An integrated equipment for coalbed methane production and drainage treatment
Through integrated coalbed methane mining and drainage treatment equipment, combined with high-frequency electrochemical, MBR membrane reactors and electrochemical desalting technologies, the problem of many harmful products after treatment in the existing technology is solved, and efficient and stable coalbed methane is achieved Drainage treatment simplifies operation and reduces costs.
Patent Information
- Application Number
- CN202011136841.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-10-22
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2040-10-22
AI Technical Summary
In the coalbed methane mining and drainage treatment, although chemical, physical and biological treatment methods can treat wastewater, they still produce harmful products after treatment, which reduces the treatment effect. The equipment covers a large area, is complex in operation and is costly, making it difficult to achieve. Stable and efficient module intensive integrated processing.
A coalbed methane mining and drainage treatment integrated equipment was designed, combining high-frequency electrochemical, MBR membrane reactor, electrochemical desalination and MVR evaporator and other technologies, through flocculation reaction, sedimentation, membrane filtration, electrodialysis and evaporation. , realize multi-stage treatment of coalbed methane wastewater, degrade COD, ammonia nitrogen, fluoride and heavy metal ions, and effectively desalinate and reduce sludge production.
Improve the effect of coalbed methane wastewater treatment, simplify operations, reduce subsequent treatment costs, realize effective treatment of harmful products, improve the practicality and treatment efficiency of the equipment, and cover a small area, which is suitable for distributed well mining and drainage treatment. .
Smart Images

Figure CN112225406B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coalbed methane production and drainage treatment, and in particular to integrated coalbed methane production and drainage treatment equipment. Background Art
[0002] Coalbed methane wastewater is produced along with coalbed methane mining, mainly from fracturing mining drainage, gas well drilling production water, coalbed methane well washing production water, etc. Due to the injection of harmful substances such as fracturing fluid, the mining and drainage wastewater turns yellow, black, and turbid, and has high mineralization, high salinity, and fluoride seriously exceeding the standard. At the same time, due to the erosion of coal seams and rock bodies during groundwater recharge and migration, the quality of mining water is complex and has the characteristics of time, diversity, and block. If the coalbed methane mining and drainage wastewater is not effectively treated, it will cause serious pollution to the surface, groundwater and surrounding environment.
[0003] The coalbed methane wastewater treatment process is different for different wastewater qualities. At present, the market mainly adopts physical treatment, chemical treatment and biological treatment for treatment. Among them, the physical treatment method mainly adopts flocculation sedimentation, aeration, sand carbon adsorption, membrane filtration and other processes, which can remove solid impurities and suspended solids in the water, reduce COD, ammonia nitrogen and mineralization to a certain extent, but it has high requirements for incoming water and requires certain pretreatment. Membrane filtration will produce a large amount of high-salt and high-concentration wastewater, and the subsequent treatment cost is high and difficult. The chemical treatment method mainly adds a variety of chemical agents for neutralization reaction, and cooperates with flocculation sedimentation to achieve the treatment effect, but the chemical treatment method has high requirements for the stability of raw water quality and treatment. The treatment effect is unstable, the amount and type of reagents added are large, secondary pollution is easy to occur, the salt content of drainage is increased, and COD is difficult to effectively degrade. The biological treatment method mainly adopts flocculation sedimentation, combined with activated sludge and biological bacteria, aeration, MBR biofilm filtration and other processes to achieve the treatment purpose, but the project occupies a large area, the bacteria have high requirements for the operating environment, the cultivation time is long, the impact resistance is poor, the effluent is unstable in winter, the sludge production is large, the desalination effect is not obvious, the utilization rate is low, the coalbed methane extraction wells are scattered, and due to traffic conditions, long-distance transportation and centralized treatment are difficult. Therefore, the research and development of stable and efficient modular intensive integrated coalbed methane extraction and drainage treatment equipment needs to be studied.
[0004] At present, in the process of treating water produced by coalbed methane, in the existing technology, although the waste gas and wastewater are treated by chemical treatment, physical treatment and biological treatment methods, many harmful products will be produced after treatment, which reduces the effect of coalbed methane wastewater treatment and makes the treatment effect unsatisfactory. Summary of the invention
[0005] In view of the shortcomings of the prior art, the present invention provides an integrated coalbed methane production and drainage treatment device, which solves the problem that in the prior art, although waste gas and wastewater are treated by chemical treatment, physical treatment and biological treatment, many harmful products are produced after treatment, which reduces the effect of coalbed methane wastewater treatment and makes the treatment effect unsatisfactory.
