A trolley for pouring asphalt into roofing joints
By designing the roof lattice seam filling asphalt cart, using roller and blanking strip structures, combined with leakage prevention and manual control mechanisms, the problems of construction arbitrary and low efficiency in traditional technology are solved, and more efficient and higher quality are achieved. Asphalt infusion in the split-chamber reduces costs and pollution.
Patent Information
- Application Number
- CN202010911243.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-09-02
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2040-09-02
AI Technical Summary
The traditional roof lattice joint asphalt filling technology has random construction operations and irregularities, resulting in different quality of the asphalt structure, low efficiency, high labor costs, and easy to pollute the panel surface, affecting the ornamentality and service life.
A roof lattice seam filling asphalt trolley is designed, using a rectangular frame surrounded by long plates and short plates, with multiple rollers and symmetrically arranged blanking strips, equipped with leakage prevention mechanism and hand The control mechanism realizes the guidance through the guide shaft and the guide ring, and manually controls the loosening and clamping of the blanking strip to control the width of the asphalt layer and improves the filling efficiency and quality.
The working efficiency of asphalt filling in roof lattice joints is improved, the degree of pollution of the slabs near construction is reduced, the ornamentality and average quality after infusion is improved, the construction cost is reduced, and the experience requirements are reduced.
Smart Images

Figure CN112049337B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of roofing partition joint construction, and in particular to a roofing partition joint asphalt pouring cart. Background Art
[0002] Asphalt grouting of the grid joints is a common construction link in civil construction. It is used for the location where the grid joints need to be set on the roof. If the grouting quality is good, the roof waterproofing effect is good and the service life can be extended; if the grouting quality is poor, the roof is easily eroded by rainwater, which will reduce the service life. When grouting the roof grid joints with asphalt, a small amount of ointment is usually repeatedly scraped on both sides of the seam groove with a scraper and a tumbler, and then the ointment is filled in the seam twice to make it firmly bonded to the wall seam and pressed tightly to prevent the ointment from leaving gaps or air from being wrapped between the ointment and the seam wall. The ointment should be slightly higher than the board surface by 3 to 5 mm, curved and covering the board seam. The traditional ointment caulking method requires high experience, and it is inevitable that the construction operation is more casual and non-standard during actual construction. According to this construction, the board surface near the grid joint is usually contaminated, the sensory effect is poor, and it is not only time-consuming and labor-intensive, but also the asphalt structure of the grid joint formed by empirical operation is inconsistent, inefficient, and has high labor costs. Summary of the invention
[0003] In view of the defects in the prior art, the present invention provides a roofing joint asphalt grouting trolley to improve work efficiency, reduce the degree of pollution of the board surface near the construction joints, improve the ornamental value after the joints are grouted with asphalt, increase the average quality of the joint asphalt grouting, reduce the experience requirements for construction, and reduce construction costs.
[0004] The present invention provides a roofing partition joint asphalt pouring cart, comprising a rectangular frame surrounded by two long plates and two short plates, wherein a plurality of rollers are installed under the rectangular frame; two blanking strips which are parallel to each other and arranged symmetrically are arranged in the rectangular frame; the two ends of each blanking strip are respectively connected to the corresponding short plates; the length direction of the blanking strip is the same as the length direction of the long plates; the cross-section of the blanking strip is a right-angled trapezoid; each blanking strip is arranged vertically with one side facing away from another blanking strip; the area of the upper surface of each blanking strip is smaller than the area of its lower surface.
