A calculation method for critical wind curtailment criterion of power grid

By combining the intersection of the load and external power curves with the lower limit curve of the system regulation capacity, the new energy acceptance capacity is optimized, the problem of the accuracy of the grid's wind curtailment determination and assessment is solved, and the calculation accuracy of the new energy acceptance capacity and the grid's wind curtailment power is improved. .

CN112186745BActive Publication Date: 2024-10-29STATE GRID LIAONING ELECTRIC POWER CO LTD +2
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010983402.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-18
Publication Date
2024-10-29
Estimated Expiration
2040-09-18

AI Technical Summary

Technical Problem

Existing technology cannot accurately determine the critical conditions for wind curtailment in the power grid and evaluate the amount of wind curtailment, resulting in insufficient new energy acceptance capabilities, low calculation accuracy, and limited scope of application.

Method used

A grid critical wind curtailment criterion calculation method is used to determine the maximum accommodation space for new energy by combining the intersection of load, external power curve and system regulation capacity lower limit curve, and optimize the new energy acceptance capacity through objective functions and constraints. Accurately assess the power grid’s wind curtailment and new energy consumption capabilities.

Benefits of technology

It improves the accuracy of determining the critical conditions of wind curtailment and the ability to accept new energy, and can more accurately calculate the amount of wind curtailment in the power grid and give full play to the value of new energy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112186745B_ABST
    Figure CN112186745B_ABST
Patent Text Reader

Abstract

The present invention relates to a calculation method for a critical wind abandonment criterion of a power grid, which is applied to the judgment of critical wind abandonment conditions of a power grid and the evaluation of the objective wind abandonment amount. Fully considering the current operating status of the power grid, the predicted output of new energy, the load forecast and other information, when the capacity of conventional units in the power grid is reduced to zero, it is the critical state of wind abandonment. The goal of the present invention is to provide a critical wind abandonment criterion for a power grid, to achieve accurate judgment of the wind abandonment conditions of the power grid, and to accurately evaluate the wind abandonment amount of the power grid. The day-ahead dispatch plan of the system is formulated based on the result of calculating the new energy acceptance capacity according to the critical wind abandonment criterion of the power grid, which will be able to accept more new energy such as wind power and photovoltaic power, and is conducive to giving full play to the value of new energy power generation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a calculation method for a critical wind abandonment criterion of a power grid, which is applied to the judgment of critical wind abandonment conditions of a power grid and the evaluation of the objective wind abandonment amount. Fully considering the current operating status of the power grid, the predicted output of new energy, the load forecast and other information, when the capacity of conventional units in the power grid is reduced to zero, it is the critical state of wind abandonment. The goal of the present invention is to provide a critical wind abandonment criterion for a power grid, to achieve accurate judgment of the wind abandonment conditions of the power grid, and to accurately evaluate the wind abandonment amount of the power grid. The day-ahead dispatch plan of the system is formulated based on the result of calculating the new energy acceptance capacity according to the critical wind abandonment criterion of the power grid, which will be able to accept more new energy such as wind power and photovoltaic power, and is conducive to giving full play to the value of new energy power generation. Background Art

[0002] Affected by the characteristics of the power system that power generation, supply and consumption are completed simultaneously, the randomness, volatility and intermittency of renewable energy output need to be uniformly regulated by the power system. After a high proportion of renewable energy is connected to the power system, the burden of system regulation is increased. The principle of power system balance is to adjust the output of conventional power sources to track load changes and maintain the dynamic balance of the power system. When the power system regulation capacity is insufficient, it will lead to the abandonment of renewable energy. The problem of renewable energy consumption is closely related to the system regulation capacity.

[0003] The calculation of wind power abandonment in my country is still in its infancy. In actual production, some wind farms use installed capacity as theoretical power, some use the average power at the start and end of the wind abandonment period as theoretical power, and some use predicted power as theoretical power. These methods all have problems such as lack of theoretical basis and large calculation errors. In recent years, as the phenomenon of wind abandonment has received increasing attention, some more scientific calculation methods have emerged, mainly in the form of characteristic wind turbine method and historical data estimation method. The basic idea is to establish a mapping relationship between wind farm output and wind measurement data during normal operation, and then apply it to the wind abandonment period to estimate the amount of electricity lost by the wind farm during the wind abandonment period. These methods have made some progress, but they all have problems such as over-simplification of elements and overly rough calculations. Therefore, the calculation accuracy is not high and the scope of application is limited. They are generally only applicable to wind farms with relatively simple terrain and other conditions.

