BIM-based smart construction site management method, system, device and storage medium
By using BIM technology in the smart construction site management system, combined with video surveillance and three-dimensional models, real-time monitoring and personnel distribution management of the construction site are realized, which solves the problem of poor real-time supervision of the existing system and improves the convenience of management and control of the construction site. and security.
Patent Information
- Application Number
- CN202011411925.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-05
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2040-12-05
AI Technical Summary
The existing smart construction site management system has relatively poor real-time supervision effect on the construction site, making it difficult to achieve intuitive and convenient monitoring of various areas of the construction site.
Adopting BIM-based smart construction site management and control methods, real-time monitoring is carried out by obtaining videos/images of multiple areas of the construction site, and combined with 3D models for monitoring 3D linkage processing, judging display instructions and remote guidance information, and realizing intuitive inspection and inspection of various work areas on the construction site. Convenient understanding of personnel distribution.
It improves the real-time control effect of the construction site, facilitates staff to check various work areas on the construction site, understands the distribution and changing trends of personnel, provides reference movement path information, and enhances the convenience and safety of on-site management.
Smart Images

Figure CN112651069B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of engineering construction management, and in particular to a BIM-based smart construction site management method, system, device and storage medium. Background Art
[0002] A smart construction site refers to the implantation of sensor technology into various objects such as buildings, machinery, personnel wearable equipment, site entry and exit checkpoints, etc., to form an "Internet of Things", which is then integrated with the "Internet". Information technology is used to establish a construction project management integration around the construction process, with interconnected collaboration, intelligent production, and scientific management.
[0003] The patent with application number CN202010753341.1 discloses a smart construction site management system and method. The system includes a smart construction site supervision platform. The smart construction site supervision platform enters the management interface according to the user's operation information. The management interface includes a smart labor unit, a smart machinery unit, a smart material unit, a smart environment unit and a smart production unit; the smart labor unit is used for real-name management, labor salary management and safety education and training management; the smart machinery unit is used for machinery monitoring, tower crane monitoring, construction elevator monitoring and tower crane video monitoring; the smart material unit is used for material inventory management; the smart environment unit is used for environmental monitoring and spray linkage; the smart production unit is used for tasks and approvals, safety inspections, quality inspections and smart progress.
[0004] With respect to the above-mentioned related technologies, the inventors believe that the following defects exist: the above-mentioned system can centrally view and manage multiple systems involved in the construction process on one platform, but the real-time supervision effect of the management personnel on the construction site is relatively poor. Summary of the invention
[0005] In order to improve the on-site management and control effect of the staff on the construction site, the present application provides a BIM-based smart construction site management method, system, device and storage medium.
[0006] In the first aspect, the present application provides a BIM-based smart construction site management method, which adopts the following technical solutions:
[0007] A BIM-based smart construction site management and control method, comprising:
[0008] Acquire videos / images of multiple areas in the construction site and use them as real-time monitoring screens; and,
[0009] Determine whether the user's display instruction is received, and if so, perform monitoring three-dimensional linkage processing;
[0010] The display instruction includes trigger information of a certain work area and work point on a preset three-dimensional model of the construction site, and defines the triggered certain work area and work point of the three-dimensional model of the construction site as a display position;
[0011] The monitoring three-dimensional linkage processing includes:
[0012] Retrieve the coordinate system of the construction site;
[0013] Obtaining the coordinates of the display location based on the coordinate system and the three-dimensional model of the construction site; and,
[0014] It is determined whether there is an area of a real-time monitoring screen containing the coordinates of the display position. If so, the corresponding monitoring screen is retrieved and output to the display unit for display.
[0015] By adopting the above technical solution, the staff can use computers, etc., through the three-dimensional model of the construction site, and through the monitoring screen to more intuitively and conveniently check each work area and work point on the construction site, so as to improve the real-time control effect of the construction site.