[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: an integrated coalbed methane production and drainage treatment device, including a raw water pool, one side of the raw water pool is connected to a raw water pool lift pump through a water pipe, one side of the raw water pool lift pump is connected to a high-frequency electro-physical device through a water pipe, one side of the high-frequency electro-physical device is provided with a flocculation reaction pool, one side of the flocculation reaction pool is provided with a lift pump, one side of the lift pump is connected to the flocculation reaction pool through a water pipe, and the other side of the lift pump is connected to an inclined tube sedimentation tank through a water pipe, one side of the inclined tube sedimentation tank is fixedly connected to a sludge collection tank, and the A first sludge pump is arranged inside the inclined tube settling tank, and one side of the first sludge pump is connected to the interior of the sludge collection tank through a mud pipe. An MBR membrane reactor is arranged on one side of the sludge collection tank, and a second sludge pump is arranged inside the MBR membrane reactor, and one side of the second sludge pump is connected to the sludge collection tank through a water pipe. An intermediate water tank is arranged on one side of the MBR membrane reactor, and the interior of the intermediate water tank is connected to the interior of the MBR membrane reactor through a water pipe. A high-pressure lifting pump is arranged on one side of the intermediate water tank, and one side of the high-pressure lifting pump is connected to the interior of the intermediate water tank through a water pipe.
[0007] Furthermore, a sand carbon filter is provided on one side of the high-pressure lifting pump, a precision filter is provided on one side of the sand carbon filter, a first electrochemical desalination device and a second electrochemical desalination device are provided on one side of the precision filter, an MVR evaporator is provided on one side of the second electrochemical desalination device, and a crystallized salt collection tank is provided on one side of the MVR evaporator.
[0008] Furthermore, the left and right sides of the sand carbon filter are respectively connected to the interior of the high-pressure lifting pump and the precision filter through water pipes, one side of the precision filter is connected to the first electrochemical desalination device through a water pipe, one side of the first electrochemical desalination device is connected to the second electrochemical desalination device through a water pipe, one side of the second electrochemical desalination device is connected to the interior of the MVR evaporator through a water pipe, and one side of the MVR evaporator is connected to the interior of the crystallized salt collection tank through a water pipe.
[0009] Furthermore, a clear water tank is provided at the bottom of the first electrochemical desalination device and the second electrochemical desalination device, and the top of the clear water tank is connected to the interior of the first electrochemical desalination device and the MVR evaporator respectively through a water pipe, and the second electrochemical desalination device is connected to the interior of the intermediate water tank through a water pipe.
[0010] Furthermore, one side of the raw water pool is connected to a plate and frame filter press through a water pipe, and a sludge pump and a filter press oil pressure device are respectively provided on the left and right sides of the plate and frame filter press. Furthermore, one side of the filter press oil pressure device is connected to the interior of the plate and frame filter press through an air pipe, and the other side of the plate and frame filter press is connected to the interior of the sludge pump through a connected mud pipe, and one side of the sludge pump is connected to the interior of the sludge collection tank through a connected mud pipe.
[0011] Furthermore, one side of the sludge pump is connected to an aeration device through a connected air pipe, and one side of the aeration device is connected to the interior of the MVR evaporator through the connected air pipe.
[0012] Furthermore, the bottom of the sludge collection tank is connected to a sludge discharge valve.
