Closed sampling device for geothermal fluid

By designing downhole sampler and ground sample table, high-fidelity and sealing sampling of downhole geothermal fluids is achieved by using timing control and sealing pistons, the problem of poor representativeness of geothermal fluid samples is solved, ensuring the accuracy and representativeness of the samples, and suitable for Chinese-Chinese Development and research of high-temperature geothermal resources.

CN112539058BActive Publication Date: 2024-12-03CHINA PETROCHEMICAL CORP +2
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN201910894309.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-09-20
Publication Date
2024-12-03
Estimated Expiration
2039-09-20

AI Technical Summary

Technical Problem

The temperature and pressure changes of geothermal fluid from the reservoir to the wellhead lead to gas precipitation, geothermal water boiling, and mineral solubility changes in the wellbore, resulting in poor representativeness of samples taken at the ground wellhead, which cannot truly reflect the properties and phase characteristics of the formation fluid, affecting geothermal heat. 水化学分析和阻垢防垢等测试工作。

Method used

A closed sampling device for geothermal fluid is designed, including a downhole sampler and a ground sample table. The downhole sampler is automatically opened through a timing control mechanism, and the pressure difference between the air chamber and the displacement liquid chamber is used to absorb the geothermal fluid, and the sampling is closed by a sealing piston. , realize high-fidelity closed sampling of downhole; the ground sample table is used to transfer samples in the downhole sampler to the sample storage bottle to achieve closed constant pressure storage.

Benefits of technology

It realizes high-fidelity closed sampling of underground geothermal fluids, ensures the accuracy and representativeness of the samples, and makes up for the defect that ground sampling is insufficient to accurately obtain geothermal fluid samples and test results. It is suitable for the development and research of medium and high temperature geothermal resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112539058B_ABST
    Figure CN112539058B_ABST
Patent Text Reader

Abstract

The present invention discloses a closed sampling device for geothermal fluid. The device may include: a downhole sampler includes a sampling part, an air chamber and a timing control mechanism connected in sequence, and a sampling port is provided on the sampling part; a sealing piston, a first floating piston and a buffer are provided in sequence from the front end to the rear end of the sampling part housing, a first sample chamber is formed between the sealing piston and the first floating piston, the first sample chamber is connected to the sampling port, a first displacement fluid chamber is formed between the first floating piston and the buffer, a displacement fluid injection port is provided on the side wall of the first displacement fluid chamber, and the sealing piston is connected to the buffer through a piston guide rod penetrating the first floating piston; the first displacement fluid chamber and the inner cavity of the air chamber housing are operably connected through an air chamber connecting pipe; the timing control mechanism is used to operate the air chamber connecting pipe at a set time to connect the first displacement fluid chamber and the inner cavity of the air chamber housing. The sampling speed can be adjusted, automatic sampling at a fixed depth in the well is achieved, and the sample is sealed and isolated with high fidelity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of geothermal exploration, and more particularly to a geothermal fluid sealed sampling device. Background Art

[0002] As the world's demand for resources increases, the demand for energy sources such as oil and coal, which dominate energy consumption, is also increasing. The proven reserves of oil, coal and other resources are very limited, and the contradiction between supply and demand is becoming increasingly tense. At the same time, the environmental pollution caused by traditional fossil energy is becoming increasingly serious, and energy conservation and emission reduction has gradually become one of the important issues for all countries. The understanding and actions of countries around the world on major issues such as greenhouse gas emission reduction are becoming more and more consistent, and new energy is needed to alleviate the world's pollution problems.

[0003] Geothermal resources are a renewable clean energy source that is clean, environmentally friendly, widely used, stable, and recyclable. They are not affected by external factors such as seasons, climate, and day and night changes. They are a realistic and competitive new energy source.

[0004] Direct water extraction and heat extraction is the most common development method for hydrothermal geothermal resources. However, as the geothermal fluid moves from the reservoir to the wellhead, changes in temperature and pressure lead to gas precipitation in the wellbore, boiling of geothermal water, and changes in mineral solubility resulting in supersaturation and precipitation. As a result, the samples taken from the ground wellhead are not representative, and the results cannot truly reflect the properties and phase characteristics of the formation fluid, which affects the geothermal water chemical analysis and water quality testing such as scale prevention and control. This impact is particularly significant in the development and research of medium and high temperature geothermal resources.

[0005] In the process of geothermal resource development and utilization, the method of ground wellhead sampling is still used, that is, the geothermal fluid in the geothermal wellbore is drawn or flows by gravity to the ground pipeline or wellhead, and then the sampling pipe section guides the fluid to the sampling container for sample collection. With the continuous development of medium and high temperature geothermal resources, the disadvantages of the ground sampling method are gradually exposed, but no effective solution has been proposed yet.

[0006] Therefore, it is necessary to propose a device that can accurately obtain geothermal fluid samples in order to obtain accurate test results. Summary of the invention

[0007] The purpose of the present invention is to provide a geothermal fluid sealed sampling device to achieve high-fidelity sealed sampling of geothermal fluid underground.