[0004] At present, there is still no accurate method for determining the critical conditions for wind power abandonment in power grids. In order to accurately evaluate the amount of wind power abandoned in power grids, based on short-term wind power forecasts and ultra-short-term wind power forecasts, combined with power grid operation modes and system constraints, the present invention determines a method for calculating the critical wind power abandonment criteria in power grids, accurately evaluates the amount of wind power abandoned in power grids, studies the key factors affecting the amount of wind power abandoned, and improves the capacity to absorb new energy. Summary of the invention

[0005] The present invention mainly determines a calculation method for determining a critical condition criterion for wind power abandonment in a power grid, which can improve the accuracy of determining the critical condition for wind power abandonment in the power grid and more accurately calculate the amount of wind power abandoned in the power grid.

[0006] The present invention mainly includes the calculation basis and calculation method for determining the critical conditions for wind power abandonment in the power grid. In theory, the critical condition for wind power abandonment in the power grid is the intersection of the "load + external power transmission" curve and the lower limit curve of the system regulation capacity. The system regulation space between the two curves represents the maximum absorption space for new energy. From the perspective of system conditions, the critical conditions for wind power abandonment in the power grid can be determined based on the power supply regulation performance (maximum technical output, minimum technical output), power grid interconnection (interconnection line transmission capacity), load scale and peak-to-valley difference. This can be used as the critical wind power abandonment criterion for calculating the amount of wind power abandoned, and the amount of wind power abandoned and the absorption capacity of new energy can be accurately evaluated.

[0007] 1. The largest space for absorbing new energy

[0008] For the power system without internal network constraints, the consumption of new energy only needs to meet the constraints of the dynamic balance of power generation and consumption and the lower limit of the system regulation capacity. The system regulation space between the "load + external power" curve and the lower limit of the system regulation capacity is the theoretical maximum consumption space of new energy. Figure 1 shown.

[0009] 2. Objective Function

[0010] In order to accept as much renewable energy power generation as possible, the renewable energy grid-connected power F W As the maximum optimization objective of the model, that is:

[0011]

[0012] Where N w is the total number of new energy power stations, j is the index number of the new energy power station (1≤j≤N w );W j,t is the actual acceptance power of the system for the renewable energy site j in period t, MW. The renewable energy acceptance power optimized according to this objective function can be used to represent the renewable energy acceptance capacity of the system.

[0013] 3. Constraints

[0014] (1) Active power balance constraint:

[0015]

[0016] Where P d,t is the load forecast value at time t, P i,t is the output of conventional unit i at time t, u i,t is the output coefficient of conventional unit i at time t, P w,tis the amount of renewable energy power generated online at time t.

[0017] (2) Output constraints of conventional units:

[0018] P min,i ≤P i,t ≤P max,i

[0019] Where P max,i With P min,i are the maximum and minimum technical output of unit i, MW respectively.

[0020] (3) Climbing constraints:

[0021] P i,t -P i,t-1 ≤ΔTR up,i

[0022] P i,t-1 -P i,t ≤ΔTR d o wn,i

[0023] In the formula, R up,i , R down,i They are respectively the maximum rate of increase and decrease of output of unit i, commonly known as the ramp rate, MW / h.

[0024] (4) Spinning reserve constraints:

[0025] In order to ensure the safe operation of the system, a certain amount of power generation capacity needs to be reserved as a backup, especially in the system after large-scale access to new energy, it is necessary to increase the backup capacity on the original basis. The rotating reserve of the power system mainly includes load reserve and accident reserve. Among them, the load reserve is generally 2% to 5% of the maximum load, and the accident reserve is generally 5% to 10% of the maximum load. Large systems use smaller values, and small systems use larger values. Considering the system reserve capacity constraints after the access of new energy, the following formula is shown:

[0026]

[0027]

[0028] In the formula, S up,t , S down,t are the minimum positive and negative reserve capacities required by the system at time t, in MW respectively.

