Scheduling of production of packaged dairy products in existing production plants through simulation
Generating and optimizing time schedules for dairy production through simulated computer methods solves the problems of instability and low resource utilization in dairy production scheduling in the existing technology, achieving more efficient production and lower investment costs.
Patent Information
- Application Number
- CN201980035816.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2018-05-31
- Filing Date
- 2019-05-29
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2039-05-29
AI Technical Summary
The time scheduling of packaged dairy products in existing dairy production plants relies on the experience of process engineers, resulting in unsatisfactory resource utilization, difficulty in minimizing investment costs, and unstable time scheduling results, making it difficult to meet the multiple requirements of on-time shipment and low inventory. Target.
Through the simulation computer method, target production data, recipes and production unit data are obtained, a time schedule for recipe activities is generated, a time schedule that meets the production target is evaluated and output, and all relevant factors are considered to optimize the production process.
It improves factory resource utilization, reduces the uncertainty of time scheduling, reduces investment costs, achieves better production efficiency and output, and meets multiple production goals.
Smart Images

Figure CN112204588B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates generally to the production of dairy products and, in particular, to a simulation tool for scheduling the production of packaged dairy products in an existing production plant. Background Art
[0002] Time scheduling, also known as production time scheduling (PTS), is related to efforts to ensure that resources in a production plant are fully utilized. Typically, a plant for producing and packaging dairy products is designed to be able to produce a large number of different types of packaged dairy products, both in terms of the type of packaging and the type of dairy product, wherein the type and / or volume of packaged dairy products to be produced may vary over time. A plant may have multiple production lines, and there may be a large number of process constraints due to changes in the capacity and processing requirements of the production lines. Some products may be produced on more than one production line, and some processes may require shared production equipment. Certain products may have priority constraints, and products with similar production conditions may be scheduled for continuous production. In addition, the production of packaged dairy products may involve batch production and continuous production, which makes time scheduling more challenging.
[0003] At present, the time scheduling for producing packaged dairy products in existing factories, such as a day or a week, is performed by process engineers through manual calculations based on their experience and knowledge of the production process and production equipment in the relevant factories. Even if process engineers can use computerized planning tools that visualize the time allocation of production equipment in a graphical way and allow process engineers to modify the time allocation, the plan is still based on trial and error and requires a lot of experience from process engineers. In addition, there are production-related factors that process engineers have not taken into account. In order to reduce complexity, time scheduling is usually limited to a subset of factories. It is also common to simply reuse and update previous time schedules, so that scheduling is simplified or excessive and expensive marginal costs are used.
[0004] Scheduling the production of an existing plant is a time-consuming and laborious task, if done thoroughly. For the same input data, the results of scheduling often vary, depending on the experience of the process engineer. Scheduling is unlikely to result in suboptimal or even poor resource utilization of the plant. Scheduling may also erroneously indicate the need to invest in updating the plant with further processing equipment in order to meet production targets. Furthermore, to the extent that the plant actually needs to be updated, it is difficult for the process engineer to determine how to update the plant in order to increase the overall plant output while minimizing the investment cost.
[0005] With the increasing emphasis on multiple goals of on-time shipment, low inventory and production quality, a scheduling tool is needed to improve production time scheduling by taking all or at least more factors related to production time scheduling into account to achieve better factory performance. Summary of the invention
[0006] It is an object of the present invention to at least partially overcome one or more limitations of the prior art.
[0007] One such object is to improve and / or facilitate the scheduling of the production of packaged dairy products in existing production plants.
[0008] One or more of these objects, as well as other objects that will become apparent from the following description, are achieved at least in part by the methods, computer-readable media, and devices described in embodiments of the present invention.
[0009] The first aspect of the present invention is a computer-implemented method for scheduling the production of packaged dairy products in a production plant by simulation. The method includes: obtaining target production data of a plurality of dairy products to be produced and packaged in the production plant to form the packaged dairy products; obtaining a recipe for producing the packaged dairy products, wherein each recipe defines a set of ingredients and a sequence of recipe activities for producing the corresponding packaged dairy products from the set of ingredients; obtaining production unit data specifying existing production units in the production plant and available fluid paths between existing production units, the production unit data further associating each existing production unit with one or more unit activities and production capacity; and simulating the production of the packaged dairy products in the production plant to determine at least one time schedule to achieve the target production data. The simulation includes: generating a time schedule for recipe activities based on the recipe and the production unit data, the recipe activities being at least partially performed by one or more combinations of existing production units to achieve the target production data; evaluating the time schedule to select the at least one time schedule; and outputting the at least one time schedule.
[0010] A second aspect of the present invention is a computer readable medium comprising computer instructions which, when executed by a processing device, cause the processing device to perform the method of the first aspect or any embodiment thereof.
[0011] A third aspect of the invention is an apparatus for scheduling the production of packaged dairy products in a production plant, the apparatus being configured to carry out the method of the first aspect of any embodiment thereof.