[0008] To achieve the above object, the present invention proposes a geothermal fluid closed sampling device, comprising:

[0009] A downhole sampler, the downhole sampler comprising a sampling part, an air chamber and a timing control mechanism connected in sequence, the sampling part being provided with a sampling port;

[0010] The sampling part comprises a sampling part housing, in which a sealing piston, a first floating piston and a buffer are arranged in sequence from the lower end to the upper end of the sampling part housing, a first sample chamber is formed between the sealing piston and the first floating piston, the sampling port is arranged at the junction of the sealing piston and the first floating piston and communicates the first sample chamber with the outside of the sampling part housing, a first replacement fluid chamber is formed between the first floating piston and the buffer, and a replacement fluid injection port is arranged between the buffer and the air chamber; the sealing piston is connected to the buffer via a piston guide rod penetrating the first floating piston, so that the sampling port can be closed under the drive of the buffer;

[0011] The air chamber comprises an air chamber housing, and the first replacement fluid chamber is operably connected to the inner cavity of the air chamber housing through an air chamber connecting pipe;

[0012] The timing control mechanism is used to operate the air chamber connecting tube at a set time to connect the first replacement fluid chamber with the inner cavity of the air chamber housing.

[0013] Optionally, the sampling portion housing at the sealing piston is provided with a sample transfer port and a positioning hole, and the sampling port is located above the positioning hole.

[0014] Optionally, a sample transfer valve and a push-type positioning pin are provided in the sealing piston, the valve switch of the sample transfer valve is arranged outside the bottom end of the sealing piston, the inlet end of the sample transfer valve is connected to the sampling chamber, the outlet end of the sample transfer valve is provided with a hollow valve plug that cooperates with the sampling port, and the push-type positioning pin cooperates with the positioning hole to lock the sealing piston.

[0015] Optionally, the sampling portion and the air chamber are sealed and connected via an air chamber sealing connector, a flow regulator is provided in the air chamber sealing connector, one end of the flow regulator is connected to the first replacement fluid chamber, and the other end is connected to the air chamber connecting pipe.

[0016] Optionally, the buffer includes a fixed component and a sliding component, the fixed component is fixedly connected to the sealing connector, the sliding component is cylindrical and fits the inner wall of the shell and is slidably mounted on the outside of the fixed component, and the sliding component is fixedly connected to the piston guide rod.

[0017] Optionally, the timing control mechanism includes a starting switch, a trigger mechanism and a clock, and the clock triggers the trigger mechanism at a set time to turn on the starting switch, thereby connecting the air chamber connecting pipe.

[0018] Optionally, the timing control mechanism also includes a clocked sealing connector and a regulating valve, wherein the clocked sealing connector is sealingly connected to the air chamber housing, the regulating valve is arranged between the air chamber connecting pipe and the inner cavity of the air chamber housing, the starting switch is arranged in the clocked sealing connector, and the trigger mechanism connects the air chamber connecting pipe with the regulating valve by operating the starting switch.

[0019] Optionally, the trigger mechanism comprises a trigger mechanism housing, one end of the trigger mechanism housing is fixedly connected to the clock-controlled sealing connector, and the other end of the trigger mechanism housing is fixedly connected to the clock machine;

[0020] A conical impact head, a spring and a connecting rod are provided in the trigger mechanism housing, wherein the conical impact head is connected to the clock machine, and the connecting rod is slidably arranged in the clock-controlled sealing connector, one end of the connecting rod is connected to the starting switch, and the other end of the connecting rod is connected to the pressing plate, and the pressing plate is fixed between the conical impact head and the clock-controlled sealing connector, and the surface of the pressing plate is connected to the trigger mechanism housing through a tension spring.

[0021] Optionally, it further comprises a sample storage bottle, wherein the interior of the sample storage bottle is a closed cavity, a second floating piston is arranged in the closed cavity, the second floating piston separates the closed cavity into a second replacement fluid chamber and a second sample chamber, and a stirring ball is arranged in the second sample chamber;

[0022] One end of the sample storage bottle is provided with a first high-pressure valve and a vacuum port connected to the second replacement fluid chamber, and the other end of the sample storage bottle is provided with a sample outlet connected to the second sample chamber and a second high-pressure valve, and the second high-pressure valve can be connected to the sample transfer port of the downhole sampler.

[0023] Optionally, it also includes a ground sample transfer platform, which includes a sampler bracket, a sample storage bottle bracket, a first pressure gauge, a second pressure gauge, a high-pressure output port, a sample storage bottle back pressure port, a first regulating valve, a second regulating valve, a manual pump and a sealed oil tank;

[0024] The sampler bracket and the sample storage bottle bracket are used to place the downhole sampler and the sample storage bottle, respectively. The replacement fluid injection port of the sampling chamber of the downhole sampler can be connected to the sealed oil tank through the high-pressure output port, the first regulating valve, the first pressure gauge, and the manual pump in sequence. The first high-pressure valve of the sample storage bottle can be connected to the sealed oil tank through the sample storage bottle back pressure port, the second regulating valve, and the second pressure gauge in sequence.

