Classification method of electricity customers participating in demand response

By establishing a demand response potential model and natural breakpoint classification method, accurately assessing and classifying users' air conditioner load power demand potential, solving the problems of evaluation errors and inaccurate classification in the existing technology, and achieving a more optimized power supply strategy and power distribution Network planning.

CN112581012BActive Publication Date: 2024-12-03STATE GRID BEIJING ELECTRIC POWER CO +3
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202011568894.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-25
Publication Date
2024-12-03
Estimated Expiration
2040-12-25

AI Technical Summary

Technical Problem

When evaluating the power demand potential of air conditioning loads, the prior art is susceptible to non-temperature-sensitive load fluctuations, resulting in large errors between the evaluation results and the actual potential, and it is impossible to accurately classify users to provide corresponding power supply strategies.

Method used

By determining the power consumption of air conditioning load, establishing a demand response potential model, and determining the demand response potential index based on the peak period of the predetermined period, classifying users, and using natural breakpoint classification method to divide user types to provide personalized power supply strategies.

Benefits of technology

A more accurate power demand potential assessment is achieved, errors are reduced, and it can accurately classify users' power demand potential, and provide corresponding power supply strategies, which improves the economic and efficiency of distribution network planning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112581012B_ABST
    Figure CN112581012B_ABST
Patent Text Reader

Abstract

The present application discloses a method for classifying electricity users who participate in demand response. The method includes: determining the air conditioning load power consumption of the target user in the power system; determining the demand response potential model of the target user based on the air conditioning load power consumption; determining the demand response potential index based on the demand potential model and the duration corresponding to the predetermined time period, wherein the predetermined time period is the peak period of electricity consumption in the historical time period; classifying the target users based on the demand potential index to obtain the user type corresponding to the target user. The present application solves the technical problem that when evaluating the actual power demand potential of the air conditioner in the related art, the static evaluation model is often used, resulting in a large error between the evaluation result and the actual power demand potential, and the user cannot be accurately classified according to the user's power demand potential, and the corresponding power supply strategy can be provided based on the classification result.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of power demand, and in particular, to a method for classifying electricity users who participate in demand response. Background Art

[0002] Electricity demand response (DR) refers to the electricity management activities carried out by improving the efficiency of terminal electricity consumption and optimizing the electricity consumption mode, reducing electricity consumption or changing the terminal energy consumption mode, so as to save energy, protect the environment and realize low-cost electricity services. Among the many demand response methods, direct load control (DLC) belongs to incentive demand response. In particular, the method of reducing the load by DLC control of the user-side air-conditioning load has been proved by academic research and industrial practice to be an effective demand response method. On the one hand, the air-conditioning load is mainly concentrated in the hundreds of hours during the peak period of electricity consumption in summer, so it has the characteristics of short time, large proportion and high peak value. On the other hand, since the building has a certain thermal energy storage capacity, the air-conditioning load can be cut off or reduced for a short period of time without excessively affecting the user's comfort. At present, many studies have considered the demand response resources on the user side in the planning of distribution networks to delay the construction investment of distribution networks. However, most of these studies simply set an upper limit based on empirical values ​​for the amount of load that can be reduced during the peak load period of the system, which is difficult to accurately reflect the actual demand response potential, and thus will bring large errors to the calculation results of planning and operation strategies. Therefore, accurately assessing the user's demand response potential is of great significance for establishing a more economical distribution network planning scheme.

[0003] At present, there is no method to obtain historical air conditioning load data of large-scale users through direct measurement. The main reason is that it is too expensive to install power measurement devices on the user-side air conditioning equipment, and it is invasive to the user. On the other hand, by establishing the user's air conditioning thermodynamic load model to simulate the operation of the user's air conditioning, it is necessary to collect the architectural parameters of the user's house (such as area, insulation materials, house orientation, etc.) and the rated power parameters of the air conditioner. In practice, facing a large number of users, it is difficult to collect these parameters for each user. In recent years, with the popularization of smart meters, a large amount of user electricity consumption data has been collected. Through deep mining of smart meter data, it is possible to extract user air conditioning usage data from it, which provides conditions for analyzing and evaluating the potential of user air conditioning load demand response.