[0029] (5) Constraints on renewable energy power generation:

[0030] Renewable energy generation is an uncertain power source. Generally speaking, the predicted value of renewable energy power generation is F w,tis the maximum theoretical output of renewable energy power generation at time t. In actual operation, the renewable energy power generation power can be controlled downwards due to the constraints of system operating conditions. Therefore, the following constraints exist:

[0031] P w,t ≤F w,t

[0032] (6) Network security constraints:

[0033] The network security constraint mainly refers to the active power flow through the line being less than the transmission power limit of the line. The DC power flow method is used to calculate the transmission power of the transmission line:

[0034] |F k |≤F k,max k∈Ω L

[0035]

[0036] In the formula, F k is the active power flow of branch k, MW; F k,max is the maximum transmission power of the branch, MW; S j,k is the power flow sensitivity coefficient of node j corresponding to branch k; P j,net is the net injected power of node j, MW; k is the branch index; Ω L is the branch set; n is the number of system nodes.

[0037] (7) Minimum continuous operation and downtime constraints of the unit:

[0038] The start and stop of the generator set requires a series of complex operations, involving the start and stop of the combustion boiler and the steam turbine. If the boiler is started and stopped too frequently, the wear of the boiler pipe joint will increase. If the steam turbine is started and stopped too frequently, the bearing part connecting the steam turbine and the generator will be heated unevenly, shortening the bearing life. Therefore, the technical condition limitations of conventional units must be considered. One of the manifestations is that the continuous operation time and continuous shutdown time of the generator set must meet the constraints of the minimum continuous operation time and the minimum continuous shutdown time:

[0039] Minimum continuous power-on time constraints:

[0040]

[0041] Minimum continuous downtime constraints:

[0042]

[0043] In the formula, and They represent the continuous operation time and continuous shutdown time of unit i at time t respectively; and They represent the minimum continuous operating time and minimum continuous downtime of unit i respectively.

[0044] The objective function and constraints constitute the grid's day-ahead wind power acceptance capacity assessment model. Optimizing the objective function maximizes the amount of renewable energy power generation on the grid, and can evaluate the renewable energy power generation acceptance capacity based on optimizing the start and stop and output of the day-ahead units, taking service dispatching as the starting point. The evaluation results can better reflect the real situation of the system.

[0045] 4. Objective assessment of wind curtailment

[0046] At present, the main methods for calculating theoretical wind power include characteristic wind turbine method, theoretical power calculation method based on wind tower data and theoretical power calculation method based on nacelle anemometer data. The theoretical wind power is calculated by selecting a suitable method, and the objective wind curtailment is obtained by comparing the theoretical wind power with the space for the grid to accept new energy.

[0047] According to the grid constraints, after determining the conventional power supply startup mode, the thermal power startup capacity P can be determined. Coal.cap and the minimum technical output of thermal power P Coal.min The difference between the load and the minimum technical output of thermal power is the space that can accommodate new energy P space :

[0048] P space =P load -P Coal.min

[0049] Compare the theoretical power generation of renewable energy with the acceptance space. If the theoretical power generation of renewable energy is greater than the acceptance space, the acceptable renewable energy power (i.e. the renewable energy power absorbed by the power grid) is the value of the renewable energy acceptance space. If the theoretical power generation of renewable energy is less than or equal to the acceptance space, the acceptable renewable energy power is the theoretical power generation of renewable energy.

[0050]

[0051] The difference between the theoretical power generation of new energy and the power consumed by the power grid is the objective power restriction of new energy:

[0052] P wind.curtail =P wind.theory -P wind.actual

[0053] 5. Criteria for critical wind power abandonment in power grid

[0054] The renewable energy power generation is fully included in the power generation curve. When the conventional units of the power grid reduce their capacity to zero, the power grid can no longer accept more renewable energy power, which is the critical state of wind abandonment. In other words, whether there is objective power restriction is the criterion for critical wind abandonment of the power grid:

[0055]

[0056] Based on this criterion, the output of renewable energy in the power grid can be calculated to obtain the critical state of wind power abandonment in the power grid, and then the amount of wind power abandoned in the power grid can be calculated, which can accurately evaluate the wind power abandonment and renewable energy absorption capacity of the power grid.

