A method for accurately predicting mechanical drilling speed

By vectorizing the designed well and drilled well trajectory data in the Gaussian projection coordinate system, and calculating the vector difference model to predict the mechanical drilling rate, the problem of inaccurate drilling rate caused by formation heterogeneity and changes in well inclination and azimuth is solved and achieved. More accurate drilling cost predictions.

CN112069646BActive Publication Date: 2024-10-29CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202010693442.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-17
Publication Date
2024-10-29
Estimated Expiration
2040-07-17

AI Technical Summary

Technical Problem

The existing technology cannot accurately consider the differences in in-situ stress in various directions in the formation and the heterogeneity of formation development when predicting the ROP, resulting in inaccurate ROP calculations and affecting the prediction of drilling cycles and costs.

Method used

The Gaussian projection coordinate system is used to establish a reference coordinate system, collect design well and drilled well trajectory data, vectorize it, and calculate the module of the vector difference to predict the mechanical penetration rate. Taking into account changes in well inclination and azimuth, select the closest drilled well trajectory data. The mechanical penetration rate at the drilling trajectory point is used as the predicted value.

Benefits of technology

It improves the accuracy of prediction of mechanical penetration rate, simplifies the calculation process, is suitable for various trajectories, and eliminates errors caused by theoretical calculation models, and can accurately predict drilling costs before the implementation of the plan.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112069646B_ABST
    Figure CN112069646B_ABST
Patent Text Reader

Abstract

The present invention relates to a method for accurately predicting mechanical drilling speed, comprising: 1) establishing a coordinate system, and establishing a reference coordinate system with a Gaussian projection coordinate system; 2) collecting data on the trajectory of the designed well and the well that has been drilled, and vectorizing all points on the trajectory of the well that has been drilled and the well that is to be drilled; 3) calculating the difference of the vector, that is, calculating the difference between the vector of the point on the designed trajectory and the vector of the point on the well that has been drilled; 4) predicting the mechanical drilling speed. The present invention eliminates the error caused by the common practice of using a unified mechanical drilling speed in the same geological layer. It also eliminates the error caused by the theoretical calculation model itself. The method is simple and easy to implement using computer programming.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of geological survey, and in particular to a method for accurately predicting mechanical drilling speed. Background Art

[0002] Mechanical drilling rate is a key parameter for predicting the drilling cycle of a designed well, and the drilling cycle plays a decisive role in determining the investment cost of a well. At present, there are three methods for predicting mechanical drilling rate: 1. Predicting drilling rate using seismic velocity. This method requires extracting information including seismic layer velocity, geological age, geological structure, formation occurrence, formation lithology, etc. from seismic data, and using mathematical statistics and other methods to simulate and optimize the quantitative calculation model between layer velocity and formation drillability and layer velocity and mechanical drilling rate. 2. Using BP neural network method to "model" and then "predict" mechanical drilling rate. This method uses the acquired parameters including well depth, drillability coefficient, abrasiveness coefficient, hardness, compressive strength, drilling pressure, speed, pump displacement, drilling fluid density, bottom hole pressure difference, bottom hole water power, drill bit type, etc. to model; 3. Use field data to directly calculate the mechanical drilling rate equation, consider the mechanical drilling rate equation of the properties of the drilled formation and the drill bit structure, and use computer simulation methods to predict the mechanical drilling rate. 4. Artificial neural networks are used to simulate the thinking mode of the human brain, which has the characteristics of high nonlinearity and strong fault tolerance. Parameters such as well depth, drillability coefficient, abrasiveness coefficient, hardness, compressive strength, drilling pressure, rotation speed, pump displacement, drilling fluid density, bottom hole pressure difference, bottom hole water power, drill bit type, etc. are collected, and a new method for predicting drilling speed is established using the error back propagation neural network model. 5. Among the established relationship models between drilling parameters such as drilling pressure, rotation speed, displacement and mechanical drilling speed, the most representative one is the Bourgoyne and Young model, and the relationship model between various drilling parameters and mechanical drilling speed is established using the multivariate regression method. 6. In the drilling quota settlement, the prediction method of mechanical drilling speed is: first, the mechanical drilling speed of typical wells in old wells is counted, and then divided into different intervals according to the size of well inclination, displacement and well depth. For example, if the well inclination is divided into two intervals: 0-50° and above 50°, the typical wells that have been drilled are filled into these two blocks according to the well inclination. In each interval, the mechanical drilling speed of the typical wells is comprehensively considered according to the geological stratification, and then a unified value is taken as the mechanical drilling speed of the geological stratification in the interval. The above methods are very complicated, and some require the collection of data from actual drilling. It is impossible to predict the mechanical drilling speed before the implementation of the plan, and thus predict the cost of the plan. It also does not take into account that due to the different ground stresses in various directions in the formation, the heterogeneity of the formation development, and the different mechanical drilling speeds when traveling in the formation with different well inclinations and different orientations. At present, in the same block and the same geological stratification, regardless of the well inclination and orientation of the drilling, no matter where in the formation, a unified mechanical drilling speed is used to predict and design the mechanical drilling speed of the well to be drilled, which will bring errors, making the calculation of the mechanical drilling speed inaccurate. The mechanical drilling speed error generated by the above methods affects the prediction of the drilling cycle, thereby affecting the estimation of drilling costs, and cannot evaluate whether the well to be drilled is economical, affecting drilling production decisions.

