A large cantilever structure for balancing insufficient end weight and its construction method
By setting up pre-tension columns and rear welding columns in the large cantilever structure, and combining anti-pull piles and anti-pressure piles, the problem of insufficient pressure and weight at the cantilever balanced end is solved, and the deflection and forward tilt displacement of the cantilever truss are reduced. The construction steps are simplified and the reliability and stability of the structure are improved.
Patent Information
- Application Number
- CN202011419066.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-07
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2040-12-07
AI Technical Summary
In large cantilever structures, insufficient pressure weight at the cantilever balanced end leads to unbalanced cantilever load, significantly increasing the design difficulty and deflection of the components, affecting the normal use of the structure.
Design a structure that includes foundation, balanced truss, cantilever truss and scaffolding. By setting up pre-tension columns and rear welding columns at the farthest point of the cantilever truss, centrally balancing the bending moment, reducing the deflection and forward tilt displacement of the cantilever truss. During the construction process, pre-tension and post-welding methods are used to combine anti-pull and compression piles to improve stability.
It effectively solves the problem of insufficient pressure and weight at the cantilever balance end, reduces the deflection and forward tilt displacement of the cantilever truss, simplifies the construction steps, and improves the reliability and stability of the structure.
Smart Images

Figure CN112392141B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a large cantilever structure and a construction method thereof, in particular to a large cantilever structure for balancing insufficient end pressure and a construction method thereof. Background Art
[0002] In modern non-residential buildings, large cantilever structures are often used. The design and construction of ordinary large cantilever structures are relatively mature, and can basically be solved by increasing the rise of cantilever components (cantilever beams, cantilever trusses, etc.) and reducing the deadweight of the structure. However, there are also some special cantilever structures that cannot be well solved by traditional methods due to some characteristics of the building itself.
[0003] In existing large cantilever structures, when the cantilever balance end (ballast end) of the structure is relatively insufficient, that is, the load on the cantilever section is large, and the load on the non-cantilever section is small, the cantilever section will be relatively insufficiently balanced. This will cause excessive tension in the tension members that transmit the bending moment formed by the cantilever load, significantly increasing the design difficulty of these members and affecting the normal use of the entire cantilever structure. Summary of the invention
[0004] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and provide a large cantilever structure for balancing the insufficient weight of the end.
[0005] The purpose of the present invention can be achieved by the following technical solutions:
[0006] A large cantilever structure for balancing the insufficient weight of the end, comprising a foundation, a balancing truss, a cantilever truss and a scaffolding, wherein the balancing truss is arranged on the foundation, the cantilever truss is arranged on the outside of the balancing truss, and the scaffolding is arranged under the cantilever truss. The balancing truss comprises an upper crossbeam, a lower crossbeam and a plurality of frame columns, wherein the upper crossbeam and the lower crossbeam are arranged horizontally at intervals, and the plurality of frame columns are arranged vertically at intervals, the top of the frame column is fixedly connected to the upper crossbeam, the middle of the frame column is fixedly connected to the lower crossbeam, and the bottom of the frame column is fixedly connected to the foundation.
[0007] The frame column farthest from the cantilever truss is cut and then a pre-tension node is applied to form a pre-tension column, and the frame column second farthest from the cantilever truss is cut and then welded to form a rear welded column.
[0008] A pre-tension node is arranged in the middle of the pre-tension column.
[0009] Preferably, the pre-tensioned column is a steel-concrete column, comprising a pre-tensioned steel column and concrete poured around the pre-tensioned steel column, and the pre-tensioned steel column is cut to form an upper pre-tensioned column and a lower pre-tensioned column.
[0010] The pre-tension node includes pre-tension bars and a first connecting steel plate. The top of the pre-tension bars is connected to the bottom of the lower pre-tension column, the bottom of the pre-tension bars is connected to the top of the lower pre-tension column, the top of the first connecting steel plate is welded to the bottom of the upper pre-tension column, and the bottom end of the first connecting steel plate is welded to the top of the lower pre-tension column.
