A large-area unit row concrete cast-in-place mold and on-site construction method

By designing the staggered snap-in assembly of cardboard materials and the concrete warehousing buffer structure, the existing problems of complex mold construction technology and low demoulding efficiency are solved, and efficient large-area unit row concrete construction without form removal is achieved, which is suitable for river flood control. Emergency needs of the project.

CN112267665BActive Publication Date: 2024-10-22TONGJI UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011124818.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-20
Publication Date
2024-10-22
Estimated Expiration
2040-10-20

AI Technical Summary

Technical Problem

The existing large-area unit-row concrete molds have complex construction techniques and low demoulding efficiency, and are prone to burrs and corner cracks on the edges of concrete blocks during crane lifting, making it difficult to meet the emergency needs of river flood control projects.

Method used

Design a large-area unit-row concrete emergency cast-in-place mold based on cardboard materials. The cardboard mold reinforcement structure and concrete warehousing buffer structure are assembled by staggered snaps to simplify the construction process, reduce demoulding steps, and improve construction efficiency.

Benefits of technology

It achieves efficient construction without formwork removal, reduces construction difficulty and cost, and improves the efficiency and quality of unit row concrete production. It is especially suitable for large-area emergency rescue projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112267665B_ABST
    Figure CN112267665B_ABST
Patent Text Reader

Abstract

The present invention relates to a large-area unit row concrete cast-in-place mold and an on-site construction method. The mold includes a frame, a grid-shaped cardboard mold arranged inside the frame, a cardboard mold reinforcement structure arranged on the cardboard mold, and a concrete silo buffer structure arranged on the cardboard mold reinforcement structure. The cardboard mold divides the internal area of ​​the frame into a plurality of concrete cavity units arranged in an array. Compared with the prior art, the present invention uses cardboard as the main material to manufacture and install the cast-in-place mold for the large-area unit row concrete emergency project. There is no need for on-site construction with heavy equipment such as cranes. After the concrete pouring is completed, there is no need for a demoulding process. The unit row production is completed when the concrete pouring is completed, which significantly reduces the difficulty of the unit row concrete pouring construction, thereby achieving a significant reduction in the construction period required for the large-area unit row production and improving the overall quality and construction efficiency of the unit row emergency project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of on-site pouring of unit row concrete, and relates to an emergency on-site cast-in-place mould for large-area unit row concrete and an on-site construction method. Background Art

[0002] It is generally believed in the engineering community that concrete casting molds must be made of steel, wood, and other materials with high rigidity. However, such molds are difficult to adapt to the needs of large-scale unit row concrete construction. The number of molds required is large, and the cleaning, application of release agent, crane installation, and crane demoulding processes are difficult to control and have high construction costs. This has attracted the attention of a large number of scholars and the engineering community. The demoulding time of unit row concrete blocks needs to be strictly controlled. Successful demoulding is difficult and inefficient. A crane is required to assist in demoulding. When the crane lifts the mold, it often causes burrs on the edges of many concrete blocks and cracks at the four corners. The unit row technology is applied to emergency projects of river flood control projects, which are often subject to the limitations of the construction water level. It is necessary to complete large-scale beach protection in a short period of time. Construction efficiency is the primary factor to be considered.

[0003] In view of the difficulties in large-scale unit-row concrete cast-in-place projects, especially large-scale unit-row concrete emergency projects near large rivers, the research and development of molds is one of the solutions, which has become one of the important issues to be solved in the field of river flood emergency engineering construction. However, the existing molds still fail to solve the problems of complex construction process and low demoulding efficiency. Summary of the invention

[0004] The purpose of the present invention is to provide a large-area unit row concrete emergency cast-in-place mold and an on-site construction method. The present invention designs a large-area unit row concrete emergency cast-in-place mold based on cardboard material, the construction process is simple, and no demoulding is required, which greatly improves the construction efficiency.