[0003] CN201710657453.5 discloses a method for evaluating the integrity of a wellbore trajectory, which uses the direction angle of the space vector of the designed wellbore trajectory and the actual wellbore trajectory as the direction difference between the actual wellbore trajectory and the designed wellbore trajectory. It calculates the vector starting from the wellhead coordinates (x0, y0, 0), and starts from the wellhead, and sequentially calculates the direction angle Ai of the space vector (x1(i+1)-x1i, y1(i+1)-y1i, Δh) of the designed wellbore trajectory and the space coordinates (x2(i+1)-x1i, y(i+1)-y1i, Δh) of the actual wellbore trajectory at the same interval Δh at different depths. The value of the same interval Δh is 10 to 30 meters. The spatial vector representation method of the actual drilling trajectory in this patent is to use the line connecting points with the same vertical depth interval of 10m-30m as the vector, and the method of calculating the vector component is to use the difference between the x-coordinate and y-coordinate of the endpoints of the vector segment, which only reflects the direction of the vector of the line connecting the two ends of the segment, and the trajectory between the two endpoints is not a straight line but a curve. And the vertical depth interval of 10-30m is used to take points, which will be larger for the inclined depth interval, so it does not reflect the actual situation of the trajectory. In addition, the patent adopts the method of taking points with equal intervals of vertical depth. In comparing the difference between the designed well and the actual drilling trajectory, this method can only be used when the actual drilling well bottom vertical depth is consistent with the designed well bottom vertical depth. In actual construction, the designed vertical depth is often inconsistent with the actual drilling vertical depth, and it is impossible to take points in this case. If this method is used to predict the mechanical drilling speed, points with the same vertical depth interval are also taken. Since the points with the same vertical depth interval are not necessarily in the same formation, it is impossible to calculate the stratification of a specific formation. At the same time, different wells have different wellhead elevations and different well bottom vertical depths, and it is impossible to implement the use of equal intervals to take points.

[0004] CN201911075820.6 discloses a drilling speed prediction method based on BP neural network and a drilling speed optimization method based on BP neural network and particle swarm algorithm, which collects the torque, drilling pressure, pump pressure and displacement of the drilling tool, and predicts the drilling speed based on the BP neural network, specifically including step 1: according to the sampling period, the torque Nm, drilling pressure Pm, pump pressure Pb and displacement Qm parameters of the drilling tool are measured by sensors; step 2: normalize the parameters in turn, determine the input layer vector x={x1 ,x2,x3,x4}; where x1 is the torque coefficient of the drilling tool, x2 is the drilling pressure coefficient, x3 is the pump pressure coefficient, and x4 is the displacement coefficient; Step 3: the input layer vector is mapped to the middle layer; Step 4: the output layer vector o={o1} is obtained; o1 is the drilling speed prediction coefficient; Step 5: the drilling speed of the drilling tool is predicted as follows: where is the drilling speed prediction coefficient of the output layer vector of the i-th sampling period, ωm_max is the maximum drilling speed of the drilling tool, and ωm(i+1) is the predicted drilling speed of the drilling tool at the i+1-th sampling period. It is a theoretical calculation method, and it needs to collect data from the actual drilling of the designed well, and it is impossible to predict its mechanical drilling speed before the implementation of the plan, thereby predicting the cost of the plan. The invention also does not take into account the differences in mechanical drilling speed due to the different ground stresses in various directions in the formation, the heterogeneity of the formation development, and the differences in mechanical drilling speeds when traveling in the formation with different well inclinations and different orientations. The present invention does not need to collect actual drilling data and can predict the drilling speed before the implementation of the plan. In addition, the actual drilling speed selected does not rely on theoretical model calculations and is relatively simple and accurate. It also takes into account the differences in mechanical drilling speeds due to the different ground stresses in various directions in the formation, the heterogeneity of formation development, and the differences in mechanical drilling speeds when drilling in the formation at different well inclinations and different orientations.

