Energy Converter

The control unit adjusts the switching signal to ensure that the new switching element achieves a preset switching time period in the energy converter, solving the electromagnetic compatibility and spectrum distribution problems caused by the replacement of switching elements, simplifying the maintenance process and maintaining stable operation. sex.

CN112204870BActive Publication Date: 2024-10-22SIEMENS MOBILITY GMBH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201980035686.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2018-05-29
Filing Date
2019-05-06
Publication Date
2024-10-22
Estimated Expiration
2039-05-06

AI Technical Summary

Technical Problem

When the switching elements of existing energy converters are replaced, the change in switching time period affects the electromagnetic compatibility and the spectrum distribution of the track idle reporting device, making it difficult to maintain the operational stability and compatibility of the original technology.

Method used

The switching signal is adjusted through the control unit to ensure that the new switching element achieves a preset switching time period at a specific point in time, coincides with the switching time period specific to the switching element, and ensures the operational stability and compatibility of the energy converter.

Benefits of technology

It is realized that when the switching element is replaced, the operation of the energy converter does not need to significantly change its preset switching time period, reducing the impact on electromagnetic compatibility and track idle reporting devices, simplifying the maintenance process, and avoiding re-inspection and certification.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112204870B_ABST
    Figure CN112204870B_ABST
Patent Text Reader

Abstract

The invention relates to an energy converter (20) for converting electrical energy, comprising at least one controllable switching element (28) providing at least one switching time period (40) specific to the switching element, which the switching element (28) requires in order to switch the switching state of a switching line (64) of the switching element (28) between a disconnected switching state and a connected switching state in accordance with a switching signal (38) provided at a control terminal (30) of the switching element (28); the control unit being configured to provide the switching signal (38) so that the switching element (28) is operated in switching operation in accordance with the switching signal (38) for converting electrical energy, wherein the control unit (36) is further configured to provide the switching signal (38) in accordance with the at least one switching time period (40) specific to the switching element with respect to a point in time so that in the intended operation of the energy converter (20) at least one predeterminable switching time period (42) is achieved at this point in time using the controllable switching element (28).
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an energy converter for converting electrical energy, which has at least one controllable switching element and a control unit, the switching element providing at least one switching time period specific to the switching element, which the switching element requires in order to switch the switching state of a switching circuit of the switching element between a switched off switching state and a switched on switching state according to a switching signal provided at a control terminal of the switching element; the control unit is configured to provide the switching signal so that the switching element is operated in a switching operation according to the switching signal for converting electrical energy. The invention further relates to a switching element for an energy converter, which has at least one control terminal for applying a switching signal and a switching circuit, which is configured to provide a switching state according to a switching signal at the control terminal, wherein the switching circuit provides at least one switching time period specific to the switching element, which the switching element requires in order to switch the switching state of the switching circuit between a switched off switching state and a switched on switching state. In addition, the invention relates to an electrically drivable vehicle, in particular a rail-guided electrically drivable vehicle, which has an electric motor for driving the vehicle and at least one energy converter electrically coupled to the electric motor. Finally, the present invention also relates to a method for operating an energy converter, wherein the energy converter converts electrical energy by operating a controllable switching element in a switching operation, wherein the controllable switching element provides at least one switching time period specific to the switching element, and the switching element requires the switching time period specific to the switching element in order to switch the switching state of a switching circuit of the switching element between a disconnected switching state and a connected switching state based on a switching signal, and to provide a switching signal so that the switching element is operated in the switching operation. Background Art

[0002] Energy converter, controllable switch element, electrically drivable vehicle, especially rail-guided electrically drivable vehicle and method for operating energy converter are known in principle in the prior art, so that no separate document proof is needed for this purpose. This type of energy converter is used to convert electrical energy in a preset manner. Energy converter is used for multiple energy conversion functions in electrical technology. Such energy converter is used to provide electrical energy for different driving and supply functions in an electrically drivable rail-guided vehicle and in an electrically drivable non-rail-guided motor vehicle. In a rail-guided vehicle, electrical energy is usually transmitted by an overhead wire arranged above two substantially parallel rails of a track. The track is the travel path of a rail-guided vehicle. However, the application of energy converter is not limited to this. Energy converter is also used in various ways for electrically drivable vehicles, electric drive systems, especially for production facilities, the manufacturing process of articles and / or the like.

[0003] It is common in particular for rail-guided electrically driven vehicles to ensure, among other things, the collision of the vehicle by means of a so-called track vacancy reporting device. The function of such a track vacancy reporting device is based, among other things, on determining the resistance between two rails forming the track in a preset track section. If a vehicle is present in the preset section, it can be determined whether the vehicle is located in the preset section by determining the resistance between the two rails. The resistance is influenced by the wheels of the vehicle, which are arranged on the rails with the wheels. The opposite wheels of the axles of the vehicle are usually electrically connected to each other. Therefore, if a resistance less than a preset resistance comparison value is detected, this serves as an indication that a vehicle is present in the track section. Conversely, if the resistance is greater than the preset resistance comparison value, this is represented as an indication that there is no vehicle in the preset track section. Therefore, the preset track section is free for use by other vehicles.

