A permeable pavement capable of restoring water permeability
By designing backwash pipes and blind pipe systems on the permeable pavement, the problem of blockage of the permeable pavement is solved, automatic sewage discharge and backwashing are realized, ensuring the permeability of the pavement and improving maintenance efficiency.
Patent Information
- Application Number
- CN202011052388.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-09-29
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2040-09-29
AI Technical Summary
Permeable pavement is easily clogged, resulting in reduced water permeability. Current maintenance methods rely on manual cleaning or municipal equipment, with limited efficiency and effectiveness.
A permeable pavement structure including a C30 permeable concrete layer, graded gravel layer, plain soil tamped layer, concealed groove, backwash pipe, upper drainage blind pipe, lower drainage blind pipe and blind branch pipe is designed. Through the backwash pipe And the blind pipe system realizes automatic sewage discharge and backwashing to ensure the water permeability of the road surface.
It realizes automatic drainage and backwashing of permeable pavement, ensuring the water permeability of the pavement, reducing the need for manual maintenance, and improving the maintenance efficiency and effect of pavement permeability.
Smart Images

Figure CN112252109B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a permeable pavement capable of restoring water permeability, and in particular to a permeable pavement capable of restoring water permeability. Background Art
[0002] Permeable concrete, also known as porous concrete, is a honeycomb structure with evenly distributed pores formed by a thin layer of cement paste covering the surface of coarse aggregate and bonding each other. It is breathable, water-permeable and lightweight. Permeable concrete can address the defects of the original urban road pavement, allowing rainwater to flow into the ground, effectively replenishing groundwater and alleviating some urban environmental problems such as the sharp drop in the city's groundwater level.
[0003] The pores of permeable concrete are composed of connected pores, semi-connected pores and closed pores. The connected pores and semi-connected pores can pass and store water, becoming effective pores, which are important indicators to characterize the performance of permeable concrete.
[0004] In the daily maintenance of permeable concrete, it is necessary to clean the blocked pores to ensure its permeability. At present, the main maintenance methods for the permeability of permeable pavement are manual cleaning and municipal maintenance equipment cleaning. Common municipal maintenance equipment includes cleaning vehicles with suction, high-pressure street sweepers and circulating air sweepers. Summary of the invention
[0005] The purpose of the present invention is to provide a permeable pavement capable of restoring water permeability, thereby solving the problem of blockage of the permeable pavement and being able to backwash the permeable pavement to ensure the water permeability of the permeable pavement.
[0006] In order to achieve the above-mentioned purpose, the present invention provides a permeable pavement with restorable permeability, which comprises: a C30 permeable concrete layer, a graded crushed stone layer arranged below the C30 permeable concrete layer, a rammed earth layer arranged below the graded crushed stone layer, a hidden groove arranged at the junction of the C30 permeable concrete layer and the graded crushed stone layer, a backwash pipe arranged in the hidden groove, and an upper drainage blind pipe, a lower drainage blind pipe and a blind pipe branch pipe arranged at the junction of the graded crushed stone layer and the rammed earth layer.
[0007] Among them, the dark groove is a cross grid structure that is interconnected; the backwash pipe is arranged in the dark groove, and the inlet end of the backwash pipe is connected to the high-pressure water source, and a valve is provided at the inlet end; a plurality of water spray outlets are arranged at intervals on the backwash pipe, and a nozzle is provided at the water spray outlet.
[0008] The upper drainage blind pipe and the lower drainage blind pipe are both semicircular blind pipes, the openings of the upper drainage blind pipe and the lower drainage blind pipe are arranged opposite to each other, the diameter of the upper drainage blind pipe is larger than the diameter of the lower drainage blind pipe, and the side walls of the upper drainage blind pipe and the lower drainage blind pipe are connected together to form a pipe with closed side walls; the connection between the upper drainage blind pipe and the lower drainage blind pipe is connected to the blind pipe branch pipe, the ends of the blind pipe branch pipe are connected to the soil on both sides of the road, and the pipeline formed by the upper drainage blind pipe and the lower drainage blind pipe is connected to the road sewer pipe; a through hole is opened on the outer wall of the upper drainage blind pipe.
[0009] The particle size of the graded crushed stone used in the graded crushed stone layer is 20-60 mm; the compaction degree of the plain soil compacted layer is greater than or equal to 90%.
[0010] At the junction of the graded crushed stone layer and the rammed earth layer, a trapezoidal groove is arranged on the upper surface of the rammed earth layer, the graded crushed stone layer is filled in the trapezoidal groove, and the upper drainage blind pipe is buried in the trapezoidal groove.
[0011] Preferably, the opening rate of the upper drainage blind pipe is 3-5% of its total area.