[0025] The beneficial effects of the present invention are:

[0026] On the one hand, the present invention designs a downhole sampler suitable for directly descending into a wellbore to collect geothermal fluid samples at a target sampling depth. The downhole sampler is automatically opened through a timing control mechanism, and an air chamber is connected to a displacement fluid chamber in a sampling part through an air chamber connecting pipe. The pressure difference between the air chamber and the displacement fluid chamber is used to make the displacement fluid in the displacement fluid chamber flow to the air chamber, thereby driving the first floating piston to move, and then using the pressure difference to absorb geothermal fluid into the sampling part. Finally, the floating piston drives the sealing piston to move to close the sampling port through the piston guide rod to complete the sampling, thereby achieving the effects of automatic opening and closing, airtight maintenance, and recyclable use, and realizing high-fidelity closed sampling of geothermal fluids in the well.

[0027] Furthermore, by cooperating with the push-type positioning pin and the positioning hole on the sampling part housing, the sampling port passage is locked and the outflow of the sample in the first sample chamber is prevented; the inlet end of the sample transfer valve is connected with the sampling chamber, and the hollow valve plug at the outlet end of the sample transfer valve is connected with the sample transfer port, so that the sample after sampling can be exported; the structure of the buffer can effectively prevent the floating piston from moving too fast, and the effect of controlling the sampling speed can be achieved in combination with the regulating valve.

[0028] On the other hand, the present invention designs a ground sample transfer table and sample storage bottle that can transfer geothermal fluid samples in a downhole sampler on the ground. The geothermal fluid samples in the downhole sampler can be transferred to the sample storage bottle with the same pressure and quality. The whole transfer process is sealed and kept at a constant pressure, which is convenient for long-term storage and transportation, and for obtaining accurate test results of geothermal fluids.

[0029] The above geothermal fluid closed sampling device makes up for the defect that only relying on ground sampling is not enough to accurately obtain geothermal fluid samples and accurate test results during the research, development and utilization of geothermal resources.

[0030] The device of the present invention has other characteristics and advantages, which will be obvious from the drawings incorporated herein and the following detailed description, or will be described in detail in the drawings incorporated herein and the following detailed description, which together are used to explain the specific principles of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The above and other objects, features and advantages of the present invention will become more apparent through a more detailed description of exemplary embodiments of the present invention in conjunction with the accompanying drawings, in which like reference numerals generally represent like components.

[0032] Figure 1 A schematic structural diagram of a downhole sampler of a geothermal fluid sealed sampling device according to an embodiment of the present invention is shown.

[0033] Figure 2A schematic structural diagram of a sample storage bottle of a geothermal fluid closed sampling device according to an embodiment of the present invention is shown.

[0034] Figure 3 A schematic structural diagram of a ground sample transfer platform of a geothermal fluid closed sampling device according to an embodiment of the present invention is shown.

[0035] Description of reference numerals:

[0036] 101, sealing piston; 101a, sampling port; 101b, sample transfer valve; 101c, hollow valve plug; 101d, sample transfer port; 101e, push-type positioning pin; 101f, positioning hole; 102, first floating piston; 103, piston guide rod; 104, buffer; 104a, sliding component; 104b, fixed component; 105, air chamber sealing connector; 106, flow regulator; 107, replacement fluid injection port; 108, air chamber; 109, regulating valve; 110, air chamber connecting pipe; 111, start switch; 112, clock-controlled sealing connector; 113, trigger mechanism; 113a, conical impact head; 113b, pressing piece; 113c, connecting rod; 113 d. tension spring; 114. clock machine; 115. guide cone; 201. high-pressure valve handle; 202. first high-pressure valve; 203. second high-pressure valve; 204. housing; 205. second floating piston; 206. second sample chamber; 207. sample outlet; 208. vacuum port; 209. second displacement fluid chamber; 210. wear-resistant straightening ring; 211. sealing ring; 212. stirring ball; 301. high-pressure output port; 302. sample bottle holder; 303. sealed oil tank; 304. sampler holder; 305a. first pressure gauge; 305b. second pressure gauge; 306. sample bottle back pressure port; 307a. first regulating valve; 307b. second regulating valve; 308. manual pump. DETAILED DESCRIPTION

[0037] The present invention will be described in more detail below with reference to the accompanying drawings. Although preferred embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to make the present invention more thorough and complete, and to fully convey the scope of the present invention to those skilled in the art.

[0038] Figure 1 FIG. 4 is a schematic diagram showing the structure of a downhole sampler of a geothermal fluid sealed sampling device according to an embodiment of the present invention. Figure 1 As shown, a geothermal fluid sealed sampling device according to the present invention comprises:

[0039] A downhole sampler, the downhole sampler comprises a sampling part, an air chamber 108 and a timing control mechanism connected in sequence, and the sampling part is provided with a sampling port 101a;

[0040] The sampling part comprises a sampling part housing, in which a sealing piston 101, a first floating piston 102 and a buffer 104 are sequentially arranged from the front end to the rear end. A first sample chamber is formed between the sealing piston 101 and the first floating piston 102. The sampling port 101a is arranged at the junction of the sealing piston 101 and the first floating piston 102 and communicates the first sample chamber with the outside of the sampling part housing. A first replacement fluid chamber is formed between the first floating piston 102 and the buffer 104. A replacement fluid injection port 107 is arranged on the replacement fluid channel between the buffer 104 and the air chamber 108. The sealing piston 101 is connected to the buffer 104 via a piston guide rod 103 penetrating the first floating piston 102, so that the sampling port 101a can be closed under the drive of the buffer 104.