[0004] In order to ensure reliable functionality of the track vacancy reporting device, it is usually provided that a direct current and / or an alternating current is used to detect the resistance, wherein when an alternating current is used, it uses one or more predetermined frequencies which may be in the range of up to approximately several kilohertz.

[0005] If an electrically driven vehicle is in a predetermined driving mode in a predetermined track section, it must be noted that the current required for the intended operation of the vehicle is conducted via the rails, among other things. If this current (also called traction current) contains frequency components that are also used by the track vacancy reporting device, there is the problem that the track section may be incorrectly reported as vacant.

[0006] In order to avoid this critical error situation, it is necessary in electrically drivable rail-guided vehicles to comply with predefined limit values ​​within the spectral distribution of the traction current, specifically in particular within the spectral range used by the track clearance reporting device.

[0007] Taking this fact into account, a clocked energy converter is usually designed for electrically drivable rail-guided vehicles, which is specially designed for the functionality of the track vacancy reporting device. This makes it possible for the function of the track vacancy reporting device to be substantially unaffected by the operation of the energy converter.

[0008] For this purpose, a predefined pulse pattern is usually provided, with which it can be ensured that the track vacancy reporting device is not disrupted. This requires that the switching elements of the energy converter are operated as unchanged as possible with this pulse pattern during the intended operation.

[0009] If, within the scope of maintenance of an electrically driven rail vehicle, the energy converter is also maintained, for example by replacing one or more switching elements, compliance with the spectral distribution of the traction current can only be ensured if the switching elements have essentially the same switching delay times or switching time periods. In this case, the criterion for replacing the switching elements is compliance with a predefined switching delay time, on which the inspection or certification of the electrically driven rail vehicle is also based.

[0010] However, rail vehicles that are only electrically drivable are used for long operating periods. This results in the provision of replacement switching elements which usually no longer have essentially the same switching characteristics. In particular, it has been shown that the switching time periods for such switching elements decrease as development progresses. For this reason, it is currently common in the prior art to re-verify the authorization of the vehicle when replacing a switching element by means of complex interference current measurements.

[0011] It follows from this that, in particular, older switching elements cannot be replaced simply by new switching elements, which generally offer significantly shorter switching time periods.

[0012] Furthermore, US 2008 / 0094121 A1 discloses a drive circuit for an energy converter and an energy converter control circuit.

[0013] However, the above-mentioned problems are not limited to rail vehicles, but can also occur in other electrical devices using energy converters. Thus, different properties with respect to electromagnetic compatibility, in particular radio interference, network feedback and / or the like can be produced by the new switching element. Summary of the invention

[0014] The technical problem to be solved by the present invention is to reduce the problems that may be caused by the change of the switching time period of the switching element.

[0015] As a solution to the problem, the invention proposes an energy converter, a switching element, an electrically drivable vehicle and a method according to the independent claims.

[0016] Advantageous embodiments are defined by the features of the dependent claims.

[0017] With regard to this type of energy converter, it is particularly proposed that the control unit is constructed to provide a switching signal regarding a point in time as a function of at least one switching time period specific to the switching element, so that in the intended operation of the energy converter at least one predeterminable switching time period is achieved at this point in time using the controllable switching element.

[0018] With regard to a switching element of this type, it is particularly proposed that the switching element is constructed to temporally influence the switching signal with respect to a point in time depending on at least one switching time period specific to the switching element, so that in the intended operation of the energy converter at least one predeterminable switching time period is achieved using the controllable switching element starting from this point in time.

[0019] With regard to an electrically drivable vehicle of this type, it is proposed in particular that an energy converter is designed according to the invention or that the energy converter has a controllable switching element designed according to the invention.

[0020] In particular, a method of this type provides that the switching signal is provided as a function of at least one switching time period specific to the switching element at a point in time so that during intended operation of the energy converter at least one predefinable switching time period is achieved with the controllable switching element starting from this point in time.

[0021] The invention is based on the idea that, on the energy converter side and, if necessary, also on the switching element side, an adjustment can be made with respect to the switching characteristics of the switching element, with which it can be achieved that at least one pre-settable switching time period can also be reliably followed. In this case, the invention can be used to influence the switching signal so that, by means of a temporal adjustment, a pre-settable switching time period can be reliably achieved taking into account the switching element-specific switching time period. It is thus possible to achieve the pre-set switching time period independently of the switching element-specific switching time period of the switching element respectively arranged in the energy converter, so that when replacing the switching element of the energy converter, the feedback occurring in the expected operation of the energy converter can be maintained as much as possible. In particular, it can be achieved that network feedback, influence on the track vacancy reporting device and / or impairment in terms of electromagnetic compatibility can be achieved as much as possible independently of the switching element currently arranged in the energy converter.

[0022] That is, the switching signal is provided so that the end of the predeterminable switching time period coincides with the end of the switching time period specific to the switching element. It should be noted that in actual operation, of course, the end of the switching time period is provided by the switching element. The end of the predeterminable switching time period is therefore determined by the end of the switching time period specific to the switching element. Thus, in order to achieve the desired value for the predeterminable switching time period, the switching signal can be adjusted accordingly so that the end of the predeterminable switching time period coincides with the end of the switching time period specific to the switching element. The end can thus be determined by a point in time.

