Gas Insulated Busway Production Process
By introducing a positioning clamping mechanism and a closing mechanism into the bus duct production line, the problem of bus duct shell deflection during transportation is solved, production efficiency and quality are improved, and stable positioning and efficient production of the bus duct are achieved.
Patent Information
- Application Number
- CN202011318400.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-11-23
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2040-11-23
AI Technical Summary
Commonly used bus duct production lines lack a clamping fixture for the bus duct shell, which causes the bus duct to easily shift during transportation, affecting production efficiency and quality.
A gas insulated bus duct production process and device is designed, which uses a positioning and clamping mechanism, including a slide rail, a slide trough, a slide block, a cylinder and a sensor. The sensor senses the position of the bus duct and controls the cylinder to extend the clamping plate and fix the bus bar. The tank shell prevents deflection, and a closing and fixing mechanism is provided at the paint box and nozzle to ensure the stability of the production process.
It effectively prevents the bus duct shell from deflecting, reduces production errors, improves production efficiency and device practicability, and ensures high-quality production of bus ducts.
Smart Images

Figure CN112452592B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bus duct production, in particular to a gas insulated bus duct and a production process thereof. Background Art
[0002] Bus duct is a closed metal device composed of copper and aluminum busbars. It is used to distribute large power to various components of the distributed system. It has increasingly replaced wires and cables in indoor low-voltage power transmission trunk line projects. It has become popular in developed countries abroad and Hong Kong and Macao in my country. In Guangzhou, Guangdong, my country, more than 90% of the main lines leading to the distribution rooms of buildings with more than 12 floors use bus ducts; bus ducts are used from 630KVA transformers to distribution cabinets. Gas-insulated bus ducts use separated air insulation, which improves the heat dissipation of the bus duct and reduces impedance; high-strength epoxy resin is used for internal insulation to improve the anti-freeze and thermal stability of the bus duct.
[0003] Gas insulated bus duct is produced on an assembly line. During transportation on the assembly line, the outer shell of the bus duct needs to be positioned and clamped. However, the commonly used bus duct production line does not have a clamp for clamping the bus duct outer shell, which makes the bus duct outer shell easily shift during transportation, causing production errors, which in turn affects the production efficiency of the gas insulated bus duct. Therefore, it is necessary to design the gas insulated bus duct and its production process. Summary of the invention
[0004] The object of the present invention is to provide a gas-insulated bus duct and a production process thereof, so as to solve the problem that the commonly used bus duct production line proposed in the above background technology does not have a clamp for clamping the bus duct shell, which makes the bus duct shell easily shifted during transportation, thereby causing production errors, which in turn affects the production efficiency of the gas-insulated bus duct.
[0005] To achieve the above object, the present invention provides the following technical solution: A gas insulated bus duct production process comprises the following steps: placing a bus duct shell on the surface of a conveying platform and clamping it by a positioning device;
[0006] In the second step, the conveyor platform transports the bus duct shell together with the positioning device to the bottom of the roller for roller forming.
[0007] In the third step, after the bus duct shell is formed, it is transported to the painting area for painting and electroplating.
[0008] The fourth step is to inspect the bus duct shell after painting and electroplating, and then discharge the material after passing the inspection.