[0041] The air chamber 108 includes an air chamber housing, and the first replacement fluid chamber is operably connected to the inner cavity of the air chamber housing through an air chamber connecting tube 110;

[0042] The timing control mechanism is used to operate the air chamber connecting tube 110 at a set time to connect the first replacement fluid chamber with the inner cavity of the air chamber housing.

[0043] Specifically, the automatic opening of the downhole sampler can be achieved through the timing control mechanism. The air chamber 108 is connected to the first displacement fluid chamber in the sampling part through the air chamber connecting tube 110. Before sampling, the air chamber 108 needs to be evacuated (or part of the air is extracted), and a certain pressure of displacement fluid is injected into the first displacement fluid chamber to move the first floating piston 102 to the bottom of the sampling part shell. The sampling port 101a is arranged at the junction of the sealing piston 101 and the first floating piston 102 and connects the first sample chamber with the outside of the sampling part shell. It should be noted that the sampling port 101a should be located above the top of the sealing piston 101 and close to the first floating piston 102, so that when the first floating piston moves upward, the geothermal fluid can be smoothly discharged from The sampling port enters the first sample chamber; when sampling, the pressure difference between the air chamber 108 and the first displacement fluid chamber is used to make the displacement fluid in the first displacement fluid chamber flow to the air chamber 108, and the geothermal fluid sample pushes the first floating piston 102 to move upward. At the sampling point, there is a pressure difference between the geothermal fluid outside the sampling port 101a and the first sample chamber, so the geothermal fluid is sucked into the first sample chamber of the sampling part by the pressure difference. Finally, the first floating piston 102 can push the buffer 104 to move upward, and the buffer 104 drives the sealing piston 101 to move upward through the piston guide rod 103, thereby closing the sampling port 101a to complete the sampling, thereby realizing the automatic opening and closing and airtight maintenance effect of the downhole sampler, and meeting the high-fidelity airtight sampling of geothermal fluids underground.

[0044] In this embodiment, the sampling portion housing at the sealing piston 101 is provided with a sample transfer port 101d and a positioning hole 101f, and the sampling port is located above the positioning hole 101f.

[0045] Specifically, refer to Figure 1 A sample transfer port 101d and a positioning hole 101f are provided on the sampling part housing at the sealing piston 101. The sample transfer port 101d is used for connecting with the ground sample transfer device after sampling is completed, and the positioning hole 101f is used to cooperate with the push-type positioning pin 101e to lock the sealing piston 101. During the specific implementation process, the sample transfer port 101d and the positioning hole 101f can be drilled on the side wall of the sampling part housing opposite to the sampling port, wherein the position of the sample transfer port 101d should be located above the positioning hole 101f and below the sampling port (the sample transfer port 101d can be provided with a sealing ring that cooperates with the hollow valve plug 101c); a guide cone 115 is also provided at the bottom end of the sampling part housing, and the guide cone 115 is detachably and sealedly connected to the sampling part housing, and the guide cone 115 has a guiding function and can prevent the internal device of the downhole sampler from being damaged by the formation rock.

[0046] In this embodiment, a sample transfer valve 101b and a push-type positioning pin 101e are provided in the sealing piston 101. The valve switch of the sample transfer valve 101b is arranged outside the bottom end of the sealing piston 101. The inlet end of the sample transfer valve 101b is connected to the sampling chamber, and the outlet end of the sample transfer valve 101b is provided with a hollow valve plug 101c that cooperates with the sampling port. The push-type positioning pin 101e cooperates with the positioning hole 101f to lock the sealing piston 101.

[0047] Specifically, refer to Figure 1 The sealing piston 101 is also provided with a sample transfer valve 101b and a push-type positioning pin 101e. The top of the push-type positioning pin 101e is in sliding contact with the inner wall of the sampling part housing. The sealing piston 101 moves while driving the push-type positioning pin 101e to translate synchronously. When the push-type positioning pin 101e moves to the positioning hole 101f, the push-type positioning pin 101e pops up and fits with the positioning hole 101f, thereby locking the sealing piston and limiting the displacement of the sealing piston. The sampling hole opening is located above the top edge of the sealing piston 101. The sealing piston is also provided with a guide sleeve, which can prevent the sealing piston from rotating. Before sampling, the push-type positioning pin 101e is aligned with the positioning hole 101f on the sampling part housing in the vertical direction, the hollow valve plug 101c is aligned with the sample transfer port 101d in the vertical direction, the inlet end of the sample transfer valve 101b is connected to the first sample chamber, and the contact surface between the sealing piston 101 and the inner wall of the sampling part housing is sealed by the sealing groove and the sealing rubber ring. During the sampling process, the buffer 104 is pushed by the first floating piston 102 to drive the piston guide rod 103 to pull the sealing piston 101 upward, and the sampling port 101a is gradually closed by the sealing piston 101 until the positioning pin is aligned with the positioning hole 101f and bounces up, and the sealing piston 101 is locked. At this time, the push-type positioning pin 101e is matched with the positioning hole 101f, the hollow valve plug 101c is aligned with the sample transfer port 101d (and cooperates with the sealing ring), the sampling port has been closed, and the sampling is completed. When transferring samples, unscrew the guide cone 115 at the bottom of the sampler, and the switch of the sample transfer valve 101b is exposed. The sample transfer valve 101b can be operated to open and close to transfer samples. The sample transfer valve 101b in this embodiment is a needle valve. The needle valve is small in size and easy to accurately control the flow of the sample transfer port 101d. The needle valve is a prior art, and the structure and working principle of the needle valve are not described here.