[0004] At present, the main method for analyzing equipment load from the whole house electricity consumption data is non-intrusive load monitoring (NILM), but most NILM methods require high-resolution data (usually Hertz level or higher) to ensure the accuracy of load decomposition, but typical smart meters usually collect data at a frequency of 15 minutes to 1 hour, which is obviously not applicable. In addition, there are some data-driven methods (mainly regression equations and hidden Markov model algorithms) used to separate the air conditioning load power consumption data in smart meters. Among them, the regression algorithm estimates the air conditioning load by regressing the energy consumption at temperature and based on the variable point model. The variable point model assumes that there is a linear relationship between the air conditioning load power consumption and temperature. Some literature proposes to use linear regression method to divide the whole house power load into basic load, active load, heating season gradient and cooling season gradient); some literature proposes to apply linear regression and unsupervised classification method to smart meter hourly data and outdoor temperature hourly data to estimate the power consumption of residential air conditioning load; some literature uses linear regression method to separate the power consumption of thermal load from smart meter data; some propose to use regression method based on Fourier decomposition to decompose the whole house load into temperature insensitive part (represented by sine and cosine functions) and temperature sensitive part (represented by linear temperature equation). These algorithms all use static models and are easily affected by non-temperature sensitive load fluctuations, which makes the air conditioning temperature response characteristics under the whole house load data become insignificant, thus bringing large deviations to the estimation.

[0005] That is, in the related art, when evaluating the actual power demand potential of air conditioners, static models are often used, which are easily affected by non-temperature sensitive load fluctuations, resulting in the air conditioner temperature response characteristics under the whole house load data becoming insignificant, resulting in a large error between the estimated power demand potential and the actual power demand potential, and it is impossible to accurately classify users according to their power demand potential and achieve the purpose of providing corresponding power supply strategies based on user types.

[0006] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention

[0007] The embodiment of the present application provides a method for classifying electricity users who participate in demand response, so as to at least solve the technical problem that when evaluating the actual power demand potential of air conditioners in the related technology, a static evaluation model is often used, resulting in a large error between the evaluation result and the actual power demand potential, and users cannot be accurately classified according to their power demand potential, and corresponding power supply strategies cannot be provided based on the classification results.

[0008] According to one aspect of an embodiment of the present application, a method for classifying electricity users who participate in demand response is provided, including: determining the air conditioning load power consumption of target users in the power system; determining a demand response potential model of the target users based on the air conditioning load power consumption; determining a demand response potential index based on the demand potential model and the duration corresponding to a predetermined time period, wherein the predetermined time period is a peak period of electricity consumption in a historical time period; and classifying the target users based on the demand potential index to obtain a user type corresponding to the target users.

[0009] Optionally, before determining the power consumption of the air-conditioning load of the target user in the power system, the method includes: obtaining the operating status of the air-conditioning load, the temperature response slope of the air-conditioning load for space cooling and heating, the outdoor temperature at a predetermined time, and the thermostat setting value corresponding to the air-conditioning load for space cooling and heating, and white noise.

[0010] Optionally, determining the power consumption of the air-conditioning load of the target user in the power system includes: determining the power consumption of the air-conditioning load of the target user in the power system according to the operating state of the air-conditioning load, the temperature response slope of the air-conditioning load for space cooling and heating, the outdoor temperature at a predetermined time, and the thermostat setting value corresponding to the air-conditioning load for space cooling and heating, and white noise.

[0011] Optionally, the air conditioning load power consumption is determined by the following formula:

[0012] Among them, z m,t Indicates the status of air conditioning load operation and stop (z m,t =1 means the air conditioning load is running; m,t =0 means the air conditioning load stops running); and are the temperature response slopes of the user’s air conditioning load for space cooling and heating, respectively; is the outdoor temperature at time t; and represents the thermostat setpoints for space cooling and heating loads at time t, respectively; ε m,t is subject to the distribution of white noise.