[0009] It comprises a gas insulated bus duct production device, the gas insulated bus duct production device comprises a device body, the device body comprises a production line body, a No. 1 conveying device is fixedly installed on the top of the production line body, and one end of the No. 1 conveying device is fixedly connected to a No. 1 motor, a No. 1 arch is fixedly installed on the top of the production line body, a hydraulic telescopic cylinder is fixedly installed on the top of the No. 1 arch, the hydraulic telescopic cylinder passes through the No. 1 arch and extends to the end of the No. 1 arch fixedly installed with a pressure roller, and one end of the pressure roller is fixedly connected to a No. 2 motor, a No. 2 conveying device is fixedly installed on one side of the No. 1 conveying device at the top of the production line body, and one end of the No. 2 conveying device is fixedly connected to a No. 3 motor, a No. 2 arch is fixedly installed on the top of the production line body, and the No. 2 arch is located above the No. 2 conveying device, a paint box is fixedly installed on the top of the No. 2 arch, one end of the paint box is fixedly connected to a water pump, one end of the water pump is fixedly connected to a conveying pipe, a spray gun is fixedly installed on the bottom of the No. 2 arch, and One end of the spray gun is fixedly connected to one end of the conveying pipe, and a nozzle is movably installed on one end of the spray gun, a No. 3 arch frame is fixedly installed on one side of the No. 2 arch frame at the top of the production line body, a detector body is fixedly installed inside the No. 3 arch frame, a fixed frame is fixedly installed on one end of the No. 3 arch frame, a display instrument is fixedly installed on the front of the fixed frame, a discharging rack is fixedly installed on one end of the production line body, a No. 2 fixed plate is fixedly installed on the bottom end of the production line body, and a control panel is fixedly installed on the front of the No. 2 fixed plate, and a positioning clamping mechanism is provided inside the No. 1 conveying device and the No. 2 conveying device, and the positioning clamping mechanism includes a No. 1 slide rail, and a No. 1 slide rail is fixedly installed at both ends of the No. 1 conveying device and the No. 2 conveying device, and a No. 1 slide groove is provided inside the No. 1 slide rail, and a No. 1 slide groove is evenly slidably installed inside the No. 1 slide groove, and a cylinder is fixedly installed inside the No. 1 slide block, one end of the cylinder is fixedly connected with a sensor, and one end of the clamping plate is fixedly installed with a sensor.
[0010] Preferably, a closing mechanism is provided at one end of the paint box, and the closing mechanism includes a fixed shaft, a fixed shaft is fixedly installed at one end of the paint box, a baffle is movably installed at one end of the fixed shaft, a No. 1 connecting shaft is fixedly installed at one end of the baffle, a No. 1 fixed clamping rod is fixedly installed at one end of the No. 1 connecting shaft, a connecting plate is fixedly installed at one end of the baffle, a No. 2 spring is fixedly installed at one end of the connecting plate, and one end of the No. 2 spring is fixedly connected to the No. 1 fixed clamping rod, a fixed block is fixedly installed at one end of the paint box, a No. 1 clamping slot is provided at one end of the fixed block, and one end of the No. 1 fixed clamping rod extends to the inside of the No. 1 clamping slot.
[0011] Preferably, a fixing mechanism is provided at both ends of the spray head, and the fixing mechanism includes a fixing box, and both ends of the spray head are fixedly installed with a fixing box, and the interior of the fixing box is movably installed with a fixing bolt, and the interior of the fixing box is fixedly installed with a No. 3 spring, and one end of the No. 3 spring is fixedly connected to the fixing bolt, and one end of the fixing bolt is fixedly installed with a No. 1 pull rod, and one end of the No. 1 pull rod extends to the outside of the fixing box, and both ends of the spray gun are provided with a No. 2 slot, and one end of the fixing bolt extends to the inside of the No. 2 slot.
[0012] Preferably, a maintenance mechanism is provided on the front side of the No. 3 arch frame, and the maintenance mechanism includes hinges. Hinges are evenly fixedly installed on the front side of the No. 3 arch frame, and an inspection door is fixedly installed on one end of the hinge. A No. 2 fixed clamping rod is fixedly installed on the front side of the inspection door. A connecting block is fixedly installed on the front side of the No. 3 arch frame, and a cavity is opened inside the connecting block, and a No. 2 connecting shaft is fixedly installed inside the cavity, and a No. 3 fixed clamping rod is fixedly connected to one end of the No. 2 connecting shaft, and a No. 4 spring is fixedly installed inside the cavity, and one end of the No. 4 spring is fixedly connected to the No. 3 fixed clamping rod, one end of the No. 2 fixed clamping rod extends to the inside of the cavity and engages with the No. 3 fixed clamping rod, and one end of the No. 2 pull rod is fixedly installed on one end of the No. 3 fixed clamping rod, and one end of the No. 2 pull rod extends to the outside of the connecting block.
[0013] Preferably, a cleaning mechanism is provided on the front of the fixed frame, and the cleaning mechanism includes a No. 2 slide rail, and the No. 2 slide rail is evenly fixedly installed on the front of the fixed frame, and a No. 2 slide groove is opened inside the No. 2 slide rail, and a No. 2 slider is slidably installed inside the No. 2 slide groove, and one end of the No. 2 slider is fixedly connected with a cleaning brush, and one end of the cleaning brush abuts against the surface of the display.