[0012] Preferably, the top of the upper drainage blind pipe is covered with geotextile.
[0013] Preferably, the distance between adjacent water spray outlets is 200 to 300 mm.
[0014] Preferably, a fixing member or a steel mesh for supporting is fixed in the concealed groove, and the fixing member is a truss mesh supporting structure.
[0015] Preferably, the backwash pipe comprises: a backwash pipe main pipe and a backwash pipe branch pipe, the backwash pipe main pipe and the backwash pipe branch pipe intersect to form a cross grid structure, and a plurality of the water spray ports are arranged at intervals on the backwash pipe branch pipe.
[0016] Preferably, the diameter of the backwashing pipe branch is smaller than the diameter of the backwashing pipe main pipe.
[0017] Preferably, the backwash pipe branch is a D20 PVC water pipe, and the backwash pipe main is a D40PVC water pipe.
[0018] The permeable pavement capable of restoring water permeability of the present invention solves the problem of blockage of the permeable pavement and has the following advantages:
[0019] The permeable pavement with restorable permeability of the present invention, through the design of the hidden groove and the backwashing pipe, can wash away the dirt particles attached to the pores by backwashing, thereby achieving the effect of automatic sewage discharge. Moreover, with the design of the upper drainage blind pipe, the lower drainage blind pipe and the blind pipe branch pipe, the water of the road surface drainage and backwashing can be discharged smoothly. The holes on the upper drainage blind pipe can ensure that the upper layer of water enters the blind pipe branch pipe or the lower drainage blind pipe, and then is discharged. In addition, the upper drainage blind pipe is coated with a geotextile to prevent the holes on the upper drainage blind pipe from being blocked, thereby ensuring smooth drainage. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic structural diagram of the permeable pavement capable of restoring water permeability according to the present invention.
[0021] Figure 2 For the present invention Figure 1 Schematic diagram of the structure in the C-C' direction.
[0022] Figure 3 For the present invention Figure 1 Schematic diagram of the structure in the B-B' direction.
[0023] Figure 4 For the present invention Figure 1 Schematic diagram of the structure along the A-A' direction.
[0024] Figure 5 It is a schematic structural diagram of the C30 permeable concrete layer and the graded crushed stone layer of the present invention. DETAILED DESCRIPTION
[0025] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] A permeable pavement capable of restoring permeability, see Figure 1-5 The permeable pavement comprises: a C30 permeable concrete layer 1, a graded crushed stone layer 5 arranged below the C30 permeable concrete layer 1, a rammed earth layer 9 arranged below the graded crushed stone layer 5, a hidden groove 3 arranged at the junction of the C30 permeable concrete layer 1 and the graded crushed stone layer 5, a backwash pipe 4 arranged in the hidden groove 3, and an upper drainage blind pipe 6, a lower drainage blind pipe 8 and a blind pipe branch pipe 7 arranged at the junction of the graded crushed stone layer 5 and the rammed earth layer 9. The thickness of the C30 permeable concrete layer 1 is 200 mm, including: a 50 mm C30 permeable concrete surface layer 11 and a 120 mm C30 permeable concrete structural layer 12, the thickness of the graded crushed stone layer 5 is 300 mm, and the thickness of the rammed earth layer 9 is 250 mm.
[0027] Among them, the hidden groove 3 is a cross grid structure that is interconnected. The hidden groove 3 is formed by a pre-buried steel pipe, and the steel pipe will be taken out after forming; the backwashing pipe 4 is arranged in the hidden groove 3, and the inlet end of the backwashing pipe 4 is connected to the high-pressure water source, and a valve is provided at the inlet end; a plurality of water spray outlets are arranged at intervals on the backwashing pipe 4, and a nozzle is provided at the water spray outlet.
[0028] The upper drainage blind pipe 6 and the lower drainage blind pipe 8 are both semicircular blind pipes. The openings of the upper drainage blind pipe 6 and the lower drainage blind pipe 8 are arranged oppositely. The diameter of the upper drainage blind pipe 6 is larger than the diameter of the lower drainage blind pipe 8, and the side walls of the upper drainage blind pipe 6 and the lower drainage blind pipe 8 are connected together to form a pipe with closed side walls. Since the backwash water flows slowly after passing through the C30 permeable concrete layer 1 and the graded gravel layer 5, most of the water with a slow flow rate will flow down along the pipe wall. Therefore, the diameter of the upper drainage blind pipe 6 is set larger than the lower drainage blind pipe 8, and the water directly flows into the blind pipe branch 7 for discharge. The connection between the upper drainage blind pipe 6 and the lower drainage blind pipe 8 is connected to the blind pipe branch 7, and the end of the blind pipe branch 7 is connected to the soil on both sides of the road. The pipeline formed by the upper drainage blind pipe 6 and the lower drainage blind pipe 8 is connected to the road sewer pipe. A through hole is opened on the outer wall of the upper drainage blind pipe 6.
