The sealing structure and installation method of the top of a million-kilowatt tower boiler

By using a combined structure of sealed steel plates, medium-free water-cooled wall tubes and hanging tubes on the top of the tower boiler, combined with specific installation methods, the problems of smoke and ash leakage caused by welding quality problems are solved, reducing design costs and improving efficiency. The sealing effect is improved.

CN112503563BActive Publication Date: 2024-10-08HUANENG LONGDONG ENERGY CO LTD ZHENGNING POWER PLANT +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202011525318.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-22
Publication Date
2024-10-08
Estimated Expiration
2040-12-22

AI Technical Summary

Technical Problem

The membrane wall sealing structure on the top of the tower boiler causes smoke and ash leakage due to welding quality problems, which increases the design and manufacturing costs and affects safety and economy.

Method used

It adopts a combined structure of sealed steel plates, medium-free water-cooled wall tubes and hanging tubes, and is connected through welding, combined with the installation methods of hoisting and process welding to form a million-tower boiler top sealing structure.

Benefits of technology

It reduces design and manufacturing costs, reduces smoke and ash leakage problems, improves sealing effect, and improves the power plant operating environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112503563B_ABST
    Figure CN112503563B_ABST
Patent Text Reader

Abstract

A sealing structure for the furnace top of a million-ton tower boiler and its installation method. The furnace top of a conventional tower boiler adopts a mechanical sealing device and uses a membrane wall tube for welding and sealing, which increases the design and manufacturing cost of the boiler. Due to the difference in actual welding quality on site, welding quality problems lead to smoke and ash leakage from the furnace top, affecting the overall safety of the unit. The composition of the present invention comprises: a sealing steel plate (1), the sealing steel plate is welded and connected to the boiler front wall (2), the boiler right wall (3), the boiler rear wall (4) and the boiler left wall (5) on all sides, the boiler front wall, the boiler right wall, the boiler rear wall and the boiler left wall are all composed of non-medium water-cooled wall tubes (6), the non-medium water-cooled wall tubes are connected by fins (8), and a group of non-medium hanging tubes (7) are evenly arranged and welded on the sealing steel plate. The present invention is used for the sealing of a new type of million-ton tower boiler furnace top.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of boiler furnace top sealing, and in particular to a million-tower boiler furnace top sealing structure and an installation method thereof. Background Art

[0002] Compared with P-type boilers, tower boilers have many advantages, such as no flue gas turning, uniform distribution, small steam temperature deviation, horizontal arrangement of heating surface, self-drainage, excellent standby and fast start-up characteristics, simple structure and small footprint, etc. Therefore, in recent years, more and more domestic power plants have chosen tower boilers. However, this type of furnace also has its shortcomings. The membrane wall sealing structure (without medium pipe) arranged above the furnace top is not strictly welded due to the actual welding quality problems on site, resulting in smoke and ash leakage. This structure brings great difficulties to the boiler sealing and post-operation maintenance work.

[0003] The traditional tower boiler furnace top adopts a mechanical sealing device and uses a membrane wall tube for welding and sealing. However, there is no medium (water or steam) in the membrane wall tube. On the one hand, the processing cost of the membrane wall tube is high, which increases the design and manufacturing cost of the boiler. On the other hand, due to the difference in actual welding quality on site, smoke and ash leakage from the furnace top has occurred due to welding quality problems, affecting the overall safety and economy of the unit. Summary of the invention

[0004] The purpose of the present invention is to provide a million-tower boiler furnace top sealing structure and an installation method thereof, so as to solve the problem of furnace top smoke and ash leakage caused by welding quality problems, thereby saving design and manufacturing costs.

[0005] The above purpose is achieved through the following technical solutions:

[0006] A sealing structure for the furnace top of a million-tower boiler comprises: a sealing steel plate, wherein the sealing steel plate is respectively welded to a front wall, a right wall, a rear wall and a left wall of the boiler, wherein the front wall, the right wall, the rear wall and the left wall of the boiler are all composed of medium-free water-cooled wall tubes, wherein the medium-free water-cooled wall tubes are connected via fins, and a group of medium-free hanging tubes are evenly arranged and welded on the sealing steel plate, wherein the medium-free hanging tubes pass through the sealing steel plate.

[0007] The million-tower boiler furnace top sealing structure, the lower part of the medium-free hanging pipe connected to the sealing steel plate is connected to the heating surface.

