A pile foundation construction monitoring device
Through the global satellite navigation system and information processing system, the real-time monitoring of pile foundation construction parameters has been solved, and the problem of manual supervision in the existing technology is difficult to achieve real-time quality control, and the quality and efficiency of pile foundation construction have been improved.
Patent Information
- Application Number
- CN202011424509.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-08
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2040-12-08
AI Technical Summary
The existing technology has large investment in manual supervision in pile foundation construction and is difficult to achieve real-time quality control, which makes it difficult to accurately monitor the pile quality, and is prone to quality problems and construction period impacts.
The global satellite navigation system and information processing system are adopted to obtain the coordinate position and status information of the pile machine through a satellite signal receiver in real time, calculate the pile length, drilling speed and verticality, and realize real-time monitoring and feedback of the pile foundation construction process.
Real-time quality control of pile foundation construction is achieved, manpower investment is reduced, construction parameters are promptly feedback, post-test detection and remediation are avoided, and construction efficiency and quality are improved.
Smart Images

Figure CN112502204B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of civil engineering pile foundation construction, and more specifically, relates to a pile foundation construction monitoring device. Background Art
[0002] In 1980, cement-soil mixing piles were successfully used for the first time in soft soil foundation reinforcement projects. Since then, they have been promoted in soft soil foundation reinforcement projects across the country, especially in the treatment of soft soil foundations in railway projects.
[0003] The focus of existing technical research is on how to improve the pile-forming operation of mixing piles. For example, cement-soil mixing piles have developed into a common method for treating soft foundations. However, pile foundation projects are concealed projects with complex construction processes, many uncertain factors, and high construction difficulty. They are prone to quality problems, and the quality of pile foundations is related to the safety of the entire project. Therefore, monitoring of the pile foundation construction process is crucial.
[0004] Due to the high professional requirements of mixing pile construction technology, the main railway industry is currently mainly supervised by special departments, such as specific project departments and supervisory stations. This supervision method has a large labor input and is affected by many human factors, which easily leads to the problem that the quality of piles is difficult to accurately control. In addition, the information obtained by all parties involved in the construction is not synchronized, and the personnel of the supervision department cannot obtain the surrounding environment of the pile driving and the real-time progress of the pile driving in real time. Based on the above reasons, for the monitoring of pile quality, it is generally a certain period of time after the construction is completed, and the test piles are randomly selected in proportion. The quality of cement soil mixing piles is tested by coring and load testing methods, which are all post-inspections. If the test finds that the quality does not meet the standard, remediation is required. It not only affects the construction period, but also causes construction quality hazards due to the failure to find the problem in time.
[0005] In response to the above problems, at this stage, it is very important to be able to control the quality of piles through real-time monitoring of the construction parameters of cement-soil mixing pile foundations and real-time feedback of monitoring data. Summary of the invention
[0006] In view of the defects of the prior art, the purpose of the present invention is to provide a pile foundation construction monitoring device, which aims to achieve accurate control of the pile quality through real-time monitoring of the pile body position, pile length, drilling speed and verticality during the pile foundation construction process.
[0007] To achieve the above-mentioned object, the present invention provides a pile foundation construction monitoring device, including a satellite signal receiver, a foundation enhancement system reference station and an information processing system;
[0008] The GBS base station is used to network the global satellite navigation system with satellite signal receivers;
[0009] The satellite signal receiver is installed above the power device in the pile driver; it is used to obtain satellite observation data fed back by the global satellite navigation system in real time and transmit it to the information processing system;
[0010] The information processing system is used to obtain the status information of the pile driver after decoding the satellite observation data; wherein the satellite observation data includes the time and the coordinate position of the pile driver head.
[0011] Preferably, the status information of the pile driver includes the pile length, drilling speed and verticality of the pile.
[0012] Preferably, the information processing system is also used to record and print construction reports.
[0013] Preferably, satellite signal receivers are installed on several pile drivers within the signal range of the ground-based augmentation system reference station.
[0014] Preferably, the drilling speed is calculated by measuring the coordinate position of the pile driver head at two adjacent time points.
[0015] Preferably, the pile length is obtained by calculating the difference between the vertical coordinate when the pile driver starts grouting and the vertical coordinate when the grouting is stopped.