[0011] Preferably, the rear weld column is a steel-concrete column, which includes a rear weld column steel column and concrete poured around the rear weld column steel column. The rear weld column steel column is cut to form an upper rear weld column and a lower rear weld column. The rear weld column also includes a second connecting steel plate. When the pre-tension node is connected to the pre-tension steel column, the bottom of the upper rear weld column and the top of the lower rear weld column are welded and fixed by the second connecting steel plate.
[0012] Preferably, the foundation comprises a foundation layer and a plurality of foundation fixing columns, and the tops of the foundation fixing columns are fixedly connected to the bottom surface of the foundation layer.
[0013] Preferably, the foundation fixing columns include pull-out piles, foundation piles and compression piles, the pull-out piles are arranged below the pre-tension piles, the compression piles are arranged below the frame piles closest to the cantilever trusses, and the foundation piles are arranged between the pull-out piles and the compression piles.
[0014] Preferably, the scaffolding is removed when the concrete strength of the large cantilever structure reaches 80% of the design strength.
[0015] Preferably, the balanced truss further comprises a plurality of truss diagonal rods, one end of the truss diagonal rod is fixedly connected to the upper crossbeam, and the other end of the truss diagonal rod is fixedly connected to the lower crossbeam.
[0016] Preferably, the cantilever truss comprises an upper cantilever beam horizontally extending outward from the upper cross beam, a lower cantilever beam horizontally extending outward from the lower cross beam, and a plurality of cantilever columns, wherein the cantilever columns are vertically arranged between the upper cantilever beam and the lower cantilever beam.
[0017] Preferably, the cantilever truss further comprises a plurality of cantilever diagonal rods, one end of each cantilever diagonal rod is fixedly connected to the upper cantilever beam, and the other end of each cantilever diagonal rod is fixedly connected to the lower cantilever beam.
[0018] Preferably, the frame columns are all steel-concrete columns.
[0019] A construction method for a large cantilever structure with insufficient balance end weight according to the present invention comprises the following steps:
[0020] S1: Construction foundation, balanced truss, cantilever truss and scaffolding, the balanced truss is arranged on the foundation, the cantilever truss is arranged on the outside of the balanced truss, the scaffolding is arranged under the cantilever truss, the balanced truss includes an upper crossbeam, a lower crossbeam and a plurality of frame columns, the upper crossbeam and the lower crossbeam are arranged horizontally at intervals, the plurality of frame columns are arranged vertically at intervals, the top of the frame column is fixedly connected to the upper crossbeam, the middle of the frame column is fixedly connected to the lower crossbeam, the bottom of the pre-tensioned column, the rear welded column and the frame column are fixedly connected to the foundation,
[0021] Among the frame columns, the two frame columns farthest and second farthest from the cantilever truss are steel columns;
[0022] S2: Transversely cut the frame column farthest from the cantilever truss to form an upper pre-tension column and a lower pre-tension column, and transversely cut the frame column second farthest from the cantilever truss to form an upper rear weld column and a lower rear weld column;
[0023] S3: a pre-tension node is set between the upper rear welding column and the lower rear welding column, and the upper pre-tension column and the lower pre-tension column are welded with equal strength;
[0024] S4: Weld the upper rear welding column and the lower rear welding column with equal strength;
[0025] S5: pour concrete into the frame column farthest from the cantilever truss to form a pre-tensioned column, and pour concrete into the frame column second farthest from the cantilever truss to form a post-weld column;
[0026] S6: Remove the scaffolding.
[0027] Compared with the prior art, the present invention has the following advantages:
[0028] (1) The pre-tensioned column is arranged at the farthest distance from the cantilever truss of the balancing truss of the present invention, so that most of the balancing bending moment is concentrated in the pre-tensioned column, which effectively solves the problem of insufficient weight at the cantilever balancing end and reduces the deflection and forward displacement of the cantilever truss. The principle is clear, the force transmission is simple and reasonable, and the reliability is high.
