A guide wall formwork for interlocking pile concrete guide wall

By adopting a continuous semicircular fixed steel formwork and angle steel support system with flanges around in the foundation pit support project, combined with wooden formwork and scaffolding pipe reinforcement, the concrete forming quality problem caused by deviation of guide wall formwork is solved, and an efficient and solid guide wall formwork system is achieved, and the construction quality and progress are improved.

CN112049126BActive Publication Date: 2025-04-15MCC TIANGONG GROUP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010851333.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-08-21
Publication Date
2025-04-15
Estimated Expiration
2040-08-21

AI Technical Summary

Technical Problem

In the existing foundation pit support projects, the different operating levels of construction personnel lead to deviations in the guide wall formwork system, affecting the forming quality of concrete guide walls, and thus affecting the construction quality and progress of the bite piles.

Method used

A continuous semicircular fixed steel formwork with flanges is adopted, combined with the support system of the second angle steel and the third angle steel, which is easy to install, disassemble and move through bolt connections, and is reinforced by wooden formwork and scaffolding pipes to form a solid and reliable guide wall formwork system.

Benefits of technology

It effectively solves the concrete forming quality problems caused by deviation of guide wall formwork, improves the concrete forming quality of guide wall concrete, increases the stiffness of fixed steel formwork, and improves construction efficiency and progress.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112049126B_ABST
    Figure CN112049126B_ABST
Patent Text Reader

Abstract

The present invention discloses a guide wall formwork for interlocking pile concrete guide wall. The present invention solves the problem of the quality of the guide wall concrete molding caused by the deviation of the formwork system to different degrees when supporting the wooden formwork in such projects by adopting a continuous semicircular shaped steel formwork with flanges on all sides on the inner side of the guide wall. At the same time, the shaped steel formwork has flanges on all sides, which effectively increases the rigidity of the shaped steel formwork itself. The shaped steel formwork support system on the inner side of the guide wall formed by connecting the second angle steel and the third angle steel is finally connected to the first angle steel on the shaped steel formwork, effectively supporting and reinforcing the shaped steel formwork. At the same time, the angle steels are connected with bolts to facilitate installation, disassembly and movement, thereby improving construction efficiency. The bottom of the scaffolding pipe for reinforcing the wooden formwork on the outer side of the guide wall is anchored into the foundation, and the top is connected to the fixed plate on the angle steel with tension bolts, so that the overall formwork system of the guide wall is firm and reliable, the construction is convenient and fast, and the construction progress is accelerated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foundation pit support engineering construction, in particular to a guide wall template for interlocking pile concrete guide wall. Background Art