[0013] Furthermore, in the process of coalbed methane production and drainage treatment, the following steps are included: S1, firstly, the sludge precipitated at the bottom of the sludge collection tank is discharged, and the clear liquid produced by filtering the liquid in the upper layer of the sludge collection tank by the plate and frame filter press is then transported to the raw water tank, and the supernatant is transported to the high-frequency electro-physical device by the extraction of the raw water tank lifting pump, and through the built-in aluminum electrode plate, under the action of the DC low-voltage electric field, the anode generates electrons to form micro-flocculation bodies, and flocculation reactions are generated with suspended particles, colloidal pollutants, etc. in the water in the flocculation reaction tank, so as to achieve the effect of degrading harmful substances such as COD, ammonia nitrogen, fluoride, and heavy metal ions;
[0014] S2, the effluent from the high-frequency electro-physical chemical device enters the flocculation reaction tank, and after the dosing system is added to the flocculation reaction tank, it enters the inclined tube sedimentation tank. After the flocs are isolated and settled, the supernatant enters the MBR membrane reactor. The MBR membrane reactor and the flocculation reaction tank are equipped with an aeration system and a self-cleaning device, and the sludge generated on the MBR membrane reactor enters the sludge collection tank;
[0015] S3, and the effluent of the MBR membrane reactor flows to the intermediate water tank, and after the manganese sand + coconut shell activated carbon adsorbs heavy metal ions such as iron and manganese, it enters the first electrochemical desalination device through the precision filter and the sand carbon filter, and the filtered clean water flows into the clean water tank for collection and testing, and is discharged or recycled when it reaches qualified water;
[0016] S4. Fresh water with a salt content of less than 1000 mg / L after desalination can be discharged or reused in a qualified manner. The high-salinity concentrated water enters the ion homogeneous membrane concentration unit, and finally produces ultra-high-salinity concentrated water with a salt content greater than 150,000 mg / L with a proportion of about 0.5%, which enters the second electrochemical desalination device. The ultra-high-salinity concentrated liquid is collected and enters the MVR evaporator for subsequent treatment. The crystallized salt body after the concentrated liquid is evaporated, and the fresh water treated by the second electrochemical desalination device enters the MBR membrane reactor for treatment;
[0017] S5. The inclined tube sedimentation tank and MBR membrane reactor in the equipment are equipped with sludge return pumps, which are connected to the sludge collection tank by pipelines. After filtration by the plate and frame filter press, the filtered water is returned to the raw water tank, and the bulk sludge is treated separately.
[0018] Compared with the prior art, the beneficial effects of the present invention are: the equipment can filter and purify the water generated in the coal seam through an integrated design, which not only improves the treatment effect, but also can process the generated products. It is simple to operate and easy to use, thereby improving the practicability of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the structure of the present invention; Figure 2 It is a flowchart of the steps of using the present invention.
[0020] In the figure: 1-raw water tank, 2-raw water tank lifting pump, 3-high frequency electro-physical chemical device, 4-flocculation reaction tank, 5-lifting pump, 6-inclined tube sedimentation tank, 7-sludge collection tank, 8-first sludge pump, 9-MBR membrane reactor, 10-second sludge pump, 11-intermediate water tank, 12-high pressure lifting pump, 13-sand carbon filter, 14-precision filter, 15-first electrochemical desalination device, 16-second electrochemical desalination device, 17-MVR evaporator, 18-crystallized salt collection barrel, 19-clear water tank, 20-plate and frame filter press, 21-sludge pump, 22-filter press oil pressure device, 23-sludge discharge valve, 24-aeration device. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0022] See also Figure 1-2The present invention provides a technical solution: an integrated coalbed methane production and drainage treatment device, comprising a raw water pool 1, one side of the raw water pool 1 is connected to a raw water pool lift pump 2 through a water pipe, one side of the raw water pool lift pump 2 is connected to a high-frequency electro-physical device 3 through a water pipe, one side of the high-frequency electro-physical device 3 is provided with a flocculation reaction pool 4, one side of the flocculation reaction pool 4 is provided with a lift pump 5, one side of the lift pump 5 is connected to the flocculation reaction pool 4 through a water pipe, and the other side of the lift pump 5 is connected to an inclined tube sedimentation pool 6 through a water pipe, one side of the inclined tube sedimentation pool 6 is fixedly connected to a sludge collection pool 7, a first sludge pump 8 is provided inside the inclined tube sedimentation pool 6, and the first One side of the sludge pump 8 is connected to the interior of the sludge collection tank 7 through a sludge pipe, one side of the sludge collection tank 7 is provided with an MBR membrane reactor 9, the interior of the MBR membrane reactor 9 is provided with a second sludge pump 10, one side of the second sludge pump 10 is connected to the sludge collection tank 7 through a water pipe, one side of the MBR membrane reactor 9 is provided with an intermediate water tank 11, the interior of the intermediate water tank 11 is connected to the interior of the MBR membrane reactor 9 through a water pipe, one side of the intermediate water tank 11 is provided with a high-pressure lifting pump 12, one side of the high-pressure lifting pump 12 is connected to the interior of the intermediate water tank 11 through a water pipe; the raw water tank lifting pump 2 is connected to an external power supply and a control switch;