[0057] There are two main reasons for wind power curtailment and power rationing in power grids, peak load restriction and section restriction. According to the theoretically available power of wind power, when wind power curtailment and power rationing occur, the cause of power rationing should be confirmed first. If it is peak load restriction, determine whether the thermal power unit can reduce its output according to the unit constraints. If so, reduce the output of the thermal power unit until wind curtailment no longer occurs. If the thermal power output is adjusted to the lower limit and there is still wind curtailment or the thermal power unit cannot reduce its output, adjust the wind power generation curve. If it is section restriction, determine whether the section transmission capacity is exhausted according to the grid constraints. If not, increase the section transmission until wind curtailment no longer occurs. If the transmission section capacity is adjusted to the limit and there is still wind curtailment or the transmission section cannot be adjusted, adjust the wind power generation curve. At this time, the grid can no longer accept more renewable energy electricity, and the wind curtailment that occurs is objective wind curtailment. This boundary condition is the critical state of wind curtailment in the grid. The objective wind curtailment process determination process is as follows: Figure 2 shown. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] Figure 1 This is a schematic diagram of the new energy consumption space.

[0059] Figure 2 This is a flow chart for objective wind curtailment judgment. DETAILED DESCRIPTION

[0060] 1. The largest space for absorbing new energy

[0061] For the power system without internal network constraints, the consumption of new energy only needs to meet the constraints of the dynamic balance of power generation and consumption and the lower limit of the system regulation capacity. The system regulation space between the "load + external power" curve and the lower limit of the system regulation capacity is the theoretical maximum consumption space of new energy. Figure 1 shown.

[0062] 2. Objective Function

[0063] In order to accept as much renewable energy power generation as possible, the renewable energy grid-connected power F W As the maximum optimization objective of the model, that is:

[0064]

[0065] Where N w is the total number of new energy power stations, j is the index number of the new energy power station (1≤j≤N w );W j,t is the actual acceptance power of the system for the renewable energy site j in period t, MW. The renewable energy acceptance power optimized according to this objective function can be used to represent the renewable energy acceptance capacity of the system.

[0066] 3. Constraints

[0067] (1) Active power balance constraint:

[0068]

[0069] Where P d,t is the load forecast value at time t, P i,t is the output of conventional unit i at time t, u i,t is the output coefficient of conventional unit i at time t, P w,t is the amount of renewable energy power generated online at time t.

[0070] (2) Output constraints of conventional units:

[0071] P min,i ≤P i,t ≤P max,i

[0072] Where P max,i With P min,i are the maximum and minimum technical output of unit i, MW respectively.

[0073] (3) Climbing constraints:

[0074] P i,t -P i,t-1 ≤ΔTR up,i

[0075] P i,t-1 -P i,t ≤ΔTR down,i

[0076] In the formula, R up,i , R down,i They are respectively the maximum rate of increase and decrease of output of unit i, commonly known as the ramp rate, MW / h.

[0077] (4) Spinning reserve constraints:

[0078] In order to ensure the safe operation of the system, a certain amount of power generation capacity needs to be reserved as a backup, especially in the system after large-scale access to new energy, it is necessary to increase the backup capacity on the original basis. The rotating reserve of the power system mainly includes load reserve and accident reserve. Among them, the load reserve is generally 2% to 5% of the maximum load, and the accident reserve is generally 5% to 10% of the maximum load. Large systems use smaller values, and small systems use larger values. Considering the system reserve capacity constraints after the access of new energy, the following formula is shown:

[0079]

[0080]

[0081] In the formula, S up,t , S down,t are the minimum positive and negative reserve capacities required by the system at time t, in MW respectively.

[0082] (5) Constraints on renewable energy power generation:

[0083] Renewable energy generation is an uncertain power source. Generally speaking, the predicted value of renewable energy power generation is F w,t is the maximum theoretical output of renewable energy power generation at time t. In actual operation, the renewable energy power generation power can be controlled downwards due to the constraints of system operating conditions. Therefore, the following constraints exist:

[0084] P w,t ≤F w,t

[0085] (6) Network security constraints:

[0086] The network security constraint mainly refers to the active power flow through the line being less than the transmission power limit of the line. The DC power flow method is used to calculate the transmission power of the transmission line:

[0087] |F k |≤F k,max k∈Ω L

[0088]

[0089] In the formula, F k is the active power flow of branch k, MW; F k,max is the maximum transmission power of the branch, MW; S j,k is the power flow sensitivity coefficient of node j corresponding to branch k; P j,net is the net injected power of node j, MW; k is the branch index; Ω L is the branch set; n is the number of system nodes.

