Power estimation method, device, electric vehicle, electronic device and storage medium

The gray prediction method is used to predict the power demand of electric vehicles and start the engine in advance, which solves the problem of being unable to accurately predict future power demand in the existing technology and improves the power performance and user experience of electric vehicles.

CN112231879BActive Publication Date: 2024-10-11BYD CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN201910563472.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-06-26
Publication Date
2024-10-11
Estimated Expiration
2039-06-26

AI Technical Summary

Technical Problem

Existing technology cannot accurately predict the future power demand of electric vehicles or hybrid vehicles, leading to problems such as battery over-discharge or power lag.

Method used

Using the gray prediction method, a voltage gray prediction sequence and a current gray prediction sequence are established based on the output voltage and current values ​​​​of the battery pack to predict the output voltage and current values ​​​​at the next moment, thereby predicting the power demand of the vehicle, and when the demand power exceeds the maximum Allows early starting of the engine into hybrid mode when discharging power.

Benefits of technology

It achieves accurate estimation of the future power demand of the vehicle, avoids battery over-discharge and power lag, and improves the power performance and user experience of electric vehicles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112231879B_ABST
    Figure CN112231879B_ABST
Patent Text Reader

Abstract

The present disclosure relates to a power estimation method, device, electric vehicle, electronic device and storage medium, which can accurately estimate the future power demand of the whole vehicle. A power estimation method includes: when the whole vehicle is in pure electric mode, receiving the output current value and output voltage value of the battery pack in real time; establishing a voltage gray prediction sequence and a current gray prediction sequence based on the latest n output voltage values ​​and the latest m output current values; using the voltage gray prediction sequence and the current gray prediction sequence to respectively predict the output voltage value and output current value of the battery pack at the next moment; using the predicted output voltage value and output current value of the battery pack at the next moment, predicting the power demand of the whole vehicle at the next moment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of vehicles, and in particular, to a power estimation method, device, electric vehicle, electronic device and storage medium. Background Art

[0002] In order to meet the power requirements of electric vehicles (EV) or hybrid electric vehicles (HEV) in starting, acceleration, climbing, braking feedback, fast charging, etc. without over-discharging the battery, and to achieve the optimal allocation of engine power and motor power in HEV, battery power state (SOP) estimation and SOP estimation accuracy are crucial. However, there is currently no effective method to accurately estimate the future power requirements of the entire vehicle. Summary of the invention

[0003] The purpose of the present disclosure is to provide a power estimation method, device, electric vehicle, electronic device and storage medium, which can accurately estimate the future power demand of the entire vehicle.

[0004] According to a first embodiment of the present disclosure, a power estimation method is provided, the method comprising: when the whole vehicle is in a pure electric mode, receiving the output current value and the output voltage value of the battery pack in real time; establishing a voltage gray prediction sequence and a current gray prediction sequence based on the latest n output voltage values ​​and the latest m output current values, respectively; using the voltage gray prediction sequence and the current gray prediction sequence to respectively predict the output voltage value and the output current value of the battery pack at the next moment; using the predicted output voltage value and output current value of the battery pack at the next moment, predicting the required power of the whole vehicle at the next moment.

[0005] Optionally, establishing the voltage gray prediction sequence and the current gray prediction sequence respectively based on the latest n output voltage values ​​and the latest m output current values ​​includes: using a sliding window method to select the latest n output voltage values ​​and the latest m output current values; and establishing the voltage gray prediction sequence and the current gray prediction sequence respectively based on the selected latest n output voltage values ​​and the latest m output current values.

[0006] Optionally, the using of the voltage gray prediction sequence and the current gray prediction sequence to respectively predict the output voltage value and the output current value of the battery pack at the next moment includes: using the voltage gray prediction sequence and the current gray prediction sequence to respectively establish a voltage gray prediction model and a current gray prediction model; using the established voltage gray prediction model and current gray prediction model to respectively predict the output voltage value and the output current value of the battery pack at the next moment.