[0029] The particle size of the graded crushed stone used in the graded crushed stone layer 5 is 20-60 mm; the compaction degree of the plain soil compacted layer 9 is greater than or equal to 90%.
[0030] At the junction of the graded gravel layer 5 and the rammed earth layer 9, a trapezoidal groove is set on the upper surface of the rammed earth layer 9, the graded gravel layer 5 is filled in the trapezoidal groove, and the upper drainage blind pipe 6 is buried in the trapezoidal groove, which can avoid the blockage of the holes on the upper drainage blind pipe 6 on the one hand, and reduce the extrusion strength of the upper drainage blind pipe 6 on the other hand.
[0031] According to a specific embodiment of the present invention, the opening rate of the upper drainage blind pipe 6 is 3-5% of its total area, ensuring that water can flow into the upper drainage blind pipe 6 while meeting the strength requirements.
[0032] According to a specific embodiment of the present invention, the top of the upper drainage blind pipe 6 is covered with a geotextile to prevent the holes on the upper drainage blind pipe 6 from being blocked.
[0033] According to a specific embodiment of the present invention, the distance between adjacent water spray outlets is 200-300 mm.
[0034] According to a specific embodiment of the present invention, a fixing member or a steel mesh for supporting is fixed in the blind groove 3 , and the fixing member is a truss mesh support structure, which ensures that the blind groove 3 will not be deformed and avoids squeezing of the backwash pipe 4 .
[0035] According to a specific embodiment of the present invention, the backwash pipe 4 includes: a backwash pipe main pipe and a backwash pipe branch pipe, the backwash pipe main pipe and the backwash pipe branch pipe intersect to form a cross grid structure, and a plurality of water spray ports are arranged at intervals on the backwash pipe branch pipe.
[0036] According to a specific embodiment of the present invention, the diameter of the backwashing pipeline branch is smaller than the diameter of the backwashing pipeline main pipe, so that the jet velocity of the backwashing is increased and the backwashing effect is improved.
[0037] According to a specific embodiment of the present invention, the backwash pipe branch is a D20 PVC water pipe, and the backwash pipe main is a D40 PVC water pipe.
[0038] The implementation process of the permeable pavement capable of restoring water permeability of the present invention is as follows:
[0039] At the junction of the C30 permeable concrete layer 1 and the graded gravel layer 5, a steel pipe is pre-buried as a dark groove 3, the radius of the dark groove 3 is 37.5mm, and the dark groove 3 is in a cross grid shape that is interconnected. A backwash pipe 4 is laid in the dark groove 3, and the backwash pipes 4 in each dark groove 3 are interconnected. The branch pipe diameter of the backwash pipe 4 is 20mm, and water spray ports are arranged at intervals on the branch pipe of each backwash pipe 4, and the spacing between adjacent water spray ports is 300mm. A high-pressure rotating nozzle or multiple directional nozzles are installed at the water spray port. Under the centrifugal action and reaction force of the high-pressure water jet sprayed by the high-pressure rotating nozzle, the nozzle rotates while spraying water to expand the flushing range.
[0040] The inlet end of the backwash pipe 4 is connected to the fire hydrant, and a valve and a water pressure gauge are provided at the inlet end to control the water flow and the size of the water flow. According to the fire acceptance specification, the outdoor fire hydrant water test reaches a distance of 10 meters to be qualified. The outlet of the fire hydrant is connected to the backwash pipe 4. Before use, the entire pipe needs to be filled with water. When backwashing is required, the valve is opened. Since the pipe is already full of water at this time, water pressure will be generated after the valve is opened. From the main pipe to the branch pipe of the backwash pipe 4, the water flow diameter will suddenly decrease, and the water pressure will increase. Then, the water will be further pressurized from the branch pipe to the nozzle, thereby achieving the effect of high-pressure water spraying.
[0041] An upper drainage blind pipe 6, a lower drainage blind pipe 8 and a blind pipe branch 7 are buried at the junction of the graded gravel layer 5 and the rammed soil layer 9. The porosity of the upper drainage blind pipe 6 is maintained at 3-5%. The upper drainage blind pipe 6 is covered with a geotextile to prevent the upper drainage blind pipe 6 from being blocked.
[0042] The backwash water and rainwater penetrate downward along the graded gravel of the graded gravel layer 5. Part of it penetrates directly into the soil through the graded gravel, part of it penetrates into the blind pipe branch 7 through the holes on the upper drainage blind pipe 6, and then flows into the soil on both sides through the blind pipe branch 7; part of it directly flows into the lower drainage blind pipe 8 to the road sewer pipe.
