A garbage storage

By setting up partitions in the garbage warehouse to separate multiple compartments, the problems of inconvenient partitioning of garbage materials and insufficient anaerobic fermentation in the design of the garbage warehouse are solved, the effective storage capacity and fermentation efficiency of the garbage warehouse are improved, and the water content of the garbage is reduced rate and equipment load, improving combustion efficiency.

CN112443846BActive Publication Date: 2024-10-22SHANGHAI INSTALLATION ENGINEERING GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011327731.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-11-24
Publication Date
2024-10-22
Estimated Expiration
2040-11-24

AI Technical Summary

Technical Problem

The waste warehouse design of existing domestic waste incineration power plants lacks segmentation, which results in inconvenient partitioning and sequential segmentation of new and old waste materials. It is difficult to form and maintain anaerobic fermentation space, resulting in high waste moisture content, low calorific value, heavy equipment load, and operational problems. The cost is high and the effective storage capacity is insufficient.

Method used

Design a garbage storage warehouse, which is divided into multiple compartments by setting up a number of partitions in the warehouse, including an unloading compartment, a turnover compartment and a fermentation compartment. It is also divided into two equal rows along the longitudinal direction, and each row is divided into two equal rows. Divide into multiple rows to form multiple storage spaces, increase high material level filter press pressure and standing leakage time, reduce ineffective operations, reduce moisture content, and improve calorific value and equipment efficiency.

Benefits of technology

It increases the effective storage capacity and fermentation time of the garbage bin, extends the standing time of the leachate liquid, reduces the moisture content of the garbage in front of the furnace, reduces unnecessary water evaporation and equipment load, and improves combustion efficiency and equipment utilization. Rate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112443846B_ABST
    Figure CN112443846B_ABST
Patent Text Reader

Abstract

The present invention relates to a garbage storage, including a storage warehouse, a plurality of partitions are arranged in the storage warehouse, and the storage warehouse is divided into a plurality of compartments with upper openings, the compartments are divided into a discharge compartment, a turnover compartment, a fermentation compartment and a loading compartment, wherein the loading compartment and the turnover compartment are adjacent to the discharge compartment. Compared with the prior art, the present invention increases the effective storage capacity of the garbage warehouse, and can extend the fermentation time (especially anaerobic fermentation) of the garbage by an average of 30%, increases the filter pressure of the garbage leachate, extends the static drainage time, and produces more leachate, thereby reducing the moisture content of the garbage before entering the furnace, increasing the calorific value and power generation of the garbage incineration, and further reducing the air volume, reducing the load of the fan equipment and the dust removal, deacidification and denitrification equipment, and reducing the equipment investment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of garbage storage in the domestic garbage incineration power generation industry and relates to a garbage storage reservoir. Background Art

[0002] As waste recycling, reduction, resource utilization and domestic waste incineration power generation have become a high-speed stage for environmental protection and economic development, how to improve the economic efficiency of domestic waste has become an important issue.

[0003] According to relevant research literature, after a certain period of anaerobic fermentation (5-6 days) of domestic waste, the organic matter in the domestic waste can separate a part of the water after fermentation (including hydrolysis), and the large molecular long-chain organic matter is decomposed into smaller molecular organic matter. The small molecular organic matter has a shorter combustion time, higher calorific value, and higher combustion temperature. According to the introduction of multiple regions and relevant literature, the composition and calorific value of domestic waste vary greatly, and the moisture content also has a certain range of variation, which can reach 45-55%. According to relevant internal information, for every 1% decrease in the moisture content of general garbage, its calorific value increases by 160kJ / kg (ie 40kcal / kg). The current large proportion of moisture content makes the technological innovation of reducing moisture content have great space and development prospects.

