A method and system for optimizing the time-sharing quotation in the day-ahead market of a flexible thermal power plant
By establishing an optimized dispatch model and an output range model, the thermal power plant can optimize its day-ahead market time-of-use quotation in the power spot market, solve the operation planning problem caused by the difference between the predicted price and the actual price, and achieve the best profit and success in the market competition. stability.
Patent Information
- Application Number
- CN202010849735.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-21
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2040-08-21
AI Technical Summary
In the electricity spot market, it is difficult for thermal power plants to achieve optimal operation plans when the predicted price is not much different from the actual price, or to ensure profits when the predicted price is significantly different from the actual price, especially when the market price cannot be affected. situation.
A flexible thermal power plant day-ahead market time-sharing quotation optimization method is proposed. By obtaining the predicted price of the next day's spot market and thermal power plant system parameters, an optimal dispatch model is established to determine the hourly overall grid-connected power plan and unit operation plan of the thermal power plant, and establish an output range. Model, calculate the output range in each period and segment it, and calculate the declared price according to the marginal cost to maximize profits.
It provides an efficient quotation decision optimization method for thermal power plants, which can provide feasible quotations in market competition, ensuring that thermal power plants obtain the best returns and avoid losses under market rules.
Smart Images

Figure CN112085352B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power system dispatching, and in particular to a method and system for optimizing time-sharing quotation in the day-ahead market of a flexible thermal power plant. Background Art
[0002] At present, my country is actively promoting the construction of the electricity spot market, and the first batch of eight domestic electricity spot market pilots have successively carried out settlement trial operation. From the eight pilots, their day-ahead spot market basically adopts the mode of full electricity declaration and centralized optimization and clearing. In the day-ahead market adopting this mode, the next day's power generation plan curve of the power plant is determined by the market trading center based on the quotations of all power plants in the day-ahead spot market, with the goal of minimizing the power purchase cost or maximizing the social benefit, and with the principle of low price priority, using the centralized optimization and clearing algorithm.
[0003] In such a market environment, thermal power plants that are price takers and cannot influence market prices need to optimize and determine the production plan for each period of the next day based on the predicted market prices for each period of the next day, taking into account the operating characteristics of various equipment in the plant and their mutual coupling relationships, with the goal of maximizing their own profits. However, in theory, if you want to achieve the optimal operation plan, you need to ensure two points: 1. The actual price is the same as the predicted price; 2. The bid price at the operation plan point of the thermal power plant in each period is less than or equal to the winning bid price. In fact, the predicted price is not completely accurate, so how to construct a quotation curve so that when the actual price is not much different from the predicted price, the optimal operation plan can be achieved in the spot market, or when the predicted price is significantly different from the actual price, a certain profit can still be guaranteed? This is an urgent problem that thermal power plants participating in bidding in the electricity spot market need to solve. Summary of the invention
[0004] Based on this, in order to solve the shortcomings of the existing technology, a method for optimizing the time-sharing quotation in the day-ahead market of a flexible thermal power plant is proposed. The thermal power plant has various types of transformed thermal power units and electric-thermal decoupling equipment, which is characterized by comprising the following steps:
[0005] S1. Obtain the predicted price of the spot market for the next day and the required predicted heat load, and at the same time obtain the system parameters of the thermal power plant, the system parameters including the parameters of each unit of the thermal power plant, the heat load of the thermal power plant, the heat storage tank parameters and the electric boiler parameters;
[0006] S2. Establish an optimal dispatching model for the next day's operation plan of the day-ahead spot market corresponding to the thermal power plant, and give constraints;
[0007] S3. Based on the optimization scheduling model, determine the overall grid-connected power plan of the thermal power plant every hour on the next day, as well as the operation plans of various types of units, electric boilers, and heat storage tanks in the plant;
[0008] S4. Taking the determined operation plans of the electric boiler and the heat storage tank as known conditions, establish a thermal power plant output range model, wherein the thermal power plant output range model takes the maximum and minimum electric output of the thermal power plant in each period as the objective function, and takes the unit constraint and the heat balance constraint as the constraint conditions;
[0009] S5. Calculate the output range of the thermal power plant in each period of the next day to obtain quotation reference data;
[0010] S6. Segment the output range of the thermal power plant in each period to obtain a number of output points that the thermal power plant can apply for. The segmentation process includes: As the dividing point, the output range of the thermal power plant, i.e. the power range of the grid-connected electricity, is divided into sections for the first time; the two sections after the first division are evenly divided to obtain the output points that can be reported by the thermal power plants, which are recorded as The corresponding segment prices are recorded as M2, ..., M N ;
[0011] S7. Calculate the segment price of each segment, i.e., the declared price, according to the marginal cost, wherein the calculation formula is:
[0012]
[0013] in, is the thermal output of the thermal power plant in period t, which is equal to the thermal load. For the power output P i e,t , the heat output is The total coal consumption of the thermal power plant at that time, i∈[2,N]; at the same time, in order to ensure the minimum output to win the bid, The minimum price is declared in the current period.
[0014] Optionally, in one embodiment, in S2, the objective function of the optimization scheduling model is to maximize the profit of the thermal power plant within the set period, and the corresponding formula is:
[0015]
[0016] The first part is the thermal power sales revenue function, and the second part is the operating cost function; are the on-grid power of the thermal power plant and the heating power injected into the heating network in the next day at time t, in MW; e,t , h,t are the on-grid electricity price and sales heat price of the period, unit: ¥ / MWh; τ is the length of the period, unit: hour (h); ρ is the equivalent coal price, unit: ¥ / t; is the coal consumption of the whole plant during this period, in tons (t); at the same time, the constraints of the optimization scheduling model include heat supply and demand balance, unit operation restrictions, and operation restrictions of heat storage tanks and electric boilers;
[0017] The total coal consumption of the plant in each period is calculated by the following formula:
[0018]
[0019] Among them, n1, n2, and n3 are the number of extraction units, extraction units with flexible removal of low-pressure cylinders, and extraction back units respectively; is the coal consumption of the traditional extraction condensing unit i in period t; is the coal consumption of the condensing unit p with low-pressure cylinder removal capability in period t; Coal consumption of extraction type unit j in period t, in tons (t); T is the period;
[0020] The on-grid power of the thermal power plant in the next day at time t is expressed by the following formula:
[0021]
[0022] Among them, C e is the electricity consumption rate of the thermal power plant; The power consumption of the boiler distributed by the thermal power plant in period t; is the power generation of extraction condensing unit i in period t; is the power generation of the condensing unit p with low-pressure cylinder removal capability at time t; is the power generation of the pumping unit j in period t;
[0023] The thermal power plant's online thermal power during the next day's period t is expressed by the following formula:
[0024]
[0025] in, is the heat storage capacity of the thermal power plant's heat storage tank during the t-1 period; η HA Through the heat loss rate between time periods (1-η HA ) is calculated; The compensation heating power of the boiler distributed by the thermal power plant in period t; represents the heating power of extraction condensing unit i in period t; It represents the heating power of the condensing unit p with low-pressure cylinder cut-off capability at time t; It represents the heating power of the extraction unit j in the period t.
[0026] The operating coal consumption of the traditional extraction condensing unit is calculated by the following formula:
[0027]
[0028] Among them, a i , b i 、c i , are the coal consumption coefficients of extraction condensing unit i under pure condensing conditions, and their units are t / (MWh) 2 , t / MWh, t / h; c v , i represents the influence coefficient of extraction steam heating power on power generation power when the steam inlet volume of extraction condensing unit i remains unchanged;
[0029] The coal consumption coefficient of the unit after the low-pressure cylinder is removed is calculated by the following formula:
[0030]
[0031] Among them, a p , b p 、c p They are the coal consumption coefficients of the condensing unit p with low-pressure cylinder removal capability under pure condensing conditions, and the corresponding units are t / (MWh) 2 , t / MWh, t / h; c v,p It represents the influence coefficient of extraction steam heating power on power generation power when the steam inlet of the extraction condensing unit p with low-pressure cylinder cut-off capability remains unchanged;
[0032] The coal consumption coefficient of the back-drawn heating unit is calculated by the following formula:
[0033]
[0034] Among them, a j , b j 、c j They are the coal consumption coefficients of the back-pressure unit j operating under back pressure conditions, and the corresponding units are t / (MWh) 2 , t / MWh, t / h; c m1,j It is the electric-to-heat ratio of the exhaust steam from the low-pressure cylinder of the extraction type unit.