[0005] CN201710390739.1 discloses a double-layer intelligent drilling speed modeling method for geological exploration drilling process, and its rights disclose a double-layer intelligent drilling speed modeling method for geological exploration drilling process, and the modeling work is carried out in four steps. First, the segmented cubic Hermite interpolation method is used to fill in the missing seismic acoustic wave time data and obtain a sample data set; then, the NadaboostELM algorithm is used to establish a formation drillability sub-model; then, the Pearson correlation analysis method is used to determine the parameters with a strong correlation with the drilling speed; finally, the improved PSORBF algorithm is used to establish a drilling speed sub-model. It is a theoretical indirect calculation method with complex calculations, and it needs to collect data from actual drilling. It is impossible to predict its mechanical drilling speed before the implementation of the plan, thereby predicting the cost of the plan. It also does not take into account the differences in mechanical drilling speed due to the different ground stresses in various directions in the formation, the heterogeneity of the formation development, and the different well inclinations and different orientations in the formation.

[0006] CN201710231426.1 discloses a method and device for predicting the mechanical drilling speed of a PDC drill bit in a shale formation, the method comprising: measuring the mechanical drilling speed, sonic time difference, uniaxial compressive strength and triaxial compressive strength of the PDC drill bit of a shale sample in a preset drilling direction; determining the dynamic elastic modulus and dynamic Poisson's ratio according to the measured sonic time difference; determining the cohesion and internal friction angle in the preset drilling direction according to the triaxial compressive strength; establishing a cohesion, internal friction angle and sonic time difference model according to the sonic time difference, cohesion and internal friction angle data; establishing a PDC drill bit mechanical drilling speed prediction model according to the PDC drill bit mechanical drilling speed, drilling pressure, uniaxial compressive strength, dynamic elastic modulus, dynamic Poisson's ratio, cohesion, internal friction angle and the established cohesion, internal friction angle and sonic time difference model, and predicting the mechanical drilling speed of the PDC drill bit in shale formations in different drilling directions. It is a method of calculating drilling speed by measuring core data and then theoretically extrapolating it. Although it takes into account the difference in mechanical drilling speed in different drilling directions, it requires the collection of formation cores, which is very expensive because it is impossible to drill all the formations and take cores. Therefore, it cannot be widely used. At the same time, it uses theoretical indirect extrapolation, which is complex and depends on the accuracy of the theoretical model. Summary of the invention

[0007] Due to the different ground stresses in different directions in the formation, the heterogeneity of formation development, and drilling with different well inclinations and different orientations, the mechanical drilling speed will be inconsistent. In the cycle prediction of the designed well, a unified mechanical drilling speed is often used in the same layer, which leads to errors. Based on the above technical problems, the present invention provides a method for accurately predicting the mechanical drilling speed, which can eliminate errors. At the same time, since the actual drilling mechanical drilling speed is used, the error caused by the theoretical calculation model itself is also eliminated, which is convenient for computer programming.

[0008] In order to achieve the above-mentioned object of the invention, the technical solution provided by the present invention is as follows:

[0009] A method for accurately predicting mechanical drilling speed comprises the following steps:

[0010] 1) Establish a coordinate system and establish a reference coordinate system using the Gauss projection coordinate system;

[0011] 2) Collect the trajectory data of the designed wells and the wells that have been drilled, and vectorize all the points on the trajectory of the wells that have been drilled and the wells that are to be drilled;

[0012] 3) Calculate the difference of the vector, that is, calculate the difference between the vector of the point on the designed trajectory and the vector of the point on the drilled trajectory;

[0013] 4) Compare the magnitude of the vector difference and predict the mechanical drilling speed.