[0005] The purpose of the present invention can be achieved by the following technical solutions:

[0006] A large-area unit row concrete cast-in-place mold, the mold comprising a frame, a grid-shaped cardboard mold arranged inside the frame, a cardboard mold reinforcement structure arranged on the cardboard mold, and a concrete entry buffer structure arranged on the cardboard mold reinforcement structure, wherein the cardboard mold divides the inner area of ​​the frame into a plurality of concrete cavity units arranged in an array. The frame is located at the outermost periphery of the mold, providing concrete cast-in-place construction support for the cardboard mold, and preventing deformation and displacement of the outer cardboard. The cast-in-place concrete of each concrete cavity unit forms a ballast concrete block of the unit row.

[0007] Furthermore, the frame is formed by four stainless steel rectangular tubes enclosing each other to form a quadrilateral (such as a square, rectangle, rhombus or other quadrilateral).

[0008] Furthermore, the paperboard mold is assembled by staggered engagement of a plurality of parallel transverse slotted paperboards and a plurality of parallel longitudinal slotted paperboards. The slotted paperboard is made of paperboard, and its thickness is equal to the designed spacing of the unit row of ballast concrete blocks. The multiple concrete mold cavity units formed by the assembly are the same size as the unit row of ballast concrete blocks.

[0009] Furthermore, the bottom of the transverse slotted cardboard and the top of the longitudinal slotted cardboard are both provided with a plurality of cardboard slots. The cardboard slots at the bottom of the transverse slotted cardboard match the cardboard slots at the top of the longitudinal slotted cardboard, and the cardboard mold is assembled vertically by snapping and fastening the corresponding cardboard slots.

[0010] Furthermore, the mold further comprises a plurality of parallel transverse unit row draw cords and a plurality of parallel longitudinal unit row draw cords, the transverse unit row draw cords and the longitudinal unit row draw cords are arranged alternately, the transverse slotted paperboard and the longitudinal slotted paperboard are provided with a plurality of rope threading holes, and the frame is provided with a plurality of frame notches. The unit row draw cords pass through the corresponding rope threading holes and frame notches. The frame is provided with a plurality of frame notches with openings facing downwards, which can fix and tighten the unit row draw cords, and the positions of the frame notches are consistent with the arrangement of the unit row draw cords.

[0011] Furthermore, the intersection of the horizontal unit row pull rope and the longitudinal unit row pull rope is located at the center of the corresponding concrete mold cavity unit. A rope threading hole is provided on each slotted cardboard, and the rope threading hole is located at the middle height of the slotted cardboard. The unit row pull rope passes through the center of each unit row ballast concrete block in both the longitudinal and transverse directions.

[0012] Furthermore, the cardboard mold reinforcement structure includes a grid steel sheet arranged on the top of the cardboard mold and adapted to the cardboard mold, and a plurality of reinforcement U-shaped clips with downward openings for fixing the grid steel sheet and the cardboard mold together. The grid steel sheet is formed by welding the steel sheet in the longitudinal and transverse directions. The grid size is the same as the cardboard mold, and the width of the steel sheet is the same as the thickness of the mold cardboard. The material of the reinforcement U-shaped clip is a thin steel sheet with good elasticity. During the installation process, it can withstand the deformation load of the two legs opening without plastic deformation. The grid steel sheet is installed on the cardboard mold to press the cardboard, and the grid steel sheet is clamped to the cardboard mold by the reinforcement U-shaped clip, so as to improve the rigidity of the slotted cardboard and prevent the slotted cardboard from being damaged during concrete pouring. At the same time, it is also beneficial to improve the flatness of the concrete surface after the concrete pouring is completed.

[0013] Furthermore, the concrete entry buffer structure includes a plurality of concrete entry buffer plates arranged on the cardboard mold reinforcement structure, and a plurality of concrete entry holes are opened on the concrete entry buffer plates. The concrete entry buffer plates are laid on the cardboard mold and the grid steel sheet to buffer the impact pressure of the concentrated concrete entry.