[0013] Optionally, the demand response potential model of the target user is:

[0014] Among them, x m,t Represents the demand response potential model of target users, Indicates the highest temperature adjusted by the air conditioner in the first predetermined time period. Indicates the lowest temperature adjusted by the air conditioner in the second predetermined time period.

[0015] Optionally, the demand response potential index is determined by the following formula:

[0016]

[0017] Among them, DRI m represents the target user's demand response potential index, H DR Represents the peak hours of electricity consumption in the historical time period.

[0018] Optionally, before determining the demand response potential model of the target user according to the air conditioning load power consumption, the method further includes:

[0019] Determine the inelastic net load and net load of the power system; sort the net load and the inelastic net load according to a predetermined sorting rule, wherein the predetermined sorting rule is to sort the net load and the inelastic net load in a descending order as the duration increases; determine the duration corresponding to the predetermined time period according to the sorting result.

[0020] Optionally, determining the duration corresponding to the predetermined period according to the sorting result includes: taking the duration corresponding to the maximum value of the net load greater than the inelastic net load in the sorting result as the duration of the predetermined period.

[0021] Optionally, before classifying the target users based on the demand potential index, the method also includes: determining the demand response potential index of multiple users in the power system; using a natural breakpoint classification method to divide the multiple users into multiple user types according to the demand response potential indexes of the multiple users, wherein the demand response potential levels of the users represented by the multiple user types are different.

[0022] Optionally, after classifying the target users based on the demand potential index, the method further includes: determining a power supply strategy of the power system according to the user type.

[0023] In an embodiment of the present application, a demand response potential model is established. The air-conditioning load power consumption of the target user in the power system is determined, and then the demand response potential model of the target user is determined based on the air-conditioning load power consumption, and the demand response potential index is determined based on the demand potential model and the duration corresponding to the predetermined time period. Finally, the target user is classified based on the demand potential index to obtain the user type corresponding to the target user, thereby achieving the purpose of determining the user's demand response potential model based on the user's air-conditioning power consumption, thereby achieving the technical effect of classifying users based on the demand response potential model, and further solving the technical problem that when evaluating the actual power demand potential of the air conditioner in the related technology, the static evaluation model is often used, resulting in a large error between the evaluation result and the actual power demand potential, and the user cannot be accurately classified according to the user's power demand potential, and the corresponding power supply strategy can be provided based on the classification result. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0025] Figure 1 It is a flowchart of an optional method for classifying electricity customers participating in demand response according to an embodiment of the present application;

[0026] Figure 2 This is a schematic diagram of an optional SNL and SNFNL L sorted in descending order according to the increasing duration according to an embodiment of the present application;

[0027] Figure 3 This is a schematic diagram of an optional method of classifying users into different types using a natural breakpoint classification method according to an embodiment of the present application. DETAILED DESCRIPTION

[0028] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0029] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0030] According to an embodiment of the present application, an embodiment of a method for classifying electricity customers participating in demand response is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0031] Figure 1 A method for classifying electricity users participating in demand response according to an embodiment of the present application is as follows: Figure 1 As shown, the method comprises the following steps:

[0032] Step S102, determining the air conditioning load power consumption of the target user in the power system;

[0033] Step S104, determining a demand response potential model of the target user according to the air conditioning load power consumption;

[0034] Step S106, determining a demand response potential index according to the demand potential model and the duration corresponding to the predetermined time period, wherein the predetermined time period is a peak time period of electricity consumption in a historical time period;

[0035] Step S108: classify the target users based on the demand potential index to obtain the user type corresponding to the target users.