[0012] Other objects, as well as features, aspects and advantages of the present invention will become apparent from the following detailed description and accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Embodiments of the invention will now be described, by way of example, with reference to the accompanying schematic drawings.
[0014] Figure 1 A method for producing a packaged dairy product from grouped ingredients in a production plant is schematically shown.
[0015] Figure 2 is a block diagram of a production plant for packaged dairy products.
[0016] Figures 3A-3C The process for producing three different dairy product packages is shown. Figure 2 Material flow in a factory.
[0017] Figure 4 is a summary of an embodiment of a method for scheduling the production of packaged dairy products in an existing production plant.
[0018] Figure 5 A series of activities corresponding to a recipe for producing yogurt is shown.
[0019] Fig. 6A is a flow chart of a scheduling process according to one embodiment, and Figure 6B is a flow chart of a portion of a scheduling process according to another embodiment.
[0020] Figure 7A-7B The variation of the time schedule depending on the sequence of material supply to the production units is shown.
[0021] Figures 8A-8C The variation of the time schedule depending on the production capacity and the number of production units is shown.
[0022] Fig. 9 Is for Figure 2 An example of a proposed time schedule generated by a production plant in .
[0023] Fig.10 is a block diagram of an apparatus for performing a scheduling process according to an embodiment of the present invention. DETAILED DESCRIPTION
[0024] Embodiments of the present invention will now be described more fully hereinafter with reference to the accompanying drawings, in which some, but not all, embodiments of the invention are shown. Indeed, the invention may be embodied in many different forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided so that this disclosure may satisfy applicable legal requirements.
[0025] In addition, it will be understood that, where possible, any advantages, features, functions, equipment and / or operational aspects of any embodiment of the present invention described and / or considered herein may be included in any other embodiment of the present invention described and / or considered herein, and / or vice versa. In addition, where possible, unless otherwise expressly stated, any term expressed in the singular herein is also intended to include the plural form and / or vice versa. As used herein, "at least one" should mean "one or more", and these phrases are intended to be interchangeable. Therefore, even if the phrases "one or more" or "at least one" are also used in this article, the terms "one" and / or "a kind of" should mean "at least one" or "one or more". As used herein, unless the context requires otherwise due to the expression language or necessary suggestion, the word "include" or a variation such as "contain" or "includes" is used with an inclusive meaning, that is, specifying the presence of the feature, but not excluding the presence or addition of other features in various embodiments of the present invention. As used herein, the term "and / or" includes any and all combinations of one or more associated listed items. As used herein, a "group" of items is intended to imply that one or more items are provided. Thus, a "group of ingredients" may specify a single ingredient or a plurality of ingredients. Likewise, a "group of production units" may specify a single production unit or a plurality of production units. As used herein, "dairy product" refers to a food product produced from a substance comprising the milk of a mammal (primarily but not exclusively a cow) or an emulsion from a plant source. The substance may be made from fresh milk and / or milk powder.
[0026] For brevity and / or clarity, well-known functions or constructions may not be described in detail. Unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art to which the invention belongs.
[0027] Like reference numerals refer to like elements throughout.
[0028] Figure 1It is a schematic diagram of a production plant 10, which is arranged to produce three different packaged dairy products 30A, 30B, 30C from ingredients I1, I2, I3 by using three production processes 20A, 20B, 20C performed by the production equipment in the plant 10. The production processes 20A, 20B, 20C and the ingredients I1, I2, I3 are defined by the recipes of the corresponding dairy products 30A-30C. In order to maximize the production throughput, it is desirable to perform the processes 20A-20C in parallel by using different production equipment. However, for economic reasons, it is usually impossible to determine the size of the plant for the parallel production of all possible types of packaged dairy products. Therefore, the processes 20A-20C usually have to share at least partially the existing production equipment in the plant. The task of allocating the activities of the corresponding processes 20A-20C to the production equipment in the plant 10 is called time scheduling.
[0029] Figure 2 A general example of a factory 10 for producing packaged dairy products is shown. Figure 2 In the figure, the hollow squares represent production units, hereinafter referred to as "production units" or PUs, and the solid lines extending between the PUs represent fluid conduits (fluid paths). The fluid conduits can be permanently arranged to extend as shown, but it is also conceivable that the fluid conduits can be added and / or moved by manual operation by the operator of the factory 10. The fluid conduits are shown schematically, and each typically includes multiple fluid paths that allow one or more fluids to pass through simultaneously and separate from each other in opposite directions in the fluid conduits. In addition, the conventional pump symbol represents the setting of the fluid pump along the fluid conduit, and the hollow circle represents the flow control valve. The PU of the factory 10 shown includes milk receiving units R1-R3, each of which can include a tank and a device for further processing (such as preheating, degassing, homogenization, etc.). The pasteurizers PS1-PS3 are arranged for heat treatment. Tanks T1-T8 are distributed throughout the factory 10 for storing ingredients, intermediate products or final dairy products. Fermentation tanks ST1 and ST2 are provided to accommodate and distribute starter cultures for the production of fermented dairy products (such as yogurt). Mixing devices M1, M2 are provided to enable mixing of dry or liquid ingredients, and a heat exchanger C1 is provided for cooling or heating. Filling machines or packaging lines P1-P3 are provided to fill the dairy product into packages (e.g. packages made of cartons and / or plastic) which can be sealed for subsequent distribution. The plant 10 also includes an aseptic (sterilization) production area, which includes units UHT1, UHT2 for ultra-high temperature treatment (also known in the art as ultra-heat treatment or ultra-pasteurization), aseptic tanks AT1, AT2 for storing the sterilized dairy product, and aseptic filling machines or packaging lines AP1-AP4. Figure 2All PUs shown in are known to those skilled in the art, who will also appreciate that plant 10 may include additional PUs, including but not limited to separators, heaters, homogenizers, and packaging dispensing devices.