[0023] The lift pump 5 is connected to an external power source and a control switch;
[0024] The high-pressure lift pump 12 is connected to an external power source and a control switch;
[0025] The MBR membrane reactor 9 is a new type of wastewater treatment system that organically combines membrane separation technology with biological treatment technology. It replaces the terminal raw water tank 1 of the traditional biological treatment technology with membrane components, maintains a high concentration of activated sludge in the bioreactor, increases the organic load of biological treatment, thereby reducing the footprint of sewage treatment facilities, and reduces the amount of residual sludge by maintaining a low sludge load. It mainly uses the activated sludge and macromolecular organic matter in the interception tank of the membrane separation equipment immersed in the aerobic biological pool. The concentration of activated sludge (MLSS) in the membrane bioreactor system can be increased to 8000-10,000mg / L, or even higher; the sludge age (SRT) can be extended to more than 30 days;
[0026] The first sludge pump 8 and the second sludge pump 10 are connected to an external power source and a control switch.
[0027] A sand carbon filter 13 is arranged on one side of the high-pressure lifting pump 12, a precision filter 14 is arranged on one side of the sand carbon filter 13, a first electrochemical desalination device 15 and a second electrochemical desalination device 16 are arranged on one side of the precision filter 14, an MVR evaporator 17 is arranged on one side of the second electrochemical desalination device 16, and a crystal salt collection bucket 18 is arranged on one side of the MVR evaporator 17; the first electrochemical desalination device 15 and the second electrochemical desalination device 16 refer to the combination of electrodialysis and ion exchange technology, filling ion exchange agents in the fresh water chamber of the electrodialyzer, and realizing the process of electrodialysis, ion exchange desalination and ion exchange continuous electrical regeneration under the action of a direct current electric field; the MVR evaporator is a new type of high-efficiency and energy-saving evaporation equipment mainly used in the pharmaceutical industry. The equipment adopts low-temperature and low-pressure steaming technology and clean energy as energy to generate steam and separate water from the medium. It is an internationally advanced evaporation technology and an upgraded product to replace traditional evaporators; the MVR evaporator adopts existing technology and adopts low-temperature and low-pressure steaming technology and clean energy as energy to generate steam.
[0028] The left and right sides of the sand carbon filter 13 are respectively connected to the interior of the high-pressure lifting pump 12 and the precision filter 14 through water pipes, one side of the precision filter 14 is connected to the first electrochemical desalination device 15 through a water pipe, one side of the first electrochemical desalination device 15 is connected to the second electrochemical desalination device 16 through a water pipe, one side of the second electrochemical desalination device 16 is connected to the interior of the MVR evaporator 17 through a water pipe, and one side of the MVR evaporator 17 is connected to the interior of the crystallized salt collection tank 18 through a water pipe.
[0029] A clear water tank 19 is provided at the bottom of the first electrochemical desalination device 15 and the second electrochemical desalination device 16. The top of the clear water tank 19 is connected to the interior of the first electrochemical desalination device 15 and the MVR evaporator 17 respectively through a water pipe, and the second electrochemical desalination device 16 is connected to the interior of the intermediate water tank 11 through a water pipe.
[0030] One side of the raw water pool 1 is connected to a plate-frame filter press 20 through a water pipe, and the left and right sides of the plate-frame filter press 20 are respectively provided with a sludge pump 21 and a filter press oil pressure device 22; the plate-frame filter press 20 is the first machine used in chemical dehydration. Although the plate-frame filter press 20 is generally operated intermittently, the infrastructure equipment investment is large, and the filtering capacity is also low, it is still widely used in some small sewage treatment plants because of its advantages such as large filtering driving force, high solid content of filter cake, clear filtrate, high solid recovery rate, and low consumption of conditioning drugs;
[0031] The plate-frame filter press 20 adopts the existing technology, and the plate-frame filter press 20 is connected to an external power source and a control switch;
[0032] The sludge pump 21 is connected to an external power source and a control switch;
[0033] The filter press oil pressure device 22 adopts the existing technology and realizes oil pressure filtration of liquid.