[0014] Preferably, a No. 1 fixing plate is fixed to one end of the discharging rack, a No. 1 spring is evenly fixedly installed on one end of the No. 1 fixing plate, and a blocking block is fixedly installed on one end of the No. 1 spring.
[0015] Preferably, one end of the clamping plate is provided with anti-slip grooves.
[0016] Preferably, a No. 1 magnetic block is fixedly mounted on one end of the No. 2 sliding block, a No. 2 magnetic block is fixedly mounted on one end of the No. 2 sliding groove, and the No. 1 magnetic block and the No. 2 magnetic block are adsorbed to each other.
[0017] Compared with the prior art, the present invention has the following beneficial effects:
[0018] By providing a No. 1 slide rail, a No. 1 slide slot, a No. 1 slider, a cylinder, a clamping plate and a sensor, the sensor is provided to perform sensing monitoring on the bus duct shell. When the bus duct is sensed, the sensor controls the cylinder to extend so that the clamping plate clamps the bus duct shell, and fixes the bus duct shell on the surface of the No. 1 conveying device for positioning, thereby preventing the bus duct shell from being offset, reducing production errors, improving production efficiency, and enhancing the practicability of the device.
[0019] By providing a fixed shaft, a baffle, a No. 1 connecting shaft, a No. 1 fixed clamping rod, a connecting plate, a No. 2 spring, a fixed block and a No. 1 clamping slot, the No. 1 fixed clamping rod at one end of the baffle is pushed by the elasticity of the No. 2 spring to engage in the fixed block inside the No. 1 clamping slot, and the baffle is fixed to one end of the paint box, so that the paint box can be closed to prevent the paint inside the paint box from spilling out, thereby improving the practicality of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic cross-sectional view of the structure of the present invention;
[0021] Figure 2 It is a schematic front view of the structure of the present invention;
[0022] Figure 3 It is a schematic top view of the structure of the present invention;
[0023] Figure 4 It is a partial enlarged schematic diagram of the positioning and clamping mechanism structure of the present invention;
[0024] Figure 5 For the present invention Figure 1 A schematic diagram of the enlarged local structure at center A;
[0025] Figure 6 For the present invention Figure 1 A magnified schematic diagram of the local structure at B in the middle;
[0026] Figure 7 It is a partially enlarged schematic diagram of the maintenance mechanism structure of the present invention;
[0027] Figure 8 It is a partially enlarged schematic diagram of the cleaning mechanism structure of the present invention;
[0028] Fig. 9 It is a partially enlarged schematic diagram of the discharge rack structure of the present invention.
[0029] In the figure: 100, device body; 110, production line body; 111, No. 1 conveying device; 112, No. 1 arch frame; 113, hydraulic telescopic cylinder; 114, pressure roller; 115, No. 2 conveying device; 116, No. 2 arch frame; 117, paint box; 118, water pump; 119, conveying pipe; 120, spray gun; 121, nozzle; 122, No. 3 arch frame; 123, detector body; 1 24, fixed frame; 125, display instrument; 126, unloading frame; 127, No. 1 fixed plate; 128, No. 1 spring; 129, blocking block; 130, No. 2 fixed plate; 131, control panel; 200, positioning clamping mechanism; 210, No. 1 slide rail; 211, No. 1 slide groove; 212, No. 1 slide block; 213, cylinder; 214, clamping plate; 215, sensor; 216, anti-slip pattern; 30 0, closing mechanism; 310, fixed shaft; 311, baffle; 312, No. 1 connecting shaft; 313, No. 1 fixed clamping rod; 314, connecting plate; 315, No. 2 spring; 316, fixed block; 317, No. 1 clamping slot; 400, fixing mechanism; 410, fixing box; 411, fixing clamping bolt; 412, No. 3 spring; 413, No. 1 pull rod; 414, No. 2 clamping slot; 500, maintenance mechanism; 5 10. Hinge; 511. Inspection door; 512. Fixed lever No. 2; 513. Connecting block; 514. Cavity; 515. Connecting shaft No. 2; 516. Fixed lever No. 3; 517. Spring No. 4; 518. Pull rod No. 2; 600. Cleaning mechanism; 610. Slide rail No. 2; 611. Slide groove No. 2; 612. Slider No. 2; 613. Cleaning brush; 614. Magnetic block No. 1; 615. Magnetic block No. 2. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] See also Figure 1-9 , an embodiment provided by the present invention:
[0032] The gas-insulated bus duct production process includes the first step of placing the bus duct shell on the surface of the conveyor platform and clamping it by a positioning device.