[0030] Figure 2 It is also shown that the plant 10 includes a cleaning unit CIP, such as a conventional cleaning-in-place system, which is connected to communicate with the fluid conduits and / or PU fluids in the plant 10 to enable the circulation of cleaning fluids. The ability to clean production equipment is a strict requirement in dairy production and is set by regulatory agencies. However, the need for cleaning may vary, depending on the dairy product being produced, the time since the last cleaning, etc. Typically, the plant 10 includes one or only a few CIPs, which usually need to be cleaned sequentially between the PU and the fluid conduits of the plant 10. Therefore, the scheduling of the CIPs may have a significant impact on the duration of the production processes 20A-20C in the plant 10 ( Figure 1 ).
[0031] Figures 3A-3C Shows how materials flow through the Figure 2 0048] An example of a plant 10 in which thick arrow lines represent material flows and solid squares represent PUs operating for processing.
[0032] Figure 3A The material flow for producing standard milk for packaging is shown. A delivery of raw milk is pumped into milk receiving units R1-R3 and then undergoes heat treatment as it is pumped through pasteurizer PS1 into storage tank T1. The treated milk is pumped from tank T1 to filling machine P1 which is operated to produce milk packaging. Figure 3A The combination of PUs indicated by solid squares in FIG. 1 may be shown as performing Figure 1 The production process 20C is used to produce packaging of milk 30C based on raw milk I1.
[0033] Figure 3B The material flow for producing packaged yogurt is shown. A delivery pump of raw milk is delivered to milk receiving units R1-R3, where the milk is then subjected to heat treatment as it is pumped through a pasteurizer PS1 into storage tank T2. The treated milk is pumped from tank T2 through a fermentation tank ST1, which is operated to add a starter culture to the milk. The mixture of milk and starter culture is pumped into tank T4 for fermentation (incubation) over a predetermined period of time, whereupon the resulting yogurt is cooled as it is pumped through a heat exchanger C1 into tank T6 for intermediate storage. The yogurt is pumped from tank T6 to a filling machine P3, which is operated to produce packages of yogurt. In Figure 3B The combination of PUs indicated by solid squares in FIG. 1 is shown as performing Figure 1The production process 20B is used to produce packaged yogurt 30B based on raw milk I1 and starter culture I2.
[0034] Figure 3C The material flow for producing chocolate milk in aseptic packaging is shown. A delivery of raw milk is pumped into milk receiving units R1-R3, where the milk is then subjected to heat treatment as it is pumped through a pasteurizer PS1 into a storage tank T1. The treated milk is pumped from tank T1 through a mixing unit M1, which is operated to mix chocolate powder and sugar into the milk. The resulting chocolate milk is pumped through an aseptic heat treatment unit UHT2 and into an aseptic tank AP2 for intermediate storage. The aseptic chocolate milk is pumped from the aseptic tank AP2 to aseptic filling machines AP3, AP4, which operate in parallel to produce aseptic packaging of the chocolate milk. In Figure 3C The combination of PUs indicated by solid squares in FIG. 1 is shown as performing Figure 1 The production process 20A in the embodiment is to produce a package of chocolate milk 30A based on raw milk I1, chocolate powder I2 and sugar I3.
[0035] Figure 4 It is used to schedule production (e.g. Figure 2 The production scheduling process may also be expressed as an engineering design process, a simulation process, or a configuration process. Figure 4 It can be shown as representing input data 400 - 403 for scheduling, blocks 410 , 420 configured to perform the scheduling process, and output data 430 generated by the scheduling process.