[0014] Furthermore, the center point of the concrete inlet hole is located directly above the center point of the corresponding concrete cavity unit. The concrete inlet buffer plate is provided with a concrete inlet hole that is consistent with the position of the underlying concrete cavity unit, the diameter of the concrete inlet hole is 30-35 cm, and the concrete inlet buffer plate is arranged with a net spacing of 2-3 concrete cavity units.

[0015] A field construction method based on a large-area unit-row concrete cast-in-place mold, the field construction method is: after assembling the mold, the concrete is concentratedly added to the concrete silo buffer structure, and then the concrete is dispersed into each concrete mold cavity unit, and then the concrete in the concrete mold cavity unit is vibrated and compacted using a flat vibrator, and after the vibration is completed, it is smoothed and finished, and the field construction is completed.

[0016] The on-site construction method includes cardboard mold assembly, mold structure reinforcement, rope threading, concrete warehouse board placement, concrete unit row pouring and concrete vibration, and finishing steps. Specifically:

[0017] Cardboard mold assembly: assemble the frame, and assemble the longitudinal and transverse slotted cardboards in the frame in an interlaced manner to form a cardboard mold;

[0018] Mould structure reinforcement: Press the grid steel sheet onto the cardboard mould and fix it with a reinforced U-shaped clip. Connect the longitudinal and transverse slotted cardboards into a whole through the grid steel sheet to enhance the rigidity and integrity of the mould.

[0019] Rope threading: according to the design requirements, the unit row rope is passed through the rope threading hole of the cardboard mold, the frame notch of the frame, through the center position of the concrete mold cavity unit, and tightened and fixed on the frame;

[0020] Concrete entry board placement: The concrete entry board must be placed symmetrically on the cardboard mold and the grid steel sheet, and the concrete entry hole coincides with the center of the underlying concrete mold cavity unit;

[0021] Casting concrete unit rows and vibrating and finishing concrete: The concrete is concentrated into the concrete buffer plate, and then manually distributed into the surrounding concrete cavity units. Each concrete unit is vibrated, compacted, smoothed and finished.

[0022] The present invention provides a large-area unit row concrete engineering cast-in-place mold, and in particular relates to an emergency rescue construction technology for a large-area unit row on a waterfront beach. Based on the traditional large-area unit row concrete cast-in-place mold, the present invention introduces corrugated / honeycomb paperboard materials to replace traditional steel plate materials. Due to the strong plasticity of paper, it can also be treated with waterproofing, moisture-proofing, flame retardancy and the like. The paperboard is applied to the unit row concrete casting mold, and there is no need for a demolding process. The unit row is completed when the concrete casting is completed, which greatly shortens the large-area production period of the unit row in the project, controls the construction cost, reduces the construction difficulty of the unit row concrete casting, and improves the unit row production efficiency and overall quality. Among them, the paperboard mold is assembled by staggered engagement of multiple slotted paperboards in both the vertical and horizontal directions, and the internal area of ​​the frame is divided into multiple concrete cavity units; multiple frame notches are provided on the frame, which can fix and tighten the unit row draw rope, and multiple slotted paperboards are provided with rope holes, and the unit row draw rope can pass through each concrete cavity unit in both the vertical and horizontal directions.

[0023] Compared with the prior art, the present invention has the following characteristics:

[0024] 1) The present invention uses cardboard as the main material to manufacture and install cast-in-place molds for large-area unit row concrete emergency projects. There is no need for on-site construction with heavy equipment such as cranes. After the concrete pouring is completed, there is no need to remove the mold. The unit row production is completed when the concrete pouring is completed, which significantly reduces the difficulty of unit row concrete pouring construction, thereby greatly reducing the construction period required for large-area unit row production and improving the overall quality and construction efficiency of the unit row emergency project.