[0002] With the continuous development of my country's economy, bored interlocking cast-in-place piles for foundation pit support have gradually been widely used in design and construction. The interlocking piles for foundation pit support are generally continuous circular concrete piles connected crosswise. Before the construction of interlocking piles, it is necessary to cast concrete guide walls to provide a working surface for the interlocking pile pile forming machinery. The guide wall formwork generally uses wooden formwork to make an arc-shaped formwork system on site. Since the quality of production and support depends on the operation level of the construction personnel, it often leads to different degrees of deviation in the formwork system, and ultimately cannot guarantee the quality of concrete guide wall forming, which is not conducive to the construction of interlocking piles, thus affecting the construction quality and progress of interlocking piles. Therefore, in order to eliminate the occurrence of such problems in such engineering construction, a method for the construction of interlocking pile concrete guide walls is studied to improve the quality of guide wall concrete forming and speed up the construction progress. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a guide wall formwork for interlocking pile concrete guide wall, so as to solve the problem in the existing construction technology that due to the different operating levels of the construction workers, the formwork system often has deviations to varying degrees, and ultimately the quality of the concrete guide wall cannot be guaranteed.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0005] A guide wall formwork for an interlocking pile concrete guide wall. Before the guide wall formwork is supported, it is necessary to level the site before the construction of the guide wall, lay out the center line of the guide wall, the center line of the interlocking pile and the side line, and then carry out trench excavation and guide wall reinforcement binding; after the reinforcement binding is completed, the guide wall formwork is supported and constructed, and the inner side of the guide wall is made of steel plates into a continuous semicircular steel formwork with flanges on all sides according to the designed interlocking pile specifications and the guide wall height, including a pair of steel formworks in a continuous semicircular structure, one side of the center of the steel formwork is relatively spaced and installed on the foundation, and a pair of mutually parallel steel formworks are arranged along the length direction of the steel formwork near the center of the semicircular structure. The second angle steel, one of which is arranged at the bottom of the shaped steel template, and the other second angle steel is arranged at the top of the shaped steel template, each second angle steel is attached to the shaped steel template, and the upper and lower layers of the first angle steel are fixed at the middle position of the arc-shaped protrusion of the shaped steel template, the upper first angle steels are vertically extended to the second angle steel on the top of the shaped steel template, and the lower first angle steels are vertically extended to the second angle steel on the bottom of the shaped steel template, and the first fixing plate is fixed on the end of the upper first angle steel close to the arc-shaped protrusion of the shaped steel template, and the first mounting hole is opened on the end of each first angle steel close to the second angle steel, and the second angle steel is opened with a second mounting hole corresponding to the first angle steel. The first angle steel and the second angle steel are fixed together by a first bolt that penetrates the first mounting hole and the second mounting hole, and the two ends of the two second angle steels of the same layer corresponding to each shaped steel template are connected together by a third angle steel. A wooden template in the length direction is also arranged in the length direction of the shaped steel template. The wooden template in the length direction is arranged at intervals on one side of the arc-shaped protrusion of the shaped steel template. A wooden square arranged with a transverse back rib is also attached to the side of the wooden template in the length direction away from the shaped steel template. One side of the shaped steel template in the width direction is attached to the existing guide wall, and a wooden template in the width direction is attached to the other side of the shaped steel template in the width direction. A transverse back rib is also attached to the outer side of the wooden template in the width direction. For the wooden planks arranged toward the back ribs, the wooden formworks in the length direction and the wooden formworks in the width direction all coincide with the outer edge of the guide wall. The wooden formworks in the length direction, the wooden formworks in the width direction, the existing guide wall and the shaped steel formworks cooperate to form a casting cavity. A plurality of scaffolding tubes whose bottoms are anchored into the foundation are arranged on the outer side of the wooden planks corresponding to the wooden formworks in the length direction. Tension bolts are installed on the top of the scaffolding tubes. The ends of the tension bolts away from the scaffolding tubes are installed on the first fixed plate. Fixed scaffolding tubes are attached to the outer side of the wooden planks corresponding to the wooden formworks in the width direction. The bottom of the fixed scaffolding tubes is anchored into the foundation. Ground anchor scaffolding tubes are arranged at intervals on the side of the fixed scaffolding tubes away from the wooden planks. The ground anchor scaffolding tubes and the fixed scaffolding tubes are fixedly connected by diagonal bracing scaffolding tubes.

[0006] The third angle steel is perpendicular to the second angle steel, and third mounting holes are respectively provided at both ends of the third angle steel, and fourth mounting holes matching the third mounting holes are respectively provided on the second angle steels located on both sides of the third angle steel.

[0007] The second angle steel located at the upper layer has second fixing plates fixed at both ends, end tension bolts are installed on the second fixing plates, and end scaffolding pipes are fixed to the other ends of the end tension bolts, and the other ends of the end scaffolding pipes are anchored in the foundation.

[0008] The length of the anchor scaffolding tube is shorter than that of the fixed scaffolding tube.

[0009] The beneficial effects of the present invention are:

[0010] 1. The present invention adopts a continuous semicircular steel formwork with flanges on all sides on the inner side of the guide wall, thereby solving the problem of the quality of the guide wall concrete forming caused by different degrees of formwork system deviation when supporting the wooden formwork in such projects. At the same time, the steel formwork has flanges on all sides, which effectively increases the rigidity of the steel formwork itself.

[0011] 2. The present invention utilizes a support system for the inner side shaped steel formwork of the guide wall formed by connecting the second angle steel and the third angle steel, which is finally connected to the first angle steel on the shaped steel formwork, effectively supporting and reinforcing the shaped steel formwork. At the same time, the angle steels are connected with bolts to facilitate installation, disassembly and movement, thereby improving construction efficiency.