[0023] The invention has proven to be particularly advantageous when the energy converter has more than just one switching element, for example two switching elements, four switching elements or more switching elements, which interact in a suitable manner together with corresponding inductors and / or capacitors in order to provide the desired energy conversion functionality.

[0024] It is provided that the control unit provides a corresponding switching signal to at least one switching element, by means of which the switching signal can be operated in a provided switching operation for the purpose of achieving energy conversion by the energy converter. In the case of a plurality of switching elements, it can be provided that a corresponding plurality of individualized switching signals are provided for each switching element. Of course, it can also be provided that the switching signal is used jointly for two or more switching elements. This depends, among other things, on the circuit structure of the energy converter.

[0025] In the sense of the present disclosure, a switching element is preferably a controllable electronic switching element, for example a controllable electronic semiconductor switch, such as a transistor operated in switching mode, a thyristor, a combination thereof, preferably a combination with a reverse diode connected in parallel, a gate turn-off thyristor (GTO), an insulated gate bipolar transistor (IGBT), a combination thereof, etc. In principle, however, the switching element can also be formed by a field effect transistor, in particular a metal oxide semiconductor field effect transistor (MOSFET).

[0026] In order to provide the desired energy conversion functionality of the energy converter, at least one switching element is operated in switching operation. With regard to semiconductor switches of the transistor type, this means that in the switched-on state, a very low resistance is provided between the terminals of the transistor forming the switching circuit, so that a high current can be achieved at a very low residual voltage. In the switched-off state, on the other hand, the switching circuit of the transistor is high-resistance, i.e., it provides a high resistance, so that even at a high voltage applied to the switching circuit, there is essentially no current, or only a very low, in particular negligible, current. This is different from linear operation in transistors, which is usually not used in clocked energy converters.

[0027] In order to realize the control functionality, the switching element has at least one control connection, to which the switching element can be applied with a switching signal provided by the control unit, so that the desired switching function of the switching element can be realized. The switching signal can be a binary switching signal, which can assume two state values, so that the desired switching function of the switching element can be provided. For example, the switching signal can be formed by a pulse sequence, which is applied to the control connection by means of the pulse sequence. This is firstly suitable in thyristors and GTOs. In addition, it can be provided in transistors that the switching signal is a rectangular signal, wherein one of the potentials of the rectangular signal can be assigned to the corresponding switching state of the switching element. Such a signal is suitable, for example, for transistors, in particular bipolar transistors, field effect transistors, etc.

[0028] The control unit provides functionality for generating the switching signal. Further functions of the energy converter, such as monitoring functions, safety functions and / or the like, can also be implemented by the control unit. For this purpose, the control unit can include a hardware circuit and / or a program-controlled computer unit or the like.

[0029] The switching time period is currently the time period during which a switchover between the switching states of the switching element takes place. That is, the switching time period does not currently denote the time period during which the switched-on switching state or the switched-off switching state lasts. The switching time period specific to the switching element thus denotes the time period during which the switching element switches between two switching states when a corresponding switching signal is provided at the control connection. The switching time period specific to the switching element is thus the time period which is particularly required by the respective switching element in order to switch the switching state in the desired manner based on the switching signal.

[0030] In principle, the switching element-specific switching time period for the respective switching element can be a substantially constant switching time period. However, the switching element-specific switching time period can also be dependent on other parameters relating to the expected operation of the switching element, such as the temperature of the switching element, the operating current of the switching element in the switched-on switching state, the operating voltage of the switching element in the switched-off switching state and / or the like.

[0031] On the contrary, the preset switching time period is a time period that is preset for the expected operation of the energy converter and should be realized by means of the switching element using the expected operation of the energy converter. By appropriately influencing the switching signal by the control unit and / or by the switching element itself, the preset switching time period can be set when the switching time period specific to the switching element is known. For this purpose, a corresponding adjustment circuit and / or controller can be provided, by means of which the switching signal can be adjusted in a suitable manner in view of the time position of the switching signal, so that although there is a deviation in the switching time period specific to the switching element, the preset switching time period can still be achieved. In general, the present invention is therefore able to achieve that the switching element can be replaced almost arbitrarily in the energy converter without significantly changing its specific functionality required for the preset switching time period. It is particularly possible to use a switching element with a very short switching time period specific to the switching element to replace a switching element with a large switching time period specific to the switching element. This takes into account that, as the development progresses, the switching element has a shorter switching time period specific to the switching element. The maintenance of the energy converter can be simplified as a whole.

[0032] Furthermore, the invention makes it possible that even by replacing at least one switching element, the technical requirements to be followed for the intended operation of the energy converter, such as network feedback, requirements regarding electromagnetic compatibility and / or the like, do not need to be substantially compromised. It is thus no longer necessary to re-test or certify the energy converter with regard to its properties after maintenance, in particular after replacing at least one switching element.