[0090] (7) Minimum continuous operation and downtime constraints of the unit:

[0091] The start and stop of the generator set requires a series of complex operations, involving the start and stop of the combustion boiler and the steam turbine. If the boiler is started and stopped too frequently, the wear of the boiler pipe joint will increase. If the steam turbine is started and stopped too frequently, the bearing part connecting the steam turbine and the generator will be heated unevenly, shortening the bearing life. Therefore, the technical condition limitations of conventional units must be considered. One of the manifestations is that the continuous operation time and continuous shutdown time of the generator set must meet the constraints of the minimum continuous operation time and the minimum continuous shutdown time:

[0092] Minimum continuous power-on time constraints:

[0093]

[0094] Minimum continuous downtime constraints:

[0095]

[0096] In the formula, and They represent the continuous operation time and continuous shutdown time of unit i at time t respectively; and They represent the minimum continuous operating time and minimum continuous downtime of unit i respectively.

[0097] The objective function and constraints constitute the grid's day-ahead wind power acceptance capacity assessment model. Optimizing the objective function maximizes the amount of renewable energy power generation on the grid, and can evaluate the renewable energy power generation acceptance capacity based on optimizing the start and stop and output of the day-ahead units, taking service dispatching as the starting point. The evaluation results can better reflect the real situation of the system.

[0098] 4. Objective assessment of wind curtailment

[0099] At present, the main methods for calculating theoretical wind power include characteristic wind turbine method, theoretical power calculation method based on wind tower data and theoretical power calculation method based on nacelle anemometer data. The theoretical wind power is calculated by selecting a suitable method, and the objective wind curtailment is obtained by comparing the theoretical wind power with the space for the grid to accept new energy.

[0100] According to the grid constraints, after determining the conventional power supply startup mode, the thermal power startup capacity P can be determined. Coal.cap and the minimum technical output of thermal power P Coal.min The difference between the load and the minimum technical output of thermal power is the space that can accommodate new energy P space :

[0101] P space =P load -PCoal.min

[0102] Compare the theoretical power generation of renewable energy with the acceptance space. If the theoretical power generation of renewable energy is greater than the acceptance space, the acceptable renewable energy power (i.e. the renewable energy power absorbed by the power grid) is the value of the renewable energy acceptance space. If the theoretical power generation of renewable energy is less than or equal to the acceptance space, the acceptable renewable energy power is the theoretical power generation of renewable energy.

[0103]

[0104] The difference between the theoretical power generation of new energy and the power consumed by the power grid is the objective power restriction of new energy:

[0105] P wind.curtail =P wind.theory -P wind.actual

[0106] 5. Criteria for critical wind power abandonment in power grid

[0107] The renewable energy power generation is fully included in the power generation curve. When the conventional units of the power grid reduce their capacity to zero, the power grid can no longer accept more renewable energy power, which is the critical state of wind abandonment. In other words, whether there is objective power restriction is the criterion for critical wind abandonment of the power grid:

[0108]

[0109] Based on this criterion, the output of renewable energy in the power grid can be calculated to obtain the critical state of wind power abandonment in the power grid, and then the amount of wind power abandoned in the power grid can be calculated, which can accurately evaluate the wind power abandonment and renewable energy absorption capacity of the power grid.