[0007] Optionally, the method further includes: when the predicted power demand of the entire vehicle at the next moment is greater than the current maximum allowable discharge power of the battery pack, sending an engine start request to put the entire vehicle into a hybrid power mode.

[0008] Optionally, the method further includes: sending an engine start request to put the vehicle into hybrid power mode when the predicted power demand of the vehicle at the next moment is greater than a preset percentage of the current maximum allowable discharge power of the battery pack.

[0009] According to a second embodiment of the present disclosure, a power estimation device is provided, which includes: a receiving module, which is used to receive the output current value and the output voltage value of the battery pack in real time when the whole vehicle is in a pure electric mode; a gray prediction sequence establishment module, which is used to establish a voltage gray prediction sequence and a current gray prediction sequence respectively based on the latest n output voltage values ​​and the latest m output current values; a gray prediction module, which is used to use the voltage gray prediction sequence and the current gray prediction sequence to respectively predict the output voltage value and the output current value of the battery pack at the next moment; a required power prediction module, which is used to use the predicted output voltage value and output current value of the battery pack at the next moment to predict the required power of the whole vehicle at the next moment.

[0010] Optionally, the gray prediction sequence establishing module includes: a selection submodule, used to select the latest n output voltage values ​​and the latest m output current values ​​using a sliding window method; and a gray prediction sequence establishing submodule, used to establish the voltage gray prediction sequence and the current gray prediction sequence respectively based on the selected latest n output voltage values ​​and the latest m output current values.

[0011] Optionally, the gray prediction module includes: a gray prediction model establishment submodule, used to use the voltage gray prediction sequence and the current gray prediction sequence to establish a voltage gray prediction model and a current gray prediction model respectively; a gray prediction submodule, used to use the established voltage gray prediction model and current gray prediction model to respectively predict the output voltage value and output current value of the battery pack at the next moment.

[0012] Optionally, the device further includes: a sending module, configured to send an engine start request to enable the vehicle to enter a hybrid power mode when the predicted power demand of the vehicle at the next moment is greater than the current maximum allowable discharge power of the battery pack.

[0013] Optionally, the device also includes: a sending module, which is used to send an engine start request to put the vehicle into hybrid power mode when the predicted power demand of the vehicle at the next moment is greater than a preset percentage of the current maximum allowable discharge power of the battery pack.

[0014] According to a third embodiment of the present disclosure, a vehicle is provided. The vehicle includes the power estimating device according to the second embodiment of the present disclosure.

[0015] According to a fourth embodiment of the present disclosure, an electronic device is provided, comprising: a memory for storing executable program code; and a processor for running a program corresponding to the executable program code by reading the executable program code stored in the memory, so as to implement the power estimation method according to the first embodiment of the present disclosure.

[0016] According to a fifth embodiment of the present disclosure, a computer-readable storage medium is provided, on which a computer program is stored. When the program is executed by a processor, the power estimation method according to the first embodiment of the present disclosure is implemented.

[0017] By adopting the above technical solution, the output voltage value and output current value of the battery pack at the next moment are predicted using the gray prediction sequence, and then the predicted output voltage value and output current value of the battery pack at the next moment are used to predict the required power of the whole vehicle at the next moment, thereby achieving an accurate prediction of the future required power of the whole vehicle.

[0018] Other features and advantages of the present disclosure will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The accompanying drawings are used to provide a further understanding of the present disclosure and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present disclosure but do not constitute a limitation of the present disclosure. In the accompanying drawings:

[0020] Figure 1 A flow chart of a power estimation method according to an embodiment of the present disclosure is shown.

[0021] Figure 2 A schematic diagram of the sliding window method is shown.

[0022] Figure 3 Another flow chart of a power estimation method according to an embodiment of the present disclosure is shown.

[0023] Figure 4 A schematic block diagram of a power estimation device according to an embodiment of the present disclosure is shown.

[0024] Figure 5 Another schematic block diagram of a power estimation device according to an embodiment of the present disclosure is shown.