[0016] Preferably, the verticality of the pile is obtained through the initial coordinates of the pile driver, the real-time coordinates of the pile driver and the length of the drill rod.
[0017] Compared with the prior art, the above technical solution conceived by the present invention can achieve the following beneficial effects:
[0018] The present invention adopts the global satellite navigation system to locate the pile driver head in real time, obtains the coordinate position of the pile driver head corresponding to each moment, and the information processing system decodes the satellite observation data and calculates the status information of the pile driver. The status information of the pile driver includes the pile length, drilling speed and verticality of the pile, thereby realizing real-time control of the working status of the pile driver and improving the quality of pile formation.
[0019] The information processing system provided by the present invention can automatically record, display and print construction reports and parameter records, avoiding the possibility of modification and reducing the manpower input of construction, supervision and testing personnel. At the same time, timely feedback of construction parameters can realize the evaluation of construction quality during construction and avoid post-processing. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of a pile driver and a pile foundation construction monitoring device provided by the present invention;
[0021] Throughout the drawings, the same reference numerals are used to denote the same elements or structures, wherein:
[0022] 1-pile driver anchor; 2-pile driver mobile drum; 3-pile driver frame; 4-steel strand; 5-power unit slideway; 6-power unit suspension line; 7-satellite signal receiver; 8-power unit; 9-mud volume monitoring element; 10-drill rod; 11-drill rod limiter; 12-drill bit; 13-ground augmentation system base station; 14-information processing system; 15-global satellite navigation system (GNSS). DETAILED DESCRIPTION
[0023] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0024] The present invention provides a pile foundation construction monitoring device, comprising: a satellite signal receiver 7, a foundation enhancement system reference station 13 and an information processing system 14;
[0025] The ground-based augmentation system reference station 13 is used to connect the global satellite navigation system 15 to the satellite signal receiver 7 through a network;
[0026] The satellite signal receiver 7 is installed above the power device 8 in the pile driver; it is used to obtain the satellite observation data fed back by the global satellite navigation system 15 in real time and transmit it to the information processing system 14;
[0027] The information processing system 14 is used to obtain the status information of the pile driver after decoding the satellite observation data; wherein the satellite observation data includes the time and the coordinate position of the pile driver head.
[0028] Preferably, the status information of the pile driver includes the pile length, drilling speed and verticality of the pile.
[0029] Preferably, the information processing system is also used to record and print construction reports.
[0030] Preferably, within the signal range of the ground-based augmentation system reference station 13 , a plurality of pile drivers are equipped with satellite signal receivers 7 .
[0031] Preferably, the drilling speed is calculated by measuring the coordinate position of the pile driver head at two adjacent time points; specifically as follows:
[0032] The coordinate information of the pile driver head at two adjacent times are o(x, y, z) and o'(x', y', z');
[0033] The drilling speed v is: v = (z-z') / Δt; Δt is the time interval between two adjacent time intervals;
[0034] Preferably, the pile length is obtained by calculating the difference between the vertical coordinate when the pile driver starts grouting and the vertical coordinate when the grouting stops; specifically as follows:
[0035] Pile length L = z0-z t ; Among them, z0 is the vertical coordinate when the pile driver starts grouting; z t It is the vertical coordinate when the pile driver stops grouting;
[0036] Preferably, the verticality of the pile is obtained through the initial coordinates of the pile driver, the real-time coordinates of the pile driver and the length of the drill rod; specifically as follows:
[0037]
[0038] Among them, the initial coordinates of the pile driver are o0(x0,y0,z0); the real-time coordinates of the pile driver are o n (x n ,y n ,z n ), l is the length of the drill rod, and α is the verticality of the pile.