[0033] With regard to the warning operation of the track vacancy reporting device, it can thus also be achieved that after maintenance or after the replacement of switching elements of the vehicle's energy converter, the electrically drivable rail vehicle no longer needs to be re-tested or re-certified. On the contrary, the invention can achieve that undesirable properties that occur in the prior art, for example in connection with the track vacancy reporting device, are reduced, if not completely avoided.

[0034] In principle, this is of course not limited to a warning mode but can also be used accordingly for other drive situations, for example an electrically drivable motor vehicle, an electric drive train and / or the like.

[0035] In particular, it can of course be provided that the energy converter has a plurality of switching elements, wherein the switching elements can provide different switching characteristics specific to the switching elements. In this case, a corresponding adjustment can also be implemented. For this purpose, it is preferably provided that, according to the invention, a corresponding adjustment is implemented for each switching element.

[0036] It is further proposed that the energy converter has a communication connection between the control unit and the switching element, which is designed for transmitting data about at least one switching time period specific to the switching element and / or at least one predefinable switching time period between the control unit and the switching element. This makes it possible to make available specific functional data of the switching element, in particular specific functional data about the switching time period specific to the switching element, available on the control unit side. The control unit can thus provide the switching signal in a corresponding manner.

[0037] If, on the other hand, the adjustment functionality is provided on the switching element side, the control unit can transmit a predeterminable switching time period to the switching element, so that the switching element can adapt its switching functionality accordingly based on the switching signal. Of course, combinations thereof can also be provided. The data can be provided either at regular intervals or only once, so that the control unit or the switching element can make corresponding settings. For example, it can be provided that the corresponding data are stored on the control unit side and / or on the switching element side for use.

[0038] For this purpose, it can be provided, for example, that the control unit includes a memory unit having values ​​relating to at least one switching time period specific to the switching element and / or at least one predefinable switching time period. The corresponding situation can of course also be provided for the switching element. As a result, it can be achieved on the control unit side that the switching signal is provided taking into account the above-mentioned switching times.

[0039] On the other hand, it can be provided on the switching element side that the switching signal on the control connection is evaluated accordingly so that a predeterminable switching time period can be achieved. In this case, no adjustment by the control unit is necessarily required. On the contrary, in this embodiment, it can be achieved that in the case of maintenance of the energy converter, only the switching element needs to be directly replaced.

[0040] It is further proposed that the control unit is designed to retrieve data corresponding to at least one switching time period specific to the switching element and / or at least one predeterminable switching time period from a database, which is at least temporarily in communication connection with the control unit. As a result, the corresponding data does not need to be stored directly in the control unit or the switching element. The data can be retrieved from the database when necessary. For this purpose, the communication connection can use a communication network, such as the Internet or the like.

[0041] However, in principle, there is also the possibility of specifically configuring the control unit or the switching element, for example in such a way that the programming or regulation of the control unit or the switching element is configured accordingly. This can be done, for example, manually or by means of configuring an automatic device or the like. Of course, in this case, a communication connection is not absolutely necessary. Nevertheless, this can of course also be combined with the above-mentioned options.

[0042] According to an extended solution, the control unit is configured to determine the control signal based on at least one switching time period specific to the switching element and / or at least one pre-set switching time period. In this design, the switching signal is not necessarily adjusted only in terms of its position in time, but a completely new control signal that already has a corresponding time position is generated. This can be done by corresponding calculations taking into account the switching time period specific to the switching element and / or the pre-set switching time period. The calculation can be repeated at pre-set time points for the expected operation of the energy converter. Of course, it can also be provided in particular that a corresponding calculation or adaptation is performed for each switching of the switching state of the switching element.

[0043] At least one switching time period is preferably an on time period and / or a off time period. Different pre-settable switching time periods can be set or assigned for at least one on time period and / or for at least one off time period. Accordingly, the switching signal can be adjusted for the on time period and / or the off time period. In particular, it can be provided that the on time period and the off time period are generated independently of each other. This can take into account characteristics specific to the switching element, by means of which the off characteristic and the on characteristic can differ from each other. This can improve the adjustment overall.

[0044] On the switching element side, in particular, a communication interface connector for transmitting data related to a preset switching time period and / or a switching time period specific to the switching element can be provided. In this way, it is possible for a control unit or an external data source, such as a database, to provide corresponding data for the switching element. In particular, it can be provided that the switching time period specific to the switching element is transmitted to the switching element, so that the data is specific to the switching element for use by the switching element. This takes into account that the switching element is not further constructed to automatically determine the switching time period specific to the switching element. For this reason, it may be meaningful to have transmitted the corresponding data to the switching element when the switching element is manufactured, and it can be stored there. In principle, this is of course also applicable to the preset switching time period, which is provided in particular by the control unit, and the switching element is arranged in the energy converter of the control unit. It is possible that the switching element can also be matched to almost any use in the energy converter after its manufacture. Therefore, in this design, the switching element does not need to be a switching element specific to the corresponding energy converter, but a standard switching element can be used, and the standard switching element can be specifically matched to the use in the corresponding energy converter when using the corresponding above-mentioned data. Flexibility can be further improved overall.