[0036] The input data includes target production data ("production target") 400 for the factory. The production target 400 may specify the dairy product packages ("products") and production volumes ("volumes") to be produced in a specific time period (e.g., one or more days or weeks), where the respective dairy product packages may be defined by the type of dairy product and the type of packaging. Such production targets 400 are also referred to in the art as SKU lists (stock keeping units). Figure 4As shown, the production objectives 400 may also include a production schedule ("schedule") for dairy product packaging, that is, the amount of a particular packaged dairy product to be produced as a function of time. The input data also includes a recipe 401 for the dairy product to be produced. Each recipe defines a series of recipe activities ("activities"), a set of ingredients ("ingredients"), and may also specify characteristics of one or more activities, such as minimum and / or maximum duration, time interval, pressure, pumping speed, etc. The input data also includes production unit data 402, which specifies the existing PUs in the factory and the available fluid connections between the existing PUs. The production unit data 402 associates each PU with one or more unit activities ("activities") and one or more production capacities ("capacities"), for example, given as volume, volume flow rate, packaging production rate, etc. For example, a tank can be associated with one or more of a total capacity, a maximum filling rate, and a maximum emptying rate. Unit activities are defined to correspond to recipe activities, so that each recipe activity can be matched with one or more unit activities. As Figure 4 As shown, the production unit data 402 may also associate one or more rules ("rules") with the PU. The rules may be directed to a cleaning process and, for example, specify one or more of the following: the duration of a short cleaning process ("short CIP"), the duration of an extended cleaning process ("full CIP"), the number of consecutive short CIPs allowed before a full CIP is required, a first time limit for not using the PU and not needing cleaning (i.e., if the PU is not used for a period of time exceeding the first time limit, a CIP is required), a second time limit for using the PU and not needing cleaning (i.e., a CIP is required as long as the second time limit is exceeded), and a CIP is required at the end of the use of the PU. Alternatively or additionally, the rules may be directed to other characteristics of the PU. For example, a rule for a tank may specify the volume or proportion of the tank that needs to be filled before it can begin to empty ("minimum volume before emptying"), a rule for a thermal processing unit may specify the maximum time that water may circulate in the unit ("circulation limit"), a rule for any PU may specify the nominal time required for an operator to set up the PU ("preparation event duration"), a rule for any PU may specify the nominal time required for daily care ("daily care duration"), etc. The input data may also include delivery data 403 for ingredients, including a delivery schedule for delivering one or more ingredients. Such a delivery schedule may specify the amount of a particular ingredient that is to be delivered and needs to be processed at the plant based on time.
[0037] like Figure 4As shown, the combination block 410 is arranged to process the input data 400-403 to generate a time schedule of recipe activities to be performed by one or more combinations of existing PUs in the factory to achieve the production target 400. The evaluation block 420 is arranged to evaluate the time schedule generated by the block 410 to implement at least one evaluation constraint. Figure 4 As shown, the combination and evaluation blocks 410, 420 may implement an iterative optimization process, wherein the evaluation block 420 provides information about the evaluation results to the combination block 410, so that the combination block 410 can systematically generate a time schedule to achieve the purpose of reducing the time it takes for the evaluation block 420 to find one or more acceptable time schedules. Such an iterative optimization process may be based on any suitable optimization model. Figure 6A-6B An example of the scheduling process performed by blocks 410 , 420 is further given.
[0038] The output data of the scheduling process are one or more proposed time schedules for the factory ("factory schedules"), wherein each proposed time schedule comprises a time allocation to the existing PUs or a subset thereof to implement a corresponding production process (see Figure 1 20A-20C in order to achieve the production target 400, wherein the production process is given by the recipe 401 and the existing PU is given by the production unit data 402. The proposed time schedule can be presented to the user, such as a process engineer, for further evaluation of relevance and feasibility, or directly provided as a basis for setting up a production plant. The output data can also include other production-related data for each time schedule, such as the estimated time to achieve the production target, the cost, and the consumption of one or more utilities such as water, energy, steam (for heat treatment and / or cleaning), detergents, coolants, etc.
[0039] Figure 5An exemplary recipe 500 for producing yogurt is shown in the form of a flow chart. The recipe 500 shown includes a series of processing steps 501-506 for producing a package containing yogurt. The recipe 500 also defines two ingredients: milk I1 and starter culture I2. Some processing steps are associated with specific characteristics, and some processing steps include a series of sub-steps, some of which are associated with specific characteristics. Specifically, the recipe 500 includes a milk processing step 501, in which milk I1 is received and processed including a series of sub-steps as follows: preheating, degassing, homogenization, heating, holding and cooling. The sub-steps preheating, heating and cooling are associated with corresponding characteristics TE1, TE2, TE3, which indicate the temperature to be used in the corresponding sub-steps. The milk processing step 501 is followed by an inoculation step 502, in which the starter culture I2 is added to the milk by online addition. Then an incubation step 503 is performed, in which the mixture of milk and starter culture is stirred, fermented and stirred. The fermentation sub-step is associated with a characteristic Δt1 indicating its duration. A subsequent cooling step 504 reduces the temperature of the fermented mixture to TE4 and the resulting yoghurt is then buffered 505 for a time not exceeding Δt2. The recipe 500 is completed by a step 506 of filling the yoghurt into packaging.