[0039] Example
[0040] like Figure 1 As shown, the cement soil mixing pile driver provided in this embodiment includes a pile driver anchor 1, a pile driver moving drum 2, a pile driver frame 3, a steel strand 4, a power device slideway 5, a power device suspension wire 6, a power device 8, a mud volume monitoring element 9, a drill rod stopper 10 and a drill bit 12;
[0041] The pile driver mobile drum 2 is used for ground movement of the cement soil mixing pile. When the cement soil mixing pile reaches the specified position, the pile driver anchor 1 is used to fix it on the ground. The pile driver frame is the main support of the cement soil mixing pile. The steel strand 4 is used to enhance the overall stability of the pile driver. With the cooperation of the power device slideway 5, the power device suspension line 6 pulls the power device 8 to slide in the vertical direction. The mud volume monitoring element 9 is used to monitor the mud volume in real time. The drill rod limiter 11 controls the lowest position of the drill rod 10 in the vertical direction. The power device 8 hits the drill rod downward, and the drill bit 12 extends into the ground under the downward force generated by the power device 8.
[0042] like Figure 1 As shown, this embodiment provides a pile foundation construction parameter monitoring device corresponding to a cement soil mixing pile machine, including: a satellite signal receiver 7, a foundation enhancement system reference station 13 and an information processing system 14;
[0043] The ground-based augmentation system reference station 13 is used to connect the global satellite navigation system 15 to the satellite signal receiver 7 through a network;
[0044] The satellite signal receiver 7 is installed above the power device 8 of the cement-soil mixing pile; it is used to obtain the time and the coordinate position of the pile driver head fed back by the global satellite navigation system 15 in real time; and transmit the time and the coordinate position of the pile driver head to the information processing system 14;
[0045] The information processing system 14 is used to decode the satellite observation data to obtain the pile length, drilling speed and verticality of the pile; the satellite observation data includes the time and the coordinate position of the pile driver head.
[0046] The information processing system 14 is also used to record and print construction reports and parameter records;
[0047] Within the signal range of the ground-based augmentation system base station 13, satellite signal receivers 7 are installed on several pile drivers;
[0048] The drilling speed is calculated by measuring the coordinate position of the pile driver head at two adjacent time points in real time. The pile length is obtained by calculating the difference between the vertical coordinate when the pile driver starts grouting and the vertical coordinate when the grouting stops. The verticality of the pile is obtained through the initial coordinates of the pile driver, the real-time coordinates of the pile driver and the length of the drill rod.
[0049] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A pile foundation construction monitoring device, characterized in that: It includes a satellite signal receiver (7), a ground-based augmentation system reference station (13) and an information processing system (14); The ground-based augmentation system reference station (13) is used to establish a network connection between the global satellite navigation system (15) and the satellite signal receiver (7); The satellite signal receiver (7) is installed above the power device (8) in the pile driver; Used to obtain satellite observation data fed back by a global satellite navigation system (15) in real time and transmit it to an information processing system (14); The information processing system (14) is used to obtain the status information of the pile driver after decoding the satellite observation data; wherein the satellite observation data includes the time and the coordinate position of the head of the pile driver; The status information of the pile driver includes pile length, drilling speed and pile verticality; The drilling speed is calculated by measuring the coordinate position of the pile driver head at two adjacent time points; The pile length is obtained by calculating the difference between the vertical coordinate when the pile driver starts grouting and the vertical coordinate when the grouting stops; Obtain the verticality of the pile through the initial coordinates of the pile driver, the real-time coordinates of the pile driver and the length of the drill rod; The verticality of the pile is: Among them, the initial coordinates of the pile driver are o0(x0,y0,z0); the real-time coordinates of the pile driver are o n (x n ,y n ,z n ), l is the length of the drill rod, and α is the verticality of the pile.
2. The pile foundation construction monitoring device according to claim 1, characterized in that: The information processing system (14) is also used to record and print construction reports.
3. The pile foundation construction monitoring device according to claim 1, characterized in that: The satellite signal receiver (7) is installed on a plurality of pile drivers within the signal range of the ground-based augmentation system reference station (13).
4. The pile foundation construction monitoring device according to claim 1, characterized in that: The pile driver is a cement soil mixing pile driver.
Citation Information
Patent Citations
Three-dimensional guiding piling method based on satellite positioning technology
CN108265713A
Intelligent cement mixing pile machine
CN109736300A
Construction method based on precise control of Internet of things in special treatment of highway bridge and soft foundation
CN110552349A
Quick -witted positioning system of stake based on beiDou navigation satellite system
CN207020317U
Digital construction system of CFG stake
CN208415329U