[0004] Reducing the moisture content of the garbage entering the furnace has great economic value. In addition to increasing the calorific value, reducing the moisture content of the garbage entering the furnace also reduces the amount of primary and secondary air, hot air, deacidification and denitration gas, dust removal gas, total exhaust flue gas, etc., and permanently reduces the corresponding grate equipment load, various high-power fans (primary and secondary air, deacidification and denitration, dust removal, exhaust gas) equipment load and other equipment load, thereby reducing equipment investment, reducing operating costs, and achieving better economic efficiency.

[0005] According to the design and layout of many current domestic waste incineration power plants, the garbage storage in front of the incinerator is a complete overall space without any internal division. The advantage of the overall space is that it is unobstructed, which is convenient for the lifting, movement and operation of the garbage crane, but it is not conducive to the new and old partitions and sequential segmentation operations of garbage materials. The exposed surface of the garbage slope in a large space and the negative pressure space with a large flow of air are also not conducive to the large-scale formation and long-term maintenance of local anaerobic fermentation space. High-level garbage materials are very easy to slide and collapse when piled up, and garbage materials in a large area of ​​the bottom space will be retained for a long time and have poor turnover or very low turnover efficiency. The high-level materials in fewer areas and the garbage materials in the large slope area result in less seepage pressure on the garbage materials, and less seepage water; frequent garbage grabbing and scattering will cause the garbage materials to frequently squeeze and shift each other, resulting in a shorter garbage static time, less time for the seepage water to flow due to static, and less total amount of seepage water reaching the bottom of the storage.

[0006] Due to the existence of the accumulation angle of domestic waste materials and wet and smooth collapse, while it strengthens the sufficient mixing, it also leads to many invalid lifting operations and waste of lifting operation time for the garbage crane and grab bucket in the garbage bin; when calculating the effective storage capacity, due to the existence of the accumulation angle of garbage materials and wet and smooth collapse, the general design is also based on the stacking angle of the space above the garbage unloading door, or half of the triangle formed by the height of the side wall of the hopper into the furnace, so there is a lot of invalid storage capacity, which reduces the total effective storage capacity of the garbage bin and reduces the garbage bin's ability to carry more domestic waste that may be generated due to peak times such as maintenance, seasons, and festivals. Summary of the invention

[0007] The purpose of the present invention is to provide a garbage storage reservoir to improve the efficiency of domestic garbage fermentation, especially anaerobic fermentation, and the effective storage capacity in the garbage storage reservoir. Specifically, the reasons may be to form more fermentation space and maintain the fermentation space for a longer time, increase the high material level filter pressure and static leaching time, reduce the ineffective operation of the garbage hoist, reduce the moisture content of the garbage, increase the calorific value of the garbage, reduce various air volumes and equipment loads, reduce operating costs and / or increase the effective domestic garbage storage capacity. The present invention aims to propose a new garbage storage reservoir in front of the incinerator of a domestic garbage incineration power plant.

[0008] The purpose of the present invention can be achieved by the following technical solutions:

[0009] A garbage storage warehouse comprises a storage warehouse, in which a plurality of partitions are arranged to divide the storage warehouse into a plurality of compartments with open upper parts, wherein the compartments are divided into a discharge compartment, a turnover compartment, a fermentation compartment and a loading compartment, wherein the loading compartment and the turnover compartment are both adjacent to the discharge compartment.

[0010] Furthermore, the storage warehouse is divided into two equal columns by a partition along the longitudinal direction (the same as the unloading direction of the tail of the garbage truck with the unloading door), and each column is further divided into 5 or n rows, where n is a positive integer greater than or equal to 4 and less than or equal to 6, to form 2n equal storage spaces, wherein the two storage spaces in the middle part of a column close to the unloading side of the garbage truck are combined into the unloading cabin, and the total number of compartments is 2n-1. The remaining storage spaces are formed into a separate compartment, and the compartment adjacent to the unloading compartment is the turnover compartment.

[0011] Furthermore, a compartment in the middle of the side away from the unloading side of the garbage truck is the loading compartment.