[0016] Optionally, it further includes: determining whether remote guidance trigger information is received, and if so, providing remote guidance; wherein the remote guidance trigger information includes a trigger instruction;
[0017] The remote guidance includes:
[0018] Acquiring remote guidance information; wherein the remote guidance information includes guidance instructions and guidance coordinates; and,
[0019] Retrieve the coordinate system of the construction site, combine it with the guidance coordinates, and output guidance instructions to the workstation in the work area to which the guidance coordinates belong.
[0020] By adopting the above technical solution, the backend management staff can remotely guide the construction workers at each workstation in each work area, thereby achieving relatively better management and control effects.
[0021] Optionally, also include:
[0022] Obtaining identity information of people entering and leaving the construction site; wherein the identity information includes facial information; and,
[0023] Determine whether there are people in each monitoring screen. If yes, perform three-dimensional linkage processing for personnel positioning;
[0024] The three-dimensional linkage processing of personnel positioning includes:
[0025] Retrieve the coordinate system of the construction site;
[0026] Obtaining the coordinates of the person according to the coordinate system and the monitoring screen; and,
[0027] According to the personnel coordinates, coordinate system and the three-dimensional model of the construction site, the number of personnel in each work area of the construction site is obtained.
[0028] By adopting the above technical solution, it is convenient for workers to understand the distribution of personnel in various work areas of the construction site, so as to facilitate subsequent personnel deployment.
[0029] Optionally, also include:
[0030] Take time period T1 as sampling node;
[0031] Obtain the number of personnel at each work area and work point at each sampling node; and
[0032] The changes in the number of personnel in each work area and work point within the time period T2 are summarized, and a trend chart of the change in the number of personnel is obtained; wherein the time period T2 is greater than the time period T1.
[0033] By adopting the above technical solution, it is convenient for staff to understand the personnel changes in various locations on the construction site at each construction stage, so as to summarize and analyze the personnel deployment plan later.
[0034] Optionally, also include:
[0035] Obtaining facial information of the person to be pursued; and determining whether facial information of the person to be pursued exists in each real-time monitoring screen, and if so, conducting pursuit processing;
[0036] The recourse process includes:
[0037] Obtaining the coordinates of the person to be traced based on the coordinate system and real-time monitoring images; and,
[0038] According to the coordinates of the person to be traced, the coordinate system and the three-dimensional model of the construction site, the work area and work point where the person to be traced is located are obtained and output.
[0039] By adopting the above technical solution, it is convenient for workers to quickly find relevant personnel on the construction site, providing convenience for the deployment of construction personnel and personnel safety supervision.
[0040] Optionally, also include:
[0041] Obtaining the coordinates of the destination; and obtaining and outputting the reference moving path information according to the three-dimensional model of the construction site, the coordinates of the destination and the coordinates of the person to be traced.
[0042] By adopting the above technical solution, reference movement path information can be provided to the person to be pursued to assist him / her in moving quickly on the construction site. For example, it can be used as a reference when a safety accident occurs and emergency rescue or escape is required.
[0043] In the second aspect, the present application provides a BIM-based intelligent construction site management and control system, which adopts the following technical solution: A BIM-based intelligent construction site management and control system, comprising:
[0044] An information acquisition module is used to acquire videos / images of multiple areas in the construction site and use them as real-time monitoring screens; and a three-dimensional monitoring linkage module is used to determine whether a display instruction from the user is received. If so, three-dimensional monitoring linkage processing is performed.
[0045] By adopting the above technical solution, the staff can use the above system to select the area that needs to be inspected from the three-dimensional model of the construction site, and obtain the corresponding monitoring screen relatively conveniently, so as to complete real-time monitoring of various areas of the construction site.
[0046] Optionally, it also includes a three-dimensional linkage module for personnel positioning, which is used to obtain the identity information of personnel entering and leaving the construction site; determine whether there are personnel in each monitoring screen, and if so, perform three-dimensional linkage processing for personnel positioning.
[0047] By adopting the above technical solution, the staff can relatively easily understand the number of personnel in each work area of the construction site, that is, understand the distribution of personnel on the construction site, so as to make subsequent personnel deployment work.
[0048] On the third aspect, the present application provides an intelligent construction site management and control device based on BIM, which adopts the following technical solution: an intelligent construction site management and control device based on BIM, comprising a memory and a processor, wherein the memory stores a computer program that can be loaded by the processor and execute any one of the methods described above.