[0045] In addition, it can be provided that the switching signal is determined in addition according to the current and / or voltage and / or temperature of the energy converter, in particular the switching element. This extension takes into account that the switching time period specific to the switching element can also be related to the expected operation of the energy converter or the switching element in the energy converter. For example, the switching time period specific to the switching element can be related to the operating current during the switched state of the connection. However, the switching time period specific to the switching element can also be related to the voltage applied to its switch line, for example, in the switched state of the switching element being cut off. A combination thereof can also be provided. The functionality of the switching element in the energy converter can thus be further improved.

[0046] Preferably, at least one presettable switching time period is greater than at least one switching time period specific to the switching element. It can be achieved that a simple adjustment can be achieved by, for example, a time delay by means of a delay unit or the like. In this way, a particularly simple adjustment can be achieved. In addition, the expansion scheme takes into account the fact that, as the development progresses, the switching element usually provides a faster switching time period specific to the switching element, so that the switching of the switching element by the energy converter usually leads to a faster switching time period specific to the switching element to be compensated for the new switching element. In principle, the opposite situation is of course also possible, but wherein, preferably in the case of using a control unit, the switching signal is accordingly advanced in time, so that a presettable switching time period can also be achieved here. Of course, different combinations thereof can also be set.

[0047] Furthermore, it can be provided that at least one switching time period specific to the switching element is determined during the expected operation of the energy converter. The expected operation can be carried out, for example, during a test operation, during a test phase and / or the like. Corresponding data of the switching time period specific to the switching element can then be provided to the control unit and / or the switching element. Furthermore, it can of course also be provided that the switching element and / or the control unit are adjusted accordingly so that a predeterminable switching time period can be achieved.

[0048] The advantages and effects described for the energy converter according to the invention naturally also apply to the switching element according to the invention and the method according to the invention, and vice versa. In particular, device features can of course be expressed as method features, and vice versa. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] Further advantages and features are apparent from the following description of the exemplary embodiments with the aid of the accompanying drawings. In the accompanying drawings, the same reference numerals denote the same features and functions. In the accompanying drawings:

[0050] Figure 1 A schematic block diagram of an electrically driven rail vehicle on a track having two rails arranged parallel in the longitudinal direction is shown;

[0051] Figure 2 Shows the Figure 1 A schematic diagram of switching signals of switching elements of an energy converter of a rail vehicle;

[0052] Figure 3 It shows that Figure 2 a schematic diagram of a switching signal of such a switching element;

[0053] Figure 4 The basis for the connection process is shown Figure 3 An enlarged chart of

[0054] Figure 5 Shown according to Figure 3 A schematic diagram of a spectral distribution of a current of a switching element of a first switching element, the switching element having a switching element-specific switching time period of a first switching element, the switching element-specific switching time period corresponding to a predefinable switching time period;

[0055] Figure 6 It shows that Figure 5 However, the schematic diagram for the second switching element shows that the second switching element has a larger Figure 5 a smaller switching element-specific switching time period of the first switching element on which the line diagram is based;

[0056] Figure 7 A schematic diagram showing a voltage-time diagram for a predeterminable switching signal;

[0057] Figure 8 It shows that Figure 7 Such a schematic diagram for switching time periods specific to the switching element;

[0058] Fig. 9 It shows that Figure 8 , Fig. 9 Such a schematic diagram for determining a delay time of a switching signal for a control unit for controlling a switching element; and

[0059] Fig.10 A schematic block diagram for implementing the present invention by means of a delay unit is shown. DETAILED DESCRIPTION

[0060] Figure 1 The schematic diagram shows an electrically driven rail vehicle 10 which is arranged on a track 14 and is guided by the rails by means of wheels 70, only one of which is schematically shown. The rail vehicle 10 comprises a top structure with a pantograph 16 which slides in contact with an overhead line 12 which is arranged above the track 14 parallel to its course.

[0061] Between the pantograph 16 and the wheel 70, the rail vehicle 10 has a transformer 18, which has a primary winding 32, which is connected to the pantograph 16 by a first connection and to the wheel 70 by a second connection. The transformer 18 is currently designed as an isolating transformer. An AC voltage of approximately 15 kV and a frequency of approximately 16.7 Hz is currently applied to the primary winding 32. In alternative designs, the AC voltage can also have other values, such as approximately 25 kV, etc. Similarly, in alternative designs, the frequency can also be approximately 50 Hz, etc. A correspondingly transformed AC voltage is provided on the secondary winding 34 of the transformer 18, which is significantly lower than the AC voltage between the overhead line 12 and the track 14.

[0062] An energy converter is connected to the secondary winding 34, the energy converter having two half-bridge circuits 20, which include respective IGBTs 28 as switching elements. In addition, each IGBT 28 includes a reverse diode, which is not shown, however. The respective intermediate connections 72 of the half-bridge circuits 20 are connected to the respective connections of the secondary winding 34. The half-bridge circuits 20 are connected together to the intermediate circuit capacitor 22. In addition, an inverter 24 is connected to the intermediate circuit capacitor 22, which inverter provides a three-phase AC voltage network for the respective electric machines 26, which are used to drive at least some of the wheels 70.