[0012] Furthermore, the partitions surrounding the fermentation chamber are of the same height and are flush with the top opening of the upper hopper of the garbage incinerator located next to the garbage storage warehouse.

[0013] Furthermore, the height of the partition between the unloading chamber and the turnover chamber is flush with the floor of the unloading hall where the garbage truck is located.

[0014] Furthermore, the height of the partition between the unloading cabin and the loading cabin is between the height of the partition surrounding the fermentation cabin and the height of the partition between the unloading cabin and the turnover cabin.

[0015] Furthermore, the height of the partition between the discharge tank and the loading tank is 65-75% of the height of the partitions forming the fermentation tank. More preferably, the height of the partition between the discharge tank and the loading tank is 70% of the height of the partitions forming the fermentation tank.

[0016] Furthermore, the bottom of the compartment is sloped and provided with a leachate groove directly connected to a leachate collection tank.

[0017] Furthermore, a garbage crane grab bucket which can move freely and is used to transfer garbage materials is also provided on the upper part of the storage warehouse.

[0018] Compared with the prior art, the present invention improves the effective storage capacity of the garbage storage, and can increase the storage capacity by more than 10% or more than half a day compared with the garbage storage of the same overall size, prolongs the fermentable time of garbage (especially anaerobic fermentation) by an average of 30%, increases the filtration pressure of the garbage leachate, prolongs the static drainage time, and produces more leachate, thereby reducing the moisture content of the garbage in front of the furnace, reducing the evaporation of unnecessary water in the garbage (water evaporation absorbs heat and the water is pumped to the furnace by the negative pressure in the storage, reducing the overall energy utilization efficiency and the failure to remove the water as a whole), heating and cooling, and the loss of waste heat, improving the dryness of the garbage entering the furnace and the calorific value per unit mass, reducing the air volume of the primary and secondary air of the incinerator and the subsequent hot air volume, denitrification, deacidification and dust removal air volume, and the total amount of exhaust flue gas, reducing the total load intensity of the grate and a large number of fans, and sufficient fermentation (especially anaerobic fermentation) causes more materials to participate in combustion in the form of small molecules, achieving a shorter combustion time and a higher combustion temperature. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the plan layout of the garbage storage of the present invention;

[0020] Figure 2 This is a schematic diagram of the elevation layout of the garbage storage facility;

[0021] Description of the markings in the figure:

[0022] 1-storage warehouse, 2-partition, 21-first partition, 22-second partition, 23-third partition, 3-unloading cabin, 4-turnover cabin, 5-fermentation cabin, 6-loading cabin, 7-garbage truck, 8-furnace loading hopper, 9-garbage crane grab bucket. DETAILED DESCRIPTION

[0023] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.

[0024] In the following implementation manners or examples, unless otherwise specified, functional components or structures are conventional components or structures used in the art to achieve corresponding functions.

[0025] In order to improve the efficiency of domestic waste fermentation, especially anaerobic fermentation and the effective storage capacity of the waste storage, the present invention provides a waste storage. Figure 1 and Figure 2 As shown, it includes a storage warehouse 1, in which a plurality of partitions 2 are arranged, and the storage warehouse 1 is divided into a plurality of compartments with open upper parts, and the compartments are divided into a discharge compartment 3, a turnover compartment 4, a fermentation compartment 5 and a loading compartment 6, wherein the loading compartment 6 and the turnover compartment 4 are both adjacent to the discharge compartment 3.

[0026] In a specific implementation, please refer to Figure 1 and Figure 2 As shown, the storage warehouse 1 is divided into two equal columns by the partition 2 in the longitudinal direction, and each column is further divided into 5 or n rows, wherein n is a positive integer greater than or equal to 4 and less than or equal to 6, so as to form 2n equal storage spaces, wherein the two storage spaces in the middle part of a column close to the unloading side of the garbage truck 7 are combined into the unloading cabin 3, and the total number of cabins is 2n-1. The remaining storage spaces are formed into a separate compartment, and the compartment adjacent to the unloading compartment 3 is the turnover compartment 4.