[0012] 3. The present invention uses a scaffolding tube to reinforce the outer wooden formwork of the guide wall, anchoring the bottom into the foundation, and connecting the top with the fixing plate on the angle steel with tension bolts, so that the overall formwork system of the guide wall is firm and reliable, the construction is convenient and fast, and the construction progress is accelerated. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is the overall support plan view of the guide wall formwork of the present invention.

[0014] Figure 2 It is a transverse cross-sectional view of the guide wall formwork system of the present invention.

[0015] Figure 3 It is a longitudinal sectional view of the guide wall formwork system of the present invention.

[0016] Figure 4 This is a connection node diagram of the first angle steel, the standard steel template and the second angle steel in the present invention.

[0017] Figure 5 This is the connection node diagram of the second angle steel and the third angle steel in the present invention.

[0018] Graphic markings: 1. Standard steel formwork, 2. First angle steel, 3. First fixed plate, 4. First mounting hole, 5. Second angle steel, 6. Second mounting hole, 7. First bolt, 8. Third mounting hole, 9. Second fixed plate, 10. Third angle steel, 11. Fourth mounting hole, 12. Second bolt, 13. Wooden formwork, 14. Wooden square, 15. Scaffolding tube, 16. Tension bolt, 17. Fixed scaffolding tube, 18. Ground anchor scaffolding tube, 19. Diagonal brace scaffolding tube, 20. Casting cavity. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] A guide wall formwork for an interlocking pile concrete guide wall. Before the guide wall formwork is supported, it is necessary to level the site before the construction of the guide wall, lay out the center line of the guide wall, the center line of the interlocking pile and the side line, and then carry out trench excavation and guide wall reinforcement binding; after the reinforcement binding is completed, the guide wall formwork is supported and constructed, and the inner side of the guide wall is made of steel plates into a continuous semicircular shaped steel formwork 1 with flanges on all sides according to the designed interlocking pile specifications and the guide wall height. A pair of shaped steel formworks 1 with continuous semicircular structures are taken, and one side of the center of the shaped steel formwork 1 is relatively spaced and installed on the foundation, and a pair of second angle steels 5 parallel to each other are arranged along the length direction of the shaped steel formwork 1 close to the center of its semicircular structure, one of which is a first angle steel 5. Two angle steels 5 are arranged at the bottom of the shaped steel template 1, and another second angle steel 5 is arranged at the top of the shaped steel template 1. Each second angle steel 5 is attached to the vertical flange of the shaped steel template 1. The upper and lower layers of first angle steels 2 are fixed at the middle position of the arc-shaped protrusion of the shaped steel template 1. The upper first angle steels are vertically extended to the second angle steel 5 on the top of the shaped steel template, and the lower first angle steels 2 are vertically extended to the second angle steel 5 on the bottom of the shaped steel template. A first fixing plate 3 is fixed to one end of the upper first angle steel close to the arc-shaped protrusion of the shaped steel template. A first mounting hole 4 is opened on one end of each first angle steel close to the second angle steel, and a second mounting hole 6 corresponding to the first angle steel is opened on the second angle steel 5. The first angle steel 2 and the second angle steel 5 are fixed together by the first bolt 7 that passes through the first mounting hole 4 and the second mounting hole 6. The two ends of the two second angle steels of the same layer corresponding to each shaped steel template are connected together by the third angle steel 10. The length direction of the shaped steel template is also provided with a length direction wooden template 13. The length direction wooden template 13 is arranged at intervals on one side of the arc-shaped protrusion of the shaped steel template. The length direction wooden template is away from the shaped steel template. The side of the length direction wooden template is also pasted with a wooden square 14 arranged with a transverse back rib. One side of the shaped steel template in the width direction is pasted on the existing guide wall, and the other side of the shaped steel template in the width direction is pasted with a width direction wooden template. The outer side of the width direction wooden template is also pasted with a transverse back rib arrangement. The wooden formwork in the length direction and the wooden formwork in the width direction all coincide with the outer edge of the guide wall. The wooden formwork in the length direction, the wooden formwork in the width direction, the existing guide wall and the shaped steel formwork cooperate to form a casting cavity. The wooden formwork in the length direction is provided with a plurality of pairs of scaffolding tubes whose bottoms are anchored into the foundation corresponding to the outer side of the wooden formwork. A tension bolt is installed on the top of each pair of scaffolding tubes. The end of the tension bolt away from the scaffolding tube is installed on the first fixed plate 3. A fixed scaffolding tube 17 is affixed to the outer side of the wooden formwork 13 in the width direction. The bottom of the fixed scaffolding tube 17 is anchored into the foundation. A ground anchor scaffolding tube 18 is arranged at intervals on the side of the fixed scaffolding tube 17 away from the wooden formwork. The ground anchor scaffolding tube 18 and the fixed scaffolding tube 17 are fixedly connected by a diagonal bracing scaffolding tube 19.After the guide wall formwork system is set up, guide wall concrete is poured in the pouring cavity 20. After the guide wall concrete in the pouring cavity 20 reaches the demoulding strength, the components of the guide wall formwork system are removed and moved to the next guide wall position to repeat the above construction.