[0063] The IGBT 28 has a control terminal 30 which is connected to a control unit 36. The IGBT 28 is thus individually controlled by the control unit 36 ​​so that the IGBT can be operated in switching mode. In switching mode, the IGBT 28 has only an on switching state and an off switching state, which the IGBT assumes or switches accordingly depending on the switching signal 38 of the control unit 36 ​​if this is required by the switching signal of the control unit 36. By means of the half-bridge circuit 20 of the energy converter, a four-quadrant operation can be achieved with respect to the energy supply of the DC voltage intermediate circuit.

[0064] The number of half-bridge circuits 20 may also be changed according to requirements.

[0065] The above-described concept is of course also applicable in principle to the inverter 24 . In the present case, the inverter can have, for example, three half-bridge circuits 20 , wherein corresponding phases can be provided by means of corresponding half-bridge circuits of the half-bridge circuits 20 .

[0066] The energy converter having the half-bridge circuit 20 and the inverter 24 are preferably designed for operation in four-quadrant operation.

[0067] The abovementioned idea is furthermore applicable not only to two-point converters but also to three-point or multi-point converters and to current and voltage intermediate circuit converters, ie also to matrix converters.

[0068] In order to operate the track vacancy reporting device as little as possible without interfering with the operation of the energy converter, the IGBT 28 should provide a predeterminable switching time period 42. When manufacturing the energy converter, a specific IGBT 28 is provided for this purpose, so that the predeterminable switching time period 42 can be achieved in such a way that the predeterminable switching time period corresponds to the switching element-specific switching time period of the IGBT 28. In this case, the switching time periods are approximately the same.

[0069] Furthermore, the pulse pattern of the switching signal 38 for the control unit 36 ​​is selected accordingly so that a spectral distribution of the received current can be achieved, such as, for example, depending on Figure 5 As shown in FIG. 4 . It can be seen that an amplitude value 46 is set there for some frequencies, which has a predetermined maximum amplitude value of the current at a specific frequency. This makes it possible to ensure that the frequency range that is important for the operation of the track vacancy reporting device is essentially not disturbed. This range is Figure 5 In the figure, 44 is used.

[0070] Figure 2 The schematic diagram shows a voltage-time diagram of one of the switching signals 38 for the control unit 36. Figure 2 It can be seen that at time points t1 and t2 , the switching state of the IGBT controlled by the switching signal is switched.

[0071] If one or more or all of the IGBTs 28 are to be replaced within the scope of maintenance, it should be noted that newer versions of the IGBTs 28 generally have shorter switching time periods specific to the switching element due to further development, as shown in the data from Figure 3 The enlarged fragment of Figure 4 As schematically shown in .

[0072] Figure 3 The schematic diagram shows a voltage-time diagram for a switching process 40, 44 as it is implemented with the aid of an IGBT 28. Figure 3 In the time resolution of , no clear difference can be seen between the previous IGBT 28 that should be replaced with the new IGBT 28. On the contrary, Figure 4 This shows that Figure 4 The range 60 is shown in an enlarged temporal resolution.

[0073] From the basis Figure 4It can be seen from the schematic diagram that the new IGBT 28 significantly reduces the predeterminable switching time period 42 shown by the curve 42 of the IGBT 28 originally arranged in the half-bridge circuit 20 of the energy converter, as shown in FIG. Figure 4 As can be seen from the curve 40 of FIG. This results in changes in the switching times, which can lead to the track vacancy reporting device no longer being able to operate reliably as expected. This is according to the Figure 6 The schematic diagram shows that Figure 6 It shows that Figure 5 A schematic diagram is shown in which the IGBT 28 is now replaced by a new IGBT 28 which provides switching element-specific switching times according to the curve 40, as shown in FIG. Figure 4 As shown.

[0074] from Figure 6 It can be seen that the amplitude value 48 extends into the range 44 , so that the intended operation of the track clearance reporting device can no longer be reliably ensured.

[0075] In order to eliminate this problem, the following knowledge is used: an identical time shift for the switch-on and switch-off processes of all IGBTs 28 or half-bridge circuits 20 of an energy converter is unimportant, whereas a switching element-specific or phase-specific time shift for the switch-on and switch-off processes can have a significant influence on the spectrum and can lead to the appearance of desired spectral components or to an inadmissible increase in the amplitude values ​​of spectral components.

[0076] In order to avoid this, a delay time unit 58 is implemented between the pulse pattern generator 56 of the control unit 36 ​​and the IGBT 28 as follows:

[0077] T delay,on =t delay,on1 -t delay,on2

[0078] T delay,off =t delay,off1 -t delay,off2

[0079] t delay,on1 and t delay,off1 Corresponds to the initial switching element-specific switching time period of the IGBT 28. delay,on2 and t delay,off2 This corresponds to the switching element-specific switching time period of the new IGBT 28 which is to replace the original IGBT 28 .

[0080] The impact is based on Figures 7 to 9 , which respectively show a voltage-time diagram.

[0081] Accordingly, the present invention is implemented such that the switching time period is corrected so that, taking into account the switching time period 40 specific to the switching element, the switching time period can be corrected according to Fig. 9 The curve 54 in embodies a predeterminable switching time period which corresponds to the switching element-specific switching time period 42 of the IGBT 28 originally arranged in the energy converter.