[0005] Preferably, it also includes a synchronous frame and three sets of anti-leakage mechanisms evenly distributed on both sides of the two blanking strips; the synchronous frame is respectively connected to the upper ends of the six sets of anti-leakage mechanisms; the two short boards are respectively provided with a plurality of vertical downward sliding grooves at both ends of the corresponding synchronous frames, and the two ends of the synchronous frame are respectively slidably matched with the corresponding sliding grooves through the sliders connected thereto;
[0006] The anti-leakage mechanism includes a crossbeam, a square rod, a limit ring, a spring, a sliding rod, a matching wedge block, a return spring and two fixed plates;
[0007] The two ends of the crossbeam are respectively connected to the blanking strip and the long plate; one end of the two fixed plates is connected to the lower surface of the crossbeam; the two fixed plates are provided with square holes with the same center line; one end of the tightening square rod passes through the square holes of the two fixed plates horizontally in sequence and corresponds to the lower part of the blanking strip; the square rod and the square holes of the two fixed plates are slidably matched; the limiting ring is sleeved on the square rod, and the limiting ring is located between the two fixed plates; one end of the tightening spring is against the fixed plate, and the other end of the tightening spring is against the blanking strip behind the limiting ring abutting against one side of the locking cam; a tightening wedge block is connected to the upper side of the limiting ring; a vertical through hole is provided on the cross beam corresponding to the tightening wedge block; one end of the sliding rod is connected to the synchronous frame, and the other end of the sliding rod passes through the through hole on the cross beam and is connected to the matching wedge block; when the matching wedge block moves downward, it abuts against the tightening wedge block to drive the tightening wedge block away from the blanking strip; the return spring is sleeved on the sliding rod; one end of the return spring abuts against the upper surface of the cross beam, and the other end of the return spring abuts against the lower surface of the synchronous frame.
[0008] Preferably, it also includes a U-shaped rod, a straight rod and two sets of manual control mechanisms;
[0009] The two sets of hand-controlled mechanisms are respectively arranged corresponding to the anti-leakage mechanisms in the middle of the two sides of the two blanking strips;
[0010] The hand control mechanism comprises a rotating shaft, a convex block and two connecting rods;
[0011] One end of the two connecting rods is connected to the upper surface of the corresponding cross beam, and the other end of the two connecting rods is connected to the rotating shaft; the axial center line of the rotating shaft is parallel to the upper surface of the synchronous frame; a bearing is sleeved on the rotating shaft; the two ends of the U-shaped rod are respectively rotatably connected to the bearings on the two rotating shafts, and the straight rod is connected to the U-shaped rod; the length direction of the straight rod is the same as the length direction of the blanking strip; the protrusion is connected to the outer side of the bearing on the rotating shaft; the protrusion is located below the U-shaped rod; the protrusion is against the upper surface of the synchronous frame.
[0012] Preferably, a surface of the projection facing away from the rotation axis is a plane.
[0013] Preferably, it also includes a locking square rod, a second limiting ring, a locking spring, a triangular push rod, a first locking plate, a second locking plate, a linkage rod and a linkage gear;
[0014] One end of the first locking plate and the second locking plate are respectively connected to the outer surface of the short plate; the first locking plate and the second locking plate are both provided with square holes with the same center line; the first locking plate and the second locking plate are arranged parallel to each other up and down; one end of the locking square rod vertically passes through the square hole of the first locking plate and the square hole of the second locking plate in sequence, and the other end of the locking square rod corresponds to the straight rod and is provided with a makeshift groove along its axial direction; the makeshift groove is clearance-matched with the straight rod; the second limiting ring is sleeved on the locking square rod, and the second limiting ring is located between the first locking plate and the second locking plate; the locking spring is sleeved on the locking square rod; one end of the locking spring is against the second limiting ring, and the other end of the locking spring is against the first locking The lower surface of the plate; a penetrating triangular through hole is provided on the first locking plate, and the triangular push rod is slidably fitted in the triangular through hole; the center line of the triangular through hole is parallel to the center line of the square hole of the first locking plate; a penetrating long hole is provided between the square hole of the first locking plate and the triangular through hole; the long holes are respectively connected with the square hole and the triangular through hole of the first locking plate; the two ends of the linkage rod are respectively connected with the inner walls of the two sides of the long hole; the linkage gear is sleeved on the linkage rod, and a rack is provided on the side of the locking square rod close to the linkage gear, and a rack is provided on the side of the triangular push rod close to the linkage gear; the linkage gear is respectively meshed with the rack of the locking square rod and the rack of the triangular push rod; the upper end of the triangular push rod is against the straight rod.
[0015] Preferably, a pointed tip is provided at one end of the locking square rod far from the straight rod.
[0016] Preferably, it also includes a guide ring, a guide shaft and a guide bracket; the side surface of the short plate close to the locking square rod is recorded as side A, and the outer side surface of the other short plate is recorded as side B; the guide bracket is connected to the B side of the short plate; two through holes coaxial with the center line are opened on the guide bracket; the guide shaft is rotatably connected to the two through holes of the guide bracket through two bearings; the guide ring is sleeved on the guide shaft; the guide ring is located between the two through holes of the guide bracket.