[0025] Figure 6 It is a block diagram of an electronic device according to an exemplary embodiment. DETAILED DESCRIPTION

[0026] The specific implementation of the present disclosure is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described herein is only used to illustrate and explain the present disclosure, and is not used to limit the present disclosure.

[0027] Figure 1 FIG. 1 is a flow chart showing a power estimation method according to an embodiment of the present disclosure, which can be implemented by a battery management system (BMS) of a vehicle. Figure 1 As shown, the method includes the following steps S11 to S14.

[0028] In step S11 , when the vehicle is in pure electric mode, the output current value and output voltage value of the battery pack are received in real time.

[0029] Among them, when the vehicle is in EV mode, the acquisition module on the vehicle will collect the output current value I(m) and output voltage value U(m) of the battery pack in real time. The acquisition module can be separated from the vehicle's battery management system or integrated into the battery management system. When the acquisition module is separated from the battery management system, the battery management system can obtain the real-time output current value and output voltage value collected by the acquisition module through the controller area network (CAN) bus.

[0030] In step S12, the voltage grey prediction sequence U is established based on the latest n output voltage values ​​and the latest m output current values. (0) and current grey prediction sequence I (0) .

[0031] Here, n and m can be equal or different.

[0032] Voltage grey prediction sequence U (0) It is a grey prediction sequence used to predict the output voltage value of the battery pack at the next moment. The current grey prediction sequence I (0) It is a grey prediction sequence used to predict the output current value of the battery pack at the next moment.

[0033] Select the latest m non-negative output current values ​​from the output current values ​​of the battery pack that have been received in real time up to time k, and select the latest n non-negative output voltage values ​​from the output voltage values ​​of the battery pack that have been received in real time up to time k, then the established voltage grey prediction sequence and current grey prediction series They are:

[0034]

[0035]

[0036] Among them, I (0) (i)≥0, U (0) (j)≥0, i=1,2,…,m-1,m, j=1,2,…,n-1,n.

[0037] In addition, those skilled in the art should understand that the voltage gray prediction sequence and current grey prediction sequence I (0) The number of non-negative output current values ​​and output voltage values ​​included can be determined according to actual conditions, and this application does not impose any limitation on this.

[0038] In step S13, the voltage grey prediction sequence and the current grey prediction sequence are used to respectively predict the output voltage value and the output current value of the battery pack at the next moment.

[0039] In step S14, the required power of the whole vehicle at the next moment is predicted using the predicted output voltage value and output current value of the battery pack at the next moment.

[0040] Assume that the output voltage value and output current value estimated at the next moment in step S13 are I k+1 and U k+1 , then by calculating the estimated output voltage value U at the next moment k+1 And the output current value I k+1 By multiplying them, we can estimate the required power of the vehicle at the next moment as P k+1 =I k+1 ·U k+1 .

[0041] It should be noted that the product of the output current value of the battery pack received in real time in step S11 and the corresponding output voltage value is the power actually output by the battery pack to meet the power demand of the whole vehicle. Therefore, the output voltage value U of the battery pack at the next moment estimated based on the latest n output voltage values ​​and the latest m output current values ​​is k+1 And the output current value I k+1The product of is actually the power that the battery pack should output at the next moment to meet the power demand of the whole vehicle. Therefore, estimating the power that the battery pack should output at the next moment to meet the power demand of the whole vehicle is equivalent to estimating the power demand of the whole vehicle at the next moment.

[0042] By adopting the above technical scheme, the output voltage value and output current value of the battery pack at the next moment are predicted by using the grey prediction sequence, and then the power required to be output by the battery pack at the next moment is predicted by using the predicted output voltage value and output current value of the battery pack at the next moment as the output power of the whole vehicle at the next moment, that is, the required power of the whole vehicle at the next moment. Therefore, an accurate prediction of the future required power of the whole vehicle is achieved. The power prediction result is not affected by the coupling of factors such as working conditions, temperature, state of charge and attenuation, which can ensure the accuracy of power estimation, reduce the amount of calculation, speed up the calculation speed of power estimation, and has strong practicality.