[0082] This can be realized, for example, in the pulse pattern generator 56 of the control unit 36. However, it is currently provided that a separate delay time unit 58 is provided, through which the switching signal 38 is passed, and the corresponding time delay t is realized according to the above formula. delay,on and t delay,off The delay time unit 58 can be integrated into the control unit 36. Furthermore, the delay time unit can of course also be integrated into the IGBT 28. Furthermore, there is the possibility of also equipping a driver circuit (not shown) for the IGBT 28 with the delay time unit 58 and implementing a corresponding adjustment there.

[0083] If the modification in the switching element or IGBT 28 is carried out autonomously, this results in a particularly user-friendly and therefore advantageous implementation of the invention, since the switching element or IGBT 28 can be replaced without further intervention or adjustment on the part of the control unit 36 ​​.

[0084] If the delay time t delay,on and t delay,off Alternatively, corresponding correction times are stored in the switching element or IGBT 28 and these data are used, as described above, for correcting the switching signal 38 , which results in further advantageous possibilities.

[0085] Alternatively, the delay time t delay,on / off2 Or correction time t delay,on and t delay,off It can also be provided in a storage unit of the control unit 36, in a sequentially stored memory and in an external database which is in communication connection 62 with the control unit 36. The database can be formed, for example, via a cloud, a thinkball and / or the like. In order to ensure the required security, an error-proofing protocol can be used for data transmission.

[0086] Fig.10 A schematic diagram for realizing the present invention by additionally arranging a delay time unit 58 is shown.

[0087] From the basis Figure 7As can be seen from the schematic diagram, the predeterminable switching time period 42 is obtained in that the initially arranged IGBT 28 does not immediately perform the switching process at time t1, as predetermined by the switching signal 38, but only performs the switching process at time t3. Accordingly, the switchover from the switched-on switching state to the switched-off switching state is delayed from time t2 to time t4 according to the switching signal 38. The corresponding time delays t delay,on1 and t delay,off1 .

[0088] Figure 8 As Figure 7 Such a schematic diagram shows the situation for a new IGBT 28, which provides shorter switching time periods specific to the switching element. Figure 8 This can be seen with the aid of the curve 40. It can be seen that the IGBT 28 has already switched from the switched-off state to the switched-on state at the time t5 based on the switching signal 38, which is in accordance with Figure 7 The time point for switching from the switched-on state to the switched-off state is accordingly advanced, and the switching is performed at the switching time point t6, which is also in accordance with Figure 7 Before the time point t4. Accordingly, a shortened switching time period t specific to the switching element is generated. delay,on2 and t delay,off2 , which is in accordance with arrows 50, 52 Figure 8 is shown in the line graph.

[0089] Fig. 9 Now, a diagram is shown for determining the correction time in order to achieve a predeterminable switching time period according to curve 54. For this purpose, Fig. 9 The curve 54 is shown in FIG. Figure 7 The curve 42 in the voltage-time diagram shows the course for a predeterminable switching time period, which corresponds to the switching time period according to Figure 7 The switching time period 42 is specific to the switching element. The corresponding time difference is indicated by the arrow 68, which is realized by the delay time unit 58. Figure 8 The IGBT 28 can be replaced by a newer IGBT 28 with switching time periods specific to the switching element, without this affecting the operation of the energy converter and thus without disrupting the track vacancy reporting device.

[0090] Overall, the exemplary embodiments of the invention show how a predefined characteristic of an energy converter can be achieved independently of the switching time periods of the switching elements of the energy converter, which are specific to the switching elements. This is particularly advantageous for use in rail-guided, electrically driven vehicles 10. However, the invention is not limited thereto, but can also be applied to other drive situations, such as electrically driven vehicles, or also to drive trains, such as for production facilities, etc.

[0091] The energy converter can be formed by two or three half-bridge circuits 20 or optionally more half-bridge circuits. In special cases, especially in the low power range, the half-bridge can be replaced by a capacitive voltage divider.

[0092] In the present case, the term energy converter can include in particular a four-quadrant regulator on the transformer side and a pulse-controlled inverter on the machine side. However, an energy converter can also include a direct current voltage converter, such as a DC / DC converter or the like in principle.

[0093] The examples are only used to illustrate the present invention and should not limit the present invention.

Claims

1. An energy converter (20) for converting electrical energy, comprising: - at least one controllable switching element (28), which provides at least one switching element-specific switching time period (40), during which a switchover between the switching states of the switching element (28) takes place, and the switching element (28) specifically requires the switching element-specific switching time period in order to switch the switching state of a switching line (64) of the switching element (28) between a disconnected switching state and a connected switching state in dependence on a corresponding switching signal (38) provided at a control terminal (30) of the switching element (28), and a control unit (36) which is designed to provide a switching signal (38) so that the switching element (28) is operated in a switching mode in accordance with the switching signal (38) for converting electrical energy, It is characterized in that - The control unit (36) is further configured to provide a switching signal (38) with respect to a point in time based on at least one switching time period (40) specific to the switching element, so that in the intended operation of the energy converter (20) at least one predefined switching time period (42) is implemented at the time point using the controllable switching element (28), so that the end of the predefined switching time period (42) coincides with the end of the switching time period (40) specific to the switching element, the predefined switching time period being predefined for the intended operation of the energy converter (20) and to be implemented using the intended operation of the energy converter using the switching element (28).