[0027] In a more specific embodiment, the middlemost compartment on the side away from the unloading side of the garbage truck 7 is the loading compartment 6 .

[0028] In a specific implementation, please refer to Figure 1 As shown in the figure, the partition 2 (i.e., the first partition 21) surrounding the fermentation chamber 5 is of the same height and is flush with the top of the upper hopper 8 of the garbage incinerator located next to the garbage storage warehouse, thereby making full use of the effective volume of the garbage storage warehouse to the maximum extent, which is more than 10% higher than the effective storage capacity of a large-span garbage storage warehouse without partition boards, or increasing the storage capacity of domestic garbage for more than half a day of rated capacity.

[0029] In a specific implementation, please refer to Figure 2 As shown in FIG. 1 , the height of the partition 2 (i.e., the second partition 22 ) between the unloading compartment 3 and the turnover compartment 4 is flush with the floor of the unloading hall where the garbage truck 7 is located.

[0030] In a specific implementation, please refer to Figure 2 As shown in FIG. 1 , the height of the partition 2 (i.e., the third partition 23 ) between the unloading cabin 3 and the loading cabin 6 is between the heights of the partition 2 surrounding the fermentation cabin 5 and the partition 2 between the unloading cabin 3 and the turnover cabin 4 .

[0031] For more specific implementations, please refer to Figure 2 As shown in the figure, the height of the partition 2 between the unloading cabin 3 and the loading cabin 6 is 65-75% of the height of the partition 2 that surrounds the fermentation cabin 5, and the effective volume of the loading cabin 6 determined by the height of its lowest partition 2 is about 65-75% of the volume of the fermentation cabin 5. Therefore, the effective volume of the turnover cabin 4 used for loading the fermented garbage mixture only needs to be about 25-35% of the volume of the fermentation cabin 5. From the above, it can be seen that the volume ratio of the unloading cabin 3 to the turnover cabin 4 is 2:1, that is, the volume of the turnover cabin 4 is one-third of the total volume of the entire factory unloading cabin 3. In this way, the effective volume of the entire garbage storage warehouse is as large as possible, and the turnover efficiency will not be reduced due to the excessive travel of the garbage crane grab 9 during the garbage transfer process. More preferably, the height of the partition 2 between the unloading cabin 3 and the loading cabin 6 is 70% of the height of the partition 2 that surrounds the fermentation cabin 5.

[0032] In a specific implementation, please refer to Figure 2 As shown in the figures, the bottom of the compartment is sloped and provided with a leachate groove directly connected to the leachate collection tank.

[0033] In a specific implementation, please refer to Figure 2 As shown in Figures 1 and 2, the upper part of the storage warehouse 1 is also provided with a garbage crane grab 9 which can move freely and is used to transfer garbage materials.

[0034] The above embodiments may be implemented individually or in any combination of two or more.

[0035] The above implementation is described in more detail below in conjunction with specific examples.

[0036] Example 1

[0037] In order to improve the efficiency of domestic waste fermentation, especially anaerobic fermentation and the effective storage capacity of the waste storage, this embodiment provides a waste storage. Figure 1 and Figure 2 As shown, it includes a storage warehouse 1, in which a plurality of partitions 2 are arranged, and the storage warehouse 1 is divided into a plurality of compartments with open upper parts, and the compartments are divided into a discharge compartment 3, a turnover compartment 4, a fermentation compartment 5 and a loading compartment 6, wherein the loading compartment 6 and the turnover compartment 4 are both adjacent to the discharge compartment 3.