[0035] Optionally, in one embodiment, the operating restriction conditions of the unit include:
[0036] (1) Traditional extraction condensing unit constraints, including traditional extraction condensing unit operating range constraints and traditional extraction condensing unit ramp rate constraints; wherein the traditional extraction condensing unit operating range constraints are obtained by the following formula:
[0037]
[0038] in, is the maximum and minimum output of unit i under pure condensing conditions; is the electrothermal characteristic constant of unit i; c m,i is the ratio of electric power to thermal power of extraction steam thermal power unit i under back pressure condition;
[0039] The ramp rate constraint condition of the conventional extraction condensing unit is obtained by the following formula:
[0040]
[0041] Among them, P up,i , P dn,i They respectively represent the upward and downward climbing rates of the unit under pure condensing conditions.
[0042] (2) Operation constraints of the extraction steam unit after the low-pressure cylinder is flexibly cut off, which include the operation range constraints of the extraction steam unit after the low-pressure cylinder is flexibly cut off and the ramp rate constraints of the extraction steam unit after the low-pressure cylinder is flexibly cut off; among which, the operation range constraints of the extraction steam unit after the low-pressure cylinder is flexibly cut off are obtained by the following formula:
[0043]
[0044] in, Indicates the cylinder cutting status of the pth low-pressure cylinder cutting and transformation unit: In this formula, 1 indicates that the low-pressure cylinder is cut off, and 0 indicates that it is not cut off; and Respectively represent the combined heat and power supply power and heating power of the unit in the extraction and back pressure states; The heat output increased by cutting off the low-pressure cylinder when the steam inlet of the unit remains unchanged, that is, when the coal consumption before and after the cutting is equal; is the maximum heating power of unit p in the uncut state; They respectively represent the combined heat and power supply power and heating power when the unit is not cut off; They respectively represent the combined heat and power supply power and heating power when the unit is in the cut-off state; is the maximum and minimum output of unit p under pure condensing conditions; c m,p It is the ratio of the electrical power to the thermal power of the unit p under back pressure conditions; is the electrothermal characteristic constant of unit p; is the minimum heating power of unit p under back pressure conditions;
[0045] The climbing rate constraint condition of the extraction steam unit after the low-pressure cylinder flexible removal transformation is obtained by the following formula:
[0046]
[0047] Among them, P up,p , P dn,p They respectively represent the up and down climbing rates of the unit under pure condensing conditions;
[0048] (3) The operation constraints of the extraction steam-high back pressure unit include: the operation range constraints of the extraction steam-high back pressure unit and the ramp rate constraints of the extraction steam-high back pressure unit; the operation range constraints of the extraction steam-high back pressure unit are obtained by the following formula:
[0049]
[0050] in, and are the power generation and heating power of the jth back-type unit in period t; c m1,j 、c m2,j They are the electric-to-heat ratios when the unit is operating under pure back pressure conditions and maximum steam extraction conditions respectively; is the maximum and minimum power output of the jth unit under pure back pressure conditions; The maximum heating power of the unit;
[0051] The climbing rate constraint condition of the extraction steam-high back pressure unit is obtained by the following formula:
[0052]
[0053] in, The electric and thermal power of the back-pressure unit at time t is converted into the electric power under pure back-pressure conditions with equal coal consumption; The electric and thermal power of the back-pressure unit at time t-1 is converted into the electric power under pure back-pressure conditions with equal coal consumption; P up,j , P dn,j They represent the up and down ramp rates of the extraction steam unit modified with high back pressure respectively;
[0054] The constraints of the heat storage tank are obtained by the following formula:
[0055]
[0056] in, is the heat storage capacity of the thermal storage tank, and are the maximum heat storage and release powers respectively;
[0057] The constraints of the electric boiler are obtained by the following formula:
[0058]
[0059] in, is the capacity of the electric boiler, η EB is the electricity-to-heat efficiency; are the power consumption and compensation heating power of the boiler distributed by the thermal power plant in period t respectively;
[0060] The heat supply and demand balance constraint is obtained by the following formula:
[0061]
[0062] in, is the heat load of the heating object in period t.
[0063] Optionally, in one embodiment, the formula corresponding to the objective function in S4 is:
[0064]
[0065]
[0066] Among them, n1, n2, and n3 are the number of extraction units, extraction units with flexible removal of low-pressure cylinders, and extraction back units, respectively. are the maximum and minimum power output of the thermal power plant during this period, respectively. They represent the power generation of the extraction condensing unit i, the extraction condensing unit p with low-pressure cylinder removal capability, and the extraction back unit j in time period t, respectively. e is the power consumption rate of the plant; It is the power consumption of the boiler distributed by the thermal power plant during period t.
[0067] Optionally, in one of the embodiments, the constraints in S4 include heat supply and demand balance constraints and unit operation restriction constraints; wherein the unit operation restriction constraints include traditional extraction condensing unit constraints, extraction unit operation constraints after low-pressure cylinder flexible removal and transformation, and extraction-high back pressure unit operation constraints; the traditional extraction condensing unit constraints include traditional extraction condensing unit operation range constraints and ramp rate constraints; the traditional extraction condensing unit operation range constraints are
[0068]
[0069] Among them, c v,i , is the ratio of electric power to thermal power of unit i under back pressure condition; c m,i is the influence coefficient of the extraction steam heating power on the power generation power of unit i when the steam inlet amount remains unchanged; represents the power generation and heating power of extraction condensing unit i in period t; is the maximum heating power of extraction condensing unit i, is the maximum and minimum output of machine i under pure condensing conditions; is the electrothermal characteristic constant of unit i;
[0070] The climbing rate constraint condition is:
[0071]
[0072] Among them, P up,i , P dn,i They respectively represent the up and down climbing rates of the unit under pure condensing conditions;
[0073] The operating constraints of the extraction steam unit after the low-pressure cylinder is flexibly removed include the operating range constraints and ramp rate constraints of the extraction steam unit after the low-pressure cylinder is flexibly removed: The operating range constraints of the extraction steam unit after the low-pressure cylinder is flexibly removed are:
[0074]
[0075] in, Indicates the cylinder cutting status of the pth low-pressure cylinder cutting and transformation unit: subscript 1 means the low-pressure cylinder is cut off, and subscript 0 means it is not cut off; is the maximum heating power of unit p in the uncut state; c v,p is the ratio of the electrical power to the thermal power of the unit p under back pressure conditions; c m,p is the influence coefficient of the extraction steam heating power on the power generation power of unit p when the steam inlet amount remains unchanged; They respectively represent the combined heat and power supply power and heating power of the unit when it is not cut off; They respectively represent the combined heat and power supply power and heating power when the unit is in the cut-off state; When the steam intake of the unit remains unchanged, the increased heat output caused by cutting off the low-pressure cylinder is are the maximum and minimum outputs of unit p under pure condensing conditions respectively; is the electrothermal characteristic constant of unit p; is the minimum heating power of unit p under back pressure conditions; It represents the external power generation and heating power of the extraction condensing unit p with low-pressure cylinder removal capability in period t; the ramp rate constraint condition of the extraction steam unit after the low-pressure cylinder flexible removal transformation is:
[0076]
[0077] The extraction steam-high back pressure unit operation constraint conditions include: extraction steam-high back pressure unit operation range constraint conditions and extraction steam-high back pressure unit climbing rate constraint conditions; the extraction steam-high back pressure unit operation range constraint conditions are:
[0078]
[0079] in, and are the power generation and heating power of the jth back-type unit in period t, c m1,j 、c m2,jThey are the electric-to-heat ratios when the unit is operating under pure back pressure conditions and maximum steam extraction conditions respectively; are the maximum and minimum electrical outputs of the jth unit under pure back pressure conditions; The maximum heating power of the unit;
[0080] Extraction steam-high back pressure unit ramp rate constraints:
[0081]
[0082] in, P is the electric and thermal power of the back-pressure unit during period t converted to the electric power under pure back-pressure conditions with equal coal consumption; up,j , P dn,j They represent the up and down ramp rates of the extraction steam unit modified with high back pressure respectively;
[0083] The heat supply and demand balance constraint condition is:
[0084]
[0085] in, Refers to the heat load of the heating object in period t.