[0049] By adopting the above technical solution, the staff only needs to configure other hardware components to conduct real-time monitoring of each work area and work point on the construction site relatively conveniently, thereby improving the supervision effect of the construction site.
[0050] In a fourth aspect, the present application provides a computer storage medium, which adopts the following technical solution:
[0051] A computer storage medium stores a computer program that can be loaded by a processor and execute any one of the above methods.
[0052] By adopting the above technical solution, the staff only needs to connect it and load it to an appropriate computer and other hardware components to conduct real-time monitoring of the construction site relatively conveniently and improve the supervision effect of the construction site.
[0053] In summary, the present application includes at least one of the following beneficial technical effects:
[0054] 1. By linking the three-dimensional model of the construction site with the monitoring of each area of the construction site, it is relatively more intuitive and convenient for staff to check each work area and work point of the construction site;
[0055] 2. By combining facial information, three-dimensional model of the construction site and monitoring images, it is convenient for workers to understand the distribution of personnel on the construction site and understand the trend of personnel changes, so as to facilitate the staff to carry out personnel deployment;
[0056] 3. By combining facial information, three-dimensional model of the construction site and monitoring images, it can also facilitate the search for personnel on the construction site and provide them with reference movement path information, thereby providing better auxiliary effect for real-time monitoring of the construction site. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] Figure 1 It is a system block diagram of an embodiment of the present application.
[0058] Explanation of the accompanying drawings: 1. Information acquisition module; 2. Monitoring three-dimensional linkage module; 3. Personnel positioning three-dimensional linkage module; 4. Remote guidance module; 5. Personnel quantity change trend analysis module; 6. Personnel tracing module; 7. Mobile guidance module. DETAILED DESCRIPTION
[0059] The following is combined with Figure 1 This application is described in further detail.
[0060] The embodiment of the present application discloses a BIM-based smart construction site management method. The BIM-based smart construction site management method can be implemented by cooperating with a server / computer and other hardware components, and includes:
[0061] Obtain videos / images of multiple areas in the construction site and use them as real-time monitoring screens. The following methods can be used to obtain videos / images:
[0062] Surveillance cameras are installed at key areas such as the inside and outside of the entrances and exits of the construction site, the main working surface, the material yard, the material processing area, the warehouse, the fence, the tower crane, etc. to collect videos / images of the corresponding areas. The surveillance cameras are connected to the server / computer executing the method in a wired / wireless manner to provide a monitoring basis for the execution of the method.
[0063] Based on the above foundation, it is determined whether a display instruction from the user is received. If so, three-dimensional monitoring linkage processing is performed.
[0064] Among them, the display instruction includes trigger information of a certain work area point on a preset three-dimensional model of the construction site. The preset three-dimensional model of the construction site can be a BIM three-dimensional model obtained from a design institute or other units; the trigger information includes text information entered by the user through the keyboard or a click of the mouse on a certain work area point on the three-dimensional model of the construction site; to facilitate subsequent description, a certain work area point of the triggered three-dimensional model of the construction site is defined as the display position.
[0065] The above-mentioned monitoring three-dimensional linkage processing includes:
[0066] Retrieving the site's coordinate system; and,
[0067] The coordinates of the display position are obtained according to the coordinate system and the three-dimensional model of the construction site.
[0068] Regarding the coordinate system, for example: three-dimensional coordinates are established and a coordinate origin is set at the entrance of the construction site; after the coordinate system is determined, it is pre-stored in the server / computer waiting to be called; when calculating the coordinates of the display position, the three-dimensional model of the construction site is placed in the coordinate system, or combined with the original modeling coordinates of the three-dimensional model of the construction site to obtain the coordinates of the display position.
[0069] The monitoring three-dimensional linkage processing also includes: determining whether there is an area of a real-time monitoring screen containing the coordinates of the display position, and if so, calling the corresponding monitoring screen and outputting it to a display unit (eg, a computer monitor) for display.