[0038] Please see again Figure 1 and Figure 2 As shown, the storage warehouse 1 is divided into two equal columns by the partition 2 in the longitudinal direction, and each column is further divided into 5 rows to form 10 equal storage spaces, among which the two storage spaces in the middle part of a column close to the unloading side of the garbage truck 7 are combined into the unloading cabin 3, and the remaining storage spaces are formed into a separate compartment, and the compartment adjacent to the unloading cabin 3 is the turnover cabin 4. The most middle compartment on the side away from the unloading side of the garbage truck 7 is the loading cabin 6.

[0039] Please see again Figure 1 As shown in the figure, the partition 2 (i.e., the first partition 21) that encloses the fermentation chamber 5 is of the same height and is flush with the top of the upper hopper 8 of the garbage incinerator located next to the garbage storage warehouse, thereby making full use of the effective volume of the garbage storage warehouse to the maximum extent, which is more than 10% higher than the effective storage capacity of a large-span garbage storage warehouse without partition boards, or increasing the storage capacity of domestic garbage for more than half a day of rated capacity.

[0040] Please see again Figure 2 As shown in FIG. 1 , the height of the partition 2 (i.e., the second partition 22 ) between the unloading compartment 3 and the turnover compartment 4 is flush with the floor of the unloading hall where the garbage truck 7 is located.

[0041] Please see again Figure 2 As shown in FIG. 1 , the height of the partition 2 (i.e., the third partition 23 ) between the unloading cabin 3 and the loading cabin 6 is between the height of the partition 2 surrounding the fermentation cabin 5 and the height of the partition 2 between the unloading cabin 3 and the turnover cabin 4 .

[0042] Please see again Figure 2 As shown in the figure, the height of the partition 2 between the unloading cabin 3 and the loading cabin 6 is 65-75% of the height of the partition 2 that encloses the fermentation cabin 5, and the effective volume of the loading cabin 6 determined by the height of its lowest partition 2 is about 65-75% of the volume of the fermentation cabin 5. Therefore, the effective volume of the turnover cabin 4 used for loading the fermented garbage mixture only needs to be about 25-35% of the volume of the fermentation cabin 5. From the above, it can be seen that the volume ratio of the unloading cabin 3 and the turnover cabin 4 is 2:1, that is, the volume of the turnover cabin 4 is one-third of the total volume of the entire factory unloading cabin 3. In this way, the effective volume of the entire garbage storage warehouse is as large as possible, and the turnover efficiency will not be reduced due to the excessive travel of the garbage crane grab 9 during the garbage transfer process. More preferably, the height of the partition 2 between the unloading cabin 3 and the loading cabin 6 is 70% of the height of the partition 2 that encloses the fermentation cabin 5.

[0043] Please see again Figure 2 As shown in the figure, the bottom of the compartment is sloped and provided with a leachate groove directly connected to the leachate collection tank.

[0044] Please see again Figure 2As shown in FIGS. 1 and 2 , a garbage crane grab bucket 9 which can move freely and is used to transfer garbage materials is also provided on the upper part of the storage warehouse 1.

[0045] In the specific use of this embodiment, the storage warehouse 1 is divided into nine compartments by the partition 2. The volume of a single fermentation compartment is the total volume of the rated 24-hour incoming garbage unloading plus a certain proportion of the design margin, and the total volume of the unloading compartment 3 and the turnover compartment 4 is the total volume of the rated 24-hour incoming garbage unloading plus a certain proportion of the design margin. In general, the rated 24-hour incoming garbage unloading volume plus a certain proportion of the margin can be stored in any fermentation compartment 5.

[0046] During normal operation, the fermentation tanks 5 are numbered in sequence, such as from 3 to 8. Every day or every 24 hours, after the unloading tank 3 and the turnover tank 4 are respectively unloaded and mixed, one fermentation tank 5 is filled, and at the same time, the other fermentation tank 5, which has been left to ferment for 5-6 days, is discharged, and the materials are mixed in the loading tank 6 and the turnover tank 4 respectively, and then enter the incinerator feed hopper. Multiple fermentation tanks 5 are loaded and discharged in sequence every 5-6 days.