[0029] (2) After the overall structure of the main structure of the present invention is completed, the two columns farthest from the cantilever truss are cut, pre-tensioned, and then welded to form pre-tensioned columns and post-welded columns. The large cantilever structure is constructed using clear and economical construction steps to form a large cantilever structure for balancing the insufficient end pressure, which has a wide range of applications and strong practicality.
[0030] (3) The foundation fixing piles of the present invention cooperate with the structure of the balanced truss, and anti-pulling piles, foundation piles and anti-compression piles are arranged to improve the stability of the present invention;
[0031] (4) The balanced truss and cantilever truss of the present invention are both reinforced and stabilized by diagonal rods, thereby improving the reliability of the present invention;
[0032] (5) The construction method of the present invention can achieve the application of pre-tension to the column farthest from the cantilever truss by cutting the frame columns farthest and second farthest from the cantilever truss, and performing pre-tensioning and post-welding construction, so that most of the balancing bending moment is concentrated in the pre-tensioning column, effectively solving the problem of insufficient weight at the cantilever balancing end, reducing the deflection and forward displacement of the cantilever truss, and the construction steps are simple and clear. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a structural schematic diagram of the present invention;
[0034] Figure 2 It is a structural front view of a pre-tension node of a pre-tension column of the present invention;
[0035] Figure 3 It is a structural side view of a pre-tension node of a pre-tension column of the present invention;
[0036] Among them, 1. upper cross beam, 2. lower cross beam, 3. pre-tensioned column, 4. rear welded column, 5. frame column, 6. truss diagonal rod, 7. cantilever column, 8. upper cantilever beam, 9. cantilever diagonal rod, 10. foundation layer, 11. pull-out piles, 12. foundation piles, 13. compression piles, 14. lower cantilever beam, 15. scaffolding, 16. pre-tensioned node, 17. upper pre-tensioned column, 18. pre-tensioned reinforcement, 19. first connecting steel plate, 20. lower pre-tensioned column. DETAILED DESCRIPTION
[0037] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. Note that the following embodiments are merely illustrative in nature, and the present invention is not intended to limit its applicable objects or uses, and the present invention is not limited to the following embodiments.
[0038] Example
[0039] A large cantilever structure for balancing an insufficiently weighted end comprises a foundation, a balancing truss, a cantilever truss and a scaffold 15, wherein the balancing truss is arranged on the foundation, the cantilever truss is arranged on the outside of the balancing truss, and the scaffold 15 is arranged under the cantilever truss. The balancing truss comprises an upper crossbeam 1, a lower crossbeam 2 and a plurality of frame columns 5, wherein the upper crossbeam 1 and the lower crossbeam 2 are arranged horizontally at intervals, and the plurality of frame columns 5 are arranged vertically at intervals, the top of the frame column 5 is fixedly connected to the upper crossbeam 1, the middle of the frame column 5 is fixedly connected to the lower crossbeam 2, and the bottom of the frame column 5 is fixedly connected to the foundation, the frame column 5 farthest from the cantilever truss is cut and then a pre-tension node 16 is applied to form a pre-tension column 30, the frame column 5 second farthest from the cantilever truss is cut and then welded to form a rear weld column 4, and a pre-tension node 16 is arranged in the middle of the pre-tension column 3.
[0040] Further, regarding the specific structure of the pre-tensioned column 3 and the setting method of the pre-tensioned node 16 in this embodiment: the pre-tensioned column 3 is a steel-concrete column, the pre-tensioned column 3 includes a pre-tensioned steel column and concrete poured around the pre-tensioned steel column, and the pre-tensioned steel column is cut to form an upper pre-tensioned column 17 and a lower pre-tensioned column 20.
[0041] The pre-tension node 16 includes a pre-tension bar 18 and a first connecting steel plate 19. The top of the pre-tension bar 18 is connected to the bottom of the lower pre-tension column 20, the bottom of the pre-tension bar 18 is connected to the top of the lower pre-tension column 20, the top of the first connecting steel plate 19 is welded to the bottom of the upper pre-tension column 17, and the bottom end of the first connecting steel plate 19 is welded to the top of the lower pre-tension column 20.