[0014] Furthermore, step 1) includes establishing a reference coordinate system using a Gaussian projection coordinate system, where the x-axis direction is the east-west direction, denoted as EW, the positive x direction is east, and the negative x direction is west; the y-axis direction is the north-south direction, denoted as NS, the positive y direction is north, and the negative y direction is south; the positive z-axis direction is vertically downward, denoted as TVD.

[0015] Further, step 2) comprises the following steps:

[0016] Step 2-1: collecting well depth MD, well inclination α, azimuth β, altitude depth TVD, north-south coordinate NS in Gaussian coordinate system, east-west coordinate EW in Gaussian coordinate system, geological layer ZONE, formation lithology SL and drilled well mechanical drilling speed V as trajectory data;

[0017] Step 2-2: vectorize all points on the trajectory, the direction of the vector is the tangent direction of the trajectory point at the selected well depth on the trajectory, and the vector modulus is the unit vector 1;

[0018] Step 2-3: Decompose the vector onto the coordinate axis. The vector magnitude component on the X axis is X. i , the vector magnitude component on the Y axis is Y i , the component of the vector magnitude on the Z axis is Z i , the starting coordinates of the vector are expressed as: (EW i ,NS i ,TVD i ), the vector is represented as (X i ,Y i ,Z i ).

[0019] Furthermore, the difference of the vector in step 3) is expressed as:

[0020]

[0021] Among them, B i is any point i in the design trajectory; The vector is represented as the tangent line of the wellbore trajectory at any point i in the designed trajectory, and its value is the unit vector 1; X Bi For vector The component of the modulus on the X axis; Bi For vector The component of the modulus on the Y axis; Bi For vector The component of the modulus on the Z axis; A kj The well number selected is any point j on the actual drilling trajectory of the wellbore in the well k; The vector represents the tangent line of the actual drilling trajectory at that point, and its value is the unit vector 1; X Akj For vector The component of the modulus on the X axis;kj Represented as a vector The component of the modulus on the Y axis; kj For vector The component of the magnitude on the Z axis.

[0022] Furthermore, the magnitude of the vector difference in step 4) is It is expressed as:

[0023]

[0024] Among them, B i For any point i in the design trajectory, β i is the azimuth at the point; α i is the well inclination angle at that point; A kj For any point j in the wellbore trajectory of the selected well number k, β kj is the azimuth at the point; α kj is the well inclination angle at this point.

[0025] Furthermore, in step 4), when the modulus of the vector difference When the value is the smallest and is between 0 and 1.42, the actual drilling speed at that point on the drilled trajectory is selected as the predicted speed on the designed trajectory to be drilled.

[0026] Beneficial effects of the present invention:

[0027] 1. Improved accuracy. The method of the present invention uses the tangent direction of the point on the trajectory as the vector direction, which can almost reflect the trajectory conditions of all points on the trajectory, and uses the well inclination and azimuth that can best reflect the subtle changes in the trajectory to calculate the vector components in the X, Y, and Z directions, which can more accurately reflect the trajectory conditions.

[0028] 2. The point selection method is applicable to various trajectories. The present invention uses the trajectory tangent vector as the comparison object and can select any point on the trajectory.

[0029] 3. Simple calculation: The present invention directly uses well inclination and azimuth for calculation, and only needs to know two parameters, which is more applicable and simpler.

[0030] 4. The method takes into account the differences in mechanical drilling speed due to the different ground stresses in various directions in the stratum, the heterogeneity of stratum development, and the differences in mechanical drilling speed when drilling in the stratum with different well inclinations and different orientations. It also eliminates the error caused by the common practice of using a unified mechanical drilling speed in the same geological layer. It also eliminates the error caused by the theoretical calculation model itself. The method of the present invention is simple and easy to implement using computer programming. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1It is a schematic diagram of the coordinate system established by the present invention. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0033] A method for accurately predicting mechanical drilling speed comprises the following steps:

[0034] (1) Establishing a reference coordinate system

[0035] The reference coordinate system is established using the Gauss projection coordinate system. The x-axis direction is the east-west direction, denoted as EW, the positive x direction is east, and the negative x direction is west; the y-axis direction is the north-south direction, denoted as NS, the positive y direction is north, and the negative y direction is south; the positive z-axis direction is vertically downward, denoted as TVD.