[0025] 2) The mold of the present invention has wide applicability, and is particularly suitable for emergency rescue projects such as large-area unit row on-site construction areas, with low construction cost, simple structure and easy operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the overall structure of the mold in the present invention;

[0027] Figure 2 It is a schematic diagram of the three-dimensional decomposition structure of the mold in the present invention;

[0028] Figure 3 This is a schematic diagram of the assembly principle of the paperboard mold in the present invention;

[0029] Figure 4 It is a schematic diagram of the structure of a single slotted paperboard in the present invention;

[0030] Figure 5 This is a schematic diagram of the installation of the reinforcement U-shaped clip in the present invention;

[0031] Description of the markings in the figure:

[0032] 1—frame, 2—cardboard mold, 3—grid steel sheet, 4—concrete entry buffer plate, 5—concrete cavity unit, 6—unit row pull rope, 601—transverse unit row pull rope, 602—longitudinal unit row pull rope, 7—slotted cardboard, 701—transverse slotted cardboard, 702—longitudinal slotted cardboard, 8—cardboard notch, 9—rope threading hole, 10—frame notch, 11—reinforcement U-shaped clip, 12—concrete entry hole. DETAILED DESCRIPTION

[0033] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments. Example 1

[0034] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 As shown, a large-area unit row concrete emergency cast-in-place mold includes a frame 1, a cardboard mold 2, a grid steel sheet 3, a concrete storage buffer plate 4, and a reinforcement U-shaped clip 11. The specific structural structure is as follows:

[0035] The design size of a unit row is 500×500cm, the length, width and thickness of each concrete block is 48×48×10cm, the gap between concrete blocks is 2cm, there are 100 concrete blocks in total, and the diameter of the unit row pull rope 6 that passes through the concrete blocks vertically and horizontally is 16mm. The frame 1 is a square frame assembled from four 6×10cm stainless steel rectangular tubes with a wall thickness of 5mm. The width and height of the frame slot 10 are 18mm and 58mm respectively. The cardboard mold 2 is assembled by staggered engagement of 22 slotted cardboards 7 in both the vertical and horizontal directions. The cardboard mold 2 divides the internal area of ​​the frame 1 into 10×10 concrete cavity units 5, and the internal empty plane size is 48×48cm. Each slotted cardboard 7 is 2 cm thick, 502×9.7 cm long and wide, and has 11 cardboard slots 8 and 10 rope holes 9; the cardboard slots 8 are 2 cm wide and 50 cm apart, and the rope holes 9 are 18 mm in diameter and 50 cm apart; the cardboard slots 8 are all located on the same side of the slotted cardboard 7, and the rope holes 9 are all located at the middle height of the slotted cardboard 7 and the midpoints of the four sides of the concrete mold cavity unit 5. The rope hole 9 has a diameter of 18 mm, which is slightly larger than the diameter of the unit row rope 6 of 16 mm, which is conducive to smooth rope threading.

[0036] The grid of the grid steel sheet 3 has a space of 48×48cm, a steel sheet width of 2cm and a thickness of 3mm. The grid steel sheet 3 is pressed onto the cardboard mold 2 and fixed with a reinforcing U-shaped clip 11 to improve the integrity of the mold. The length of the clip of the reinforcing U-shaped clip 11 is 6cm and the width is 1cm. The installation of the grid steel sheet 3 can not only significantly improve the integrity of the mold and reduce the possibility of damage to the cardboard, but also help to improve the flatness of the surface after concrete pouring. The four concrete entry buffer plates 4 are lightweight wooden boards with a length and width of 130×130cm and a thickness of 1cm. The plates are provided with four symmetrically arranged concrete entry holes 12, which are circular holes with a spacing of 50cm and a hole diameter of 35cm. The center spacing of the concrete entry buffer plates 4 is 2m, and they are symmetrically placed on the cardboard mold 2, and the concrete entry holes 12 coincide with the center of the concrete cavity unit 5.