[0043] The present disclosure is based on a gray prediction model and uses a gray prediction sequence to establish a gray prediction model to predict the output voltage value and output current value of a battery pack at the next moment. That is, using the voltage gray prediction sequence and the current gray prediction sequence, a voltage gray prediction model and a current gray prediction model are established respectively; then, using the established voltage gray prediction model and current gray prediction model, the output voltage value and output current value of the battery pack at the next moment are predicted respectively.

[0044] The following uses the GM(1,1) prediction model as an example to explain how to predict the output voltage and output current of the battery pack at the next moment. The GM(1,1) prediction model represents a first-order, one-variable differential equation model. In addition, since the principles and methods of the GM(1,1) prediction model for predicting the output current value at the next moment are similar to those of the GM(1,1) prediction model for predicting the output voltage value at the next moment, the GM(1,1) prediction model for predicting the output current value at the next moment is used as an example for explanation.

[0045] First, the current grey prediction sequence at time k obtained in step S12 is Perform a first-order accumulation transformation (Accumulating Generation Operator, 1-AGO) to obtain the sequence for:

[0046]

[0047] in,

[0048] Pair Sequence Generate sequence Z by taking the nearest mean (1) :

[0049] Z (1) =(z (1) (2),z (1) (3),…,z (1) (m)) (4)

[0050] in,

[0051] Assumptions is a parameter, and the data matrix B and data vector Y are:

[0052]

[0053] Then the following GM(1,1) prediction model is solved by the least squares method:

[0054]

[0055] The following parameters are obtained:

[0056]

[0057] If the GM(1,1) prediction model The whitening equation is:

[0058]

[0059] Then, the GM(1,1) prediction model The time response sequence of is:

[0060]

[0061] Restore the time response sequence and obtain the GM(1,1) grey prediction model expression of the output current value at the next moment:

[0062]

[0063] Among them, -a is the development coefficient and b is the grey action.

[0064] According to the GM(1,1) current grey prediction model of formula (11), the output current value I at time k+1 can be estimated k+1 .

[0065] Similarly, for the voltage grey prediction sequence By executing the above process, the output voltage value U at time k+1 can be estimated. k+1 .

[0066] In addition, the GM(1,1) prediction model used to predict the output current value and output voltage value of the battery pack at the next moment can be used for gray modeling with at least 4 data points (that is, the current gray prediction sequence only needs to include the 4 latest output current values, and the voltage gray prediction sequence only needs to include the 4 latest output voltage values). The modeling is simple and the storage space is small.

[0067] In one embodiment, the step S12 of establishing the voltage gray prediction sequence and the current gray prediction sequence based on the latest n output voltage values ​​and the latest m output current values ​​includes: using a sliding window method to select the latest n output voltage values ​​and the latest m output current values; and establishing the voltage gray prediction sequence and the current gray prediction sequence based on the selected latest n output voltage values ​​and the latest m output current values. Using the sliding window method to select the latest output voltage value and output current value has high tracking capability, can update the current and voltage values ​​in real time, has high accuracy, is convenient for calculation, and is highly practical.

[0068] Since the principle and method of using the sliding window method to establish the current gray prediction sequence and the voltage gray prediction sequence are the same, here we take the establishment of the current gray prediction sequence as an example and combine it with Figure 2 The sliding window method is explained with reference to the schematic diagram of the sliding window method shown in FIG.

[0069] like Figure 2 As shown, assuming that the current grey prediction sequence with a window size of m established at time k is The window size m here can be set according to the actual situation and is not limited. When the real-time output current value I (0) After (m+1) is collected, the current grey prediction sequence is updated by the sliding window method, that is, the latest output current value I is added to the current grey prediction sequence. (0) (m+1), and remove the oldest output current value I in the current grey prediction sequence (0) (1), the updated current grey prediction sequence can be obtained In this way, as the collected output current value is updated, the current grey prediction sequence can be updated in real time through the sliding window method, so that the power estimation method according to the embodiment of the present disclosure has a fast operation speed and a strong tracking capability, and realizes the function of adaptive prediction.