[0086] Optionally, in one embodiment, in S7, the coal consumption of the thermal power plant in each period Obtained from the following formula:
[0087]
[0088] in, is the coal consumption of the traditional extraction condensing unit i in period t; Coal consumption of condensing unit p with low-pressure cylinder cut-off capability during period t; Coal consumption of extraction type unit j in period t, in tons (t);
[0089] It is obtained by the following formula:
[0090]
[0091] Among them, a i 、b i 、c i are the coal consumption coefficients of extraction condensing unit i under pure condensing conditions, in units of t / (MWh) 2 , t / MWh, t / h;
[0092] It is obtained by the following formula:
[0093]
[0094] Among them, a p , b p 、c p They are the coal consumption coefficients of the condensing unit p with low-pressure cylinder removal capability under pure condensing conditions, in units of t / (MWh) 2 , t / MWh, t / h;
[0095] It is obtained by the following formula:
[0096]
[0097] Among them, a j , b j 、c j are the coal consumption coefficients of the back-pressure unit j operating under back pressure conditions, in units of t / (MWh) 2 , t / MWh, t / h.
[0098] In addition, a day-ahead market time-sharing quotation optimization system for flexible thermal power plants is proposed. The system is applied to thermal power plants with various types of reformed thermal power units and electric-thermal decoupling equipment, and is characterized by including:
[0099] A parameter prediction unit, which is used to obtain the predicted price of the spot market for the next day and the required predicted heat load, and at the same time obtain the system parameters of the thermal power plant, the system parameters including the parameters of each unit of the thermal power plant, the heat load of the thermal power plant, the parameters of the heat storage tank and the parameters of the electric boiler;
[0100] The profit calculation unit is used to establish an optimization scheduling model for the next day's operation plan of the day-ahead spot market corresponding to the thermal power plant and give constraints, taking the maximum profit of the thermal power plant within the set period as the objective function;
[0101] A plan selection unit can determine the overall grid-connected power plan of the thermal power plant every hour of the next day, as well as the operation plans of various types of units, electric boilers and heat storage tanks in the plant based on the optimization scheduling model.
[0102] The output range calculation unit is used to establish a thermal power plant output range model with the determined operation plan of the electric boiler and the heat storage tank as known conditions, the maximum and minimum electric output of the thermal power plant in each period as the objective function, and the unit constraint and the heat balance constraint as the constraint conditions; and calculate the output range of the thermal power plant in each period of the next day to obtain quotation reference data;
[0103] The output segmentation unit is used to segment the output range of the thermal power plant in each period to obtain a number of output points that the thermal power plant can apply for. The segmentation process includes: As the dividing point, the output range of the thermal power plant, i.e. the power range of the grid-connected electricity, is divided into sections for the first time; the two sections after the first division are evenly divided to obtain the output points that can be reported by the thermal power plants, which are recorded as The corresponding segment prices are recorded as M2, ..., M N ;
[0104] The segment price calculation unit is used to calculate the segment price of each segment, that is, the declared price, according to the marginal cost, wherein the calculation formula is:
[0105]
[0106] in, is the thermal output of the thermal power plant in period t, which is equal to the thermal load. For the power output Heat output is The total coal consumption of the thermal power plant at that time, i∈[2,N]; at the same time, in order to ensure the minimum output to win the bid, The minimum price is declared in the current period.
[0107] The beneficial effects of the present invention are:
[0108] The present invention can provide a quotation decision optimization method that is efficient and in line with the parameter characteristics of the power plant itself for a thermal power plant containing multiple types of modified thermal power units and diversified electric thermal decoupling equipment. It first obtains the optimal operation plan for the next day by establishing an optimization model, and then uses the output range model of the thermal power plant to determine the output range of the thermal power plant in each time period, divides it into sections according to market rules, and calculates the marginal cost of each section as the declared price, thereby providing a feasible quotation method for thermal power plants to participate in market competition. BRIEF DESCRIPTION OF THE DRAWINGS
[0109] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0110] in:
[0111] Figure 1 A flowchart of a technology implemented in one embodiment;
[0112] FIG2( a ) is a schematic diagram of the electric and thermal operation range of the extraction steam unit (including the removal of the low-pressure cylinder) of the thermal power plant (350MW thermal power unit) in one embodiment;
[0113] FIG2( b ) is a schematic diagram of the electric and thermal operation range of the back-drawing unit of the thermal power plant (350MW thermal power unit) in one embodiment;
[0114] Figure 3 A schematic diagram of the on-grid power output range in each time period in an embodiment;
[0115] Figure 4 A schematic diagram of a next-day segmented quotation curve for a thermal power plant in one embodiment; DETAILED DESCRIPTION
[0116] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0117] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by those skilled in the art of the technical field of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. It is understood that the terms "first", "second", etc. used in the present invention can be used to describe various elements in this article, but these elements are not limited by these terms. These terms are only used to distinguish the first element from another element. For example, without departing from the scope of the present application, the first element can be referred to as the second element, and similarly, the second element can be the first element. Both the first element and the second element are elements, but they are not the same element.
[0118] In this embodiment, a method for optimizing the time-sharing quotation of a flexible thermal power plant in the day-ahead market is proposed, wherein the thermal power plant comprises multiple types of modified units and electric-thermal decoupling equipment, wherein the modified units comprise traditional condensing units, steam extraction units after low-pressure cylinder removal and modification, and steam extraction high back-pressure units; the electric-thermal decoupling equipment comprises electric boilers and heat storage tanks; the core design idea is as follows: this method comprises obtaining the forecast of the overall thermal load of the thermal power plant for the next day, the parameters of each unit in the thermal power plant, the operation plan of the heat storage tank and the electric boiler in the thermal power plant for the next day, and the grid-connected power generation plan for each time period of the thermal power plant; taking the maximum and minimum electric output of the thermal power plant in each time period as the objective function, and taking the unit constraints and heat supply balance constraints as conditions, a thermal power plant output range model is established; then the output range of the thermal power plant in each time period of the next day is calculated, and the electric output range of each time period is segmented; finally, the marginal cost of each segment is calculated as the declared price.
[0119] like Figure 1 As shown, the method comprises the following steps: A method for optimizing the time-sharing quotation in the day-ahead market of a flexible thermal power plant, wherein the thermal power plant has various types of transformed thermal power units and electric-thermal decoupling equipment, characterized in that it comprises the following steps:
[0120] S1. Obtain the predicted price of the spot market for the next day and the required predicted heat load, and at the same time obtain the system parameters of the thermal power plant, the system parameters including the parameters of each unit of the thermal power plant, the heat load of the thermal power plant, the heat storage tank parameters and the electric boiler parameters;
[0121] S2. Establish an optimal dispatching model for the next day's operation plan of the day-ahead spot market corresponding to the thermal power plant, and give constraints;
[0122] S3. Based on the optimization scheduling model, determine the overall grid-connected power plan of the thermal power plant every hour on the next day, as well as the operation plans of various types of units, electric boilers, and heat storage tanks in the plant;
[0123] S4. Taking the determined operation plans of the electric boiler and the heat storage tank as known conditions, establish a thermal power plant output range model, wherein the thermal power plant output range model takes the maximum and minimum electric output of the thermal power plant in each period as the objective function, and takes the unit constraint and the heat balance constraint as the constraint conditions;
[0124] S5. Calculate the output range of the thermal power plant in each period of the next day by using the optimization solver to obtain quotation reference data;
[0125] S6. Segment the output range of the thermal power plant in each period to obtain a number of output points that the thermal power plant can apply for. The segmentation process includes: As the dividing point, the output range of the thermal power plant, i.e. the on-grid power range, is segmented for the first time; the two segments after the first segmentation are evenly divided (and then the segment length limit and other factors are considered and the The capacity of the two sections before and after is evenly divided) to obtain the output points that can be declared by several thermal power plants, which are recorded as The corresponding segment prices are recorded as M2, ..., M N ; At the same time, the reason for adopting This is because if the above electricity price forecast is more accurate, the future clearing result will be within the optimal grid-connected power generation plan determined. The probability near is the largest, so is the split point, and the on-grid power range is segmented for the first time;
[0126] S7. Calculate the segment price of each segment, i.e., the declared price, according to the marginal cost, wherein the calculation formula is:
[0127]
[0128] in, is the thermal output of the thermal power plant in period t, which is equal to the thermal load. For the power output Heat output is The total coal consumption of the thermal power plant at that time, i∈[2,N]; at the same time, in order to ensure the minimum output to win the bid, Based on the above content, it can be seen that the present invention can use the output range model of thermal power plants to determine the output range of thermal power plants in each period, reasonably divide the segments according to market rules, calculate the marginal cost of each segment as the declared price, and provide a feasible quotation decision method for thermal power plants to participate in the day-ahead market.