[0021] The third angle steel is perpendicular to the second angle steel, and third mounting holes 8 are respectively opened on both ends of the third angle steel, and fourth mounting holes 11 cooperating with the third mounting holes are respectively opened on the second angle steels located on both sides of the third angle steel.

[0022] The second fixing plates 9 are fixed at both ends of the second angle steel located on the upper layer. The second fixing plates 9 are installed with end tension bolts. The other ends of the end tension bolts are fixed with end scaffolding pipes, and the other ends of the end scaffolding pipes are anchored in the foundation.

[0023] The length of the anchor scaffolding tube is shorter than that of the fixed scaffolding tube. Working principle: The present invention adopts a guide wall inner side shaped steel formwork to be made into a continuous semicircular shaped steel formwork 1 with flanges on all sides with steel plates according to the designed bite pile specifications and guide wall height. A first angle steel 2 is welded to the upper and lower flanges of each semicircular arc center point of the shaped steel formwork 1, a first fixed plate 3 is welded to one end of the first angle steel 2 close to the flange, and a first mounting hole 4 is opened in the horizontal section at the other end of the first angle steel 2. The guide wall inner side shaped steel formwork 1 is placed according to the bite pile position, which solves the problem of different degrees of template system deviation when supporting wooden formworks in such projects, which leads to poor concrete forming quality of the guide wall. The problem of the fixed formwork is solved. At the same time, the flanges are provided around the fixed steel formwork to effectively increase the rigidity of the fixed steel formwork itself; a second angle steel 5 is placed at the upper and lower ends of the fixed steel formwork 1 in the length direction on both sides, and a second mounting hole 6 is opened in the horizontal section of the second angle steel 5 corresponding to the position of the first mounting hole 4. The first angle steel 2 and the second angle steel 5 are connected by the first bolt 7 through the first mounting hole 4 and the second mounting hole 6, and the vertical section of the second angle steel 5 is close to the vertical flange of the fixed steel formwork 1, and the third mounting holes 8 are opened in the horizontal section at equal intervals along the length direction of the second angle steel 5, and welded on the second angle steel 5 on the side of the guide wall that has been cast. The second fixing plate 9 is connected, and the third angle steel 10 is placed at equal intervals along the length direction of the second angle steel 5. The third angle steel 10 opens a fourth mounting hole 11 at the position corresponding to the third mounting hole 8 in the horizontal section. The second angle steel 5 and the third angle steel 10 are connected by a second bolt 12 through the third mounting hole 8 and the fourth mounting hole 11, which effectively supports and reinforces the fixed template. At the same time, the angle steels are connected with bolts to facilitate installation and removal, thereby improving construction efficiency. The wooden template 13 is placed along the control line outside the guide wall, and the wooden template 13 is horizontally backed with a wooden square 14. The outer side of the wooden square 14 in the length direction of the guide wall corresponds to the first fixed template. Two scaffolding tubes 15 are placed at the positions of the fixed plate 3 and the second fixed plate 9, the bottom of the scaffolding tube 15 is anchored into the foundation, and the top is connected to the first fixed plate 3 and the second fixed plate 9 respectively through tension bolts 16. A single fixed scaffolding tube 17 with the bottom anchored into the soil is placed outside the wooden square 14 in the short side direction of the guide wall according to the length of the template. A shorter length of anchor scaffolding tube 18 is placed a certain distance outward from the fixed scaffolding tube 17, and the top of the fixed scaffolding tube 17 is obliquely connected to the bottom of the anchor scaffolding tube 18 by a diagonal brace scaffolding tube 19, so that the overall template system of the guide wall is firm and reliable, the construction is convenient and quick, and the construction progress is accelerated.