[0042] Correspondingly, in this embodiment, the rear weld column 4 is a steel concrete column, which includes a rear weld column steel column and concrete poured around the rear weld column steel column. The rear weld column steel column is cut to form an upper rear weld column and a lower rear weld column. The rear weld column 4 also includes a second connecting steel plate. When the pre-tension node 16 is connected to the pre-tension steel column, the bottom of the upper rear weld column and the top of the lower rear weld column are welded and fixed by the second connecting steel plate.
[0043] In the present invention, the foundation includes a foundation layer 10 and a plurality of foundation fixing columns, and the tops of the foundation fixing columns are fixedly connected to the bottom surface of the foundation layer 10 .
[0044] In one embodiment of the present invention, the foundation fixing column includes an anti-pullout pile 11, a foundation pile 12 and a compression pile 13. The anti-pullout pile 11 is arranged below the pre-tension pile, the compression pile 13 is arranged below the frame pile closest to the cantilever truss, and the foundation pile 12 is arranged between the anti-pullout pile 11 and the compression pile 13.
[0045] For the scaffold structure of the present invention, when the concrete strength of the large cantilever structure of the present invention reaches 80% of the design strength, the scaffold 15 under the cantilever truss is removed.
[0046] In this embodiment, in order to improve the structural stability of the balanced truss, the balanced truss further includes a plurality of truss diagonal rods 6 , one end of the truss diagonal rod 6 is fixedly connected to the upper crossbeam 1 , and the other end is fixedly connected to the lower crossbeam 2 .
[0047] The cantilever truss includes an upper cantilever beam 8 horizontally extending outward from the upper cross beam 1, a lower cantilever beam 14 horizontally extending outward from the lower cross beam 2, and a plurality of cantilever columns 7, wherein the cantilever columns 7 are vertically arranged between the upper cantilever beam 8 and the lower cantilever beam 14. The cantilever truss also includes a plurality of cantilever diagonal rods 9, one end of which is fixedly connected to the upper cantilever beam 8, and the other end is fixedly connected to the lower cantilever beam 14.
[0048] In this embodiment, the frame columns 5 are all steel-concrete columns.
[0049] A construction method for a large cantilever structure with insufficient balance end weight. The overall design idea is as follows:
[0050] (1) The overall structure adopts a frame support system, the cantilever part adopts a cantilever truss, the balanced end adopts a balanced truss, and the end column of the balanced truss is set as a pre-tension column 3. The columns connected to the cantilever truss and the balanced truss are all steel concrete columns;
[0051] (2) The entire structure is constructed normally, and the cantilever truss is supported by scaffolding, and the concrete of the steel concrete column connected to the balance truss is not poured first;
[0052] (3) Cut off the pre-tension column 3 and the other steel-concrete columns connected to the balance truss, apply pre-tension and then re-weld;
[0053] (4) After all main structure construction is completed and the concrete strength reaches 80% of the design strength, remove the supporting scaffolding at the cantilever end.
[0054] The construction method of the present invention comprises the following steps:
[0055] S1: Construction foundation, balanced truss, cantilever truss and scaffolding 15. The balanced truss is arranged on the foundation, the cantilever truss is arranged on the outside of the balanced truss, and the scaffolding 15 is arranged under the cantilever truss. The balanced truss includes an upper crossbeam 1, a lower crossbeam 2 and a plurality of frame columns 5. The upper crossbeam 1 and the lower crossbeam 2 are arranged horizontally at intervals, and the plurality of frame columns 5 are arranged vertically at intervals. The top of the frame column 5 is fixedly connected to the upper crossbeam 1, the middle of the frame column 5 is fixedly connected to the lower crossbeam 2, and the bottom of the pre-tension column 3, the rear welded column 4 and the frame column 5 are fixedly connected to the foundation.