[0129] Among them, in some specific embodiments, in S1, the predicted price of the next day's spot market is determined by the actual clearing historical price of the power spot pilot market corresponding to the thermal power plant on the previous day. At the same time, since the heat load does not fluctuate much during the day, the heat load data is set to remain unchanged during the day, and the typical heat load in the mid-term heating period is obtained from the historical data. In addition, it can be determined according to the historical price of the previous year, or the calculated historical price reference value can be obtained by deep learning of the historical data of the past few years.
[0130] Calculate the next day's operation plan for the heat storage tank and electric boiler in the thermal power plant, and the grid-connected power generation plan for each period of the thermal power plant.
[0131] Among them, in some specific embodiments, in said S2, an optimization scheduling model of the next day operation plan of the day-ahead spot market corresponding to the thermal power plant is established, that is, a next day operation plan formulation model of the thermal power plant in the day-ahead spot market, and constraints are given, specifically including:
[0132] The objective function of the optimization scheduling model in S2 is to maximize the profit of the thermal power plant within the set period, and its corresponding formula is:
[0133]
[0134] The first part is the thermal power sales revenue function, and the second part is the operating cost function; are the on-grid power of the thermal power plant and the heating power injected into the heating network in the next day at time t, in MW; e,t , h,t are the on-grid electricity price and sales heat price of the period, unit: ¥ / MWh; τ is the length of the period, unit: hour (h); ρ is the equivalent coal price, unit: ¥ / t; is the coal consumption of the whole plant during this period, unit: ton (t); at the same time, the constraints of the optimization scheduling model include heat supply and demand balance, unit operation restrictions and operation restrictions of heat storage tanks and electric boilers.
[0135] Among them, the coal consumption of the whole plant in each period is calculated by the following formula:
[0136]
[0137] Among them, n1, n2, and n3 are the number of extraction units, extraction units with flexible removal of low-pressure cylinders, and extraction back units respectively; is the coal consumption of the traditional extraction condensing unit i in period t; is the coal consumption of the condensing unit p with low-pressure cylinder removal capability in period t; Coal consumption of extraction type unit j in period t, in tons (t); T is the period;
[0138] The on-grid power of the thermal power plant in the next day at time t is expressed by the following formula:
[0139]
[0140] Among them, C e is the electricity consumption rate of the thermal power plant; The power consumption of the boiler distributed by the thermal power plant in period t; is the power generation of extraction condensing unit i in period t; is the power generation of the condensing unit p with low-pressure cylinder removal capability at time t; is the power generation of the pumping unit j in period t;
[0141] The thermal power plant's online thermal power during the next day's period t is expressed by the following formula:
[0142]
[0143] in, is the heat storage capacity of the thermal power plant's heat storage tank during the t-1 period; η HA Through the heat loss rate between time periods (1-η HA ) is calculated; The compensation heating power of the boiler distributed by the thermal power plant in period t; represents the heating power of extraction condensing unit i in period t; It represents the heating power of the condensing unit p with low-pressure cylinder cut-off capability at time t; It represents the heating power of the extraction unit j in the period t.
[0144] The operating coal consumption of the traditional extraction condensing unit is calculated by the following formula:
[0145]
[0146] Among them, a i , b i 、c i , are the coal consumption coefficients of extraction condensing unit i under pure condensing conditions, and their units are t / (MWh) 2 , t / MWh, t / h; c v,iIt represents the influence coefficient of extraction steam heating power on power generation power when the steam inlet volume of extraction condensing unit i remains unchanged;
[0147] Since the original condensing steam of the unit is extracted from the original extraction point for heat supply after the low-pressure cylinder is removed, the coal consumption function is the same as that of the extraction condensing unit. The coal consumption coefficient of the unit after the low-pressure cylinder is removed is calculated by the following formula:
[0148]
[0149] Among them, a p , b p 、c p They are the coal consumption coefficients of the condensing unit p with low-pressure cylinder removal capability under pure condensing conditions, and the corresponding units are t / (MWh) 2 , t / MWh, t / h; c v,p It represents the influence coefficient of extraction steam heating power on power generation power when the steam inlet of the extraction condensing unit p with low-pressure cylinder cut-off capability remains unchanged;
[0150] Since the coal consumption of the back-extraction heating unit can be calculated by converting the operating point under the back-extraction condition into the operating point under the back-pressure condition, and then using the coal consumption function of the unit under the back-pressure condition, the coal consumption coefficient of the back-extraction heating unit is obtained by the following formula:
[0151]
[0152] Among them, a j , b j 、c j They are the coal consumption coefficients of the back-pressure unit j operating under back pressure conditions, and the corresponding units are t / (MWh) 2 , t / MWh, t / h; c m1,j It is the electric-to-heat ratio of the exhaust steam from the low-pressure cylinder of the extraction type unit.
[0153] In one specific embodiment, the operating constraints of the unit include:
[0154] (1) Traditional extraction condensing unit constraints, including traditional extraction condensing unit operating range constraints and traditional extraction condensing unit ramp rate constraints; wherein the traditional extraction condensing unit operating range constraints are obtained by the following formula:
[0155]
[0156] in, is the maximum and minimum output of unit i under pure condensing conditions; is the electrothermal characteristic constant of unit i; c m,i is the ratio of electric power to thermal power of extraction steam thermal power unit i under back pressure condition;
[0157] It can be seen from the above formula that the first row of constraints and the second row of constraints in the formula respectively limit the upper and lower limits of the electrical output of the traditional extraction condensing unit, and the third row of constraints limits the thermal output range of the traditional extraction condensing unit.
[0158] The ramp rate constraint condition of the conventional extraction condensing unit is obtained by the following formula:
[0159]
[0160] Among them, P up,i , P dn,i They represent the up and down ramp rates of the unit under pure condensing conditions. It can be seen from the above formula that the first row of constraints in the formula limits the up ramp rate of the extraction condensing unit, and the second row of constraints limits the down ramp rate of the extraction condensing unit;
[0161] (2) Operation constraints of the extraction steam unit after the low-pressure cylinder is flexibly cut off, which include the operation range constraints of the extraction steam unit after the low-pressure cylinder is flexibly cut off and the ramp rate constraints of the extraction steam unit after the low-pressure cylinder is flexibly cut off; among which, the operation range constraints of the extraction steam unit after the low-pressure cylinder is flexibly cut off are obtained by the following formula:
[0162]
[0163] in, Indicates the cylinder cutting status of the pth low-pressure cylinder cutting and transformation unit: In this formula, 1 indicates that the low-pressure cylinder is cut off, and 0 indicates that it is not cut off; is the maximum heating power of unit p in the uncut state; They respectively represent the combined heat and power supply power and heating power when the unit is not cut off; They respectively represent the combined heat and power supply power and heating power when the unit is in the cut-off state; is the maximum and minimum output of unit p under pure condensing conditions; c m,p It is the ratio of the electrical power to the thermal power of the unit p under back pressure conditions; is the electrothermal characteristic constant of unit p; is the minimum heating power of unit p under back pressure conditions; It is the thermal output increased by cutting off the low-pressure cylinder when the steam intake of the unit remains unchanged, that is, the coal consumption before and after the cutting is equal; the corresponding meaning of the above formula is that due to the minimum flow constraint on the low-pressure cylinder of the extraction unit, it is impossible to continuously extract steam to zero, so many units have carried out flexible cylinder cutting technology transformation, specifically: the first row of constraints in the formula represents the range of thermal output when the low-pressure cylinder is not cut off; the second and third rows of constraints in the formula represent the range of electrical output when the low-pressure cylinder is not cut off; the fourth row of constraints in the formula represents the operating range of thermal output when the low-pressure cylinder is cut off; the fifth row of constraints represents the operating range of electrical output when the low-pressure cylinder is cut off; the sixth and seventh rows of constraints indicate that the sum of the electric thermal output in the cut-off state and the non-cut-off state is equal to the electric thermal output of the unit.