[0048] In one example, the sampling portion and the air chamber 108 are sealed and connected via an air chamber sealing connector 105 , a flow regulator 106 is provided in the air chamber sealing connector 105 , one end of the flow regulator 106 is connected to the first replacement fluid chamber, and the other end is connected to the air chamber connecting tube 110 .

[0049] Specifically, refer to Figure 1The flow regulator 106 in this embodiment is a pressure regulating valve. The bottom of the core rod of the pressure regulating valve is a cone and the displacement fluid channel between the flow regulator 106 and the buffer 104 is sealed with a conical surface. The spring is connected in series to the core rod of the pressure regulating valve. The pressure regulating valve is assembled with the air chamber sealing connector 105 and connected with threads. By tightening or loosening the pressure regulating screw of the pressure regulating valve, the opening pressure of the downhole sampler is adjusted and controlled. Before sampling, the pressure of the pressure regulating valve should be slightly lower than the pressure at the sampling point to ensure that the displacement fluid can smoothly flow into the air chamber connecting pipe 110 through the pressure regulating valve during sampling, and the flow rate of the displacement fluid is controlled by the pressure regulating valve, thereby controlling the sampling speed. The displacement fluid injection port 107 is arranged on the displacement fluid channel and integrated with the air chamber sealing connector 105. The flow regulator 106 is a prior art. People in this field can adopt a specific type of flow regulator 106 according to actual needs, which will not be repeated here.

[0050] In this embodiment, the buffer 104 includes a fixed component 104b and a sliding component 104a. The fixed component 104b is fixedly connected to the sealing connector. The sliding component 104a is cylindrical and fits the inner wall of the shell and can be slidably mounted on the outside of the fixed component 104b. The sliding component 104a is fixedly connected to the piston guide rod 103.

[0051] Specifically, refer to Figure 1 The buffer 104 is mainly composed of a fixed component 104b and a sliding component 104a. The sliding component 104a includes a barrel-shaped outer wall and a sliding rod at the center of the inner wall of the barrel-shaped outer wall. The sliding rod is provided with a channel that can allow the displacement fluid to flow to the air chamber connecting pipe 110. The fixed component 104b is a barrel-shaped, and the fixed component 104b is sealed and fixedly connected to the sealing connector at one end, and the other end cooperates with the sliding rod. The sliding rod can slide on the inner wall of the fixed component 104b, so that the barrel-shaped outer wall of the sliding component 104a, the fixed component 104b, and the sliding rod of the sliding component 104a form a connection from the outside to the inside. The structure is nested in sequence, one end of the sliding component 104a is connected to the sealing piston 101 through the piston guide rod 103. When sampling, the first floating piston 102 moves to the position of the sliding component 104a of the buffer 104 and continues to push the sliding component 104a, thereby driving the sealing piston 101 to move upward through the piston guide rod 103. The structure of the buffer 104 can effectively prevent the first floating piston 102 from moving too fast under the action of the pressure difference and causing damage to the downhole sampler. At the same time, it can control the sampling speed to ensure that the geothermal fluid can gradually fill the first sample chamber at a reasonable speed.

[0052] In this embodiment, the timing control mechanism includes a start switch 111, a trigger mechanism 113 and a clock 114. The clock 114 triggers the trigger mechanism 113 at a set time to turn on the start switch 111, thereby connecting the air chamber connecting pipe 110.

[0053] Specifically, refer to Figure 1 The start switch 111 is arranged on the air chamber connecting pipe 110 near one end of the flow regulator 106 (pressure regulating valve). The start switch 111 is linked with the trigger mechanism 113. The clock 114 starts the trigger mechanism 113 through countdown, thereby turning on the start switch 111, so that a passage is formed between the first replacement fluid chamber and the air chamber 108. The replacement fluid can flow into the air chamber 108 under the action of the pressure difference, thereby starting the first floating piston 102 to start absorbing geothermal fluid.

[0054] In this embodiment, the timing control mechanism further includes a clock-controlled sealed connector 112 and a regulating valve 109, wherein the clock-controlled sealed connector 112 is sealedly connected to the air chamber housing, the regulating valve 109 is disposed between the air chamber connecting pipe 110 and the inner cavity of the air chamber housing, the start switch 111 is disposed in the clock-controlled sealed connector 112, and the trigger mechanism 113 connects the air chamber connecting pipe 110 to the regulating valve 109 by operating the start switch 111.