[0070] The inventor of the present application also found that when an existing plug-in hybrid electric vehicle is running in EV mode, if the current maximum allowable discharge power of the battery pack is insufficient, there is a hysteresis in the power output of the whole vehicle from the start of the engine to the time when the vehicle control unit (VCU) redistributes the output power to the engine and the motor, resulting in problems such as vehicle power jamming and poor user experience. For example, on a highway, the whole vehicle is running in EV mode. When the driver wants to overtake, the current maximum allowable discharge power of the battery pack is insufficient to request to start the engine during the overtaking process. Since it takes time to start the engine and the VCU to redistribute the output power to the motor and the engine according to the intervention of the engine, the vehicle temporarily experiences acceleration hysteresis, which makes the acceleration characteristics of the whole vehicle poor and may cause serious accidental injuries.

[0071] In order to solve the above problems, Figure 3 FIG. 2 shows another flow chart of a power estimation method according to an embodiment of the present disclosure. Figure 3 As shown, in Figure 1 On the basis of, the method may also include step S15: when the predicted power demand of the whole vehicle at the next moment is greater than the current maximum allowable discharge power of the battery pack, sending an engine start request to make the whole vehicle enter the hybrid mode. In the present disclosure, the current maximum allowable discharge power of the battery pack is the product of the maximum discharge current allowed by the battery pack calibrated at different states of charge (SOC) and temperatures and the battery pack voltage, which can be pre-stored in the vehicle and obtained by table lookup when needed. Of course, the current maximum allowable discharge power of the battery pack can also be calculated in real time using the current SOC and temperature of the battery pack when needed. The predicted power demand of the whole vehicle at the next moment is greater than the current maximum allowable discharge power of the battery pack, indicating that the power that the battery pack needs to output at the next moment has exceeded its maximum allowable discharge power. Therefore, in this case, the battery management system will send an engine start request to the VCU, so that the engine can be started in advance before the battery pack can provide output power to meet the future power demand of the whole vehicle, so that the engine can intervene in advance and speed up the power distribution of the motor and engine by the VCU, effectively solving the problem of vehicle power jamming caused by starting the engine when the maximum allowable discharge power of the battery pack is insufficient in EV mode, thereby improving the power performance of plug-in hybrid vehicles.

[0072] Furthermore, if the predicted power demand of the vehicle at the next moment is less than the current maximum allowable discharge power of the battery pack, the engine start request will not be sent, and the vehicle will continue to travel in EV mode.

[0073] Of course, the power estimation method according to the embodiment of the present disclosure can also send an engine start request to put the whole vehicle into hybrid mode when the predicted power demand of the whole vehicle at the next moment is greater than the preset percentage (for example, more than 85%) of the current maximum allowable discharge power of the battery pack. The predicted power demand of the whole vehicle at the next moment is greater than the preset percentage of the current maximum allowable discharge power of the battery pack, indicating that at the next moment, the battery pack can still output an output power that meets the future power demand of the whole vehicle, but the power that the battery pack can output at the next moment is already at the edge of the maximum allowable discharge power of the battery pack, so starting the engine in advance in this case can better improve the aforementioned phenomenon of vehicle power jamming.

[0074] Furthermore, if the predicted power demand of the vehicle at the next moment is less than a preset percentage (eg, greater than 85%) of the current maximum allowable discharge power of the battery pack, no engine start request is sent and the vehicle will continue to travel in EV mode.

[0075] Figure 4 FIG. 2 is a schematic block diagram of a power estimation device according to an embodiment of the present disclosure, which may be implemented by a battery management system. Figure 4 As shown, the power estimation device includes: a receiving module 41, which is used to receive the output current value and output voltage value of the battery pack in real time when the whole vehicle is in pure electric mode; a gray prediction sequence establishment module 42, which is used to establish a voltage gray prediction sequence and a current gray prediction sequence respectively based on the latest n output voltage values ​​and the latest m output current values; a gray prediction module 43, which is used to use the voltage gray prediction sequence and the current gray prediction sequence to respectively predict the output voltage value and output current value of the battery pack at the next moment; a required power prediction module 44, which is used to use the predicted output voltage value and output current value of the battery pack at the next moment to predict the required power of the whole vehicle at the next moment.