[0033] In the second step, the conveyor platform transports the bus duct shell together with the positioning device to the bottom of the roller for roller forming.
[0034] In the third step, after the bus duct shell is formed, it is transported to the painting area for painting and electroplating.
[0035] The fourth step is to inspect the bus duct shell after painting and electroplating, and then discharge the material after passing the inspection.
[0036] The invention comprises a gas-insulated bus duct production device, which comprises a device body 100 and a production line body 110. The hydraulic telescopic cylinder 113, water pump 118, spray gun 120, detector body 123, and sensor 215 used in the present application are all products that can be directly purchased on the market. Their principles and connection methods are all existing technologies well known to those skilled in the art, so they are not repeated here. The device body 100 comprises a production line body 110, a No. 1 conveying device 111 is fixedly installed on the top of the production line body 110, and one end of the No. 1 conveying device 111 is fixedly connected to a No. 1 motor, a No. 1 arch frame 112 is fixedly installed on the top of the production line body 110, and a hydraulic telescopic cylinder 113, a water pump 118, a spray gun 120, a detector body 123, and a sensor 215 are all products that can be directly purchased on the market. Their principles and connection methods are all existing technologies well known to those skilled in the art, so they are not repeated here. The device body 100 comprises a production line body 110, a No. 1 conveying device 111 is fixedly installed on the top of the production line body 110, and a No. 1 motor is fixedly connected to one end of the No. 1 conveying device 111, and a No. 1 arch frame 112 is fixedly installed on the top of the No. 1 arch frame 112. A hydraulic telescopic cylinder 113 passes through the No. 1 arch frame 112 and extends to one end of the interior of the No. 1 arch frame 112, and a pressure roller 114 is fixedly installed thereon, and one end of the pressure roller 114 is fixedly connected to a No. 2 motor. A No. 2 conveying device 115 is fixedly installed on one side of the No. 1 conveying device 111 at the top of the production line body 110, and one end of the No. 2 conveying device 115 is fixedly connected to a No. 3 motor. A No. 2 arch frame 116 is fixedly installed on the top of the production line body 110, and the No. 2 arch frame 116 is located above the No. 2 conveying device 115. A paint box 117 is fixedly installed on the top of the No. 2 arch frame 116, and one end of the paint box 117 is fixedly connected to a water pump 118, and one end of the water pump 118 is fixedly connected to a conveying pipe 119. A spray gun 120 is fixedly installed at the bottom end of the arch frame 116, and one end of the spray gun 120 is fixedly connected to one end of the conveying pipe 119, a nozzle 121 is movably installed at one end of the spray gun 120, a No. 3 arch frame 122 is fixedly installed on one side of the No. 2 arch frame 116 at the top of the production line body 110, a detector body 123 is fixedly installed inside the No. 3 arch frame 122, a fixing frame 124 is fixedly installed at one end of the No. 3 arch frame 122, a display instrument 125 is fixedly installed on the front of the fixing frame 124, a discharging frame 126 is fixedly installed at one end of the production line body 110, a No. 2 fixed plate 130 is fixedly installed at the bottom end of the production line body 110, a control panel 131 is fixedly installed on the front of the No. 2 fixed plate 130, and an output of the control panel 131 The ends are electrically connected to the input ends of the hydraulic telescopic cylinder 113, the input end of the water pump 118, the input end of the spray gun 120, the input end of the detector body 123 and the input end of the sensor 215 respectively. The interiors of the No. 1 conveying device 111 and the No. 2 conveying device 115 are both provided with a positioning clamping mechanism 200, and the positioning clamping mechanism 200 includes a No. 1 slide rail 210. Both ends of the interiors of the No. 1 conveying device 111 and the No. 2 conveying device 115 are fixedly installed with the No. 1 slide rail 210, and the interiors of the No. 1 slide rail 210 are provided with No. 1 slide grooves 211, and the interiors of the No. 1 slide grooves 211 are uniformly slidably installed with No. 1 sliders 212, and the interiors of the No. 1 sliders 212 are fixedly installed with cylinders 213, and one end of the cylinders 213 is fixedly connected with sensors 215.A sensor 215 is fixedly installed at one end of the clamping plate 214. The sensor 215 is set to sense and monitor the bus duct shell. When the bus duct is sensed, the sensor 215 controls the cylinder 213 to extend, so that the clamping plate 214 clamps the bus duct shell and fixes the bus duct shell on the surface of the No. 1 conveying device 111 for positioning, preventing the bus duct shell from deviating, reducing production errors, improving production efficiency, and enhancing the practicality of the device.