[0037] The unit row concrete casting implementation process of this embodiment is as follows:

[0038] 1) Mold installation: According to the design, 4 6×10cm stainless steel rectangular tubes are assembled to form a frame 1, so that the internal clearance size is 5.02m×5.02m; the interior of the frame 1 is assembled through longitudinal and transverse slotted cardboards 7, and 22 slotted cardboards 7 divide the interior of the frame 1 into 10×10 concrete mold cavity units 5; the longitudinal and transverse slotted cardboards 7 have opposite notches in the upper and lower directions, and are fastened and fixed to each other through cardboard notches 8. In this way, a cardboard mold 2 is formed as a whole, which is not only efficient in placement, but also forms a standard size of 48×48cm for the concrete mold cavity unit 5.

[0039] 2) Mould structure reinforcement: Press the grid steel sheet 3 onto the cardboard mould 2 to fix it with the reinforced U-shaped clip 11, and connect the longitudinal and transverse slotted cardboards 7 into one through the grid steel sheet 3 to enhance the rigidity and integrity of the mould.

[0040] 3) Rope threading: After the mold is installed and reinforced, according to the design requirements, the unit row pull rope 6 (polypropylene rope) is passed through the rope threading hole 9 of the cardboard mold 2 and the frame notch 10 of the frame 1 in turn, and the rope is threaded horizontally and vertically, and tightened and fixed to the frame 1.

[0041] 4) Placement of concrete entry buffer plate 4: The concrete entry buffer plate 4 has a center spacing of 2m and is symmetrically placed on the cardboard mold 2. The concrete entry hole 12 coincides with the center of the underlying concrete cavity unit 5. The center of the opening on the concrete entry buffer plate 4 coincides with the center of the underlying concrete cavity unit 5.

[0042] 5) Casting concrete unit rows and vibrating and finishing concrete: The concrete is concentrated into the concrete buffer plate 4, and then manually distributed into the surrounding concrete cavity units 5. Each concrete grid is vibrated and compacted with a flat vibrator. Efficiency can also be improved by assembling multiple flat vibrators to vibrate multiple concrete grids at the same time; after the vibration is completed, it is smoothed and finished.

[0043] A large-area unit row concrete pouring mold constructed using the above process effectively overcomes the defects of low efficiency and high construction cost in previous construction, and can also ensure construction quality, avoid secondary construction, and reduce the labor intensity of workers. It is particularly suitable for large-area unit row on-site construction areas. Example 2

[0044] like Figure 1 , Figure 2 A large-area unit-row cast-in-place concrete mold shown includes a frame 1, a grid-shaped cardboard mold 2 arranged inside the frame 1, a cardboard mold reinforcement structure arranged on the cardboard mold 2, and a concrete silo buffer structure arranged on the cardboard mold reinforcement structure. The cardboard mold 2 divides the internal area of ​​the frame 1 into a plurality of concrete cavity units 5 arranged in an array.

[0045] The frame 1 is formed by enclosing four stainless steel rectangular tubes.

[0046] like Figure 3 , Figure 4 As shown, the paperboard mold 2 is assembled by staggered engagement of a plurality of parallel transverse slotted paperboards 701 and a plurality of parallel longitudinal slotted paperboards 702. The bottom of the transverse slotted paperboard 701 and the top of the longitudinal slotted paperboard 702 are both provided with a plurality of paperboard notches 8.

[0047] The mold further includes a plurality of parallel transverse unit row drawstrings 601 and a plurality of parallel longitudinal unit row drawstrings 602, the transverse unit row drawstrings 601 and the longitudinal unit row drawstrings 602 are arranged alternately, a plurality of rope threading holes 9 are provided on the transverse slotted paperboard 701 and the longitudinal slotted paperboard 702, and a plurality of frame notches 10 are provided on the frame 1. The intersection of the transverse unit row drawstrings 601 and the longitudinal unit row drawstrings 602 is located at the center of the corresponding concrete mold cavity unit 5.

[0048] like Figure 5 As shown, the cardboard mold reinforcement structure includes a grid steel sheet 3 arranged on the top of the cardboard mold 2 and adapted to the cardboard mold 2, and a plurality of reinforcement U-shaped clips 11 with downward openings and used to fix the grid steel sheet 3 and the cardboard mold 2 together.