[0076] By adopting the above technical scheme, the output voltage value and output current value of the battery pack at the next moment are predicted by using the grey prediction sequence, and then the power required to be output by the battery pack at the next moment is predicted by using the predicted output voltage value and output current value of the battery pack at the next moment as the output power of the whole vehicle at the next moment, that is, the required power of the whole vehicle at the next moment. Therefore, an accurate prediction of the future required power of the whole vehicle is achieved. The power prediction result is not affected by the coupling of factors such as working conditions, temperature, state of charge and attenuation, which can ensure the accuracy of power estimation, reduce the amount of calculation, speed up the calculation speed of power estimation, and has strong practicality.

[0077] Optionally, the gray prediction sequence establishing module 42 includes: a selection submodule, used to select the latest n output voltage values ​​and the latest m output current values ​​using a sliding window method; and a gray prediction sequence establishing submodule, used to establish the voltage gray prediction sequence and the current gray prediction sequence respectively based on the selected latest n output voltage values ​​and the latest m output current values.

[0078] Optionally, the gray prediction module 43 includes: a gray prediction model establishment submodule, which is used to use the voltage gray prediction sequence and the current gray prediction sequence to establish a voltage gray prediction model and a current gray prediction model respectively; a gray prediction submodule, which is used to use the established voltage gray prediction model and current gray prediction model to predict the output voltage value and output current value of the battery pack at the next moment respectively.

[0079] Figure 5 Another schematic block diagram of a power estimation device according to an embodiment of the present disclosure is shown as follows: Figure 5 As shown, in Figure 4 On the basis of, the power estimation device also includes: a sending module 45, which is used to send an engine start request to make the whole vehicle enter the hybrid power mode when the predicted required power of the whole vehicle at the next moment is greater than the current maximum allowable discharge power of the battery pack.

[0080] Optionally, the sending module may also be used to send an engine start request to put the vehicle into hybrid mode when the predicted power demand of the vehicle at the next moment is greater than a preset percentage of the current maximum allowable discharge power of the battery pack.

[0081] The specific implementation of the operations performed by the various modules included in the power estimation device according to the embodiment of the present disclosure has been described in detail in the power estimation method according to the embodiment of the present disclosure, and will not be repeated here.

[0082] According to another embodiment of the present disclosure, an electric vehicle is provided, comprising the power estimation device according to the embodiment of the present disclosure described above. The electric vehicle is preferably a plug-in electric vehicle.

[0083] By adopting the above technical scheme, the output voltage value and output current value of the battery pack at the next moment are predicted by using the grey prediction sequence, and then the power required to be output by the battery pack at the next moment is predicted by using the predicted output voltage value and output current value of the battery pack at the next moment as the output power of the whole vehicle at the next moment, that is, the required power of the whole vehicle at the next moment. Therefore, an accurate prediction of the future required power of the whole vehicle is achieved. The power prediction result is not affected by the coupling of factors such as working conditions, temperature, state of charge and attenuation, which can ensure the accuracy of power estimation, reduce the amount of calculation, speed up the calculation speed of power estimation, and has strong practicality.

[0084] Figure 6 FIG. 7 is a block diagram of an electronic device 700 according to an exemplary embodiment. Figure 6 As shown, the electronic device 700 may include: a processor 701 and a memory 702. The electronic device 700 may also include one or more of a multimedia component 703, an input / output (I / O) interface 704, and a communication component 705.