[0036] (2) Collecting data on the trajectory of the designed well and the drilled well

[0037] Collect trajectory data of the designed well and the wells drilled in the same block. The collected trajectory data include: well depth MD, well inclination α, azimuth β, altitude depth TVD, north-south coordinate NS in Gaussian coordinate system, east-west coordinate EW in Gaussian coordinate system, geological layer ZONE, formation lithology SL, and mechanical drilling speed V of the drilled well. Then vectorize all points on the trajectory. The direction of the vector is the tangent direction of the trajectory point at the selected well depth on the trajectory, which can also be considered as the drilling speed direction of the point. The modulus of the vector is taken as unit vector 1. Finally, decompose the vector to the coordinate axis. The component of the vector modulus on the X axis is X. i , the vector magnitude component on the Y axis is Y i , the component of the vector magnitude on the Z axis is Z i The starting coordinates of the vector are expressed as: (EW i ,NS i ,TVD i ), the vector can be represented as X i ,Y i ,Z i .

[0038] (3) Calculate the difference of vectors

[0039] Select the same layer and away from the design trajectory B i The distance S of the point i ≤S points on the drilled trajectory, S i Do the following calculation:

[0040]

[0041] Calculate the difference between the vector of the point on the design trajectory and the vector of the point on the drilled trajectory. Select B on the design trajectory i Point, vector representation The direction is the tangent direction of the point on the design trajectory, which is also the direction of the mechanical drilling speed at that point. The vector modulus is taken as unit vector 1. Decompose the vector onto the coordinate axis, and the vector modulus component on the x-axis is X Bi ; The component of the vector magnitude on the Y axis is Y Bi ; The component of the vector magnitude on the Z axis is Z Bi The starting point of the vector is expressed as: (EW Bi ,NS Bi ,TVD Bi ). The vector can be expressed as Select point A on the drilling trajectory of the same layer kj Point, vector representation The direction is the tangent direction of the point on the actual drilling trajectory, which is also the direction of the actual drilling mechanical drilling speed at this point. The vector modulus is taken as unit vector 1. Decompose the vector onto the coordinate axis, and the vector modulus component on the X axis is X kj ; The component of the vector magnitude on the Y axis is Y kj ; The component of the vector magnitude on the Z axis is Z kj ; The starting point of the vector is expressed as: (EW kj ,NS kj ,TVD kj ); the vector can be expressed as

[0042] The vector difference is expressed as:

[0043] like Figure 1 shown.

[0044] (4) Prediction of mechanical drilling speed

[0045] Compare vector differential mode The magnitude of the vector difference It is expressed as:

[0046]

[0047]

[0048]

[0049] Substituting (2) and (3) into (1), we can obtain:

[0050]

[0051] Among them, A kjThe well number selected is any point j on the actual drilling trajectory of the wellbore in the well k; The vector represents the tangent line of the actual drilling trajectory at that point, and its value is the unit vector 1; X Akj For vector The component of the modulus on the X axis; kj Represented as a vector The component of the modulus on the Y axis; kj For vector The component of the modulus on the Z axis; β kj is the azimuth at the point; α kj is the well inclination angle at this point. kj is the east-west coordinate of the point, that is, the value on the x-axis; NS kj is the north-south coordinate of the point, that is, the value on the Y axis; TVD kj It is the altitude depth of the point, that is, the value on the Z axis.

[0052] Among them, B i is any point i in the design trajectory; The vector is represented as the tangent line of the wellbore trajectory at any point i in the designed trajectory, and its value is the unit vector 1; X Bi For vector The component of the modulus on the X axis; Bi For vector The component of the modulus on the Y axis; Bi For vector The component of the modulus on the Z axis; β i is the azimuth at the point; α i is the well inclination angle at this point. i The east-west coordinate of the point, that is, the value on the x-axis; NS i The north-south coordinate of the point, that is, the value on the Y axis; TVD i It is expressed as the altitude depth of the point, that is, the value on the Z axis.

[0053] When the value is the smallest, and the lithology of the point on the actual drilling trajectory is close to that of the designed trajectory point, it indicates that the vector direction of the point on the drilled trajectory is very close to the vector direction of the point selected on the designed trajectory, which also means that the drilling direction is very close. The actual drilling speed of the point on the drilled trajectory is selected as the B speed on the designed trajectory to be drilled. i Predicted mechanical penetration rate.