2. The energy converter according to claim 1, Features A communication connection between a control unit (36) and a switching element (28), the communication connection being designed for transmitting data relating to at least one switching element-specific switching time period (40) and / or at least one predefinable switching time period (42) between the control unit (36) and the switching element (28).

3. The energy converter according to claim 1 or 2, It is characterized in that The control unit (36) comprises a memory unit having data relating to at least one switching time period (40) specific to the switching element and / or at least one predefinable switching time period (42).

4. The energy converter according to claim 1 or 2, It is characterized in that The control unit (36) is designed to retrieve data corresponding to at least one switching element-specific switching time period (40) and / or at least one predefinable switching time period (42) from a database, which is at least temporarily in communication connection (62) with the control unit (36).

5. The energy converter according to claim 1 or 2, It is characterized in that The control unit (36) is designed to determine a control signal (38) as a function of at least one switching time period (40) specific to the switching element and / or at least one predefinable switching time period (42).

6. The energy converter according to claim 1 or 2, It is characterized in that At least one switching time period (40, 42) is an on-time period and / or an off-time period.

7. A switching element (28) for an energy converter (20), comprising: - at least one control connection (30) for applying a switching signal, and a switching circuit (64) which is designed to provide a switching state as a function of a switching signal at a control connection (30), in, The switching circuit (64) provides at least one switching element-specific switching time period (40), during which switching between the switching states of the switching element (28) takes place, and the switching element (28) specifically requires the switching element-specific switching time period in order to switch the switching state of the switching circuit (64) between the disconnected switching state and the connected switching state, It is characterized in that The switching element (28) is designed to influence the switching signal in time with respect to a point in time based on at least one switching time period (40) specific to the switching element, so that in the intended operation of the energy converter (28), at least one predeterminable switching time period (42) is implemented starting from the time point using the controllable switching element (28), so that the end of the predeterminable switching time period (42) coincides with the end of the switching time period (40) specific to the switching element, the predeterminable switching time period being predetermined for the intended operation of the energy converter (20) and to be implemented using the switching element (28) using the intended operation of the energy converter.

8. The switching element according to claim 7, Features A memory element is provided for storing data relating to at least one predefinable switching time period (42) and / or at least one switching time period (40) which is specific to a switching element.

9. The switching element according to claim 7 or 8, It is characterized in that The switching time periods (40, 42) are switch-on time periods and / or switch-off time periods.

10. The switching element according to claim 7 or 8, Features A communication interface connection is provided for transmitting data relating to a predefinable switching time period (42) and / or a switching time period (40) specific to a switching element.

11. An electrically drivable vehicle (10), comprising: - an electric motor (26) for driving the vehicle (10), and - at least one energy converter (20, 22, 24) electrically coupled to the electric machine (26), It is characterized in that - an energy converter (20) constructed according to any one of claims 1 to 6, or The energy converter (20) has a controllable switching element (28) configured according to any one of claims 7 to 10.

12. The vehicle (10) according to claim 11, in, The vehicle is a rail-guided, electrically drivable vehicle.

13. A method for operating an energy converter (20) for converting electrical energy by operating a controllable switching element (28) in a switching mode, wherein during the switching mode, - the controllable switching element (28) provides at least one switching time period (40) specific to the switching element, during which switching between the switching states of the switching element (28) takes place, and the switching element (28) specifically requires the switching time period in order to switch the switching state of a switching line (64) of the switching element (28) between a disconnected switching state and a connected switching state in dependence on a switching signal, and - providing the switching signal so that the switching element (28) is operated in a switching mode, It is characterized in that - providing a switching signal with respect to a time point based on at least one switching time period (40) specific to the switching element, so that in the expected operation of the energy converter (20), at least one pre-settable switching time period (42) is implemented starting from the time point using the controllable switching element (28), so that the end of the pre-settable switching time period (42) coincides with the end of the switching time period (40) specific to the switching element, the pre-settable switching time period being pre-set for the expected operation of the energy converter (20) and to be implemented using the expected operation of the energy converter with the help of the switching element (28).

14. The method according to claim 13, It is characterized in that An on-switching signal and / or an off-switching signal is determined as a switching signal (40, 42).

15. The method according to claim 13 or 14, It is characterized in that In addition, the switching signal (40, 42) is determined as a function of a current and / or a voltage and / or a temperature of the energy converter.

16. The method according to claim 15, It is characterized in that In addition, the switching signal (40, 42) is determined as a function of a current and / or a voltage and / or a temperature of the switching element (28).

17. The method according to claim 13 or 14, It is characterized in that At least one predefinable switching time period (42) is greater than at least one switching time period (40) specific to the switching element.

18. The method according to claim 13 or 14, It is characterized in that During expected operation of the energy converter (20), the at least one switching element-specific switching time period (40) is determined.