[0056] Among the frame columns 5, the two frame columns 5 farthest and second farthest from the cantilever truss are steel columns;
[0057] S2: Transversely cut the frame column 5 farthest from the cantilever truss to form an upper pretension column 17 and a lower pretension column 20, and transversely cut the frame column 5 second farthest from the cantilever truss to form an upper rear weld column and a lower rear weld column;
[0058] S3: a pre-tension node 16 is set between the upper rear welding column and the lower rear welding column, and the upper pre-tension column 17 and the lower pre-tension column 20 are welded with equal strength;
[0059] S4: Weld the upper rear welding column and the lower rear welding column with equal strength;
[0060] S5: pouring concrete into the frame column 5 farthest from the cantilever truss to form a pre-tensioned column 3, and pouring concrete into the frame column 5 second farthest from the cantilever truss to form a post-weld column 4;
[0061] S6: Remove scaffolding 15.
[0062] In this embodiment, when the concrete strength of the large cantilever structure of the present invention reaches 80% of the design strength, the scaffolding 15 under the cantilever truss is removed.
[0063] Furthermore, in this embodiment, the truss diagonal rod 6 connected to the pre-tension column 3 is first hinged to the pre-tension column 3, and subsequent connection construction is performed after the pre-tension node 16 of the pre-tension column 3 is completed.
[0064] Based on this construction method, the construction of a large cantilever structure for balancing insufficient end weight in this embodiment can be completed.
[0065] The above embodiments are merely examples and do not limit the scope of the present invention. These embodiments can also be implemented in various other ways, and various omissions, substitutions, and changes can be made without departing from the technical concept of the present invention.
Claims
1. A large cantilever structure for balancing the insufficient end weight, characterized in that: The invention comprises a foundation, a balanced truss, a cantilever truss and a scaffold (15), wherein the balanced truss is arranged on the foundation, the cantilever truss is arranged on the outside of the balanced truss, and the scaffold (15) is arranged under the cantilever truss. The balanced truss comprises an upper crossbeam (1), a lower crossbeam (2) and a plurality of frame columns (5), wherein the upper crossbeam (1) and the lower crossbeam (2) are arranged horizontally at intervals, and the plurality of frame columns (5) are arranged vertically at intervals. The top of the frame column (5) is fixedly connected to the upper crossbeam (1), the middle of the frame column (5) is fixedly connected to the lower crossbeam (2), and the bottom of the frame column (5) is fixedly connected to the foundation. The frame column (5) farthest from the cantilever truss is cut and then a pre-tension node (16) is applied to form a pre-tension column (3); the frame column (5) second farthest from the cantilever truss is cut and then welded to form a rear weld column (4); A pre-tension node (16) is arranged in the middle of the pre-tension column (3).
2. A large cantilever structure for balancing insufficient end weight according to claim 1, characterized in that: The pre-tensioned column (3) is a steel-concrete column, comprising a pre-tensioned steel column and concrete poured around the pre-tensioned steel column, and the pre-tensioned steel column is cut to form an upper pre-tensioned column (17) and a lower pre-tensioned column (20). The pre-tension node (16) includes a pre-tension bar (18) and a first connecting steel plate (19), the top of the pre-tension bar (18) is connected to the bottom of the lower pre-tension column (20), the bottom of the pre-tension bar (18) is connected to the top of the lower pre-tension column (20), the top of the first connecting steel plate (19) is welded to the bottom of the upper pre-tension column (17), and the bottom end of the first connecting steel plate (19) is welded to the top of the lower pre-tension column (20).
3. A large cantilever structure for balancing insufficient end weight according to claim 2, characterized in that: The rear weld column (4) is a steel concrete column, and the rear weld column (4) includes a rear weld column steel column and concrete poured around the rear weld column steel column. The rear weld column steel column is cut to form an upper rear weld column and a lower rear weld column. The rear weld column (4) also includes a second connecting steel plate. When the pre-tension node (16) is connected to the pre-tension steel column, the bottom of the upper rear weld column and the top of the lower rear weld column are welded and fixed by the second connecting steel plate.