[0043] Although the content of the present invention has been described in detail through the above preferred embodiments, it should be appreciated that the above description should not be considered as a limitation of the present invention. After reading the above content, it will be apparent to those skilled in the art that various modifications and substitutions of the present invention will occur. Therefore, the protection scope of the present invention should be limited by the appended claims.
Claims
1. A permeable pavement capable of restoring water permeability, characterized in that: The permeable pavement comprises: a C30 permeable concrete layer (1), a graded crushed stone layer (5) arranged below the C30 permeable concrete layer (1), a rammed earth layer (9) arranged below the graded crushed stone layer (5), a concealed groove (3) arranged at the junction of the C30 permeable concrete layer (1) and the graded crushed stone layer (5), a backwashing pipeline (4) arranged in the concealed groove (3), and an upper drainage blind pipe (6), a lower drainage blind pipe (8) and a blind pipe branch pipe (7) arranged at the junction of the graded crushed stone layer (5) and the rammed earth layer (9); The dark groove (3) is a cross-grid structure that is interconnected; the backwashing pipe (4) is arranged in the dark groove (3), and the inlet end of the backwashing pipe (4) is connected to a high-pressure water source, and a valve is arranged at the inlet end; a plurality of water spraying ports are arranged at intervals on the backwashing pipe (4), and a nozzle is arranged at the water spraying port; The upper drainage blind pipe (6) and the lower drainage blind pipe (8) are both semicircular blind pipes, the openings of the upper drainage blind pipe (6) and the lower drainage blind pipe (8) are arranged opposite to each other, the diameter of the upper drainage blind pipe (6) is larger than the diameter of the lower drainage blind pipe (8), and the side walls of the upper drainage blind pipe (6) and the lower drainage blind pipe (8) are connected together to form a pipe with closed side walls; the connection between the upper drainage blind pipe (6) and the lower drainage blind pipe (8) is connected to the blind pipe branch pipe (7), the ends of the blind pipe branch pipe (7) are connected to the soil on both sides of the road, and the pipeline formed by the upper drainage blind pipe (6) and the lower drainage blind pipe (8) is connected to the road sewer pipe; a through hole is provided on the outer wall of the upper drainage blind pipe (6); The graded crushed stone layer (5) has a particle size of 20 to 60 mm; the compaction degree of the plain soil compacted layer (9) is greater than or equal to 90%; At the junction of the graded crushed stone layer (5) and the rammed earth layer (9), a trapezoidal groove is provided on the upper surface of the rammed earth layer (9), the graded crushed stone layer (5) is filled in the trapezoidal groove, and the upper drainage blind pipe (6) is buried in the trapezoidal groove.
2. The permeable pavement capable of restoring water permeability according to claim 1, characterized in that: The opening rate of the upper drainage blind pipe (6) is 3-5% of its total area.
3. The permeable pavement capable of restoring water permeability according to claim 1, characterized in that: The top of the upper drainage blind pipe (6) is covered with geotextile.
4. The permeable pavement capable of restoring water permeability according to claim 1, characterized in that: The distance between adjacent water nozzles is 200 to 300 mm.
5. The permeable pavement capable of restoring water permeability according to claim 1, characterized in that: A fixing member or a steel mesh for supporting is fixed in the concealed groove (3), and the fixing member is a truss mesh support structure.
6. The permeable pavement capable of restoring water permeability according to claim 1, characterized in that: The backwashing pipeline (4) comprises: a backwashing pipeline main pipe and a backwashing pipeline branch pipe, wherein the backwashing pipeline main pipe and the backwashing pipeline branch pipe intersect to form a cross grid structure, and a plurality of water spray ports are arranged at intervals on the backwashing pipeline branch pipe.
7. The permeable pavement capable of restoring water permeability according to claim 6, characterized in that: The diameter of the backwash pipeline branch pipe is smaller than the diameter of the backwash pipeline main pipe.
8. The permeable pavement capable of restoring water permeability according to claim 7, characterized in that: The backwash pipe branch is a D20 PVC water pipe, and the backwash pipe main is a D40 PVC water pipe.
Citation Information
Patent Citations
Water drainage gutter has water guides at the side walls which direct the water inflow into the outflow direction along the drain and also support the covering grid
CH697138A5
Dust-removal drainage macropore asphalt pavement comprising graded crushed stone composite layer
CN105625133A
Water permeable pavement blocking treatment device based on backwash and method
CN108103885A
Well lid for road drain hole
CN108678134A
Planting surface waterproof system
CN109057180A