[0037] Furthermore, a closing mechanism 300 is provided at one end of the paint box 117, and the closing mechanism 300 includes a fixed shaft 310, a fixed shaft 310 is fixedly installed at one end of the paint box 117, a baffle 311 is movably installed at one end of the fixed shaft 310, a No. 1 connecting shaft 312 is fixedly installed at one end of the baffle 311, a No. 1 fixed clamping rod 313 is fixedly installed at one end of the No. 1 connecting shaft 312, a No. 1 connecting shaft 312 is fixedly installed at one end of the baffle 311, a connecting plate 314 is fixedly installed at one end of the connecting plate 314, a No. 2 spring 315 is fixedly installed, and one end of the No. 2 spring 315 is fixedly installed with the No. 1 fixed clamping rod 313 is fixedly connected, a fixing block 316 is fixedly installed at one end of the paint box 117, a No. 1 card slot 317 is opened at one end of the fixing block 316, one end of the No. 1 fixing clamping rod 313 extends to the inside of the No. 1 card slot 317, and the No. 1 fixing clamping rod 313 at one end of the baffle 311 is elastically pushed by the No. 2 spring 315 to engage in the fixing block 316 inside the No. 1 card slot 317, and the baffle 311 is fixed to one end of the paint box 117, so that it can close the paint box 117 and prevent the paint inside the paint box 117 from spilling outward, thereby improving the practicability of the device.
[0038] Furthermore, a fixing mechanism 400 is provided at both ends of the nozzle 121, and the fixing mechanism 400 includes a fixing box 410, and both ends of the nozzle 121 are fixedly installed with a fixing box 410, and the interior of the fixing box 410 is movably installed with a fixing bolt 411, and the interior of the fixing box 410 is fixedly installed with a No. 3 spring 412, and one end of the No. 3 spring 412 is fixedly connected to the fixing bolt 411, and one end of the fixing bolt 411 is fixedly installed with a No. 1 pull rod 413, and the No. 1 pull rod 413 is fixedly installed. One end of the pull rod 413 extends to the outside of the fixed box 410, and a No. 2 slot 414 is opened at both ends of the spray gun 120. One end of the fixed bolt 411 extends to the inside of the No. 2 slot 414. The fixed bolt 411 is arranged to be engaged with the No. 2 slot 414 opened at both ends of the spray gun 120, which can fix the nozzle 121 to prevent the nozzle 121 from falling during spraying. At the same time, it is also convenient to disassemble and clean the nozzle 121, thereby improving the practicality of the device.