[0047] See also Figure 1 In the direction of the arrow on the upper right side, the unloading chamber 3 is dedicated to receiving unloading, and it continuously receives unloading and mixing materials within a fixed 15 hours out of 24 hours a day; within 62.5% of the total loading (full) time of about 10 hours in the fermentation chamber 5, that is, within 6.25 hours, the materials in the unloading chamber 3 are lifted by the garbage crane and evenly loaded layer by layer into the fermentation chamber 5. Within the other 37.5% of the total loading (full) time of about 10 hours, that is, within 3.75 hours, the fermentation chamber 5 is evenly loaded with garbage materials from the turnover chamber 4 after receiving unloading and mixing materials for 9 hours (the other 9 hours after the first 15 hours out of 24 hours a day).

[0048] See also Figure 1 In the direction of the arrow on the lower right side, after the turnover cabin 4 has completed the aforementioned total of about 9+3.75=12.75 hours of fresh garbage materials for 9 hours of unloading and mixing and 3.75 hours of discharging, it begins to receive 30% of the fermented materials from the fermentation cabin 5 for 3 hours. After mixing, this 30% of the fermented materials begins to feed the incinerator feed hopper for 7.2 hours. At the same time, the other 70% of the fermented materials in the same fermentation cabin 5 begin to discharge to the loading cabin 6 for 7 hours. After mixing in the loading cabin 6, this 70% of the fermented materials begin to feed the incinerator feed hopper for 16.8 hours (i.e., another 16.8 hours outside the 7.2 hours mentioned above).

[0049] Ensure that the turnover chamber 4 completes 9 hours of fresh material receiving, unloading and mixing, 3.75 hours of discharging to the emptied fermentation chamber 5, then 3 hours of receiving 30% of the fermentation material from another fermentation chamber 5, and then 7.2 hours of feeding to the incinerator feed hopper.

[0050] Ensure that the loading chamber 6 completes 7 hours of receiving the remaining 70% of the fermentation material from the same fermentation chamber 5 within 24 hours, and the subsequent 16.8 hours of feeding the incinerator feed hopper.

[0051] Ensure that the unloading chamber 3 completes the 15-hour fresh material unloading and mixing within 24 hours, and the fermentation chamber 5 is emptied after the subsequent 6.25-hour discharge.

[0052] Ensure that the fermentation tank 5 completes receiving the mixed fresh materials from the unloading tank 3 and the turnover tank 4 within 6.25 hours and 3.75 hours respectively. After that, the garbage materials in the fermentation tank 5 are left to stand, fully fermented, fully compressed, and fully drained for 5-6 days before entering the next round of fermentation material discharging and mixing stage, that is, 30% of the fermentation material is discharged to the turnover tank 4 for 3 consecutive hours, and 70% of the fermentation material is discharged to the loading tank 6 in the next 7 hours. After the fermentation tank 5 is emptied, it enters the next round of fresh material feeding stage, and this cycle repeats.

[0053] To ensure uniform mixing of garbage materials, the garbage crane grab 9 tries to first take materials from the center of the cabin at every 4-6 meter elevation, and tries to produce enough garbage materials to slide and collapse to promote mixing; the garbage crane grab 9 tries to evenly shift and drop materials in circles and layers at higher levels in the cabin in a U-shaped pattern when dropping materials. Afterwards, at another 4-6 meter elevation, the garbage crane grab 9 tries to evenly shift and drop materials in circles and layers in the cabin in a U-shaped pattern when dropping materials. When the garbage crane grab 9 drops materials, it tries to first drop materials from the higher center of the cabin, and tries to produce enough garbage materials to slide and collapse to promote mixing. That is, center material picking and circle material picking are performed alternately at every 4-6 meter elevation, while dropping materials is the opposite.