[0164] The climbing rate constraint condition of the extraction steam unit after the low-pressure cylinder flexible removal transformation is obtained by the following formula:
[0165]
[0166] Among them, P up,p , P dn,p They respectively represent the up and down climbing rates of the unit under pure condensing conditions;
[0167] (3) The operation constraints of the extraction steam-high back pressure unit include: the operation range constraints of the extraction steam-high back pressure unit and the ramp rate constraints of the extraction steam-high back pressure unit; the operation range constraints of the extraction steam-high back pressure unit are obtained by the following formula:
[0168]
[0169] in, and are the power generation and heating power of the jth back-type unit in period t; c m1,j 、c m2,j They are the electric-to-heat ratios when the unit is operating under pure back pressure conditions and maximum steam extraction conditions respectively; is the maximum and minimum power output of the jth unit under pure back pressure conditions; is the maximum heating power of the unit; the corresponding meaning of the above formula is that after the extraction steam unit is transformed into an extraction unit with high back pressure, the first row of constraints in the formula limits the lower limit of the operating power of the extraction unit; the second row of constraints in the formula limits the upper limit of the operating power of the extraction unit; the third row of constraints in the formula limits the operating range of the thermal output of the extraction unit.
[0170] The climbing rate constraint condition of the extraction steam-high back pressure unit is obtained by the following formula:
[0171]
[0172] in, The electric and thermal power of the back-pressure unit at time t is converted into the electric power under pure back-pressure conditions with equal coal consumption; The electric and thermal power of the back-pressure unit at time t-1 is converted into the electric power under pure back-pressure conditions with equal coal consumption; P up,j , P dn,j They represent the up and down ramp rates of the extraction steam unit modified with high back pressure respectively;
[0173] The constraints of the heat storage tank are obtained by the following formula:
[0174]
[0175] in, is the heat storage capacity of the thermal storage tank, and are the maximum heat storage and release powers respectively;
[0176] The constraints of the electric boiler are obtained by the following formula:
[0177]
[0178] in, is the capacity of the electric boiler, η EB is the electricity-to-heat efficiency; are the power consumption and compensation heating power of the boiler distributed by the thermal power plant in period t respectively;
[0179] The heat supply and demand balance constraint is obtained by the following formula:
[0180]
[0181] in, is the heat load of the heating object in period t. It should also be noted that, due to the coupling effect of heat storage during the period, and if the electricity price forecast is relatively accurate during actual operation, the actual operation point does not deviate much from the planned operation point made by the production decision, so when calculating the power range of the thermal power plant in each period of the next day, it is considered to be known and unchanged when considering the operation plan of the heat storage tank and electric boiler in the plant.
[0182] In some specific embodiments, the formula corresponding to the objective function in S4 is:
[0183]
[0184]
[0185] Among them, n1, n2, and n3 are the number of extraction units, extraction units with flexible removal of low-pressure cylinders, and extraction back units, respectively. are the maximum and minimum power output of the thermal power plant during this period, respectively. They represent the power generation of the extraction condensing unit i, the extraction condensing unit p with low-pressure cylinder removal capability, and the extraction back unit j in time period t, respectively. e is the power consumption rate of the plant; It is the power consumption of the boiler distributed by the thermal power plant during period t.
[0186] In some specific embodiments, the constraints in S4 include heat supply and demand balance constraints and unit operation restriction constraints; wherein the unit operation restriction constraints include traditional extraction condensing unit constraints, extraction unit operation constraints after low-pressure cylinder flexible removal and transformation, and extraction-high back pressure unit operation constraints; the traditional extraction condensing unit constraints include traditional extraction condensing unit operation range constraints and ramp rate constraints; the traditional extraction condensing unit operation range constraints are
[0187]
[0188] Among them, c v,i , is the ratio of electric power to thermal power of unit i under back pressure condition; c m,i is the influence coefficient of the extraction steam heating power on the power generation power of unit i when the steam inlet amount remains unchanged; represents the power generation and heating power of extraction condensing unit i in period t; is the maximum heating power of extraction condensing unit i, is the maximum and minimum output of machine i under pure condensing conditions; is the electrothermal characteristic constant of unit i.
[0189] In addition, the first and second row constraints limit the upper and lower limits of the electric output of the traditional extraction condensing unit, and the third row constraint limits the thermal output range of the traditional extraction condensing unit;
[0190] The climbing rate constraint condition is:
[0191]
[0192] Among them, P up,i , P dn,i They represent the up and down ramp rates of the unit under pure condensing conditions respectively; the first row of constraints limits the up ramp rate of the extraction condensing unit, and the second row of constraints limits the down ramp rate of the extraction condensing unit;
[0193] The operating constraints of the extraction steam unit after the flexible removal of the low-pressure cylinder include the operating range constraints and ramp rate constraints of the extraction steam unit after the flexible removal of the low-pressure cylinder: Since the low-pressure cylinder of the extraction steam unit has a minimum flow constraint and cannot continuously extract steam to zero, many units have undergone flexible cylinder cutting technology transformation. The feasible operating range after the transformation is based on ABCDA in Figure 2 (a), with B'C' added. The corresponding operating range constraints of the extraction steam unit after the flexible removal of the low-pressure cylinder are:
[0194]
[0195] in, Indicates the cylinder cutting status of the pth low-pressure cylinder cutting and transformation unit: subscript 1 means the low-pressure cylinder is cut off, and subscript 0 means it is not cut off; is the maximum heating power of unit p in the uncut state; c v,p is the ratio of the electrical power to the thermal power of the unit p under back pressure conditions; c m,p is the influence coefficient of the extraction steam heating power on the power generation power of unit p when the steam inlet amount remains unchanged; They respectively represent the combined heat and power supply power and heating power of the unit when it is not cut off; They respectively represent the combined heat and power supply power and heating power when the unit is in the cut-off state; When the steam intake of the unit remains unchanged, the increased heat output caused by cutting off the low-pressure cylinder is are the maximum and minimum outputs of unit p under pure condensing conditions respectively; is the electrothermal characteristic constant of unit p; is the minimum heating power of unit p under back pressure conditions; It represents the external power generation and heating power of the condensing unit p with low-pressure cylinder removal capability in time period t; at the same time, it can be seen that the first row of constraints represents the range of thermal output when the low-pressure cylinder is not removed; the second row of constraints and the third row of constraints represent the range of electrical output when the low-pressure cylinder is not removed; the fourth row of constraints represents the operating range of thermal output when the low-pressure cylinder is removed; the fifth row of constraints represents the operating range of electrical output when the low-pressure cylinder is removed; the sixth row of constraints and the seventh row of constraints represent that the sum of the electrical and thermal output in the removed state and the unremoved state is equal to the electrical and thermal output of the unit;
[0196] The climbing rate constraint condition of the extraction steam unit after the low-pressure cylinder flexible removal transformation is:
[0197]
[0198] The extraction steam-high back pressure unit operation constraint conditions include: extraction steam-high back pressure unit operation range constraint conditions and extraction steam-high back pressure unit climbing rate constraint conditions; since the extraction steam unit is transformed from a high back pressure unit to an extraction steam unit, its feasible operation range changes from ABCDA in FIG2(b) to MNKLM, the extraction steam-high back pressure unit operation range constraint conditions are:
[0199]
[0200] in, and are the power generation and heating power of the jth back-type unit in period t, c m1,j 、c m2,j They are the electric-to-heat ratios when the unit is operating under pure back pressure conditions and maximum steam extraction conditions respectively; are the maximum and minimum electrical outputs of the jth unit under pure back pressure conditions; is the maximum heating power of the unit; it can be seen that the first row of constraints limits the lower limit of the electric output of the back-drawing unit; the second row of constraints limits the upper limit of the electric output of the back-drawing unit; the third row of constraints limits the operating range of the thermal output of the back-drawing unit;
[0201] Extraction steam-high back pressure unit ramp rate constraints:
[0202]
[0203] in, P is the electric and thermal power of the back-pressure unit during period t converted to the electric power under pure back-pressure conditions with equal coal consumption; up,j , P dn,j They represent the up and down ramp rates of the extraction steam unit modified with high back pressure respectively;
[0204] The heat supply and demand balance constraint condition is:
[0205]
[0206] in, Refers to the heat load of the heating object in period t.