[0054] The vector differential mode The smaller it is, the more accurate the mechanical drilling speed prediction is; when its value is 0, the mechanical drilling speed prediction result is the most accurate; when its value is ≥1.42, that is, when the two vectors are perpendicular, the mechanical drilling speed prediction result is unreliable.

[0055] Example 1

[0056] (1) Establishing a reference coordinate system

[0057] The reference coordinate system is established using the Gauss projection coordinate system. The x-axis direction is the east-west direction, denoted as EW, the positive x direction is east, and the negative x direction is west; the y-axis direction is the north-south direction, denoted as NS, the positive y direction is north, and the negative y direction is south; the positive z-axis direction is vertically downward, denoted as TVD.

[0058] (2) Collecting data on the trajectory of the designed well and the drilled well

[0059] Collect trajectory data of the designed well and the wells drilled in the same block. The collected trajectory data include: well depth MD, corresponding well inclination α, azimuth β, altitude depth TVD, north-south coordinate NS in Gaussian coordinate system, east-west coordinate EW in Gaussian coordinate system, geological layer ZONE, formation lithology SL, and mechanical drilling speed V of the wells drilled. The mechanical drilling speed of the wells drilled is obtained from the well logging during drilling.

[0060] (3) Calculate the difference of vectors.

[0061] Select the same layer and away from the design trajectory B i The distance S of the point i ≤S points on the drilled trajectory, S i Do the following calculation:

[0062]

[0063] Calculate the modulus of the difference between the vector of the point on the designed trajectory and the vector of the point on the drilled trajectory. Select B on the design trajectory i Select point A on the well track in the same layer. kj point.

[0064] Magnitude of vector difference

[0065]

[0066] Among them, A kj The well number selected is any point j on the actual drilling trajectory of the wellbore in the well k; The vector represents the tangent line of the actual drilling trajectory at that point, and its value is the unit vector 1; β kj is the azimuth at the point; α kj is the well inclination angle at this point. kj is the east-west coordinate of the point, that is, the value on the x-axis; NS kj is the north-south coordinate of the point, that is, the value on the Y axis; TVD kj It is the altitude depth of the point, that is, the value on the Z axis.

[0067] Among them, B i is any point i in the design trajectory; The vector is represented as the tangent line of the wellbore trajectory at any point i in the designed trajectory, and its value is the unit vector 1; β i is the azimuth at the point; α i is the well inclination angle at this point. i The east-west coordinate of the point, that is, the value on the x-axis; NS i The north-south coordinate of the point, that is, the value on the Y axis; TVD i It is expressed as the altitude depth of the point, that is, the value on the Z axis.

[0068] 4. Predicting mechanical drilling speed

[0069] Compare vector differential mode When the value is the smallest, and the lithology of the point on the actual drilling trajectory is close to that of the designed trajectory point, it means that the vector direction of the point on the drilled trajectory is very close to the vector direction of the point selected on the designed trajectory, which also means that the drilling direction is very close. The actual drilling mechanical penetration rate of the point on the drilled trajectory is selected as the B on the designed trajectory to be drilled. i The predicted mechanical drilling speed is The smaller it is, the more accurate the mechanical drilling speed prediction is; when its value is 0, the mechanical drilling speed prediction result is the most accurate; when its value is ≥1.42, that is, when the two vectors are perpendicular, the mechanical drilling speed prediction result is unreliable.

[0070] Example 2

[0071] This example takes two wells A and B that have been drilled, and the well C to be drilled as an example. They have the same geological stratification: the depth of well A is from 1404m to 1440m; the depth of well B is from 1354m to 1358m; the depth of the well C geological stratification is predicted to be from 1274m to 1310m. The specific trajectory is as follows:

[0072] Part of the actual drilling trajectory of Well A

[0073]

[0074] Part of the actual drilling trajectory of Well B

[0075]

[0076] Part of the designed trajectory of the designed well C

[0077]

[0078]

[0079] Select point B1 on the designed well trajectory and use formula (4) to calculate the distance between point B1 and each point on the actual drilling trajectory of wells A and B, as shown in the following table:

[0080]

[0081]

[0082] Assume S = 85m, take S i For the drilled points with a value of ≤S, i.e., the points within 85 m from the B1 point of the designed trajectory of well C, select their well inclination and azimuth data, and use formula (5) to calculate the modulus of the vector difference, as shown in the following table:

[0083]