[0055] Specifically, refer to Figure 1 The regulating valve 109 and the starting switch 111 are integrated at one end of the clock-controlled sealing connector 112 close to the air chamber 108. The part of the air chamber connecting tube 110 in the air chamber 108 can be made into a spiral shape as required to increase the flow path of the replacement fluid and play a role in buffering and controlling the flow rate.

[0056] In this embodiment, the trigger mechanism 113 includes a trigger mechanism 113 shell, one end of the trigger mechanism 113 shell is fixedly connected to the clock-controlled sealing connector 112, and the other end of the trigger mechanism 113 shell is fixedly connected to the clock machine 114; the trigger mechanism 113 shell is provided with a conical impact head 113a, a spring and a connecting rod 113c, the conical impact head 113a is connected to the clock machine 114, the connecting rod 113c is slidably arranged in the clock-controlled sealing connector 112, one end of the connecting rod 113c is connected to the switch of the regulating valve 109, and the other end of the connecting rod 113c is connected to the pressing plate 113b, the pressing plate 113b is fixed between the conical impact head 113a and the clock-controlled sealing connector 112, and the surface of the pressing plate 113b is connected to the trigger mechanism shell through a tension spring 113d.

[0057] Specifically, refer to Figure 1One end of the connecting rod 113c is connected to the starting switch 111, and the other end is connected to the pressing piece 113b through a stop pin. The clock machine 114 can preset the countdown. During the countdown, the conical collision head 113a keeps pressing the pressing piece 113b, and the tension spring 113d keeps being pulled apart. After the countdown is completed, the clock machine 114 triggers the conical collision head 113a to move upward, and the pressing piece 113b gets rid of the pressure of the conical collision head 113a. The tension spring 113d pulls the pressing piece 113b to deform and drives the connecting rod 113c to slide downward through the stop pin, thereby triggering the starting switch 111 to open, and the passage of the air chamber connecting pipe 110 is opened. Under the action of the pressure difference, the replacement fluid can flow into the air chamber 108. The tension spring 113d is respectively connected to the pressing piece 113b and the inner wall of the trigger mechanism 113 shell, and can press the pressing piece 113b down and reset when the clock machine 114 sets the countdown and the conical collision head 113a is reset, so as to realize recycling. The clockwork 114 in this embodiment is an existing spring-type clockwork 114, the conical impact head 113a can be integrated with the clockwork 114, and the pressing piece 113b can also select an existing pressing piece 113b spring without a tension spring 113d and with elasticity. It should be noted that the form of the trigger mechanism 113 is not limited to the solution of this embodiment, and those skilled in the art can also design other alternative trigger mechanism 113 structures according to actual conditions, which will not be repeated here.

[0058] The sampling process of the downhole sampler is as follows: analyzing the geothermal reservoir characteristics, the wellbore structure of the geothermal well, the flow state of the geothermal fluid in the wellbore and other factors, selecting a downhole sampler of suitable material, size and pressure, and determining the location of the sampling point. If the scaling and other conditions in the well are unclear, it is necessary to conduct a well pass before sampling to explore the wellbore conditions, and at the same time measure and record the necessary parameters such as the pressure at the sampling position and the time used for recording. The air chamber 108 is evacuated and the opening pressure of the control device is adjusted by tightening or loosening the pressure regulating screw of the pressure regulating valve (flow regulator 106) to make it slightly lower than the pressure at the sampling point. Confirm that the start switch 111 is closed, the first displacement fluid chamber on one side of the first floating piston 102 is filled with displacement fluid, and the piston is pushed to the bottom of the sampling part housing. The countdown time of the clock 114 is set. The time recorded in the test process can be used as the countdown time set by the downhole sampler clock 114, or the countdown of the clock 114 can be calculated and set according to the lowering speed and the sampling position under the condition that the lowering speed of the downhole sampler is controllable. A wire winch is used in conjunction with a wellhead blowout prevention device to lower the downhole sampler to a specified depth. When the countdown time set by the clock 114 is reached, the trigger mechanism 113 links the start switch 111 to open the passage between the air chamber connecting pipe 110 and the air chamber 108, and uses the pressure difference to push the first floating piston 102 upward, and the sampling port 101a collects geothermal fluid samples. The other side of the first floating piston 102 drains the replacement fluid to the air chamber 108 via the flow regulator 106. When the first floating piston 102 reaches the top through the buffer 104, the piston guide rod 103 triggers the sealing piston 101 to move upward, and the sealing piston 101 moves at the same time under the push of the formation pressure, closing the sampling port 101a and locking the seal.

[0059] In the present embodiment, a sample storage bottle is also included, the interior of the sample storage bottle is a closed cavity, a second floating piston 205 is provided in the closed cavity, the second floating piston 205 divides the closed cavity into a second displacement fluid chamber 209 and a second sample chamber 206, a stirring ball 212 is provided in the second sample chamber 206; one end of the sample storage bottle is provided with a first high-pressure valve 202 and a vacuum port 208 connected to the second displacement fluid chamber 209, and the other end of the sample storage bottle is provided with a sample outlet 207 and a second high-pressure valve 203 connected to the second sample chamber 206, and the second high-pressure valve 203 can be connected to the sample transfer port 101d of the downhole sampler.