[0036] In the method for classifying electricity users who participate in demand response, first, the air conditioning load power consumption of the target user in the power system can be determined; then, the demand response potential model of the target user is determined based on the air conditioning load power consumption; then, the demand response potential index is determined based on the demand potential model and the duration corresponding to the predetermined time period, wherein the predetermined time period is the peak period of electricity consumption in the historical time period; finally, the target users are classified based on the demand potential index to obtain the user type corresponding to the target users, thereby achieving the purpose of determining the user's demand response potential model based on the user's air conditioning power consumption, thereby achieving the technical effect of classifying users based on the demand response potential model, and further solving the technical problem that when evaluating the actual power demand potential of the air conditioner in the related technology, the static evaluation model is often used, resulting in a large error between the evaluation result and the actual power demand potential, and the users cannot be accurately classified according to their power demand potential, and the corresponding power supply strategy can be provided based on the classification result.

[0037] In some optional embodiments of the present application, before determining the power consumption of the air-conditioning load of the target user in the power system, the operating status of the air-conditioning load, the temperature response slope of the air-conditioning load for space cooling and heating, the outdoor temperature at a predetermined time, and the thermostat setting value corresponding to the air-conditioning load for space cooling and heating, as well as white noise can be obtained.

[0038] In some embodiments of the present application, the air conditioning load power consumption of the target user in the power system can be determined in the following manner. Specifically, the air conditioning load power consumption of the target user in the power system is determined based on the operating status of the air conditioning load, the temperature response slope of the air conditioning load for space cooling and heating, the outdoor temperature at a predetermined time, and the thermostat setting value corresponding to the air conditioning load for space cooling and heating, and white noise.

[0039] It is understandable that user-side demand response can change the system load curve by reducing or changing the user's electricity consumption by allowing the user to respond to prices or control signals, which is an effective means to improve the elasticity and operational flexibility of the power system. In order to evaluate the household's electricity demand response potential, data mining technology can be used to extract historical air conditioning electricity usage data from smart meter data to derive a single user demand response potential model and demand response potential index.

[0040] Specifically: Assume that the total house electricity consumption of user m at time t (i.e., the smart meter reading) is p m,t . p m,t It can be decomposed by the following formula:

[0041] p m,t =v m,t +q m,t

[0042] In the above formula, vm,t represents non-air conditioning load; q m,t represents the air conditioning load (power consumption); the air conditioning load can be modeled by a piecewise linear function of the outdoor temperature as follows:

[0043] Among them, z m,t Indicates the status of air conditioning load operation and stop (z m,t =1 means the air conditioning load is running; m,t =0 means the air conditioning load stops running); and are the temperature response slopes of the user’s air conditioning load for space cooling and heating, respectively; is the outdoor temperature at time t; and represents the thermostat setpoints for space cooling and heating loads at time t, respectively; ε m,t is subject to the distribution of white noise.

[0044] In some optional embodiments of the present application, based on the extracted air conditioning power consumption data, the following model can be used to evaluate the demand response potential of direct control of air conditioning load for a single customer. It is understandable that in a demand response project based on direct control of air conditioning load, the power grid can adjust the thermostat setting temperature of the user's air conditioner by remote control during the peak load period of the system. In some optional embodiments of the present application, the power grid company and the users participating in the demand response project can set rules in advance. For example, the power grid company's adjustment of the user's air conditioning setting temperature is not higher than 10% in the first predetermined time period (for example, in summer). During the second predetermined period (e.g., winter), the For target user m, the air conditioning load demand response potential at historical time point t (i.e., the power reduction range of the power grid for the air conditioning load of this user) χ m,t , can be determined by the following formula:

[0045] The target user's demand response potential model is:

[0046]

[0047] Among them, χ m,t Represents the demand response potential model of target users, Indicates the highest temperature adjusted by the air conditioner in the first predetermined time period. Indicates the lowest temperature adjusted by the air conditioner in the second predetermined time period.

[0048] It is understandable that after obtaining the demand response potential model of the target user, the demand response potential index of each user in the power system can be obtained through the demand response potential model. It is understandable that the air conditioning load demand response potential historical curve of each customer can be obtained through the demand potential model. Further, from the air conditioning load demand response potential historical curve, it can be determined that the demand response resources are most likely to be called during the peak load period of the system. Therefore, a demand response potential index (denoted as DRI) can be defined to evaluate the air conditioning load demand response potential level of a single customer during the peak period of the system. For the target user m, the demand response potential index is determined by the following formula:

[0049]

[0050] Among them, DRI m represents the target user's demand response potential index, H DR Represents the peak hours of electricity consumption in the historical period (peak electricity consumption duration).