[0039] Further, the front of the No. 3 arch frame 122 is provided with an inspection mechanism 500, and the inspection mechanism 500 includes a hinge 510. The front of the No. 3 arch frame 122 is evenly fixed with the hinge 510, and one end of the hinge 510 is fixedly installed with an inspection door 511, and the front of the inspection door 511 is fixedly installed with a No. 2 fixed clamping rod 512. The front of the No. 3 arch frame 122 is fixedly installed with a connecting block 513, and a cavity 514 is opened inside the connecting block 513. A No. 2 connecting shaft 515 is fixedly installed inside the cavity 514, and one end of the No. 2 connecting shaft 515 is fixedly connected to a No. 3 fixed clamping rod 516, and a No. 4 spring 516 is fixedly installed inside the cavity 514. 7, and one end of the No. 4 spring 517 is fixedly connected to the No. 3 fixed clamp rod 516, one end of the No. 2 fixed clamp rod 512 extends to the interior of the cavity 514 and engages with the No. 3 fixed clamp rod 516, one end of the No. 3 fixed clamp rod 516 is fixedly installed with the No. 2 pull rod 518, and one end of the No. 2 pull rod 518 extends to the outside of the connecting block 513, and an openable inspection door 511 is set on the front of the No. 3 arch frame 122, which is convenient for repairing the detector body 123 when it fails. At the same time, the detector body 123 is enclosed in the interior of the No. 3 arch frame 122, which also plays a certain protective role to prevent it from being damaged, thereby improving the practicality of the device.
[0040] Furthermore, a cleaning mechanism 600 is provided on the front of the fixed frame 124, and the cleaning mechanism 600 includes a No. 2 slide rail 610. The No. 2 slide rail 610 is evenly fixedly installed on the front of the fixed frame 124. The interior of the No. 2 slide rail 610 is provided with a No. 2 slide groove 611. The interior of the No. 2 slide groove 611 is slidably installed with a No. 2 slider 612. One end of the No. 2 slider 612 is fixedly connected with a cleaning brush 613, and one end of the cleaning brush 613 is abutted against the surface of the display 125. Pulling the cleaning brush 613 can clean the surface of the display 125 and remove dust on the surface of the display 125, making it convenient to view data, timely understand the detection situation, reduce production errors, and improve the practicability of the device.
[0041] Furthermore, a No. 1 fixing plate 127 is fixed to one end of the discharge rack 126, a No. 1 spring 128 is evenly fixedly installed on one end of the No. 1 fixing plate 127, and a blocking block 129 is fixedly installed on one end of the No. 1 spring 128. The No. 1 fixing plate 127 can play a blocking role when the gas insulated bus duct is discharged. At the same time, the No. 1 spring 128 and the blocking block 129 can play a buffering role, thereby reducing the impact damage suffered by the bus duct during discharge, making it more stable to discharge, thereby improving the practicability of the device.
[0042] Furthermore, one end of the clamping plate 214 is provided with an anti-slip groove 216. The anti-slip groove 216 can increase the friction force of the clamping plate 214, so that the bus duct housing can be better positioned, thereby improving the practicality of the device.
[0043] Furthermore, a No. 1 magnetic block 614 is fixedly installed at one end of the No. 2 slider 612, and a No. 2 magnetic block 615 is fixedly installed at one end of the No. 2 slide groove 611. The No. 1 magnetic block 614 and the No. 2 magnetic block 615 are adsorbed on each other. The adsorption of the No. 1 magnetic block 614 and the No. 2 magnetic block 615 can fix the cleaning brush 613 above the display 125, thereby preventing the cleaning brush 613 from slipping and affecting data viewing, thereby improving the practicality of the device.
[0044] Working principle: When producing gas-insulated bus duct, first place the bus duct shell on the No. 1 conveying device 111, operate the control panel 131 to start the sensor 215, and after the sensor 215 senses the position of the shell, control the cylinder 213 to extend, so that the clamping plate 214 clamps and positions the bus duct shell. After the positioning is completed, operate the control panel 131 to control the No. 1 motor to start, so that the No. 1 conveying device 111 conveys the bus duct shell. After it is sent to the bottom of the No. 1 arch frame 112, operate the No. 1 fixed clamp rod 313 to control the No. 2 motor and the hydraulic telescopic cylinder 113 to start, so that the roller wheel 114 rolls the bus duct shell.
[0045] The formed bus duct shell is then conveyed to the No. 2 conveying device 115. The positioning and clamping mechanism 200 arranged on the No. 2 conveying device 115 also clamps and positions the bus duct shell. Then the control panel 131 is operated to start the No. 3 motor to enable the No. 2 conveying device 115 to convey the formed shell. After conveying it to the bottom of the No. 2 arch frame 116, the water pump 118 and the spray gun 120 are controlled to paint and electroplate the bus duct shell.