[0054] To ensure uniform mixing of garbage materials, fermentation chamber 5 is scheduled to feed and discharge materials to the two chambers respectively; after reasonable scheduling, especially when fermentation chamber 5 has a fermentation time of 5 to 6 days, cross-feeding and cross-discharging can be achieved to achieve the goal of fully mixing domestic garbage materials. (Such cross-feeding and discharging requires a higher crane grab load capacity)

[0055] In the garbage storage warehouse of this embodiment, equipment such as the garbage crane grab bucket 9 on the top of the warehouse are all conventional equipment in the field. In addition, the materials used for the walls of the partition 2 and the storage warehouse 1 can be reinforced concrete or stainless steel plates or galvanized steel plates or other materials, and the grooves and slopes set at the bottom of the compartment are to facilitate the flow of leachate water to the leachate collection pool. The top of the storage warehouse 1 is also provided with an exhaust main pipe and branch pipes to ensure negative pressure in the warehouse and prevent odor from overflowing and leaking.

[0056] Example 2

[0057] Compared with Example 1, most of them are the same, except that the storage warehouse 1 in this embodiment is divided into seven compartments by the partition 2, of which four are fermentation compartments 5, and the remaining three are the unloading compartment 3, the turnover compartment 4 and the loading compartment 6.

[0058] The above description of the embodiments is to facilitate the understanding and use of the invention by those skilled in the art. It is obvious that those skilled in the art can easily make various modifications to these embodiments and apply the general principles described herein to other embodiments without creative work. Therefore, the present invention is not limited to the above embodiments, and improvements and modifications made by those skilled in the art based on the disclosure of the present invention without departing from the scope of the present invention should be within the scope of protection of the present invention.

Claims

1. A garbage storage facility, characterized in that: It includes a storage warehouse, in which a plurality of partitions are arranged, and the storage warehouse is divided into a plurality of compartments with upper openings, and the compartments are divided into a discharge compartment, a turnover compartment, a fermentation compartment and a loading compartment, wherein the loading compartment and the turnover compartment are both adjacent to the discharge compartment; The storage bin is divided into two equal columns by a partition along the unloading direction of the tail of the garbage truck at the unloading door, and each column is further divided into n rows, wherein n is a positive integer greater than or equal to 4 and less than or equal to 6, so as to form 2n equal storage spaces, wherein the two storage spaces in the middle part of a column close to the unloading side of the garbage truck are combined into the unloading cabin, and the remaining storage spaces are formed into a separate compartment, and the compartment adjacent to the unloading compartment is the turnover compartment; The middle compartment on the side away from the unloading side of the garbage truck is the loading compartment; The partitions surrounding the fermentation chamber are of equal height and flush with the top opening of the upper hopper of the garbage incinerator located next to the garbage storage warehouse; The height of the partition between the unloading compartment and the turnover compartment is flush with the floor of the unloading hall where the garbage truck is located; The height of the partition between the unloading cabin and the loading cabin is 65-75% of the height of the partition that surrounds the fermentation cabin, and the effective volume of the loading cabin determined by the height of its lowest partition is 65-75% of the volume of the fermentation cabin. Therefore, the effective volume of the turnover cabin used for loading the mixed garbage after fermentation only needs to be 25-35% of the volume of the fermentation cabin. From the above, it can be seen that the volume ratio of the unloading cabin and the turnover cabin is 2:1, that is, the volume of the turnover cabin is one third of the total volume of the entire factory unloading cabin. In this way, the effective volume of the entire garbage storage depot is as large as possible, and the turnover efficiency will not be reduced due to the excessive stroke of the garbage crane grab during the garbage transfer process.

2. A garbage storage according to claim 1, characterized in that: The bottom of the compartment is sloped and provided with a leachate groove directly connected to a leachate collection pool.

3. A garbage storage according to claim 1, characterized in that: The upper part of the storage warehouse is also provided with a garbage crane grab bucket which can move freely and is used to transfer garbage materials.