[0051] In some embodiments of the present application, before determining the demand response potential model of the target user based on the power consumption of the air-conditioning load, the duration of the predetermined time period, that is, the peak power consumption duration, can be determined as follows. Specifically, the inelastic net load and net load of the power system are determined; the net load and the inelastic net load are sorted according to a predetermined sorting rule, wherein the predetermined sorting rule is to sort the net load and the inelastic net load in order from large to small as the duration increases; and the duration corresponding to the predetermined time period is determined according to the sorting result.

[0052] In some embodiments of the present application, the duration corresponding to the predetermined period can be determined based on the sorting results. Specifically, the duration corresponding to the maximum value of the net load greater than the inelastic net load in the sorting results is used as the duration of the predetermined period.

[0053] Specifically, the peak electricity consumption duration can be determined in the following ways:

[0054] Based on historical data, the system non-flexible net load (SNFNL) is calculated according to the following formula:

[0055]

[0056] In the above formula, SNL is the system net load, which is obtained by the difference between the system load demand and the total power generation of distributed renewable energy; Indicates the maximum participation ratio of users in demand response projects; DR sys It is the total demand response potential of all users in the system.

[0057] Pair SNL and SNFNL point-to-point, and then sort them in descending order according to the system net load SNL, such as Figure 2 As shown in the figure, the system peak period (peak power consumption duration) corresponding to the maximum value of SNL exceeding the inelastic net load SNFNL is determined as H DR .

[0058] In some optional embodiments of the present application, before classifying the target users based on the demand potential index, multiple users in the power system may be classified, specifically, the demand response potential indexes of the multiple users in the power system are determined; and a natural breakpoint classification method is used to divide the multiple users into multiple user types according to the demand response potential indexes of the multiple users, wherein the users represented by the multiple user types have different levels of demand response potential.

[0059] It should be noted that the natural breakpoint classification (JNB) method can divide a one-dimensional data set into multiple continuous classes to minimize the variance in each class. Specifically, the natural breakpoint classification (JNB) method uses variance to measure the deviation level of the data points in each class to the class center point; its specific calculation process is: first calculate the sum of variances of each class, then calculate the sum of variances of all classes, and use the size of the sum of variances to measure the quality of classification. Therefore, it is necessary to calculate the sum of variances of various classifications, and the one with the smallest value determines the optimal classification scheme (but the classification scheme with the smallest variance may not be unique). JNB classification can well "group like with like" for one-dimensional data. The differences between categories are obvious, while the differences within the class are very small, and there is an obvious break between each class. The evaluation index of the JNB classification result is generally characterized by the goodness of variance fit (The Goodness of Variance Fit, GVF), and the formula is as follows:

[0060]

[0061]

[0062]

[0063] In the above formula, SDAM (the Sum of squared Deviations from the Array Mean) is the variance of the original data; SDCM (the Sum of squared Deviations about Class Mean) is the sum of the variances of each class. Obviously, SDAM is a constant, and SDCM is related to the number of classifications k. Within a certain range, the larger the GVF, the better the classification effect, the smaller the SDCM, the larger the GVF, and the closer it is to 1, and SDCM increases with the increase of k. When k is equal to n, SDMC=0, GVF=1, that is, the larger k is, the larger the GVF is.

[0064] It is easy to notice that after classifying the target users based on the demand potential index, the power supply strategy of the power system can be determined according to the user type, e.g. Figure 3 As shown, through the natural breakpoint classification method, according to the demand response potential index, users are divided into three levels, which can be first-level users, second-level users, and third-level users, respectively. Among them, the demand response potential indexes corresponding to the first-level users, the second-level users, and the third-level users respectively decrease in sequence, that is, the demand response potential index corresponding to the first-level users is the highest, the demand potential index corresponding to the second-level users is the second, and the demand response potential index corresponding to the third-level users is the lowest. Then, different power supply strategies are provided according to the demand potential indexes corresponding to users of different levels. For example, in the same power consumption time period, the first-level users are allocated the most power consumption, the second-level users are allocated more power consumption, and the third-level users are allocated less power consumption.