[0034] One side of the filter press oil pressure device 22 is connected to the interior of the plate and frame filter press 20 through an air pipe, and the other side of the plate and frame filter press 20 is connected to the interior of the sludge pump 21 through a connected mud pipe, and one side of the sludge pump 21 is connected to the interior of the sludge collection tank 7 through a connected mud pipe.
[0035] One side of the sludge pump 21 is connected to an aeration device 24 through a connected air pipe, and one side of the aeration device 24 is connected to the interior of the MVR evaporator 17 through a connected air pipe; the aeration device 24 adopts the existing technology, and the aeration device 24 refers to a device that supplies oxygen to the aeration tank during the wastewater activated sludge water treatment process.
[0036] The bottom of the sludge collection tank 7 is connected to a sludge discharge valve 23 .
[0037] In the process of coalbed methane production and drainage treatment, the following steps are included:
[0038] S1. First, the sludge precipitated at the bottom of the sludge collection tank is discharged, and the clear liquid produced by filtering the liquid in the upper layer of the sludge collection tank 7 by the plate and frame filter press 20 is transported to the raw water tank 1. The supernatant is transported to the high-frequency electrochemical device 3 by the extraction of the raw water tank lifting pump 2. Through the built-in aluminum electrode plate, under the action of the DC low-voltage electric field, the anode generates electrons to form micro-flocculation, which produces flocculation reaction with suspended particles, colloidal pollutants, etc. in the water in the flocculation reaction tank, so as to achieve the effect of degrading harmful substances such as COD, ammonia nitrogen, fluoride, and heavy metal ions;
[0039] S2, the effluent from the high-frequency electro-physical chemical device 3 enters the flocculation reaction tank 4, a small amount of coagulant is added to the flocculation reaction tank 4 through a dosing system, and the floccules quickly coagulate and enter the inclined tube sedimentation tank 6. After the floccules are isolated and settled, the supernatant enters the MBR membrane reactor 9. The MBR membrane reactor 9 and the flocculation reaction tank are provided with an aeration system and a self-cleaning device, and the sludge generated on the MBR membrane reactor 9 enters the sludge collection tank 7;
[0040] S3, and the effluent of the MBR membrane reactor 9 flows to the intermediate water tank 11, and after the heavy metal ions such as iron and manganese are adsorbed by manganese sand + coconut shell activated carbon, it enters the first electrochemical desalination device 15 through the precision filter 14 and the sand carbon filter 13, and the filtered clean water flows into the clean water tank 19 for collection and detection, and is discharged or recycled when it reaches qualified water;
[0041] S4, fresh water with a salt content of less than 1000 mg / L after desalination can be discharged or reused in a qualified manner, and the high-salinity concentrated water enters the ion homogeneous membrane concentration unit, and finally produces ultra-high-salinity concentrated water with a salt content greater than 150,000 mg / L with a proportion of about 0.5%, and enters the second electrochemical desalination device 16. The ultra-high-salinity concentrated liquid is collected and enters the MVR evaporator 17 for subsequent treatment. The crystallized salt body after the concentrated liquid is evaporated, and the fresh water treated by the second electrochemical desalination device 16 enters the MBR membrane reactor 9 for treatment;
[0042] S5. The inclined tube sedimentation tank 6 and the MBR membrane reactor 9 in the equipment are equipped with a sludge return pump, which is connected to the sludge collection tank 7 by a pipeline. After being filtered by the plate and frame filter press 20, the filtered water is returned to the raw water tank 1, and the block sludge is treated separately.