[0017] Beneficial effects of the present invention:
[0018] It can be seen from the above technical scheme that the present invention provides a roof partition joint asphalt pouring trolley, which realizes guidance through the connection of a guide shaft and a guide ring, and two blanking strips are used for blanking and pouring the partition joints. The manual lifting straight rod is pressed to realize loosening and clamping to control the width of the asphalt layer that fills the surface of the partition joints. The work efficiency is improved, the degree of pollution is reduced, the ornamental value of the partition joints after asphalt is poured, the average quality of the partition joint asphalt pouring is increased, the experience requirement for construction is reduced, and the construction cost is reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the specific embodiments or the description of the prior art. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn according to the actual scale.
[0020] Figure 1 A schematic diagram of the structure of a roofing asphalt injection trolley provided by an embodiment of the present invention (right view);
[0021] Figure 2 for Figure 1 A top view of a cart for pouring asphalt into roofing joints is shown;
[0022] Figure 3 for Figure 1 A front view of a cart for pouring asphalt into roofing joints is shown;
[0023] Figure 4 for Figure 1 The schematic diagram of the structure of the triangular top rod and the triangular through hole of a roofing split joint asphalt pouring trolley shown in the figure;
[0024] Figure 5 for Figure 1 The diagram shows a schematic structural diagram of the cooperation between the guide shaft and the guide bracket of a trolley for pouring asphalt into roofing partition joints.
[0025] Reference numerals:
[0026] 1- rectangular frame; 11- long board; 12- short board; 121- slide;
[0027] 2-Blanking strip;
[0028] 3-Synchronous frame;
[0029] 4-leakage prevention mechanism; 41-crossbeam; 42-tightening square rod; 43-limiting ring; 44-tightening spring; 45-sliding rod; 46-matching wedge block; 47-reset spring; 48-fixing plate; 49-tightening wedge block;
[0030] 5-U-shaped rod;
[0031] 6- Straight rod;
[0032] 7-hand control mechanism; 71-rotation axis; 72-bump; 73-connecting rod;
[0033] 81-locking square rod; 811-giving groove; 812-pointed head; 82-second limiting ring; 83-locking spring; 84-triangular push rod; 85-first locking plate; 851-triangular through hole; 86-second locking plate; 87-linking rod; 88-linking gear;
[0034] 91 - guide ring; 92 - guide shaft; 93 - guide bracket. DETAILED DESCRIPTION
[0035] The following embodiments of the technical solution of the present invention are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and are therefore only used as examples, and cannot be used to limit the protection scope of the present invention.
[0036] It should be noted that, unless otherwise specified, the technical terms or scientific terms used in this application should have the common meanings understood by those skilled in the art to which the present invention belongs.
[0037] Figures 1 to 5 A roofing asphalt injection cart provided for one embodiment of the present invention comprises a rectangular frame 1 surrounded by two long plates 11 and two short plates 12, and a plurality of rollers are installed under the rectangular frame 1; two blanking strips 2 which are parallel to each other and arranged symmetrically are arranged in the rectangular frame 1; the two ends of each blanking strip 2 are respectively connected to the corresponding short plates 12; the length direction of the blanking strip 2 is the same as the length direction of the long plates 11; the cross-section of the blanking strip 2 is a right-angled trapezoid; each blanking strip 2 is arranged vertically on the side facing away from another blanking strip 2; the area of the upper surface of each blanking strip 2 is smaller than the area of its lower surface.
[0038] The present embodiment provides a cart for pouring asphalt into the roof partition joints, and the space between the two blanking strips 2 is used to temporarily place the asphalt to be poured; the upper opening of the space is large and the lower opening is small. The cart is pushed to the top of the partition joint, and the asphalt is poured into the partition joint along the gap between the lower parts of the two blanking strips 2. After the pouring is completed, the cart is pushed away and manual repairs are performed in a small area. Because the size of the partition joints is generally small, compared with the waste of materials caused by large-diameter pouring and the waste of time caused by repairing the asphalt that overflows from the partition joints due to large-diameter pouring, this method can improve the accuracy of asphalt pouring, reduce waste, reduce the asphalt overflowing from the partition joints, and shorten the rest time. Compared with manual pouring, this kind of cart pouring method can also improve work efficiency.