[0085] The processor 701 is used to control the overall operation of the electronic device 700 to complete all or part of the steps in the above-mentioned power estimation method. The memory 702 is used to store various types of data to support the operation of the electronic device 700, and these data may include, for example, instructions for any application or method used to operate on the electronic device 700, and application-related data, such as contact data, sent and received messages, pictures, audio, video, etc. The memory 702 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, referred to as SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, referred to as EEPROM), erasable programmable read-only memory (Erasable Programmable Read-Only Memory, referred to as EPROM), programmable read-only memory (Programmable Read-Only Memory, referred to as PROM), read-only memory (Read-Only Memory, referred to as ROM), magnetic memory, flash memory, magnetic disk or optical disk. The multimedia component 703 may include a screen and an audio component. The screen may be, for example, a touch screen, and the audio component is used to output and / or input audio signals. For example, the audio component may include a microphone, which is used to receive external audio signals. The received audio signal may be further stored in the memory 702 or sent through the communication component 705. The audio component also includes at least one speaker for outputting audio signals. The I / O interface 704 provides an interface between the processor 701 and other interface modules, and the above-mentioned other interface modules may be keyboards, mice, buttons, etc. These buttons may be virtual buttons or physical buttons. The communication component 705 is used for wired or wireless communication between the electronic device 700 and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G or 4G, or a combination of one or more of them, so the corresponding communication component 705 may include: Wi-Fi module, Bluetooth module, NFC module.

[0086] In an exemplary embodiment, the electronic device 700 can be implemented by one or more application specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the above-mentioned power estimation method.

[0087] In another exemplary embodiment, a computer-readable storage medium including program instructions is also provided, and when the program instructions are executed by a processor, the steps of the above-mentioned power estimation method are implemented. For example, the computer-readable storage medium can be the above-mentioned memory 702 including program instructions, and the above-mentioned program instructions can be executed by the processor 701 of the electronic device 700 to complete the above-mentioned power estimation method.

[0088] The preferred embodiments of the present disclosure are described in detail above in conjunction with the accompanying drawings; however, the present disclosure is not limited to the specific details in the above embodiments. Within the technical concept of the present disclosure, a variety of simple modifications can be made to the technical solution of the present disclosure, and these simple modifications all fall within the protection scope of the present disclosure.

[0089] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present disclosure will not further describe various possible combinations.

[0090] In addition, various embodiments of the present disclosure may be arbitrarily combined, and as long as they do not violate the concept of the present disclosure, they should also be regarded as the contents disclosed by the present disclosure.

Claims

1. A power estimation method, characterized in that: The method includes: When the vehicle is in pure electric mode, the output current value and output voltage value of the battery pack are received in real time; Based on the latest n output voltage values ​​and the latest m output current values, respectively establish a voltage grey prediction sequence and a current grey prediction sequence; using the voltage grey prediction sequence and the current grey prediction sequence to respectively predict an output voltage value and an output current value of the battery pack at the next moment; and Predicting the power demand of the vehicle at the next moment by using the predicted output voltage value and output current value of the battery pack at the next moment; The step of using the voltage grey prediction sequence and the current grey prediction sequence to respectively predict the output voltage value and the output current value of the battery pack at the next moment includes: Performing first-order cumulative transformation on the current grey prediction sequence and the voltage grey prediction sequence respectively to obtain a current cumulative transformation sequence and a voltage cumulative transformation sequence; Performing adjacent mean value on the current accumulation transformation sequence and the voltage accumulation transformation sequence respectively to obtain a current adjacent mean value sequence and a voltage adjacent mean value sequence; A current grey prediction model is established based on the current grey prediction sequence and the current adjacent mean value sequence, and a voltage grey prediction model is established based on the voltage grey prediction sequence and the voltage adjacent mean value sequence; Solving the current grey prediction model and the voltage grey prediction model by using the least square method; The output current value of the battery pack at the next moment is predicted based on the solved time response sequence of the current grey prediction model, and the output voltage value of the battery pack at the next moment is predicted based on the solved time response sequence of the voltage grey prediction model.

2. The method according to claim 1, characterized in that The step of establishing a voltage grey prediction sequence and a current grey prediction sequence based on the latest n output voltage values ​​and the latest m output current values, respectively, comprises: Selecting the latest n output voltage values ​​and the latest m output current values ​​using a sliding window method; and The voltage grey prediction sequence and the current grey prediction sequence are respectively established based on the selected latest n output voltage values ​​and the latest m output current values.