[0043] Working principle, the first step: the liquid in the raw water pool is extracted through the raw water pool lifting pump 2, and then transported to the high-frequency electro-physical device 3. Through the built-in aluminum electrode plate, under the action of the DC low-voltage electric field, the anode generates electrons to form micro-flocs, and the suspended particles and colloidal pollutants in the water produce flocculation reactions, and the COD, ammonia nitrogen, fluoride, heavy metal ions and other harmful substances are degraded and processed in the flocculation reaction tank. After that, the liquid is extracted by the lifting pump 5 into the inclined tube sedimentation tank 6 for precipitation, and under the extraction of the first sludge pump 8, the sludge is transported to the sludge collection tank 7 for centralized collection, and the supernatant of the inclined tube sedimentation tank 6 and the sludge in the sludge collection tank 7 are transported to the MBR membrane reactor 9 for filtration, and then transported to the intermediate water tank 11 through a water pipe, and through the high-pressure lifting pump 12 is extracted, the liquid in the intermediate water tank 11 enters the sand carbon filter 13 for filtration, the filtered liquid is processed by the first electrochemical desalination device 15 and the second electrochemical desalination device 16, enters the MVR evaporator 17 for evaporation, and then enters the crystallized salt collection tank 18 for collection; the second step: and the liquid in the upper layer of the intermediate water tank 11 is transported to the second electrochemical desalination device 16 for treatment, and then evaporated by the MVR evaporator 17, and then enters the crystallized salt collection tank 18 for collection, wherein the clean water obtained after the treatment of the first electrochemical desalination device 15 enters the clean water tank 19 for centralized collection through the connection of the water pipe, and the clean water obtained after evaporation in the MVR evaporator 17 also enters the clean water tank 19 for centralized collection;
[0044] Step 3: The sludge generated in the sludge collection tank 7 and the sludge filtered out by the MBR membrane reactor 9 are filtered together in the plate and frame filter press 20, and then enter the filter press oil pressure device 22 for treatment, wherein the liquid generated by the MBR membrane reactor 9 is aerated by the aeration device 24, and finally the liquid in the plate and frame filter press 20 is conveyed to the raw water tank 19.
[0045] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0046] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. An integrated coalbed methane production and drainage treatment device, comprising a raw water pool (1), characterized in that: One side of the raw water pool (1) is connected to a raw water pool lift pump (2) via a water pipe, one side of the raw water pool lift pump (2) is connected to a high-frequency electro-physical device (3) via a water pipe, one side of the high-frequency electro-physical device (3) is provided with a flocculation reaction pool (4), one side of the flocculation reaction pool (4) is provided with a lift pump (5), one side of the lift pump (5) is connected to the flocculation reaction pool (4) via a water pipe, and the other side of the lift pump (5) is connected to an inclined tube sedimentation pool (6) via a water pipe, one side of the inclined tube sedimentation pool (6) is fixedly connected to a sludge collection pool (7), a first sludge pump (8) is provided inside the inclined tube sedimentation pool (6), and the first sludge pump (8) One side of the sludge collecting tank (7) is connected to the interior of the sludge collecting tank (7) through a sludge pipe, an MBR membrane reactor (9) is provided on one side of the sludge collecting tank (7), a second sludge pump (10) is provided inside the MBR membrane reactor (9), one side of the second sludge pump (10) is connected to the sludge collecting tank (7) through a water pipe, an intermediate water tank (11) is provided on one side of the MBR membrane reactor (9), the interior of the intermediate water tank (11) is connected to the interior of the MBR membrane reactor (9) through a water pipe, a high-pressure lifting pump (12) is provided on one side of the intermediate water tank (11), one side of the high-pressure lifting pump (12) is connected to the interior of the intermediate water tank (11) through a water pipe; A sand carbon filter (13) is provided on one side of the high-pressure lift pump (12), a precision filter (14) is provided on one side of the sand carbon filter (13), a first electrochemical desalination device (15) and a second electrochemical desalination device (16) are provided on one side of the precision filter (14), an MVR evaporator (17) is provided on one side of the second electrochemical desalination device (16), and a crystallized salt collection tank (18) is provided on one side of the MVR evaporator (17); A clear water tank (19) is provided at the bottom of the first electrochemical desalination device (15) and the second electrochemical desalination device (16); the top of the clear water tank (19) is connected to the interior of the first electrochemical desalination device (15) and the MVR evaporator (17) respectively through a water pipe, and the second electrochemical desalination device (16) is connected to the interior of the intermediate water tank (11) through a water pipe; One side of the raw water pool (1) is connected to a plate-and-frame filter press (20) via a water pipe, and a sludge pump (21) and a filter press oil pressure device (22) are respectively provided on the left and right sides of the plate-and-frame filter press (20).