[0060] Specifically, refer to Figure 2The geothermal fluid closed sampling device of the present invention also includes a sample storage bottle for dumping samples. The main body of the sample storage bottle is a cylindrical shell 204. The interior of the shell 204 is a closed cavity. A second floating piston 205 is arranged in the closed cavity. One side of the floating piston is a second displacement fluid chamber 209, and the other side is a second sample chamber 206. One end of the shell is provided with a first high-pressure valve 202 (with a high-pressure valve handle 201) and a vacuum port 208 for filling the displacement fluid. The vacuum port 208 is used for vacuuming and filling the displacement fluid. The first high-pressure valve 202 is used to control the outflow rate of the displacement fluid in the second displacement fluid chamber 209 during the dumping process; the other end of the shell 204 is provided with a sample outlet The second high-pressure valve 203 can be connected to the sampling port 101a of the downhole sampler through a specific connector; a stirring ball 212 is provided in the second sample chamber 206 for stirring the geothermal fluid sample in the second sample chamber 206 during sample analysis, and the sample outlet 207 is used to discharge the sample from the second sample chamber 206 to the analysis equipment during analysis; the side wall of the second floating piston 205 is provided with a wear-resistant straightening ring 210 and a sealing ring 211 (with the same structure as the outer wall of the first floating piston 102) in contact with the inner wall of the sample storage bottle shell 204.

[0061] In this embodiment, a ground sample transfer platform is also included, which includes a sampler support 304, a sample storage bottle support 302, a first pressure gauge 305a, a second pressure gauge 305b, a high pressure output port 301, a sample storage bottle back pressure port 306, a first regulating valve 307a, a second regulating valve 307b, a manual pump 308 and a sealed oil tank 303;

[0062] The sampler bracket 304 and the sample storage bottle bracket 302 are used to place the downhole sampler and the sample storage bottle, respectively. The replacement fluid injection port of the sampling chamber of the downhole sampler can be connected to the sealed oil tank 303 through the high-pressure output port 301, the first regulating valve 307a, the first pressure gauge 305a, and the manual pump 308 in sequence. The first high-pressure valve 202 of the sample storage bottle can be connected to the sealed oil tank 303 through the sample storage bottle back pressure port 306, the second regulating valve 307b, and the second pressure gauge 305b in sequence.

[0063] Specifically, refer to Figure 3The ground sample transfer platform includes a sampler bracket 304, a sample storage bottle bracket 302, a first pressure gauge 305a, a second pressure gauge 305b, a high pressure output port 301, a sample storage bottle back pressure port 306, a first regulating valve 307a, a second regulating valve 307b, a manual pump 308 and a sealed oil tank 303. During the transfer process, the sample storage bottle and the downhole sampler are first placed on the sample storage bottle holder 302 and the sampler holder 304 respectively, and the second high-pressure valve 203 of the sample storage bottle is sealed and connected to the sample transfer port 101d of the downhole sampler through a specific connector. The second replacement fluid chamber 209 of the sample storage bottle is pre-filled with replacement liquid through the vacuum port 208, and the second floating piston 205 is pushed to one end of the vacuum port 208 of the sample storage bottle to add back pressure when sampling the second sample chamber 206. The replacement fluid injection port 107 of the sampling chamber in the downhole sampler is connected to the high-pressure output port 301, the first regulating valve 307a, the first pressure gauge 305a, the manual pump 308, and the sealed oil tank 303 in sequence. The first high-pressure valve 202 of the sample storage bottle is connected to the sample storage bottle back pressure port 306, the second regulating valve 307b, the second pressure gauge 305b and the sealed oil tank 303 in sequence. Then, the manual pump 308 and the flow regulator 106 control the manual pump 308 to apply pressure to one end (first displacement fluid chamber) of the first floating piston 102 in the downhole sampler, and the displacement fluid in the sealed oil tank 303 is introduced into the first displacement fluid chamber of the downhole sampler. The geothermal fluid sample is driven out from the sample transfer port 101d at the other end of the first floating piston 102, and enters the second sample chamber 206 from the sample storage bottle through the second high-pressure valve 203 to adjust the flow rate, and the displacement fluid in the second displacement fluid chamber 209 in the sample storage bottle flows into the sealed oil tank 303. In order to maintain the pressure during the sample transfer process, it is necessary to observe the first pressure gauge 305a and the second pressure gauge 305b, and simultaneously control and adjust the first regulating valve 307a and the second regulating valve 307b to achieve homogeneous and pressure transfer, and finally the sample storage bottle is transported to the laboratory for analysis and testing.

[0064] The geothermal fluid closed sampling device of the above embodiment is suitable for the collection and preservation of geothermal fluid samples in geothermal wells, and has the characteristics of adjustable sampling speed, automatic sampling at a fixed depth in the well, closed and constant pressure during the whole sampling and dumping process, and recyclable use. In addition, due to the high-fidelity effect of closed isolation, it is convenient for long-term storage and transportation, which makes up for the defect that only relying on ground sampling is not enough to accurately obtain geothermal fluid samples and accurate test results in the process of geothermal resource cognition research and development and utilization.

[0065] The embodiments of the present invention have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those skilled in the art without departing from the scope and spirit of the described embodiments.