[0040] In the example shown, recipe 500 includes a series of recipe activities A1-A7, which are defined to correspond to activities that can be performed by existing PUs in the factory ("unit activities"). Figure 2 In the factory 10, activity A1 can be performed by receiving units R1-R3, activity A2 can be performed by pasteurizers PS1-PS2, activity A3 can be performed by starter tanks ST1-ST2, activity A4 can be performed by tanks T1-T8, activity A5 can be performed by heat exchanger (cooling unit) C1, activity A6 can be performed by tanks T1-T8, and activity A7 can be performed by filling units P1-P3.
[0041] Thus, each recipe can be structured as a set of ingredients and a series of recipe activities, where any recipe activity can be associated with one or more properties.
[0042] Fig. 6A 6 is a flow chart of a scheduling process 600 according to one embodiment. The process 600 includes a set of data collection steps 601-603 for obtaining input data. Step 601 obtains target production data ( Figure 4 400), and step 602 obtains a dairy product formula ( Figure 4 Step 603 obtains the above production unit data ( Figure 4Any of steps 601-603 may involve passing through a user interface (see Fig.10 1006 in the figure instructs the operator to manually input the input data and / or select the input data from the database. It is also conceivable that any of steps 601-603 automatically retrieves the input data from the database. For example, steps 602 and 603 can automatically retrieve the recipe 401 from the database based on the production target 400 input / selected by the operator, and automatically retrieve the production unit data 402 based on the recipe 401.
[0043] Process 600 also includes processing steps 604-605, which can be performed by Figure 4 401 and the evaluation box 420 in step 604. Step 604 generates a candidate time schedule for recipe activities based on recipe 401 and production unit data 402, which recipe activities are performed by one or more combinations of existing PUs to achieve or reach the production target 400. Step 605 evaluates the candidate time schedules to select at least one proposed time schedule. Finally, step 606 outputs the proposed time schedule selected by step 605. Steps 604-606 can be regarded as representing a simulation of the production of packaged dairy products in a production plant to determine at least one proposed time schedule for achieving the production target 400.
[0044] If the production target 400 includes a production schedule, step 604 may also take the production schedule into account when generating the candidate time schedule by ensuring that the corresponding dairy product packages are produced according to the production schedule. In addition, the process 600 may include the step of obtaining an ingredient delivery schedule ( Figure 4 403 in ), and step 604 can take the ingredient delivery schedule 403 into account when generating the candidate time schedule by adapting the timing of the recipe activities to the availability of the ingredients.
[0045] Scheduling process 600, when implemented by a computer device, provides a simulation tool that can systematically analyze the ability of an existing production plant to meet production targets and output one or more proposed time schedules that meet or are closest to the production targets. The tool will greatly facilitate the task of scheduling production in a production plant and can also significantly improve time scheduling, for example, when steps 604-605 are implemented as an iterative optimization process, the iterative optimization process is configured to find the best time schedule according to one or more evaluation constraints.
[0046] Figure 6B According to another embodiment, Fig. 6A Flowchart of steps 604-605 in FIG. Steps 604A-604C correspond to Fig. 6A. Step 604A identifies available PUs for performing recipe activities, for example, by comparing the recipe activities of recipe 401 with unit activities of existing PUs. Step 604A may thereby include any existing PUs associated with unit activities that match recipe activities in a set (available set) of available PUs for performing recipe activities. Step 604B allocates a combination of existing PUs based on available fluid paths and production capacities associated with corresponding PUs in the available set. To perform the allocation, step 604B may reverse calculate the required production capacities of the corresponding PUs through mass balancing based on the products and volumes to be produced according to the production target 400, and the production schedule (if specified). Step 604C generates one or more candidate time schedules for the allocated PU combinations to achieve the production target, and step 605 evaluates the candidate time schedules. As Figure 6B As shown, the process may then return to step 604B to allocate a new combination of existing PUs based on the evaluation results in step 605. Thus, step 604B may be adjusted based on the results of one or more previously allocated combinations of existing PUs and the corresponding candidate time schedules generated for such combinations. This iterative approach allows the scheduling process to systematically search for the best time schedule.
[0047] In one embodiment, step 604C takes into account the need to clean the PUs and / or fluid conduits when generating the candidate time schedule. As described above, in plants for the production of dairy products, intermittent cleaning is mandatory and access to cleaning units (CIPs) is often a bottleneck for time scheduling. The scheduling process 600 may therefore include the step of obtaining cleaning unit data, which specifies the fluid paths between at least one CIP and the existing PUs in the plant, as well as the cleaning activities of each existing PU, thereby allowing step 604C to generate the candidate time schedule based on the cleaning unit data. The cleaning unit data may be obtained at least in part by step 603 to the extent that the cleaning activities are defined by rules included in the production unit data 402, as described above with reference to Figure 4 Alternatively or additionally, at least a portion of the cleaning unit data may be obtained in a further data collection step (not shown).