Claims

1. A method for calculating the critical wind curtailment criterion of a power grid, characterized in that: Taking into full consideration the current operation status of the power grid, the predicted output of new energy sources, and the load forecast information, when the conventional units of the power grid reduce their capacity to zero, it is the critical state of wind abandonment; Determine the critical conditions for wind power curtailment based on power regulation performance, grid interconnection, load size, and peak-to-valley differences; The method for calculating the critical wind curtailment criterion of a power grid comprises: (1) Determine the maximum space for absorbing new energy sources based on the grid regulation capacity; For power systems without internal network constraints, the consumption of new energy meets the constraints of the dynamic balance of power generation and consumption and the lower limit of the system regulation capacity. The system regulation space between the "load + external power" curve and the lower limit of the system regulation capacity is the theoretical maximum consumption space for new energy. (2) Determine the objective function; The renewable energy grid-connected power Fw within the dispatching day is taken as the maximization optimization target of the model, and renewable energy power generation is accepted as much as possible; the renewable energy acceptance power is optimized based on this as the objective function, and the renewable energy acceptance capacity of the power grid is maximized; the expression of the objective function is: In formula (1), N w is the total number of new energy power stations, j is the index number of the new energy power station, W j,t is the actual power received by the system for the new energy site j in period t; 1≤j≤N w ; (3) Determine the critical constraint conditions for wind power curtailment based on the actual operation of the power grid; The critical constraints for wind power abandonment in the power grid include system active power balance constraints, conventional unit output constraints, thermal power unit ramp constraints, spinning reserve constraints, new energy power generation constraints, network security constraints, and unit minimum continuous operation and downtime constraints; The expression of the active balance constraint of the system is: In formula (2), P d,t is the load forecast at time t, P i,t is the output of conventional unit i at time t, u i,t is the output coefficient of conventional unit i at time t, P w,t is the amount of electricity generated by renewable energy at time t; The expression of the conventional unit output constraint is: P min,i ≤P i,t ≤P max,i (3) In formula (3), P max,i With P min,i are the maximum and minimum technical outputs of unit i, both in MW; The expression of the thermal power unit climbing constraint is: In formula (4), R up,i , R down,i They are the maximum increase and decrease output rates of unit i, i.e., the ramp rate, both in MW / h; The expression of the spinning reserve constraint after the access of new energy is: In formula (5), S up,t , S down,t are the minimum positive and negative reserve capacities required by the system at time t, both in MW; The expression of the new energy power generation constraint is: P w,t ≤F w,t (6) In formula (6), P w,t F is the amount of renewable energy power generation on the grid at time t; w,t is the predicted value of renewable energy power generation at time t; The expression of the network security constraint is: In formula (7), F k is the active power flow of branch k, in MW; F k,max is the maximum transmission power of the branch, in MW; S j,k is the power flow sensitivity coefficient of node j corresponding to branch k; P j,net is the net injected power of node j, in MW; k is the branch index; Ω L is the branch set; n is the number of system nodes; The minimum continuous operation and shutdown time constraints of the unit include: minimum continuous start-up time constraints and minimum continuous shutdown time constraints; The expression of the minimum continuous power-on time constraint is: The expression of the minimum continuous downtime constraint is: In formula (8) and formula (9), and They represent the continuous operation time and continuous shutdown time of unit i at time t respectively; and They represent the minimum continuous operation time and the minimum continuous shutdown time of unit i respectively; (4) The objective function and constraints constitute a grid day-ahead wind power acceptance capacity assessment model; The optimization objective function maximizes the amount of renewable energy power generation on the grid. Based on the service dispatch operation, the renewable energy power generation acceptance capacity can be evaluated on the basis of optimizing the start and stop and output of the units on the previous day. The evaluation results can better reflect the real situation of the system. (5) Conduct objective assessment of wind curtailment; According to the grid constraints, after determining the conventional power supply startup method, determine the thermal power startup capacity P Coal.cap and the minimum technical output of thermal power P Coal.min The difference between the load and the minimum technical output of thermal power is the space that can accommodate new energy P space ; P space =P load -P Coal.min (10) Compare the theoretical power generation of new energy with the receiving space. If the theoretical power generation of new energy is greater than the receiving space, the acceptable power of new energy is the value of the receiving space. If the theoretical power generation of new energy is less than or equal to the receiving space, the acceptable power of new energy is the theoretical power generation of new energy. The difference between the theoretical power generation of new energy and the power consumed by the power grid is the objective power restriction of new energy. (6) Determine the critical wind curtailment criteria for the power grid; The renewable energy power generation is fully included in the power generation curve. When the capacity of the conventional units in the power grid is reduced to zero, the power grid can no longer accept more renewable energy power. This is the critical state of wind abandonment. Whether there is objective wind abandonment is the criterion for critical wind abandonment in the power grid.

Citation Information

Patent Citations

  • Wind abandoning and heating system and method under coordinated dispatching of power grid

    CN108258730A