[0039] In addition, it also includes a synchronous frame 3 and three sets of anti-leakage mechanisms evenly distributed on both sides of the two blanking strips 2; the synchronous frame 3 is connected to the upper ends of the six sets of anti-leakage mechanisms respectively; the two short plates 12 are respectively provided with a plurality of vertical downward sliding grooves 121 at the two ends corresponding to the synchronous frame 3, and the two ends of the synchronous frame 3 are respectively slidably matched with the corresponding sliding grooves 121 through the sliders connected thereto;
[0040] The anti-leakage mechanism 4 includes a crossbeam 41, a square rod 42, a stop ring 43, a spring 44, a sliding rod 45, a wedge block 46, a return spring 47 and two fixing plates 48;
[0041] The two ends of the crossbeam 41 are connected to the blanking strip 2 and the long plate 11 respectively; one end of the two fixed plates 48 is connected to the lower surface of the crossbeam 41; the two fixed plates 48 are provided with square holes with the same center line; one end of the tightening square rod 42 passes through the square holes of the two fixed plates 48 in sequence and corresponds to the lower part of the blanking strip 2; the square rod and the square holes of the two fixed plates 48 are slidably matched; the limiting ring 43 is sleeved on the square rod, and the limiting ring 43 is located between the two fixed plates 48; one end of the tightening spring 44 is pressed against the fixed plate 48, and the other end of the tightening spring 44 is pressed against the side of the limiting ring 43 facing away from the blanking strip 2 abut against each other; a locking wedge block 49 is connected to the upper side of the limiting ring 43; a vertical through hole is provided on the cross beam 41 corresponding to the locking wedge block 49; one end of the sliding rod 45 is connected to the synchronous frame 3, and the other end of the sliding rod 45 passes through the through hole on the cross beam 41 and is connected to the matching wedge block 46; when the matching wedge block 46 moves downward, it abuts against the locking wedge block 49 and drives the locking wedge block 49 away from the blanking strip 2; a reset spring 47 is sleeved on the sliding rod 45; one end of the reset spring 47 abuts against the upper surface of the cross beam 41, and the other end of the reset spring 47 abuts against the lower surface of the synchronous frame 3.
[0042] The present embodiment provides a roofing joint asphalt pouring cart. In order to ensure the asphalt pouring quality of the joints, after the joints are fully filled with asphalt, sufficient asphalt needs to be left outside the joints to supplement the portion of the joints that has shrunk in volume due to cooling of the asphalt. Therefore, the blanking strip 2 is at a certain distance from the roof; when pouring asphalt, due to the distance between the blanking strip 2 and the roof, the asphalt will spread to other directions on the roof, and it needs to be blocked at this time; the anti-leakage mechanism 4 is therefore provided. Before pouring asphalt, press the synchronous frame 3, and the sliding rod 45 of the anti-leakage mechanism 4 under the synchronous frame 3 moves downward synchronously; the fitting wedge block 46 is pressed against the tight wedge block 49, so that the tight wedge block 49 drives the square rod away from the blanking strip 2; at this time, the tight spring 44 and the return spring 47 are in a compressed state; a smooth wooden strip or other long object is placed between the blanking strip 2 and the tight square rod 42; release the synchronous frame 3, the return spring 47 and the tight spring 44 rebound, and the square rod approaches the blanking strip 2, pressing the wooden strip against the blanking strip 2; at this time, one side of the smooth wooden strip that is pressed is in contact with the roof, and the other side is in contact with the blanking strip 2. The wooden strips on both sides of the blanking strip 2 form a "T"-shaped space with the blanking strip 2 and the roof partition joints. The "T"-shaped space is used to pour asphalt, and a certain amount of asphalt is poured between the two blanking strips 2 according to the requirements of the partition joints. It takes time for the asphalt to cool down. When it is slightly cooled, the fluidity of the asphalt decreases, and the square rod controlling the anti-leakage mechanism 4 is withdrawn. At this time, the cart is pushed to move along the length direction of the partition joint. At this time, the asphalt in the cart has been used up. After the cart moves, the asphalt in the previous partition joint is filled; then the cart is used to pour asphalt into the next section of the partition joint; the wooden strips are separated from the cart. If the wooden strips are connected to the cart, they will be worn out after repeated use, and asphalt will leak during pouring.