[0048] Typically, step 604 / 604C may take into account the rules included in the production unit data 402 when generating the time schedule. For example, considering a cleaning rule that states that the PU must be cleaned after each processing of a certain dairy product or intermediate product, unless the same dairy product or intermediate product is to be processed next, the PU should be cleaned according to a default cleaning rule (e.g., "short CIP" and / or "full CIP" as described above). Figure 7A-7BThe timing of recipe activities A10, A20, A30 for producing a first and a second (different) dairy product performed by three production units PU1, PU2, PU3 is shown. The recipe activities performed for producing the first and second dairy products are distinguished by subscripts 1 and 2, respectively. The first dairy product may be yogurt and the second dairy product may be standard milk. In the example shown, the production units PU2, PU3 are associated with a cleaning rule requiring cleaning after each completion of the recipe activities for producing the first dairy product, while no such cleaning rule is defined for the production of the second dairy product. Fig. 7A The sequence of recipe activities when processing a first dairy product before a second dairy product in the respective production units PU1-PU3 is shown. As shown, PU2 and PU3 require cleaning activities, indicated by CA. In addition, PU3 will have an idle or waiting period indicated by W while waiting for the processing of the second dairy product in PU2 to be completed. Figure 7B The timing of recipe activities is shown when a second dairy product is processed before a first dairy product. Clearly, the absence of cleaning activities enables better utilization of production units PU1-PU3 and also reduces the utilization of cleaning units in the plant.
[0049] from Figure 7A-7B It is understood that step 604 / 604C can generate different time schedules for the PU combination by changing the order in which the dairy product or the corresponding intermediate product is supplied to one or more PUs.
[0050] As per Figure 6B As will be appreciated, it is also conceivable to change the combination of PUs through step 604B so as to generate another candidate time schedule. Fig. 8A , which shows the timing of recipe activities A10, A20, which are performed by two production units PU1, PU2 to produce a first and a second dairy product. As shown, PU2 will have an idle period while waiting for the processing of the second dairy product in PU1 to be completed. Fig. 8A In the Figure 8B In , PU1 has been replaced by PU3, which is able to perform the same recipe activity (A10) as PU1, but with a higher production capacity. Thus, the idle period W is eliminated. Figure 8C middle, Fig. 8A PU1 is supplemented by PU4, which is able to perform the same recipe activity (A10) as PU1 and has the same production capacity as PU1. As shown, PU4 allows parallel processing of the first dairy product and the second dairy product, and eliminates the idle period W.
[0051] As per Figures 8A-8CAs will be appreciated, step 604B may enable step 604C to generate different candidate time schedules by changing the combination of PUs (e.g., by adding PUs to increase the number of PUs capable of executing recipe activities and / or by replacing PUs with corresponding PUs having different production capabilities).
[0052] It is also conceivable that step 604B adds one or more PUs (tanks) for intermediate storage, even if such intermediate storage is not included in the recipe, for example to enable sequential processing in downstream PUs or sharing of fluid conduits and PUs between recipes. Figure 5 Yogurt formula 500 with Figure 3B For comparison, see an example in which the treated milk is temporarily stored in tank T2.
[0053] Figure 6A-6B The evaluation step 605 in the embodiment may evaluate the candidate time schedule to achieve at least one evaluation constraint (see Figure 4 The evaluation constraints may be obtained as part of the data collection steps 601-603, or may be predefined and stored in memory (see Fig.10 1003 in). In one embodiment, the evaluation constraint defines at least one of the maximum production time, maximum production cost, and maximum labor cost required to achieve the production target. Therefore, step 605 can calculate a parameter value representing any evaluation constraint of the corresponding candidate time schedule and compare the parameter value with the evaluation constraint. If the production time and / or production cost and / or labor cost exceed the evaluation constraint, step 605 can discard the candidate time schedule. Labor costs can be calculated based on the amount of physical labor required to install the PU and / or rearrange the fluid conduit during the time schedule. The production cost can be calculated to represent the consumption of at least one utility (including one or more of water, energy, steam, coolant, and detergent) during the time schedule.
[0054] Step 605 may also forward compute the candidate time schedules, or at least the candidate time schedules found to satisfy the evaluation constraints, to verify whether the production goals are actually met given the batching and delivery schedules (if specified).
[0055] Typically, steps 604-605 are performed to find one or more time schedules that have high time utilization of existing PUs in the factory, few and / or short idle periods, few product changes, and few and / or short cleaning activities. Any such time schedules can be output by step 606. In addition, step 606 can output other metrics calculated for each time schedule, such as total production time, CIP utilization, graphical representation of bottlenecks, production costs, labor costs, etc.
[0056] Fig. 9 A portion of a proposed time schedule is shown in the form of a Gantt chart, which is generated and output by the scheduling process 600 for use in Figure 2 Packages containing standard milk, yoghurt and chocolate milk (as well as other packaged dairy products) are produced in factory 10 of . Figures 3A-3C The material flow in corresponds to Fig. 9 The time schedule is shown in Figure 1. The thin lines represent the life of the PUs, while the thick lines represent the cleaning activities. In addition, for the tanks, thin lines are drawn to represent the change in the volume of the fluid inside the corresponding tank over time. Only the dashed vertical lines corresponding to the time points t0-t20 are provided to facilitate the understanding of the Gantt chart by indicating the start and end of various activities. As shown in the figure, the time schedule is drawn up to synchronize the activities within the plant. It can also be seen that the cleaning activities do not overlap because there is only one CIP in the plant. Fig. 9 The top of the time schedule, DEL, indicates the time period during which milk is delivered to the factory. Figure 3A and 3C production of standard milk and chocolate milk, although the filling and emptying of tank T2 is based on Figure 3B Part of yogurt production.