[0207] In one specific embodiment, in S7, the coal consumption of the thermal power plant in each period is Obtained from the following formula:
[0208]
[0209] in, is the coal consumption of the traditional extraction condensing unit i in period t; Coal consumption of condensing unit p with low-pressure cylinder cut-off capability during period t; Coal consumption of extraction type unit j in period t, in tons (t);
[0210] It is obtained by the following formula:
[0211]
[0212] Among them, a i , b i 、c i are the coal consumption coefficients of extraction condensing unit i under pure condensing conditions, in units of t / (MWh) 2 , t / MWh, t / h;
[0213] It is obtained by the following formula:
[0214]
[0215] Among them, a p , b p 、c p They are the coal consumption coefficients of the condensing unit p with low-pressure cylinder removal capability under pure condensing conditions, in units of t / (MWh) 2 , t / MWh, t / h;
[0216] It is obtained by the following formula:
[0217]
[0218] Among them, a j , b j 、c j are the coal consumption coefficients of the back-pressure unit j operating under back pressure conditions, in units of t / (MWh) 2 , t / MWh, t / h.
[0219] The following is a specific case to further verify and illustrate the above content:
[0220] Example 1, the thermal power plant has 4 350MW pure condensing transformation heating units, among which Unit 1 has been transformed into a back-drawing heating unit, and Unit 2 is undergoing low-pressure cylinder flexible removal transformation; after Unit 2 is completed, the heating can be increased by 151MW and the electric output can be reduced by 37.6MW by cutting off the low-pressure cylinder while the steam intake remains unchanged. In addition to the flexible cutting off transformation of the low-pressure cylinder of Unit 2, the thermal power plant is also equipped with an electric boiler and a heat storage tank; the specific steps include:
[0221] S1. Obtain the predicted price of the spot market for the next day and the required predicted thermal load, and at the same time obtain the parameters of each unit of the thermal power plant, the thermal load of the thermal power plant, the parameters of the heat storage tank and the parameters of the electric boiler; among them, the predicted electricity price of the spot market for the next day adopts the predicted price sequence constructed by the historical data of the actual day-ahead market clearing prices in the wind and solar power generation scenario of the Shandong Province Electricity Spot Pilot in 2019; the thermal load data adopts the typical thermal load of the thermal power plant in the medium term for heating: 1386MW. Since the thermal load does not fluctuate much during the day, it is assumed to remain unchanged during the day; the unit parameters include: including unit operating parameters and unit coal consumption coefficient; such as the maximum power generation power of the unit, the minimum power generation power of the unit, the maximum heating power of the unit, etc. Among them, the electric and thermal operation ranges of the three types of units in this thermal power plant are as follows: Figure 2(a) , 2(b) The unit operating parameters are shown in Table 1, and the unit coal consumption parameters are shown in Table 2. The relevant parameters of the thermal power plant heat storage tank and electric boiler include: the capacity of the heat storage tank is 7200MW·h, the maximum heat release power is 900MW, which can meet the heat release demand for 8 hours; the capacity of the electric boiler is 600MW.
[0222] Table 1 Unit operating parameters
[0223]
[0224] Table 2 Coal consumption coefficient of the unit
[0225]
[0226] S2. Establish a next-day operation plan formulation model for the thermal power plant corresponding to the thermal power plant, which includes traditional extraction condensing units, extraction condensing units with low-pressure cylinder cut-off capability, extraction back units, heat storage tanks, and electric boilers in the day-ahead spot market, namely, an optimization scheduling model: the relevant technical solutions of the optimization scheduling model are referred to the above content and will not be repeated in this example.
[0227] S3. Input the system parameters of the thermal power plant into the optimization scheduling model. The optimization model of this example is solved by IBM ILOG CPLEX software to obtain the optimal operation curve of the thermal power plant when participating in the spot market price in this scenario. At the same time, the operation plan of the heat storage tank and electric boiler calculated based on the above scheme is shown in Table 3, where the power of the heat storage tank is positive when releasing heat and negative when storing heat; the optimal grid-connected power generation plan of the thermal power plant is shown in Table 4.
[0228] Table 3 Operation plan of heat storage tank and electric boiler
[0229]
[0230] Table 4 Optimal grid-connected power generation plan for thermal power plants at different time periods
[0231]
[0232] S4. Taking the determined operation plans of the electric boiler and the heat storage tank as known conditions, taking the maximum and minimum electric output of the thermal power plant in each period as the objective function, and taking the unit constraints and the heat balance constraints as conditions, a thermal power plant output range model is established;
[0233] S5. The optimization model of this example uses IBM ILOG CPLEX software to solve and determine the output range of the thermal power plant in each period, which is used as the basis for quotation and the operating range of the thermal power plant is calculated as follows: Figure 3 shown.
[0234] S6. According to the existing spot trading rules, assuming that the minimum capacity of each segment is 1 / 10 of the output range, and the number of segments does not exceed 5; first, the operation plan point of the thermal power plant in each period As the split point, the on-grid power range is segmented for the first time; then The capacities of the two sections are evenly divided; after the division, the output points that the thermal power plant can declare can be described as The corresponding segment prices are M2, ..., M N .
[0235] S7. Quote for each segment according to marginal cost, then:
[0236]
[0237] Among them, i∈[2,N]. At the same time, in order to ensure the minimum output to win the bid, The quotation curves for each period calculated according to the above principles are as follows: Figure 4 As shown (the dotted line is the winning bid price line).
[0238] from Figure 4 It can be seen that there are three results: some periods of the thermal power plant operation plan point in each period are at the upper limit of output (0, 6-11, 16-23 points), at this time the winning bid price line is higher than the highest bid, and the thermal power plant generates electricity at the maximum output; some periods are at the lower limit of output (4, 13 points), at this time the winning bid price line is higher than the declared minimum price, lower than the bid of the first section, and the thermal power plant generates electricity at the minimum output; some periods are between the upper and lower limits of output, at this time the winning bid price line falls between the best operating point quotation segments. The thermal power plant generates electricity at the best operating point.
[0239] If the actual liquidation price deviates greatly from the predicted price, and the winning bid price line is lower than the marginal cost at a certain capacity, the thermal power plant will not send out the electricity at this capacity segment, so there will be no loss. If the winning bid price line is higher than the marginal cost at a certain capacity, the thermal power plant will send out the electricity at this capacity segment, which will increase the thermal power plant's revenue, and the result is completely in line with the design rules.
[0240] Based on the same inventive concept, the present invention also proposes a day-ahead market time-sharing quotation optimization system for a flexible thermal power plant, which is applied to a thermal power plant with various types of reformed thermal power units and electric-thermal decoupling equipment, and is characterized by comprising:
[0241] A parameter prediction unit, which is used to obtain the predicted price of the spot market for the next day and the required predicted heat load, and at the same time obtain the system parameters of the thermal power plant, the system parameters including the parameters of each unit of the thermal power plant, the heat load of the thermal power plant, the parameters of the heat storage tank and the parameters of the electric boiler;
[0242] The profit calculation unit is used to establish an optimization scheduling model for the next day's operation plan of the day-ahead spot market corresponding to the thermal power plant and give constraints, taking the maximum profit of the thermal power plant within the set period as the objective function;
[0243] A plan selection unit can determine the overall grid-connected power plan of the thermal power plant every hour of the next day, as well as the operation plans of various types of units, electric boilers and heat storage tanks in the plant based on the optimization scheduling model.
[0244] The output range calculation unit is used to establish a thermal power plant output range model with the determined operation plan of the electric boiler and the heat storage tank as known conditions, the maximum and minimum electric output of the thermal power plant in each period as the objective function, and the unit constraint and the heat balance constraint as the constraint conditions; and calculate the output range of the thermal power plant in each period of the next day to obtain quotation reference data;
[0245] The output segmentation unit is used to segment the output range of the thermal power plant in each period to obtain a number of output points that the thermal power plant can apply for. The segmentation process includes: As the dividing point, the output range of the thermal power plant, i.e. the power range of the grid-connected electricity, is divided into sections for the first time; the two sections after the first division are evenly divided to obtain the output points that can be reported by the thermal power plants, which are recorded as The corresponding segment prices are recorded as M2, ..., M N ;
[0246] The segment price calculation unit is used to calculate the segment price of each segment, that is, the declared price, according to the marginal cost, wherein the calculation formula is:
[0247]
[0248] in, is the thermal output of the thermal power plant in period t, which is equal to the thermal load. For the power output P i e,t , the heat output is The total coal consumption of the thermal power plant at that time, i∈[2,N]; at the same time, in order to ensure the minimum output to win the bid, The minimum price is declared in the current period.