[0046] After painting and electroplating, the bus duct shell is transported to the bottom of the third arch frame 122, and the detector body 123 is started to detect the bus duct shell. The detected value is displayed on the display 125. After the test is qualified, the formed gas-insulated bus duct is discharged.
[0047] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
Claims
1. A gas-insulated bus duct production process, characterized in that: The specific production process is as follows: The first step is to place the bus duct housing on the surface of the conveyor platform and clamp it with the positioning device. In the second step, the conveyor platform transports the bus duct shell together with the positioning device to the bottom of the roller for roller forming. In the third step, after the bus duct shell is formed, it is transported to the painting area for painting and electroplating. The fourth step is to inspect the bus duct shell after painting and electroplating. After passing the inspection, the bus duct shell will be discharged. The above-mentioned gas-insulated bus duct production process is implemented using a gas-insulated bus duct production device, wherein the gas-insulated bus duct production device comprises a device body (100),The device body (100) comprises a production line body (110), a No. 1 conveying device (111) is fixedly mounted on the top of the production line body (110), and one end of the No. 1 conveying device (111) is fixedly connected to a No. 1 motor, a No. 1 arch frame (112) is fixedly mounted on the top of the production line body (110), a hydraulic telescopic cylinder (113) is fixedly mounted on the top of the No. 1 arch frame (112), a pressure roller (114) is fixedly mounted on one end of the hydraulic telescopic cylinder (113) that passes through the No. 1 arch frame (112) and extends into the interior of the No. 1 arch frame (112), and one end of the pressure roller (114) is fixedly connected to a No. 2 motor, and the No. 1 conveying device (111) on the top of the production line body (110) A No. 2 conveying device (115) is fixedly installed on one side of the production line body (110), and one end of the No. 2 conveying device (115) is fixedly connected to a No. 3 motor; a No. 2 arch frame (116) is fixedly installed on the top of the production line body (110), and the No. 2 arch frame (116) is located above the No. 2 conveying device (115); a paint box (117) is fixedly installed on the top of the No. 2 arch frame (116), one end of the paint box (117) is fixedly connected to a water pump (118), one end of the water pump (118) is fixedly connected to a conveying pipe (119); a spray gun (120) is fixedly installed on the bottom end of the No. 2 arch frame (116), and one end of the spray gun (120) is fixedly connected to one end of the conveying pipe (119), and the spray gun (120) is fixedly connected to one end of the conveying pipe (119). 0) is movably mounted with a nozzle (121), a No. 3 arch frame (122) is fixedly mounted on one side of the No. 2 arch frame (116) at the top of the production line body (110), a detector body (123) is fixedly mounted inside the No. 3 arch frame (122), a fixing frame (124) is fixedly mounted on one end of the No. 3 arch frame (122), a display instrument (125) is fixedly mounted on the front of the fixing frame (124), a discharging frame (126) is fixedly mounted on one end of the production line body (110), a No. 2 fixing plate (130) is fixedly mounted on the bottom end of the production line body (110), a control panel (131) is fixedly mounted on the front of the No. 2 fixing plate (130), and the No. 1 conveying device (1 A positioning clamping mechanism (200) is disposed inside the first conveying device (111) and the second conveying device (115), and the positioning clamping mechanism (200) comprises a first slide rail (210). The first slide rail (210) is fixedly installed at both ends inside the first conveying device (111) and the second conveying device (115). The first slide rail (210) is provided inside the first slide rail (210). The first slide groove (211) is evenly slidably installed inside the first slide groove (211). The first slide block (212) is fixedly installed inside the first slide block (212). One end of the cylinder (213) is fixedly connected to a clamping plate (214), and one end of the clamping plate (214) is fixedly installed with a sensor (215).