[0043] In detail, it also includes a U-shaped rod 5, a straight rod 6 and two sets of hand control mechanisms 7;
[0044] Two sets of manual control mechanisms 7 are arranged corresponding to the anti-leakage mechanisms 4 in the middle of the two sides of the two blanking strips 2;
[0045] The manual control mechanism 7 includes a rotating shaft 71, a protrusion 72 and two connecting rods 73;
[0046] One end of the two connecting rods 73 is connected to the upper surface of the corresponding crossbeam 41, and the other end of the two connecting rods 73 is connected to the rotating shaft 71; the axial center line of the rotating shaft 71 is parallel to the upper surface of the synchronous frame 3; a bearing is sleeved on the rotating shaft 71; the two ends of the U-shaped rod 5 are respectively rotatably connected to the bearings on the two rotating shafts 71, and the straight rod 6 is connected to the U-shaped rod 5; the length direction of the straight rod 6 is the same as the length direction of the blanking strip 2; the protrusion 72 is connected to the outer side of the bearing on the rotating shaft 71; the protrusion 72 is located below the U-shaped rod 5; the protrusion 72 is against the upper surface of the synchronous frame 3.
[0047] In the asphalt pouring cart for roofing joints provided in this embodiment, the manual control mechanism 7 is used to press down the synchronous frame 3 to drive the anti-leakage mechanism to move. The manual control mechanism 7 operates as follows: the operator presses down the straight rod 6, and the U-shaped rod 5 rotatably connected to the bearing on the rotating shaft 71 rotates around the rotating shaft 71; during the rotation of the U-shaped rod 5, the protrusion 72 forces the synchronous frame 3 to move downward.
[0048] Furthermore, the surface of the projection 72 facing away from the rotation shaft 71 is a flat surface.
[0049] The present embodiment provides a trolley for pouring asphalt into roof partition joints. The structure of the protrusion 72 is used for testing the pressure of the synchronous frame 3 when the protrusion 72 is pressed down on the straight rod 6. The plane setting of the protrusion 72 can be arranged so that when it is rotated to a certain position, the plane part of the protrusion 72 fits with the upper surface of the synchronous frame 3 to achieve locking, that is, the synchronous frame 3 cannot move up. After the trolley has poured the partition joints at one end, the locking of the synchronous frame 3 can directly place wooden strips when pouring the next section of the partition joints, thereby improving work efficiency.
[0050] Specifically, it also includes a locking square rod 81, a second limiting ring 82, a locking spring 83, a triangular push rod 84, a first locking plate 85, a second locking plate 86, a linkage rod 87 and a linkage gear 88;
[0051] One end of the first locking plate 85 and the second locking plate 86 are respectively connected to the outer surface of the short plate 12; the first locking plate 85 and the second locking plate 86 are both provided with square holes with the same center line; the first locking plate 85 and the second locking plate 86 are arranged parallel to each other up and down; one end of the locking square rod 81 vertically passes through the square hole of the first locking plate 85 and the square hole of the second locking plate 86 in sequence, and the other end of the locking square rod 81 corresponds to the straight rod 6 and is provided with a makeshift groove 811 along its axial direction; the makeshift groove 811 is clearance-matched with the straight rod 6; the second limiting ring 82 is sleeved on the locking square rod 81, and the second limiting ring 82 is located between the first locking plate 85 and the second locking plate 86; the locking spring 83 is sleeved on the locking square rod 81; one end of the locking spring 83 abuts against the second limiting ring 82, and the other end of the locking spring 83 abuts against the first locking On the lower surface of plate 85; a penetrating triangular through hole 851 is provided on the first locking plate 85, and the triangular push rod 84 slides in the triangular through hole 851; the center line of the triangular through hole 851 is parallel to the center line of the square hole of the first locking plate 85; a penetrating long hole is provided between the square hole of the first locking plate 85 and the triangular through hole 851; the long holes are respectively connected to the square hole of the first locking plate 85 and the triangular through hole 851; the two ends of the linkage rod 87 are respectively connected to the inner walls of the two sides of the long hole; the linkage gear 88 is sleeved on the linkage rod 87, and a rack is provided on the side of the locking square rod 81 close to the linkage gear 88, and a rack is provided on the side of the triangular push rod 84 close to the linkage gear 88; the linkage gear 88 is respectively meshed with the rack of the locking square rod 81 and the rack of the triangular push rod 84; the upper end of the triangular push rod 84 is against the straight rod 6.