[0249] Since the technical solutions and principles of the present system are completely consistent with those of the above-mentioned method, the preferred solution will not be described in detail in this example, and reference may be made directly to the embodiments corresponding to the method.
[0250] Based on the same inventive concept, the present invention also proposes a computer-readable storage medium, comprising computer instructions, and when the computer instructions are executed on a computer, the computer executes the method described.
[0251] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A method for optimizing the time-sharing quotation in the day-ahead market of a flexible thermal power plant, wherein the thermal power plant has various types of transformed thermal power units and electric-thermal decoupling equipment, characterized in that: The steps include: S1. Obtain the predicted price of the spot market for the next day and the required predicted heat load, and at the same time obtain the system parameters of the thermal power plant, the system parameters including the parameters of each unit of the thermal power plant, the heat load of the thermal power plant, the heat storage tank parameters and the electric boiler parameters; S2. Establish an optimal dispatching model for the next day's operation plan of the day-ahead spot market corresponding to the thermal power plant, and give constraints; S3. Based on the optimization scheduling model, determine the overall grid-connected power plan of the thermal power plant every hour on the next day, as well as the operation plans of various types of units, electric boilers, and heat storage tanks in the plant; S4. Taking the determined operation plans of the electric boiler and the heat storage tank as known conditions, establish a thermal power plant output range model, wherein the thermal power plant output range model takes the maximum and minimum electric output of the thermal power plant in each period as the objective function, and takes the unit constraint and the heat balance constraint as the constraint conditions; S5. Calculate the output range of the thermal power plant in each period of the next day to obtain quotation reference data; S6. Segment the output range of the thermal power plant in each period to obtain a number of output points that the thermal power plant can apply for. The segmentation process includes: The output range of the thermal power plant, i.e., the power range of the grid-connected electricity, is divided into two sections for the first time as the dividing point; the two sections after the first division are evenly divided to obtain the output points that can be declared by the thermal power plant, which are recorded as The corresponding segment prices are recorded as M2, ..., M N ; S7. Calculate the segment price of each segment, i.e. the declared price, according to the marginal cost. The corresponding calculation formula is: in, is the thermal output of the thermal power plant in period t, which is equal to the thermal load. For the power output Heat output is The total coal consumption of the thermal power plant at that time, i∈[2,N]; at the same time, in order to ensure the minimum output to win the bid, The minimum price is declared in the current period.
2. The method according to claim 1, characterized in that In S2, the objective function of the optimization scheduling model is to maximize the profit of the thermal power plant within the set period, and its corresponding formula is: The first part is the thermal power sales revenue function, and the second part is the operating cost function; are the on-grid power of the thermal power plant and the heating power injected into the heating network in the next day at time t, in MW; e,t , h,t are the on-grid electricity price and sales heat price in period t, unit: ¥ / MWh; τ is the period length of period t, unit: hour (h); ρ is the converted equivalent coal price, unit: ¥ / t; is the coal consumption of the whole plant in period t, in tons (t); at the same time, the constraints of the optimization scheduling model include heat supply and demand balance, unit operation restrictions, and operation restrictions of heat storage tanks and electric boilers; The total coal consumption of the plant in each period is calculated by the following formula: Among them, n1, n2, and n3 are the number of extraction units, extraction units with flexible removal of low-pressure cylinders, and extraction back units respectively; is the coal consumption of the traditional extraction condensing unit i in period t; is the coal consumption of the condensing unit p with low-pressure cylinder removal capability in period t; Coal consumption of extraction type unit j in period t, in tons (t); T is the period; The on-grid power of the thermal power plant in the next day at time t is expressed by the following formula: Among them, C e is the electricity consumption rate of the thermal power plant; The power consumption of the boiler distributed by the thermal power plant in period t; is the power generation of extraction condensing unit i in period t; is the power generation of the condensing unit p with low-pressure cylinder removal capability at time t; is the power generation of the pumping unit j in period t; The thermal power plant's online thermal power during the next day's period t is expressed by the following formula: in, is the heat storage capacity of the thermal power plant's heat storage tank during the t-1 period; η HA The heat loss rate between time periods (1-η HA ) is calculated; The compensation heating power of the boiler distributed by the thermal power plant in period t; represents the heating power of extraction condensing unit i in period t; It represents the heating power of the condensing unit p with low-pressure cylinder cut-off capability at time t; represents the heating power of the extraction unit j in period t; The operating coal consumption of the traditional extraction condensing unit is calculated by the following formula: Among them, a i , b i 、c i , are the coal consumption coefficients of extraction condensing unit i under pure condensing conditions, and their units are t / (MWh) 2 , t / MWh, t / h; It represents the influence coefficient of extraction steam heating power on power generation power when the steam inlet volume of extraction condensing unit i remains unchanged; The coal consumption coefficient of the unit after the low-pressure cylinder is removed is calculated by the following formula: Among them, a p , b p 、c p They are the coal consumption coefficients of the condensing unit p with low-pressure cylinder removal capability under pure condensing conditions, and the corresponding units are t / (MWh) 2 , t / MWh, t / h; c v,p It represents the influence coefficient of extraction steam heating power on power generation power when the steam inlet of the extraction condensing unit p with low-pressure cylinder cut-off capability remains unchanged; The coal consumption coefficient of the back-drawn heating unit is calculated by the following formula: Among them, a j , b j 、c j They are the coal consumption coefficients of the back-pressure unit j operating under back pressure conditions, and the corresponding units are t / (MWh) 2 , t / MWh, t / h; c m1,j It is the electric-to-heat ratio of the exhaust steam from the low-pressure cylinder of the extraction type unit.
3. The method according to claim 2, characterized in that (1) Traditional extraction condensing unit constraints, including traditional extraction condensing unit operating range constraints and traditional extraction condensing unit ramp rate constraints; wherein the traditional extraction condensing unit operating range constraints are obtained by the following formula: in, is the maximum and minimum output of unit i under pure condensing conditions; is the electrothermal characteristic constant of unit i; c m,i is the ratio of electric power to thermal power of extraction steam thermal power unit i under back pressure condition; The ramp rate constraint condition of the conventional extraction condensing unit is obtained by the following formula: Among them, P up,i , P dn,i They represent the up and down ramp rates of the conventional extraction-condensing unit under pure condensing conditions respectively; (2) Operation constraints of the extraction steam unit after the low-pressure cylinder is flexibly cut off, which include the operation range constraints of the extraction steam unit after the low-pressure cylinder is flexibly cut off and the ramp rate constraints of the extraction steam unit after the low-pressure cylinder is flexibly cut off; among which, the operation range constraints of the extraction steam unit after the low-pressure cylinder is flexibly cut off are obtained by the following formula: in, Indicates the cylinder cutting status of the pth low-pressure cylinder cutting and transformation unit: In this formula, 1 indicates that the low-pressure cylinder is cut off, and 0 indicates that it is not cut off; and Respectively represent the combined heat and power supply power and heating power of the unit in the extraction and back pressure states; The heat output increased by cutting off the low-pressure cylinder when the steam inlet of the unit p remains unchanged, that is, when the coal consumption before and after the cutting is equal; is the maximum heating power of unit p in the uncut state; They respectively represent the combined heat and power supply power and heating power when the unit is not cut off; They respectively represent the combined heat and power supply power and heating power when the unit is in the cut-off state; is the maximum and minimum output of unit p under pure condensing conditions; c m,p It is the ratio of the electrical power to the thermal power of the unit p under back pressure conditions; is the electrothermal characteristic constant of unit p; is the minimum heating power of unit p under back pressure conditions; The climbing rate constraint condition of the extraction steam unit after the low-pressure cylinder flexible removal transformation is obtained by the following formula: Among them, P up,p , P dn,p They represent the up and down ramp rates of unit p under pure condensing conditions respectively; (3) The operation constraints of the extraction steam-high back pressure unit include: the operation range constraints of the extraction steam-high back pressure unit and the ramp rate constraints of the extraction steam-high back pressure unit; the operation range constraints of the extraction steam-high back pressure unit are obtained by the following formula: in, and are the power generation and heating power of the jth back-type unit in period t; c m1,j 、c m2,j are the electric-to-heat ratios of the jth unit when it operates under pure back pressure conditions and maximum steam extraction conditions, respectively; is the maximum and minimum power output of the jth unit under pure back pressure conditions; is the maximum heating power of the jth unit; The climbing rate constraint condition of the extraction steam-high back pressure unit is obtained by the following formula: in, The electric and thermal power of the back-pressure unit at time t is converted into the electric power under pure back-pressure conditions with equal coal consumption; The electric and thermal power of the back-pressure unit at time t-1 is converted into the electric power under pure back-pressure conditions with equal coal consumption; P up,j , P dn,j They represent the up and down ramp rates of the extraction steam unit modified with high back pressure respectively; The constraints of the heat storage tank are obtained by the following formula: in, is the heat storage capacity of the thermal storage tank, and are the maximum heat storage and release powers respectively; The constraints of the electric boiler are obtained by the following formula: in, is the capacity of the electric boiler, η EB is the electricity-to-heat efficiency; are the power consumption and compensation heating power of the boiler distributed by the thermal power plant in period t respectively; The heat supply and demand balance constraint is obtained by the following formula: in, is the heat load of the heating object in period t.