[0049] The concrete entry buffer structure includes a plurality of concrete entry buffer plates 4 arranged on the cardboard mold reinforcement structure, and a plurality of concrete entry holes 12 are opened on the concrete entry buffer plates 4. The center point of the concrete entry hole 12 is located directly above the center point of the corresponding concrete mold cavity unit 5.

[0050] The on-site construction method based on the above-mentioned mold is: after assembling the mold, the concrete is concentratedly added to the concrete silo buffer structure, and then the concrete is dispersed into each concrete cavity unit 5, and then the concrete in the concrete cavity unit 5 is vibrated to make it dense. After the vibration is completed, it is smoothed and finished to complete the on-site construction.

[0051] The above description of the embodiments is to facilitate the understanding and use of the invention by those skilled in the art. It is obvious that those skilled in the art can easily make various modifications to these embodiments and apply the general principles described herein to other embodiments without creative work. Therefore, the present invention is not limited to the above embodiments, and improvements and modifications made by those skilled in the art based on the disclosure of the present invention without departing from the scope of the present invention should be within the scope of protection of the present invention.

Claims

1. A large area unit row concrete cast-in-place mold, It is characterized in that The mold comprises a frame (1), a grid-shaped cardboard mold (2) arranged inside the frame (1), a cardboard mold reinforcement structure arranged on the cardboard mold (2), and a concrete silo buffer structure arranged on the cardboard mold reinforcement structure, wherein the cardboard mold (2) divides the internal area of ​​the frame (1) into a plurality of concrete mold cavity units (5) arranged in an array; The paperboard mold (2) is assembled by staggered engagement of a plurality of parallel transverse slotted paperboards (701) and a plurality of parallel longitudinal slotted paperboards (702); The mold further comprises a plurality of parallel transverse unit row drawstrings (601) and a plurality of parallel longitudinal unit row drawstrings (602), wherein the transverse unit row drawstrings (601) and the longitudinal unit row drawstrings (602) are arranged alternately, the transverse slotted paperboard (701) and the longitudinal slotted paperboard (702) are both provided with a plurality of rope threading holes (9), and the frame (1) is provided with a plurality of frame notches (10); The concrete entry buffer structure comprises a plurality of concrete entry buffer plates (4) arranged on a cardboard mold reinforcement structure, and a plurality of concrete entry holes (12) are formed on the concrete entry buffer plates (4); The center point of the concrete inlet hole (12) is located directly above the center point of the corresponding concrete cavity unit (5).

2. A large-area unit row concrete cast-in-place mold according to claim 1, It is characterized in that The frame (1) is formed by enclosing four stainless steel rectangular tubes.

3. A large-area unit row concrete cast-in-place mold according to claim 1, It is characterized in that A plurality of paperboard slots (8) are provided at the bottom of the transversely slotted paperboard (701) and the top of the longitudinally slotted paperboard (702).

4. A large-area unit row concrete cast-in-place mold according to claim 1, It is characterized in that The intersection of the horizontal unit row of pull ropes (601) and the longitudinal unit row of pull ropes (602) is located at the center of the corresponding concrete mold cavity unit (5).

5. A large-area unit row concrete cast-in-place mold according to claim 1, It is characterized in that The cardboard mould reinforcement structure comprises a grid steel sheet (3) arranged on the top of the cardboard mould (2) and adapted to the cardboard mould (2), and a plurality of reinforcement U-shaped clips (11) with openings facing downward and used to fix the grid steel sheet (3) and the cardboard mould (2) together.

6. An on-site construction method based on the large-area unit row concrete cast-in-place mold according to any one of claims 1 to 5, It is characterized in that The on-site construction method comprises the following steps: after assembling the mold, adding the concrete to the concrete storage buffer structure, dispersing the concrete to each concrete mold cavity unit (5), vibrating and compacting the concrete in the concrete mold cavity unit (5), and smoothing and finishing the concrete after the vibration is completed, thus completing the on-site construction.