Claims

1. A geothermal fluid closed sampling device, It is characterized in that include: A downhole sampler, the downhole sampler comprising a sampling part, an air chamber and a timing control mechanism connected in sequence, the sampling part being provided with a sampling port; The sampling part comprises a sampling part housing, in which a sealing piston, a first floating piston and a buffer are arranged in sequence from the lower end to the upper end of the sampling part housing, a first sample chamber is formed between the sealing piston and the first floating piston, the sampling port is arranged at the junction of the sealing piston and the first floating piston and communicates the first sample chamber with the outside of the sampling part housing, a first replacement fluid chamber is formed between the first floating piston and the buffer, and a replacement fluid injection port is arranged between the buffer and the air chamber; the sealing piston is connected to the buffer via a piston guide rod penetrating the first floating piston, so that the sampling port can be closed under the drive of the buffer; The air chamber comprises an air chamber housing, and the first replacement fluid chamber is operably connected to the inner cavity of the air chamber housing through an air chamber connecting pipe; The timing control mechanism is used to operate the air chamber connecting tube at a set time to connect the first replacement fluid chamber with the inner cavity of the air chamber housing; The timing control mechanism includes a start switch, a trigger mechanism and a clock, and the clock triggers the trigger mechanism at a set time to turn on the start switch, thereby connecting the air chamber connecting pipe; The timing control mechanism further comprises a clock-controlled sealing connector and a regulating valve, wherein the clock-controlled sealing connector is sealed and connected to the air chamber housing, the regulating valve is arranged between the air chamber connecting pipe and the inner cavity of the air chamber housing, the starting switch is arranged in the clock-controlled sealing connector, and the trigger mechanism connects the air chamber connecting pipe with the regulating valve by operating the starting switch; The trigger mechanism comprises a trigger mechanism housing, one end of which is fixedly connected to the clock-controlled sealing connector, and the other end of which is fixedly connected to the clock; The trigger mechanism housing is provided with a conical impact head, a pressing piece and a connecting rod, the conical impact head is connected to the clock machine, the connecting rod is slidably arranged in the clock-controlled sealing connector, one end of the connecting rod is connected to the start switch, the other end of the connecting rod is connected to the pressing piece, the pressing piece is fixed between the conical impact head and the clock-controlled sealing connector, and the surface of the pressing piece is connected to the trigger mechanism housing through a tension spring; The sampling portion housing at the sealing piston is provided with a sample transfer port and a positioning hole, and the sample transfer port is located above the positioning hole; It also includes a sample storage bottle, wherein the interior of the sample storage bottle is a closed cavity, a second floating piston is arranged in the closed cavity, the second floating piston divides the closed cavity into a second replacement fluid chamber and a second sample chamber, and a stirring ball is arranged in the second sample chamber; One end of the sample storage bottle is provided with a first high-pressure valve and a vacuum port connected to the second displacement fluid chamber, and the other end of the sample storage bottle is provided with a sample outlet connected to the second sample chamber and a second high-pressure valve, and the second high-pressure valve can be connected to the sample transfer port of the downhole sampler; It also includes a ground sample transfer platform, which includes a sampler bracket, a sample storage bottle bracket, a first pressure gauge, a second pressure gauge, a high-pressure output port, a sample storage bottle back pressure port, a first regulating valve, a second regulating valve, a manual pump and a sealed oil tank; The sampler bracket and the sample storage bottle bracket are used to place the downhole sampler and the sample storage bottle, respectively. The replacement fluid injection port of the sampling chamber of the downhole sampler can be connected to the sealed oil tank through the high-pressure output port, the first regulating valve, the first pressure gauge, and the manual pump in sequence. The first high-pressure valve of the sample storage bottle can be connected to the sealed oil tank through the sample storage bottle back pressure port, the second regulating valve, and the second pressure gauge in sequence.

2. The geothermal fluid closed sampling device according to claim 1, It is characterized in that A sample transfer valve and a push-type positioning pin are provided in the sealing piston. The valve switch of the sample transfer valve is arranged outside the bottom end of the sealing piston. The inlet end of the sample transfer valve is connected to the sampling chamber. The outlet end of the sample transfer valve is provided with a hollow valve plug that cooperates with the sampling port. The push-type positioning pin cooperates with the positioning hole to lock the sealing piston.

3. The geothermal fluid closed sampling device according to claim 1, It is characterized in that The sampling part and the air chamber are sealed and connected via an air chamber sealing connector. A flow regulator is arranged in the air chamber sealing connector. One end of the flow regulator is connected to the first replacement fluid chamber, and the other end is connected to the air chamber connecting pipe.

4. The geothermal fluid closed sampling device according to claim 3, It is characterized in that The buffer includes a fixed component and a sliding component, wherein the fixed component is fixedly connected to the sealing connector, the sliding component is cylindrical and fits the inner wall of the shell and is slidably mounted outside the fixed component, and the sliding component is fixedly connected to the piston guide rod.

Citation Information

Patent Citations

  • Underground sampler

    CN103195418A

  • High-pressure physical property sample transferring device for formation test

    CN103364239A

  • Pressure maintaining sample storage bottle

    CN202141612U

  • Digital steel wire sampling trigger device

    CN209385124U