[0008] A method for installing a sealing structure for a furnace top of a million-ton tower boiler comprises the following steps:

[0009] (1) First, splice the furnace top sealing steel plate at the furnace bottom, twice in total;

[0010] (2) Use the winch arranged on the large plate beam to hoist the spliced ​​sealing steel plate through the non-medium hanging pipe to the ceiling elevation and fix it with the hanging rod bolts;

[0011] (3) Perform process welding on the contact points between the non-medium water-cooled wall tubes in front of the furnace, behind the furnace and on the upper side of the furnace and the ceiling sealing steel plate. Beneficial Effects

[0012] The present invention relates to a sealing structure for the furnace top of a million-ton tower boiler and an installation method thereof. The furnace top adopts a structure sealed with a steel plate, which can reduce the construction workload on the construction site and reduce the design and manufacturing cost of the boiler. At the same time, the problems of smoke and ash leakage caused by welding quality problems are solved. The sealing effect is good, and reducing ash and smoke leakage can improve the operating environment of the power plant. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Attached Figure 1 It is a schematic diagram of the structure of the present invention;

[0014] Attached Figure 2 Yes Figure 1 A top view of

[0015] Attached Figure 3 It is a schematic diagram of the structure of the conventional million-ton tower boiler furnace top sealing structure;

[0016] Attached Figure 4 Yes Figure 3 A top view of

[0017] In the figure: 1. Sealing steel plate, 2. Boiler front wall, 3. Boiler right wall, 4. Boiler rear wall, 5. Boiler left wall, 6. Non-medium water-cooled wall tube, 7. Non-medium hanging tube, 8. Fins. DETAILED DESCRIPTION

[0018] Example

[0019] A sealing structure for the furnace top of a million-ton tower boiler comprises: a sealing steel plate 1, wherein the sealing steel plate is respectively welded to a boiler front wall 2, a boiler right wall 3, a boiler rear wall 4 and a boiler left wall 5, wherein the boiler front wall, the boiler right wall, the boiler rear wall and the boiler left wall are all composed of medium-free water-cooled wall tubes 6, wherein the medium-free water-cooled wall tubes are connected by fins 8, and a group of medium-free hanging tubes 7 are evenly arranged and welded on the sealing steel plate, wherein the medium-free hanging tubes pass through the sealing steel plate.

[0020] Embodiment 2:

[0021] According to the million-tower boiler furnace top sealing structure described in Example 1, the lower part of the medium-free hanging pipe connected to the sealing steel plate is connected to the heating surface.

[0022] Embodiment 3:

[0023] A method for installing the million-tower boiler furnace top sealing structure described in Examples 1-2, the method comprising the following steps:

[0024] (1) First, splice the furnace top sealing steel plate at the furnace bottom, twice in total;

[0025] (2) Use the winch arranged on the large plate beam to hoist the spliced ​​sealing steel plate through the non-medium hanging pipe to the ceiling elevation and fix it with the hanging rod bolts;

[0026] (3) Perform process welding on the contact points between the non-medium water-cooled wall tubes in front of the furnace, behind the furnace and on the upper side of the furnace and the ceiling sealing steel plate.

Claims

1. A million-ton tower boiler furnace top sealing structure, comprising: The sealing steel plate is characterized in that: the sealing steel plate is respectively welded to the boiler front wall, the boiler right wall, the boiler rear wall and the boiler left wall on all sides; the boiler front wall, the boiler right wall, the boiler rear wall and the boiler left wall are all composed of medium-free water-cooled wall tubes, and the medium-free water-cooled wall tubes are connected by fins; a group of medium-free hanging tubes are evenly arranged and welded on the sealing steel plate, and the medium-free hanging tubes are connected to the sealing steel plate.

2. The sealing structure for the furnace top of a million-tower boiler according to claim 1 is characterized in that: The lower part of the medium-free hanging pipe connected to the sealing steel plate is connected to the heating surface.

3. A method for installing the sealing structure of the furnace top of a million-tower boiler according to claim 1 or 2, characterized in that: The installation method includes the following steps: (1) First, splice the furnace top sealing steel plate at the furnace bottom, twice in total; (2) Use the winch arranged on the large plate beam to hoist the spliced ​​sealing steel plate through the non-medium hanging pipe to the ceiling elevation and fix it with the hanging rod bolts; (3) Perform process welding on the contact points between the non-medium water-cooled wall tubes in front of the furnace, behind the furnace and on the upper side of the furnace and the ceiling sealing steel plate.

Citation Information

Patent Citations

  • Combined sealing device of boiler roof of a generating plant

    CN201251194Y

  • Boiler structure does not leak out

    CN207555970U

  • Novel million tower type boiler top sealing structure

    CN214426049U

  • steam generator top

    DE2245905A1

  • Improvements relating to refractory roofs

    GB884045A