamping block 84 realizes the transfer of the connector between the second clamping member 81 and the third clamping member 82, and the second clamping member 81 and the third clamping member 82 move synchronously, thereby improving work efficiency.

[0071] In the description herein, it should be understood that the terms "upper", "lower", "left", "right", etc., and the like, are based on the directions or positions shown in the drawings, and are only for the convenience of description and simplified operation, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.

[0072] In the description of this specification, the description with reference to the terms "an embodiment", "example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example.

[0073] In addition, the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.

Claims

1. A rubber core insertion device, characterized in that: include: Bracket (1); The insertion mechanism (2) comprises a pre-insertion component (21) and a press-fit component (22), wherein the pre-insertion component (21) comprises a first pusher (211) and a first clamping component (212), wherein the first pusher (211) is mounted on the bracket (1), and the first clamping component (212) is connected to the execution end of the first pusher (211), and the press-fit component (22) is mounted on the bracket (1) and is located downstream of the pre-insertion component (21), wherein the first pusher (211) is capable of pre-pushing the rubber core clamped by the first clamping component (212) into the connector body, and the press-fit component (22) is capable of completely inserting the rubber core pre-pushed into the connector body into the connector body to form a connector, and the first pusher (211) is configured as a cylinder push rod; A material pulling mechanism (3) is installed on the bracket (1) and is located on one side of the insertion mechanism (2), and the material pulling mechanism (3) is capable of transferring the connector body from the station of the pre-insertion component (21) to the station of the press-fitting component (22); The material pulling mechanism (3) comprises: A material drawing plate (31), comprising a lifting plate (311), wherein the lifting plate (311) is provided with material drawing grooves (3111) at intervals, and the connector body can be placed in the material drawing grooves (3111); A second pushing member (32), the lifting plate (311) being installed at the execution end of the second pushing member (32), and the second pushing member (32) being able to move back and forth with the lifting plate (311) along the direction from the station of the pre-insertion component (21) to the station of the press-fitting component (22); The material pulling mechanism (3) further comprises a first lifting member (33), the lifting plate (311) is connected to an execution end of the first lifting member (33), and the lifting plate (311) is mounted on the second pushing member (32) through the first lifting member (33); The pulling plate (31) also includes a positioning plate (312), and the positioning plate (312) is fixed on the bracket (1). The lifting plate (311) is slidably connected to the positioning plate (312) along a direction perpendicular to the pushing direction of the second pushing member (32). The connector body is placed on the positioning plate (312). The first lifting member (33) can drive the lifting plate (311) to rise and fall along the direction of the sliding connection with the positioning plate (312), and enable the lifting plate (311) to support or detach from the connector body.

2. The rubber core insertion device according to claim 1, characterized in that: A protruding positioning platform (3121) is provided at one end of the positioning plate (312) away from the first pushing member (211), and the positioning platform (3121) abuts against the end of the connector body.

3. A connector assembly device, characterized in that: It comprises a main body feeding mechanism (200), a workpiece feeding mechanism (300), a material transfer mechanism (400) and a rubber core insertion device (100) as described in any one of claims 1 to 2, wherein the main body feeding mechanism (200) is arranged upstream of the pulling mechanism (3), the workpiece feeding mechanism (300) is arranged upstream of the pre-insertion component (21), and the material transfer mechanism (400) is arranged downstream of the insertion mechanism (2), and the material transfer mechanism (400) can transfer the connector with the rubber core inserted to the next workstation.

4. The connector assembly device according to claim 3, characterized in that: The loading tracks (6) of the main body loading mechanism (200) and the workpiece loading mechanism (300) are arranged vertically; the main body loading mechanism (200) can convey the connector body to the pulling mechanism (3), and the workpiece loading mechanism (300) can convey the rubber core to the pre-insertion component (21).

5. The connector assembly device according to claim 3, characterized in that: A second lifting member (5) is provided at the discharge port of the workpiece feeding mechanism (300), the second lifting member (5) comprising a lifting member (51) and a power source (52), the lifting member (51) being connected to the output end of the power source (52), the power source (52) being mounted on the bracket (1), the power source (52) being able to drive the lifting member (51) to lift the rubber core to the first clamping member (212), and at the same time, the lifting member (51) being able to block the discharge port of the workpiece feeding mechanism (300); Alternatively, the first pushing member (211) is connected to the execution end of the second lifting member (5) and is installed on the bracket (1) through the second lifting member (5); the second lifting member (5) can drive the first clamping member (212) for clamping the rubber core to rise; at the same time, the side wall of the first clamping member (212) can block the discharge port of the workpiece loading mechanism (300).

6. The connector assembly device according to claim 3, characterized in that: The rubber core insertion device (100) further comprises a detection mechanism (4), which is mounted on the bracket (1) and located downstream of the press-fit assembly (22), and the detection mechanism (4) is electrically connected to the material transfer mechanism (400).

7. The connector assembly device according to claim 6, characterized in that: The material transfer mechanism (400) comprises a rotating material transfer component (7) and a good material transfer component (8), wherein the good material transfer component (8) is arranged downstream of the rotating material transfer component (7), the rotating material transfer component (7) comprises a rotating clamping member (71), a waste bucket (9) is arranged downstream of the rotating material transfer component (7), and the distances from the good material transfer component (8) and the waste bucket (9) to the rotation center of the rotating clamping member (71) are equal.

8. The connector assembly device according to claim 7, characterized in that: The good material transfer assembly (8) includes a second clamping member (81), a third clamping member (82), a material transfer frame (83) and a clamping block (84); the clamping block (84) is installed on the material transfer frame (83) and is located between the second clamping member (81) and the third clamping member (82); the second clamping member (81) and the third clamping member (82) are both slidably connected to the material transfer frame (83); the third clamping member (82) is arranged downstream of the second clamping member (81); and the clamping block (84) can realize the transfer of the connector between the second clamping member (81) and the third clamping member (82).