[0065] The serial numbers of the above-mentioned embodiments of the present application are for description only and do not represent the advantages or disadvantages of the embodiments.

[0066] In the above embodiments of the present application, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, please refer to the relevant description of other embodiments.

[0067] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.

[0068] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0069] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0070] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, in essence, or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, disk or optical disk and other media that can store program codes.

[0071] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A method for classifying electricity users participating in demand response, characterized in that: include: Determine the power consumption of the air conditioning load of the target users in the power system; Determining a demand response potential model of the target user according to the air conditioning load power consumption; Determining a demand response potential index according to the demand potential model and the duration corresponding to a predetermined period, wherein the predetermined period is a peak period of electricity consumption in a historical time period; Classifying the target users based on the demand potential index to obtain user types corresponding to the target users; The air conditioning load power consumption is determined by the following formula: ; in, Indicates the running and stopping status of the air conditioning load. Indicates that the air conditioning load is running; Indicates that the air conditioning load stops running; and are the temperature response slopes of the user’s air conditioning load for space cooling and heating, respectively; is the outdoor temperature at time t; and represent the thermostat setpoints for the air conditioning loads for space cooling and heating at time t, respectively; is subject to the distribution White noise; The target user's demand response potential model is: ; in, represents the demand response potential model of the target user, represents the highest temperature adjusted by the air conditioner in the first predetermined time period, Indicates the lowest temperature adjusted by the air conditioner in the second predetermined time period; The demand response potential index is determined by the following formula: ; in, represents the demand response potential index of the target user, Represents the peak hours of electricity consumption in the historical time period.

2. The method according to claim 1, characterized in that Before determining the air conditioning load power consumption of the target users in the power system, include: The operating state of the air conditioning load, the temperature response slope of the air conditioning load for space cooling and heating, the outdoor temperature at a predetermined time, the thermostat setting value corresponding to the air conditioning load for space cooling and heating, and white noise are obtained.

3. The method according to claim 2, characterized in that Determine the air conditioning load power consumption of target users in the power system, including: The air conditioning load power consumption of the target user in the power system is determined based on the operating status of the air conditioning load, the temperature response slope of the air conditioning load for space cooling and heating, the outdoor temperature at a predetermined time, the thermostat setting value corresponding to the air conditioning load for space cooling and heating, and white noise.

4. The method according to claim 1, characterized in that: Before determining the demand response potential model of the target user according to the air conditioning load power consumption, the method further includes: determining an inelastic net load and a net load of the power system; Sorting the net load and the inelastic net load according to a predetermined sorting rule, wherein the predetermined sorting rule is to sort the net load and the inelastic net load in descending order as the duration increases; The duration corresponding to the predetermined time period is determined according to the sorting result.

5. The method according to claim 4, characterized in that Determining the duration corresponding to the predetermined time period according to the sorting result includes: The duration corresponding to the maximum value of the net load greater than the inelastic net load in the sorting result is used as the duration of the predetermined time period.

6. The method according to claim 1, characterized in that Before classifying the target users based on the demand potential index, the method further includes: determining a demand response potential index for a plurality of users in the power system; A natural breakpoint classification method is adopted to classify the multiple users into multiple user types according to the demand response potential indexes of the multiple users, wherein the demand response potential levels of the users represented by the multiple user types are different.

7. The method according to claim 1, characterized in that After classifying the target users based on the demand potential index, the method further includes: A power supply strategy of the power system is determined according to the user type.

Citation Information

Patent Citations

  • Cluster analysis method and system for consumer power consumption behavior based on regulating potential index

    CN109146252A

  • Resident power demand response potential evaluation method

    CN111626608A