2. The gas insulated bus duct production process according to claim 1, characterized in that: A closing mechanism (300) is provided at one end of the paint box (117), the closing mechanism (300) comprising a fixed shaft (310), a fixed shaft (310) is fixedly mounted at one end of the paint box (117), a baffle (311) is movably mounted at one end of the fixed shaft (310), a first connecting shaft (312) is fixedly mounted at one end of the baffle (311), a first fixing rod (313) is fixedly mounted at one end of the first connecting shaft (312), and the baffle A connecting plate (314) is fixedly mounted on one end of the (311), a No. 2 spring (315) is fixedly mounted on one end of the connecting plate (314), and one end of the No. 2 spring (315) is fixedly connected to a No. 1 fixed clamping rod (313), a fixing block (316) is fixedly mounted on one end of the paint box (117), a No. 1 clamping groove (317) is formed on one end of the fixing block (316), and one end of the No. 1 fixed clamping rod (313) extends into the interior of the No. 1 clamping groove (317).
3. The gas insulated bus duct production process according to claim 1, characterized in that: A fixing mechanism (400) is provided at both ends of the spray head (121), and the fixing mechanism (400) includes a fixing box (410). The fixing boxes (410) are fixedly installed at both ends of the spray head (121), and a fixing bolt (411) is movably installed inside the fixing box (410). A No. 3 spring (412) is fixedly installed inside the fixing box (410), and one end of the No. 3 spring (412) is fixedly connected to the fixing bolt (411), and a No. 1 pull rod (413) is fixedly installed at one end of the fixing bolt (411), and one end of the No. 1 pull rod (413) extends to the outside of the fixing box (410). A No. 2 slot (414) is provided at both ends of the spray gun (120), and one end of the fixing bolt (411) extends to the inside of the No. 2 slot (414).
4. The gas insulated bus duct production process according to claim 1, characterized in that: The front of the third arch frame (122) is provided with an inspection mechanism (500), the inspection mechanism (500) comprising a hinge (510), the front of the third arch frame (122) is evenly and fixedly installed with the hinges (510), one end of each of the hinges (510) is fixedly installed with an inspection door (511), the front of the inspection door (511) is fixedly installed with a second fixing rod (512), the front of the third arch frame (122) is fixedly installed with a connecting block (513), the interior of the connecting block (513) is provided with a cavity (514), and the interior of the cavity (514) is fixedly installed with a A No. 2 connecting shaft (515) is provided, one end of the No. 2 connecting shaft (515) is fixedly connected to a No. 3 fixed clamping rod (516), a No. 4 spring (517) is fixedly installed inside the cavity (514), and one end of the No. 4 spring (517) is fixedly connected to the No. 3 fixed clamping rod (516), one end of the No. 2 fixed clamping rod (512) extends to the inside of the cavity (514) and is engaged with the No. 3 fixed clamping rod (516), one end of the No. 3 fixed clamping rod (516) is fixedly installed to a No. 2 pull rod (518), and one end of the No. 2 pull rod (518) extends to the outside of the connecting block (513).
5. The gas insulated bus duct production process according to claim 1, characterized in that: A cleaning mechanism (600) is arranged on the front of the fixed frame (124), and the cleaning mechanism (600) comprises a No. 2 slide rail (610). The No. 2 slide rail (610) is evenly and fixedly installed on the front of the fixed frame (124), and a No. 2 slide groove (611) is provided inside the No. 2 slide rail (610). A No. 2 slider (612) is slidably installed inside the No. 2 slide groove (611), and a cleaning brush (613) is fixedly connected to one end of the No. 2 slider (612), and one end of the cleaning brush (613) abuts against the surface of the display instrument (125).
6. The gas insulated bus duct production process according to claim 1, characterized in that: A No. 1 fixing plate (127) is fixed to one end of the discharging frame (126), a No. 1 spring (128) is evenly fixedly mounted to one end of the No. 1 fixing plate (127), and a blocking block (129) is fixedly mounted to one end of the No. 1 spring (128).
7. The gas insulated bus duct production process according to claim 1, characterized in that: One end of the clamping plate (214) is provided with an anti-slip groove (216).
8. The gas insulated bus duct production process according to claim 5, characterized in that: A first magnetic block (614) is fixedly mounted on one end of the second sliding block (612), a second magnetic block (615) is fixedly mounted on one end of the second sliding groove (611), and the first magnetic block (614) and the second magnetic block (615) are mutually attracted.
Citation Information
Patent Citations
Automatic production line of aluminium alloy bus duct covering plate
CN102941473A
Car carrying board surface plastic spraying method
CN107899917A
Steel tile shaping machine with painting repair device