[0052] The present embodiment provides a trolley for pouring asphalt into the roof divided seams. When the straight rod 6 is pressed down, the square rod 42 is pressed against and withdrawn, and the trolley is ready to move; the straight rod 6 is pressed down, and the triangular top rod 84 against the lower surface of the straight rod 6 is pushed, and the linkage gear 88 meshing with the rack of the triangular top rod 84 moves accordingly, thereby realizing the upward movement of the locking square rod 81, and the clearance groove 811 allows the locking square rod 81 to have enough space to move up; when the straight rod 6 is pressed down to a certain position and the protrusion 72 moves, the device is locked, and when the trolley moves to the next asphalt pouring location, the straight rod 6 is pushed up, and under the action of the locking spring 83, the locking square rod 81 moves down and contacts the bottom surface, and the trolley stops moving.
[0053] In order to enhance the locking effect, a pointed tip 812 is provided at one end of the locking square rod 81 far from the straight rod 6 .
[0054] In addition, it includes a guide ring 91, a guide shaft 92 and a guide bracket 93; the side surface of the short plate 12 close to the locking square rod 81 is recorded as side A, and the outer side surface of the other short plate 12 is recorded as side B; the guide bracket 93 is connected to the B side of the short plate 12; two through holes coaxial with the center line are opened on the guide bracket 93; the guide shaft 92 is rotatably connected to the two through holes of the guide bracket 93 through two bearings; the guide ring 91 is sleeved on the guide shaft 92; the guide ring 91 is located between the two through holes of the guide bracket 93.
[0055] The present embodiment provides a roofing partition joint asphalt pouring cart. In order to ensure that the moving track of the roofing partition joint asphalt pouring cart between two adjacent asphalt pourings is a straight line, the size of the guide ring 91 is adapted to the size of the partition joint. The guide ring 91 is in the partition joint, the lower surface of the guide shaft 92 is in contact with the bottom surface, and the two sides of the guide ring 91 are in clearance fit with the side wall of the partition joint. When the cart tends to deviate from the straight line, the guide ring 91 collides with the side wall of the partition joint to achieve a positioning effect. The guide ring 91 is located in the partition joint, and the gap between the two blanking strips 2 is located directly above the partition joint, which improves the accuracy of each asphalt pouring.
[0056] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.
Claims
1. A roof split joint asphalt pouring cart, characterized in that : It comprises a rectangular frame surrounded by two long boards and two short boards, and a plurality of rollers are installed under the rectangular frame; two blanking strips which are parallel to each other and arranged symmetrically are arranged in the rectangular frame; the two ends of each blanking strip are respectively connected to the corresponding short board; the length direction of the blanking strip is the same as the length direction of the long board; the cross section of the blanking strip is a right-angle trapezoid; each blanking strip is arranged vertically with one side facing away from another blanking strip; the area of the upper surface of each blanking strip is smaller than the area of its lower surface; It also includes a synchronous frame and three sets of anti-leakage mechanisms evenly distributed on both sides of the two blanking strips; the synchronous frame is respectively connected to the upper ends of the six sets of anti-leakage mechanisms; the two short boards are respectively provided with a plurality of vertical downward sliding grooves at both ends of the corresponding synchronous frames, and the two ends of the synchronous frame are respectively slidably matched with the corresponding sliding grooves through the sliders connected thereto; The anti-leakage mechanism includes a crossbeam, a square rod, a limit ring, a spring, a sliding rod, a matching wedge block, a return spring and two fixed plates; The two ends of the crossbeam are respectively connected to the blanking strip and the long plate; one end of the two fixed plates is connected to the lower surface of the crossbeam; the two fixed plates are provided with square holes with the same center line; one end of the tightening square rod passes through the square holes of the two fixed plates horizontally in sequence and corresponds to the lower part of the blanking strip; the square rod is slidably matched with the square holes of the two fixed plates; the limiting ring is sleeved on the square rod, and the limiting ring is located between the two fixed plates; one end of the tightening spring is pressed against the fixed plate, and the other end of the tightening spring is pressed against the side of the limiting ring behind the blanking strip. ; A tightening wedge block is connected to the upper side of the limit ring; a vertical through hole is opened on the cross beam corresponding to the tightening wedge block; one end of the sliding rod is connected to the synchronous frame, and the other end of the sliding rod passes through the through hole on the cross beam and is connected to the matching wedge block; when the matching wedge block moves downward, it abuts against the tightening wedge block and drives the tightening wedge block to be pushed away from the blanking strip by the matching wedge block; the return spring is sleeved on the sliding rod; one end of the return spring abuts against the upper surface of the cross beam, and the other end of the return spring abuts against the lower surface of the synchronous frame.