[0024] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A guide wall formwork for a occlusal pile concrete guide wall, characterized in that: It includes a pair of shaped steel templates with continuous semicircular structures, one side of the center of the shaped steel template is relatively spaced and installed on the foundation, and a pair of second angle steels parallel to each other are arranged near the center of the semicircular structure along the length direction of the shaped steel template, one of the second angle steels is arranged at the bottom of the shaped steel template, and the other second angle steel is arranged at the top of the shaped steel template, each second angle steel is attached to the shaped steel template, and the upper and lower layers of first angle steels are fixed at the middle position of the arc-shaped protrusion of the shaped steel template, and the upper first angle steels are vertically extended to the shaped steel template On the second angle steel at the top, the first angle steels of the lower layer are vertically extended to the second angle steel at the bottom of the shaped steel template, a first fixing plate is fixed on one end of the first angle steel of the upper layer close to the arc-shaped protrusion of the shaped steel template, a first mounting hole is opened on one end of each first angle steel close to the second angle steel, and a second mounting hole corresponding to the first angle steel is opened on the second angle steel, and the first angle steel and the second angle steel are fixed together by a first bolt penetrating through the first mounting hole and the second mounting hole, and the two ends of the two second angle steels of the same layer corresponding to each shaped steel template are connected by a third angle steel. Together, a wooden template in the length direction is also arranged in the length direction of the shaped steel template. The wooden template in the length direction is arranged at intervals on one side of the arc-shaped protrusion of the shaped steel template. A wooden square arranged with a transverse back rib is attached to the side of the wooden template in the length direction away from the shaped steel template. One side of the shaped steel template in the width direction is attached to the existing guide wall, and a wooden template in the width direction is attached to the other side of the shaped steel template in the width direction. A wooden square arranged with a transverse back rib is also attached to the outside of the wooden template in the width direction. The wooden template in the length direction and the wooden template in the width direction overlap with the outer edge of the guide wall. The wooden formwork in the length direction, the wooden formwork in the width direction, the existing guide wall and the fixed steel formwork cooperate to form a casting cavity, a plurality of scaffolding tubes with their bottoms anchored in the foundation are arranged on the outer side of the wooden square corresponding to the wooden formwork in the length direction, and tension bolts are installed on the top of the scaffolding tubes, and the ends of the tension bolts away from the scaffolding tubes are installed on the first fixed plate, and fixed scaffolding tubes are attached to the outer side of the wooden square corresponding to the wooden formwork in the width direction, and the bottoms of the fixed scaffolding tubes are anchored in the foundation, and ground anchor scaffolding tubes are arranged at intervals on the side of the fixed scaffolding tubes away from the wooden square, and the ground anchor scaffolding tubes and the fixed scaffolding tubes are fixedly connected by diagonal scaffolding tubes.

2. A guide wall formwork for a occlusal pile concrete guide wall according to claim 1, characterized in that: The third angle steel is perpendicular to the second angle steel, and third mounting holes are respectively opened on both ends of the third angle steel, and fourth mounting holes matching with the third mounting holes are respectively opened on the second angle steels located on both sides of the third angle steel.

3. The guide wall formwork for the occlusal pile concrete guide wall according to claim 1, characterized in that: The second angle steel located at the upper layer has second fixing plates fixed at both ends, end tension bolts are installed on the second fixing plates, and end scaffolding pipes are fixed to the other ends of the end tension bolts, and the other ends of the end scaffolding pipes are anchored in the foundation.

4. The guide wall formwork for the occlusal pile concrete guide wall according to claim 1, characterized in that: The length of the anchor scaffolding tube is shorter than that of the fixed scaffolding tube.