[0084]

[0085] Comparing the magnitude of the calculated vector difference modulus, the vector difference modulus of point AB1 is the smallest, with a value of 0.183730, and its lithology is igneous rock. However, since the lithology of point B1 is mudstone, this point cannot be selected. The vector difference modulus of point AB2 is 0.185305, which is very small and its lithology is mudstone, which is consistent with the lithology of point B1, so point AB2 is selected. This shows that the vector direction of the point on the drilled trajectory is very close to the vector direction of the point selected on the designed trajectory, which also means that the drilling direction is very close. The mechanical drilling speed of point AB2 is selected as the mechanical drilling speed of point B1 on the designed trajectory of well C. The mechanical drilling speed of point AB2 is 5.3m / h, so the mechanical drilling speed of point B1 is 5.3m / h.

[0086] The above-mentioned embodiments only express the implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be based on the attached claims.

Claims

1. A method for accurately predicting mechanical drilling rate, characterized in that: The following steps are involved: 1) Establish a coordinate system and establish a reference coordinate system using the Gauss projection coordinate system: Including establishing a reference coordinate system with a Gauss projection coordinate system, the x-axis direction is the east-west direction, recorded as EW, the positive x direction is east, and the negative x direction is west; the y-axis direction is the north-south direction, recorded as NS, the positive y direction is north, and the negative y direction is south; the positive z-axis direction is vertically downward, recorded as TVD; 2) Collect the trajectory data of the designed wells and the drilled wells, and vectorize all the points on the trajectory of the drilled wells and the wells to be drilled: The steps include: Step 2-1: collecting well depth MD, well inclination α, azimuth β, altitude depth TVD, north-south coordinate NS in Gaussian coordinate system, east-west coordinate EW in Gaussian coordinate system, geological layer ZONE, formation lithology SL and drilled well mechanical drilling speed V as trajectory data; Step 2-2: vectorize all points on the trajectory, the direction of the vector is the tangent direction of the trajectory point at the selected well depth on the trajectory, and the vector modulus is the unit vector 1; Step 2-3: Decompose the vector onto the coordinate axis. The vector magnitude component on the X axis is X. i , the vector magnitude component on the Y axis is Y i , the component of the vector magnitude on the Z axis is Z i , the starting coordinates of the vector are expressed as: (EW i ,NS i ,TVD i ), the vector is represented as (X i ,Y i ,Z i ); 3) Calculate the difference of the vector, that is, calculate the difference between the vector of the point on the designed trajectory and the vector of the point on the drilled trajectory: The difference of vectors is expressed as: Among them, B i is any point i in the design trajectory; The vector is represented as the tangent line of the wellbore trajectory at any point i in the designed trajectory, and its value is the unit vector 1; X Bi For vector The component of the modulus on the X axis; Bi For vector The component of the modulus on the Y axis; Bi For vector The component of the modulus on the Z axis; A kj The well number selected is any point j on the actual drilling trajectory of the wellbore in the well k; The vector represents the tangent line of the actual drilling trajectory at point j, and its value is the unit vector 1; X Akj For vector The component of the modulus on the X axis; kj Represented as a vector The component of the modulus on the Y axis; kj For vector The component of the modulus on the Z axis; 4) Compare the magnitude of the vector difference modulus and predict the mechanical drilling speed: Magnitude of vector difference It is expressed as: Among them, B i For any point i in the design trajectory, β i is the azimuth at point i; α i is the well inclination angle at point i; A kj For any point j in the wellbore trajectory of the selected well number k, β kj is the azimuth at point j; α kj is the well inclination angle at point j; When the magnitude of the vector difference When the value is the smallest and is between 0 and 1.42, the actual drilling speed at that point on the drilled trajectory is selected as the predicted speed on the designed trajectory to be drilled.

Citation Information

Patent Citations

  • Method and device for predicting mechanical drilling rate of shale stratum PDC drill bit

    CN106909759A

  • Double-layer intelligent drilling speed modeling method for geological exploration drilling process

    CN107100611A

  • A method for evaluating the overall performance of actual drilled wellbore trajectories

    CN107227950B

  • Drilling speed prediction method based on BP neural network and drilling speed optimization method based on BP neural network and particle swarm algorithm

    CN110807557A

  • Stabilized bioactive peptides and methods of identification, synthesis, and use

    AU2003261305A1