4. A large cantilever structure for balancing insufficient end weight according to claim 1, characterized in that: The foundation comprises a foundation layer (10) and a plurality of foundation fixing columns, the tops of the foundation fixing columns being fixedly connected to the bottom surface of the foundation layer (10).
5. A large cantilever structure for balancing insufficient end weight according to claim 4, characterized in that: The foundation fixing column comprises an anti-pulling pile (11), a foundation pile (12) and a compression pile (13); the anti-pulling pile (11) is arranged below the pre-tension pile, the compression pile (13) is arranged below the frame pile closest to the cantilever truss, and the foundation pile (12) is arranged between the anti-pulling pile (11) and the compression pile (13).
6. A large cantilever structure for balancing insufficient end weight according to claim 1, characterized in that: The scaffolding is removed when the concrete strength of the large cantilever structure reaches 80% of the design strength.
7. A large cantilever structure for balancing insufficient end weight according to claim 1, characterized in that: The balanced truss also includes a plurality of truss diagonal rods (6), one end of each truss diagonal rod (6) is fixedly connected to the upper crossbeam (1), and the other end of each truss diagonal rod (6) is fixedly connected to the lower crossbeam (2).
8. A large cantilever structure for balancing insufficient end weight according to claim 1, characterized in that: The cantilever truss comprises an upper cantilever beam (8) extending horizontally outward from an upper cross beam (1), a lower cantilever beam (14) extending horizontally outward from a lower cross beam (2), and a plurality of cantilever columns (7), wherein the cantilever columns (7) are vertically arranged between the upper cantilever beam (8) and the lower cantilever beam (14).
9. A large cantilever structure for balancing insufficient end weight according to claim 8, characterized in that: The cantilever truss further comprises a plurality of cantilever diagonal rods (9), one end of each cantilever diagonal rod (9) is fixedly connected to the upper cantilever beam (8), and the other end of each cantilever diagonal rod (9) is fixedly connected to the lower cantilever beam (14).
10. A construction method for a large cantilever structure with insufficient balance end weight, characterized in that: The following steps are included: S1: Construction foundation, balanced truss, cantilever truss and scaffolding (15), wherein the balanced truss is arranged on the foundation, the cantilever truss is arranged on the outside of the balanced truss, and the scaffolding (15) is arranged under the cantilever truss. The balanced truss comprises an upper crossbeam (1), a lower crossbeam (2) and a plurality of frame columns (5), wherein the upper crossbeam (1) and the lower crossbeam (2) are arranged horizontally at intervals, and the plurality of frame columns (5) are arranged vertically at intervals, wherein the top of the frame column (5) is fixedly connected to the upper crossbeam (1), and the middle of the frame column (5) is fixedly connected to the lower crossbeam (2). Among the frame columns (5), the two frame columns (5) which are the farthest and the second farthest from the cantilever truss are steel columns; S2: Transversely cut the frame column (5) farthest from the cantilever truss to form an upper pre-tension column (17) and a lower pre-tension column (20), and transversely cut the frame column (5) second farthest from the cantilever truss to form an upper rear welding column and a lower rear welding column; S3: a pre-tension node (16) is arranged between the upper rear welding column and the lower rear welding column, and the upper pre-tension column (17) and the lower pre-tension column (20) are welded with equal strength; S4: Weld the upper rear welding column and the lower rear welding column with equal strength; S5: pouring concrete into the frame column (5) farthest from the cantilever truss to form a pre-tensioned column (3), pouring concrete into the frame column (5) second farthest from the cantilever truss to form a rear welded column (4), the bottom ends of the pre-tensioned column (3), the rear welded column (4) and the frame column (5) are fixedly connected to the foundation; S6: Remove the scaffold (15).
Citation Information
Patent Citations
Large-span long-cantilever connection structure and construction technique
CN104818772A
Formwork with high cantilever structure and construction method thereof
CN105019639A
Steel structure cantilever beam of high-rise building
CN212026573U
A large cantilever structure for insufficient counterweight at the balancing end
CN215211486U