4. The method according to claim 1, characterized in that: The formula corresponding to the objective function in S4 is: Among them, n1, n2, and n3 are the number of extraction units, extraction units with flexible removal of low-pressure cylinders, and extraction back units, respectively. are the maximum and minimum power outputs of the thermal power plant in period t, They represent the power generation of the extraction condensing unit i, the extraction condensing unit p with low-pressure cylinder removal capability, and the extraction back unit j in time period t, respectively. e is the electricity consumption rate of thermal power plant; It is the power consumption of the boiler distributed by the thermal power plant during period t.
5. The method according to claim 4, characterized in that The constraints in S4 include heat supply and demand balance constraints and unit operation restriction constraints; among them, the unit operation restriction constraints include traditional extraction condensing unit constraints, extraction steam unit operation constraints after low-pressure cylinder flexible removal and transformation, and extraction steam-high back pressure unit operation constraints; the traditional extraction condensing unit constraints include traditional extraction condensing unit operation range constraints and ramp rate constraints; the traditional extraction condensing unit operation range constraints are Among them, c v,i , is the ratio of electric power to thermal power of unit i under back pressure condition; c m,i is the influence coefficient of the extraction steam heating power on the power generation power of unit i when the steam inlet amount remains unchanged; represents the power generation and heating power of extraction condensing unit i in period t; is the maximum heating power of extraction condensing unit i, is the maximum and minimum output of machine i under pure condensing conditions; is the electrothermal characteristic constant of unit i; The climbing rate constraint condition is: Among them, P up,i , P dn,i They represent the up and down ramp rates of unit i under pure condensing conditions respectively; The operating constraints of the extraction steam unit after the low-pressure cylinder is flexibly removed include the operating range constraints and ramp rate constraints of the extraction steam unit after the low-pressure cylinder is flexibly removed: The operating range constraints of the extraction steam unit after the low-pressure cylinder is flexibly removed are: in, Indicates the cylinder cutting status of the pth low-pressure cylinder cutting and transformation unit: subscript 1 means the low-pressure cylinder is cut off, and subscript 0 means it is not cut off; is the maximum heating power of unit p in the uncut state; c v,p is the ratio of the electrical power to the thermal power of the unit p under back pressure conditions; c m,p is the influence coefficient of the extraction steam heating power on the power generation power of unit p when the steam inlet amount remains unchanged; They respectively represent the combined heat and power supply power and heating power of the unit when it is not cut off; They respectively represent the combined heat and power supply power and heating power when the unit is in the cut-off state; It is the heat output increased by cutting off the low-pressure cylinder when the steam inlet of the unit p remains unchanged. are the maximum and minimum outputs of unit p under pure condensing conditions respectively; is the electrothermal characteristic constant of unit p; is the minimum heating power of unit p under back pressure conditions; It represents the external power generation and heating power of the extraction condensing unit p with low-pressure cylinder removal capability in period t; the ramp rate constraint condition of the extraction steam unit after the low-pressure cylinder flexible removal transformation is: The extraction steam-high back pressure unit operation constraint conditions include: extraction steam-high back pressure unit operation range constraint conditions and extraction steam-high back pressure unit climbing rate constraint conditions; the extraction steam-high back pressure unit operation range constraint conditions are: in, and are the power generation and heating power of the jth back-type unit in period t, c m1,j 、c m2,j are the electric-to-heat ratios of the jth unit when it operates under pure back pressure conditions and maximum steam extraction conditions, respectively; are the maximum and minimum electrical outputs of the jth unit under pure back pressure conditions; is the maximum heating power of the jth unit; Extraction steam-high back pressure unit ramp rate constraints: in, P is the electric and thermal power of the back-pressure unit during period t converted to the electric power under pure back-pressure conditions with equal coal consumption; up,j , P dn,j They represent the up and down ramp rates of the extraction steam unit modified with high back pressure respectively; The heat supply and demand balance constraint condition is: in, Refers to the heat load of the heating object in period t.
6. The method according to claim 1, characterized in that: In S7, the coal consumption of the thermal power plant in each period Obtained from the following formula: in, is the coal consumption of the traditional extraction condensing unit i in period t; Coal consumption of condensing unit p with low-pressure cylinder cut-off capability during period t; Coal consumption of extraction type unit j in period t, in tons (t); It is obtained by the following formula: Among them, a i , b i 、c i are the coal consumption coefficients of extraction condensing unit i under pure condensing conditions, in units of t / (MWh) 2 , t / MWh, t / h; It is obtained by the following formula: Among them, a p , b p 、c p They are the coal consumption coefficients of the condensing unit p with low-pressure cylinder removal capability under pure condensing conditions, in units of t / (MWh) 2 , t / MWh, t / h; It is obtained by the following formula: Among them, a j , b j 、c j are the coal consumption coefficients of the back-pressure unit j operating under back pressure conditions, in units of t / (MWh) 2 , t / MWh, t / h.
7. A day-ahead market time-sharing quotation optimization system for a flexible thermal power plant, the system is applied to a thermal power plant with various types of reformed thermal power units and electric-thermal decoupling equipment, characterized in that: include: A parameter prediction unit, which is used to obtain the predicted price of the spot market for the next day and the required predicted heat load, and at the same time obtain the system parameters of the thermal power plant, the system parameters including the parameters of each unit of the thermal power plant, the heat load of the thermal power plant, the parameters of the heat storage tank and the parameters of the electric boiler; The profit calculation unit is used to establish an optimization scheduling model for the next day's operation plan of the day-ahead spot market corresponding to the thermal power plant and give constraints, taking the maximum profit of the thermal power plant within the set period as the objective function; A plan selection unit, which can determine the overall grid-connected power plan of the thermal power plant every hour of the next day, as well as the operation plans of multiple types of units, electric boilers and heat storage tanks in the plant based on the optimization scheduling model; An output range calculation unit is used to establish an output range model of a thermal power plant with the determined operation plan of the electric boiler and the heat storage tank as known conditions, the maximum and minimum electric output of the thermal power plant in each period as the objective function, and the unit constraint and the heat balance constraint as the constraint conditions; And calculate the output range of the thermal power plant in each period of the next day to obtain quotation reference data; The output segmentation unit is used to segment the output range of the thermal power plant in each period to obtain a number of output points that the thermal power plant can apply for. The segmentation process includes: As the dividing point, the output range of the thermal power plant, i.e. the power range of the grid-connected electricity, is divided into sections for the first time; the two sections after the first division are evenly divided to obtain the output points that can be reported by the thermal power plants, which are recorded as The corresponding segment prices are recorded as M2, ..., M N ; The segment price calculation unit is used to calculate the segment price of each segment, i.e. the declared price, according to the marginal cost. The calculation formula is: in, is the thermal output of the thermal power plant in period t, which is equal to the thermal load. For the power output Heat output is The total coal consumption of the thermal power plant at that time, i∈[2,N]; at the same time, in order to ensure the minimum output to win the bid, The minimum price is declared in the current period.
Citation Information
Patent Citations
Optimization method and system for day-ahead market yield decision operation plan of thermal power plant
CN112072644A