2. The asphalt pouring trolley for roofing joints according to claim 1 is characterized in that: It also includes a U-shaped rod, a straight rod and two sets of hand control mechanisms; The two sets of hand-controlled mechanisms are respectively arranged corresponding to the anti-leakage mechanisms in the middle of the two sides of the two blanking strips; The hand control mechanism comprises a rotating shaft, a convex block and two connecting rods; One end of the two connecting rods is connected to the upper surface of the corresponding cross beam, and the other end of the two connecting rods is connected to the rotating shaft; the axial center line of the rotating shaft is parallel to the upper surface of the synchronous frame; a bearing is sleeved on the rotating shaft; the two ends of the U-shaped rod are respectively rotatably connected to the bearings on the two rotating shafts, and the straight rod is connected to the U-shaped rod; the length direction of the straight rod is the same as the length direction of the blanking strip; the protrusion is connected to the outer side of the bearing on the rotating shaft; the protrusion is located below the U-shaped rod; the protrusion is against the upper surface of the synchronous frame.
3. The asphalt pouring trolley for roofing joints according to claim 2 is characterized in that: The side of the projection facing away from the rotation axis is a plane.
4. The asphalt pouring trolley for roofing joints according to claim 3 is characterized in that: It also includes a locking square rod, a second limiting ring, a locking spring, a triangular push rod, a first locking plate, a second locking plate, a linkage rod and a linkage gear; One end of the first locking plate and the second locking plate are respectively connected to the outer surface of the short plate; the first locking plate and the second locking plate are both provided with square holes with the same center line; the first locking plate and the second locking plate are arranged parallel to each other up and down; one end of the locking square rod vertically passes through the square hole of the first locking plate and the square hole of the second locking plate in sequence, and the other end of the locking square rod corresponds to the straight rod and is provided with a makeshift groove along its axial direction; the makeshift groove is clearance-matched with the straight rod; the second limiting ring is sleeved on the locking square rod, and the second limiting ring is located between the first locking plate and the second locking plate; the locking spring is sleeved on the locking square rod; one end of the locking spring is against the second limiting ring, and the other end of the locking spring is against the first locking The lower surface of the plate; a penetrating triangular through hole is provided on the first locking plate, and the triangular push rod is slidably fitted in the triangular through hole; the center line of the triangular through hole is parallel to the center line of the square hole of the first locking plate; a penetrating long hole is provided between the square hole of the first locking plate and the triangular through hole; the long holes are respectively connected with the square hole and the triangular through hole of the first locking plate; the two ends of the linkage rod are respectively connected with the inner walls of the two sides of the long hole; the linkage gear is sleeved on the linkage rod, and a rack is provided on the side of the locking square rod close to the linkage gear, and a rack is provided on the side of the triangular push rod close to the linkage gear; the linkage gear is respectively meshed with the rack of the locking square rod and the rack of the triangular push rod; the upper end of the triangular push rod is against the straight rod.
5. The asphalt pouring trolley for roofing joints according to claim 4 is characterized in that: One end of the locking square rod far from the straight rod is provided with a pointed head.
6. The asphalt pouring trolley for roofing joints according to claim 4 is characterized in that: It also includes a guide ring, a guide shaft and a guide bracket; the side surface of the short plate close to the locking square rod is recorded as side A, and the outer side surface of the other short plate is recorded as side B; the guide bracket is connected to the B side of the short plate; two through holes coaxial with the center line are opened on the guide bracket; the guide shaft is rotatably connected to the two through holes of the guide bracket through two bearings; the guide ring is sleeved on the guide shaft; the guide ring is located between the two through holes of the guide bracket.
Citation Information
Patent Citations
A automatic car of restoreing for bituminous paving
CN204728186U
Roof dividing joint asphalt pouring cart