[0057] It is conceivable to modify the scheduling process 600 so that the production plant can be updated with the new PU when the time schedule is generated in step 604. Thus, the scheduling process can be controlled to propose a time schedule that is further improved than a feasible time schedule based on the existing production equipment. This function can be activated by user selection, or automatically, for example, whenever the evaluation 605 fails to determine an acceptable time schedule, for example, when all candidate time schedules do not meet the evaluation constraints.
[0058] In one such embodiment, the scheduling process 600 obtains (e.g., as part of step 603) additional production unit data for optional PUs that can be added to the production plant, wherein the additional production unit data associates each optional PU with one or more unit activities and production capabilities. Step 604 is modified to generate a time schedule to include recipe activities performed by one or more optional PUs in a proposed arrangement that is fluidly connected to an existing PU. In other words, steps 604 / 604B are allowed to form a combination of PUs to include one or more optional PUs. Figure 6B In the implementation scheme in, step 604A can be modified to include optional PUs in addition to existing PUs among the available PUs.
[0059] It is contemplated that the scheduling process 600 may be further modified to account for the investment cost of adding one or more PUs to the plant. In one such embodiment, the scheduling process 600 obtains (e.g., as part of step 603) cost index data that associates each optional PU with a cost index. The scheduling process 600 may be further modified to calculate an investment cost index for each time schedule that includes recipe activities performed by one or more optional PUs based on the cost index data. The investment cost index may be output through step 605, along with any selected time schedules that include the optional PUs. It is also conceivable that the time schedule is generated through step 604 so that the investment cost index is below a threshold. For example, when assigning a combination of PUs, the investment cost index may be used as a constraint of step 604B. Thus, any combination of step 604B assignments that produces an investment cost index above a threshold is prevented. The threshold may be predefined or entered by a user.
[0060] In a further variation, the scheduling method 600 allows a user to define (e.g., by selection via a user interface) one or more optional PUs that can be added to a plant, and optionally a proposed arrangement, i.e., where and how these optional PUs should be added to the plant. In yet another variation, the scheduling method 600 allows a user to define (e.g., by selection via a user interface) one or more optional PUs that should be added to an existing plant, and optionally a proposed arrangement. In these variations, the user can therefore impose restrictions on the optional PUs that are added to an existing plant. The scheduling method 600 thereby allows a user to test the impact of different modifications of an existing plant on the resulting time schedule to gain a better understanding of the existing plant and how to modify it.
[0061] Fig.101 is a block diagram of an example structure of a computer device 1000 for performing a scheduling process according to any of the embodiments and variations described above. In the example shown, the device 1000 includes a control circuit or control unit 1001 and a memory 1003. The control circuit 1001 is responsible for the overall operation of the device 1000 and may include any commercially available processing device 1002, such as a CPU ("central processing unit"), a DSP ("digital signal processor"), a microprocessor or other electronic programmable logic device, or a combination thereof. The control circuit 1001 may be implemented using instructions that enable hardware functions, such as executable computer program instructions 1004 that may be stored on the memory 1003. The processing device 1002 may be configured to read the instructions 1004 from the memory 1002 and execute these instructions to control the operation of the device 1000, such as to perform any of the methods described herein. The program instructions 1004 may be provided to the device 1000 on a computer-readable medium, which may be a tangible (non-transitory) product (e.g., magnetic media, optical disk, read-only memory, flash memory, etc.) or a transitory product, such as a propagating signal.
[0062] The memory 1003 may be, for example, one or more of a cache, a flash memory, a hard drive, a removable medium, a volatile memory, a non-volatile memory, a random access memory (RAM), or other suitable devices. In a typical arrangement, the memory 1003 includes a non-volatile memory for long-term data storage and a volatile memory used as a system memory for the control circuit 1001. Fig.10 As shown, the memory 1003 may also store data 1005 used by the control circuit 1001 (e.g., recipe 401, production unit data 402, etc.). The memory 1003 may exchange data with the control circuit 1001 via a data bus. There may also be accompanying control lines and address buses between the memory 1003 and the control circuit 1001. In one variation, the memory 1003 is at least partially located within the control circuit 1001.
[0063] The device 1000 also includes a user interface (UI) 1006 for providing information or instructions to a user and / or receiving instructions from the user. For example, the device 1000 can present the proposed time schedule 430 and any associated metrics to the user via the UI 1006. The device 1000 can also obtain input data from the user via the UI 1006, for example as part of any of steps 601-603. The UI 1006 can include, for example, a display, a button, a keypad, a touch pad, a touch panel, an indicator light, a microphone, a speaker, etc., or any combination thereof.