3. The method according to any one of claims 1 to 2, characterized in that: The method further comprises: When the predicted power demand of the entire vehicle at the next moment is greater than the current maximum allowable discharge power of the battery pack, an engine start request is sent to enable the entire vehicle to enter a hybrid power mode.

4. The method according to any one of claims 1 to 2, characterized in that: The method further comprises: When the predicted power demand of the entire vehicle at the next moment is greater than a preset percentage of the current maximum allowable discharge power of the battery pack, an engine start request is sent to enable the entire vehicle to enter a hybrid power mode.

5. A power estimation device, characterized in that: The device includes: A receiving module, used to receive the output current value and output voltage value of the battery pack in real time when the vehicle is in pure electric mode; A grey prediction sequence establishing module, used to establish a voltage grey prediction sequence and a current grey prediction sequence respectively based on the latest n output voltage values ​​and the latest m output current values; A grey prediction module, used to respectively predict the output voltage value and the output current value of the battery pack at the next moment by using the voltage grey prediction sequence and the current grey prediction sequence; A power demand prediction module, used to predict the power demand of the whole vehicle at the next moment by using the predicted output voltage value and output current value of the battery pack at the next moment; The step of using the voltage grey prediction sequence and the current grey prediction sequence to respectively predict the output voltage value and the output current value of the battery pack at the next moment includes: Performing first-order cumulative transformation on the current grey prediction sequence and the voltage grey prediction sequence respectively to obtain a current cumulative transformation sequence and a voltage cumulative transformation sequence; Performing adjacent mean value on the current accumulation transformation sequence and the voltage accumulation transformation sequence respectively to obtain a current adjacent mean value sequence and a voltage adjacent mean value sequence; A current grey prediction model is established based on the current grey prediction sequence and the current adjacent mean value sequence, and a voltage grey prediction model is established based on the voltage grey prediction sequence and the voltage adjacent mean value sequence; Solving the current grey prediction model and the voltage grey prediction model by using the least square method; The output current value of the battery pack at the next moment is predicted based on the solved time response sequence of the current grey prediction model, and the output voltage value of the battery pack at the next moment is predicted based on the solved time response sequence of the voltage grey prediction model.

6. The device according to claim 5, characterized in that The grey prediction sequence establishment module comprises: A selection submodule, configured to select the latest n output voltage values ​​and the latest m output current values ​​by using a sliding window method; and The grey prediction sequence establishing submodule is used to establish the voltage grey prediction sequence and the current grey prediction sequence respectively based on the selected latest n output voltage values ​​and the latest m output current values.

7. The device according to any one of claims 5 to 6, characterized in that The device also includes: The sending module is used to send an engine start request to enable the whole vehicle to enter a hybrid power mode when the predicted required power of the whole vehicle at the next moment is greater than the current maximum allowable discharge power of the battery pack.

8. The device according to any one of claims 5 to 6, characterized in that The device also includes: The sending module is used to send an engine start request to enable the whole vehicle to enter a hybrid power mode when the predicted power demand of the whole vehicle at the next moment is greater than a preset percentage of the current maximum allowable discharge power of the battery pack.

9. An electric vehicle, characterized in that: The electric vehicle comprises the power estimation device according to any one of claims 5 to 8.

10. An electronic device, characterized in that: include: A memory for storing executable program codes; A processor, configured to run a program corresponding to the executable program code by reading the executable program code stored in the memory, so as to implement the power estimation method as claimed in any one of claims 1 to 4.

11. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the power estimation method according to any one of claims 1 to 4 is implemented.

Citation Information

Patent Citations

  • Method for estimating surplus mileage of pure electric vehicle based on power consumption per kilometer

    CN102358190A

  • Method for predicting residual life of lithium ion battery on line

    CN107957562A

  • Drive distribution method of hybrid electric vehicle and hybrid electric vehicle

    CN108773371A

  • Method and device for testing estimation function of power state of power batter

    CN108845273A

  • Engine Control Device and Method for a Hybrid Vehicle

    US20100280737A1