2. The integrated coalbed methane production and drainage treatment equipment according to claim 1 is characterized by: The left and right sides of the sand carbon filter (13) are respectively connected to the interior of the high-pressure lift pump (12) and the precision filter (14) through water pipes; one side of the precision filter (14) is connected to the first electrochemical desalination device (15) through a water pipe; one side of the first electrochemical desalination device (15) is connected to the second electrochemical desalination device (16) through a water pipe; one side of the second electrochemical desalination device (16) is connected to the interior of the MVR evaporator (17) through a water pipe; and one side of the MVR evaporator (17) is connected to the interior of the crystallized salt collection tank (18) through a water pipe.
3. The integrated equipment for coalbed methane production and drainage treatment according to claim 1, characterized in that: One side of the filter press oil pressure device (22) is connected to the interior of the plate and frame filter press (20) via an air pipe, and the other side of the plate and frame filter press (20) is connected to the interior of a sludge pump (21) via a connected mud pipe, and one side of the sludge pump (21) is connected to the interior of a sludge collection tank (7) via a connected mud pipe.
4. The integrated equipment for coalbed methane production and drainage treatment according to claim 1, characterized in that: One side of the sludge pump (21) is connected to an aeration device (24) via a connected air pipe, and one side of the aeration device (24) is connected to the interior of the MVR evaporator (17) via the connected air pipe.
5. The integrated equipment for coalbed methane production and drainage treatment according to claim 1, characterized in that: The bottom of the sludge collection tank (7) is connected to a sludge discharge valve (23).
6. The integrated coalbed methane production and drainage treatment equipment according to claim 1 is characterized in that: In the process of coalbed methane production and drainage treatment, the following steps are included: S1. First, the sludge precipitated at the bottom of the sludge collection tank is discharged, and the clear liquid produced by filtering the liquid in the upper layer of the sludge collection tank (7) through the plate and frame filter press (20) is then transported to the raw water tank (1). The supernatant liquid is pumped by the raw water tank lifting pump (2) and transported to the high-frequency electrochemical device (3). Through the built-in aluminum electrode plate, under the action of the DC low-voltage electric field, the anode generates electrons to form micro-flocculation, which reacts with the suspended particles and colloidal pollutants in the water in the flocculation reaction tank to achieve the effect of degrading COD, ammonia nitrogen, fluoride, and heavy metal ion harmful substances; S2, the effluent from the high-frequency electro-physical chemical device (3) enters the flocculation reaction tank (4), after the dosing system is added to the flocculation reaction tank (4), it enters the inclined tube sedimentation tank (6), after the flocs are isolated and settled, the supernatant enters the MBR membrane reactor (9), the MBR membrane reactor (9) and the flocculation reaction tank are provided with an aeration system and a self-cleaning device, and the sludge generated on the MBR membrane reactor (9) enters the sludge collection tank (7); S3, and the effluent of the MBR membrane reactor (9) flows to the intermediate water tank (11), and after the iron and manganese heavy metal ions are adsorbed by manganese sand + coconut shell activated carbon, it enters the first electrochemical desalination device (15) through the precision filter (14) and the sand carbon filter (13), and the filtered clean water flows into the clean water tank (19) for collection and testing, and is discharged or recycled when it reaches qualified water; S4. Fresh water with a salt content of less than 1000 mg / L after desalination can be discharged or reused in a qualified manner. The high-salinity concentrated water enters the ion homogeneous membrane concentration unit, and finally produces ultra-high-salinity concentrated water with a salt content of more than 150,000 mg / L and a proportion of about 0.5%. The ultra-high-salinity concentrated water enters the second electrochemical desalination device (16). The ultra-high-salinity concentrated liquid is collected and enters the MVR evaporator (17) for subsequent treatment. The crystallized salt body after the concentrated liquid is evaporated, and the fresh water treated by the second electrochemical desalination device (16) enters the MBR membrane reactor (9) for treatment; S5. The inclined tube sedimentation tank (6) and the MBR membrane reactor (9) in the equipment are provided with a sludge return pump, which is connected to the sludge collection tank (7) by a pipeline. After being filtered by the plate and frame filter press (20), the filtered water is returned to the raw water tank (1), and the bulk sludge is treated separately.