[0064] In the example shown, the device 1000 also includes one or more communication interfaces 1007 for operably connecting the device 1000 to external devices by wired or wireless means (e.g., via a network). In one example, the device 1000 can retrieve data from the external device, such as the recipe 401, the production unit data 402, etc. In another example, the device 1000 can send the proposed time schedule 430 and other output data to the external device.
Claims
1. A computer-implemented method for scheduling the production of packaged dairy products in a production plant, the method include: obtaining target production data for a plurality of dairy products to be produced and packaged in the production plant to form the packaged dairy products; obtaining a plurality of recipes for producing the packaged dairy product, wherein each recipe defines a set of ingredients and a sequence of recipe activities for producing a corresponding packaged dairy product from the set of ingredients; obtaining production unit data specifying existing production units in the production plant and available fluid paths between the existing production units, the production unit data further associating each existing production unit with one or more unit activities and production capabilities, the production unit data including one or more rules for cleaning each existing production unit; acquiring cleaning unit data, the cleaning unit data specifying a fluid path between at least one cleaning unit in the production plant and a plurality of the existing production units, the cleaning unit data further specifying a cleaning activity to be performed by the at least one cleaning unit on each of the existing production units according to the one or more rules; Simulating the production of the packaged dairy product in the production plant to determine at least one time schedule for achieving the target production data, the simulation comprising: generating a plurality of time schedules of recipe activities according to the plurality of recipes and the production unit data, the recipe activities being at least partially performed by one or more combinations of the existing production units to achieve the target production data; The at least one time schedule is selected from the plurality of time schedules by: 1) eliminating an idle period during which at least one existing production unit cannot be used; 2) changing the combination of existing production units by at least one of adding one or more existing production units or replacing a first existing production unit with a second existing production unit; and 3) shortening the duration of the cleaning activity; and Outputting the at least one time schedule; determining an updated time schedule in response to one or more modifications to the production unit data resulting from the addition or replacement of one or more production units in response to a decision to increase production capacity; and The updated time schedule is automatically run in the production plant to produce packaged dairy products and achieve the target production data.
2. The computer-implemented method of claim 1, further comprising: include: A delivery schedule for the group of ingredients is obtained, wherein the plurality of time schedules are further generated according to the delivery schedule for the group of ingredients.
3. The computer-implemented method according to claim 1 or 2, further comprising: include: A production schedule for the packaged dairy product is obtained, wherein the plurality of time schedules are further generated based on the production schedule for the packaged dairy product.
4. The computer-implemented method of claim 1 or 2, wherein said generating include: comparing the recipe activity to the one or more unit activities to identify a set of existing production units that can be used to perform the recipe activity; and allocating a combination of existing production units among the set of existing production units based on said available fluid paths and said production capacities of said set of existing production units; and generating one or more time schedules of recipe activities to be performed at least in part by the combination of existing production units to achieve the target production data.
5. The computer-implemented method of claim 1 or 2, further comprising: include: At least one evaluation constraint is obtained, wherein the selecting includes evaluating the plurality of time schedules to achieve the at least one evaluation constraint. 6 . The computer-implemented method of claim 5 , wherein the at least one evaluation constraint defines at least one of: time, production cost, or labor cost required to achieve the target production data.
7. The computer-implemented method of claim 6, wherein the production cost is represented by consumption of at least one utility, the utility comprising one or more of water, energy, steam, coolant, or cleaning agent.
8. The computer-implemented method of claim 1 or 2, further comprising: include: Additional production unit data is obtained for optional production units to be added to the production plant, the additional production unit data associating each of the optional production units with one or more unit activities and production capabilities, wherein the multiple time schedules are further generated to include recipe activities performed by one or more optional production units in the proposed arrangement that are fluidly connected to the existing production units.
9. The computer-implemented method of claim 8, further comprising obtaining a user selection of one or more of the optional production units or the proposed arrangements.
10. The computer-implemented method of claim 8, further comprising: include: obtaining cost index data associating each of said optional production units with a cost index, and Based on the cost index data, an investment cost index is calculated for each time schedule including recipe activities performed by one or more of the optional production units.
11. The computer-implemented method of claim 10, wherein the plurality of time schedules are generated such that the investment cost index is below a threshold.
12. The computer-implemented method of claim 1 or 2, wherein generating and selecting are performed iteratively as part of an optimization process.
13. The computer-implemented method of claim 1 or 2, wherein the existing production unit comprises one or more of a tank, a mixer, a filling machine, a packaging dispensing device, a packaging line, a separator, a homogenizer, a thermal treatment unit, and a heat exchanger.
14. A computer readable medium comprising computer instructions which, when executed by a processing device, cause the processing device to perform the method according to any one of claims 1 to 13.
15. An apparatus for scheduling the production of packaged dairy products in a production plant, the apparatus comprising a processing device configured to perform the method according to any one of claims 1 to 13.