[0070] During use, the staff calculates the three-dimensional coordinates of each surveillance camera based on the coordinate system, and uses r (determined by manual verification based on the camera's installation position, focal length, and field of view) as the radius to obtain the coordinates of the edge of each camera's field of view; when the coordinates of the display position fall within the area defined by the coordinates of the edge of the field of view, it means that the area in the monitoring screen contains the coordinates of the display position. Based on the above content, the staff can select the work area and work point that needs to be checked in the three-dimensional model of the construction site, and obtain the corresponding monitoring screen by triggering it.
[0071] The method further includes: determining whether remote guidance trigger information is received, and if so, performing remote guidance; wherein the remote guidance trigger information includes a manually input or activated trigger instruction, for example: a function button in the user interface is clicked by a mouse.
[0072] Remote guidance includes:
[0073] Obtain remote guidance information; and,
[0074] Retrieve the coordinate system of the construction site, combine it with the guidance coordinates, and output guidance instructions to the workstation in the work area to which the guidance coordinates belong.
[0075] Remote guidance information includes guidance instructions and guidance coordinates. Guidance instructions can be real-time input or pre-stored audio information, text information, etc. The display of guidance instructions requires the cooperation of other hardware components, such as: a network speaker. The server / computer used to execute this method is connected to the network speaker through the network to output guidance instructions to the network speaker when necessary, and through it to display guidance instructions to construction personnel. The guidance coordinates are determined by the staff based on the three-dimensional model of the construction site and then manually input. When the staff inspects a certain work area and work point and believes that guidance is needed for the construction personnel at that location, the guidance instructions are displayed to the relevant personnel in combination with the three-dimensional model of the construction site, the coordinate system, and the adapted hardware components to enhance the real-time control effect of the site.
[0076] During the construction process, the construction personnel need to be dispatched due to factors such as the progress of the project. To facilitate the work of the personnel, this method also includes:
[0077] Obtain the identity information of the personnel entering and exiting the construction site; wherein the identity information includes facial information, and the facial information is obtained, for example: a gate is installed at the entrance and exit of the construction site, a facial recognition device is installed on the upper part of the gate, and the facial recognition device is connected to a computer that executes this method; when the personnel enter and exit, the facial recognition device collects facial information. In this application, before the facial recognition device collects facial information, it is necessary to ensure that the authorization consent of the corresponding personnel has been obtained and the facial information is used legally.
[0078] Based on the above content, it is subsequently determined whether there are people in each monitoring screen, that is, face comparison is performed. If yes, three-dimensional linkage processing of personnel positioning is performed; three-dimensional linkage processing of personnel positioning includes:
[0079] Retrieve the coordinate system of the construction site;
[0080] The coordinates of the personnel are obtained according to the coordinate system and the monitoring screen; wherein the coordinates of the personnel are the coordinates of the camera corresponding to the monitoring screen to which they belong; and the number of personnel in each work area and work point of the construction site is obtained according to the coordinates of the personnel, the coordinate system and the three-dimensional model of the construction site; for example: the coordinates of the personnel are X: 100, Y: 34, Z: 6; the positions of the above coordinates in the three-dimensional model of the construction site are obtained by combining the coordinate system and the three-dimensional model of the construction site, and they are divided into corresponding work areas and work points according to the distance.
[0081] During use, when there is a shortage of personnel at a certain work area, while the number of personnel at another work area is relatively surplus, the staff can make personnel adjustments in conjunction with remote guidance to improve the convenience of on-site personnel management and control.
[0082] In order to facilitate the staff to control the personnel scheduling situation at each construction stage, this method also includes:
[0083] Take time period T1 as sampling node;
[0084] Obtain the number of personnel at each work area and work point at each sampling node; and
[0085] Summarize the changes in the number of personnel in each work area and work point within the time period T2 (T2 is greater than N*T1, N is greater than or equal to 2;), and obtain a trend chart of the number of personnel changes. The number change trend chart is supervised in a two-dimensional coordinate system, with the X-axis representing time and the Y-axis representing the number of personnel.
[0086] In order to facilitate rapid determination of the location of designated personnel during on-site supervision, the method further includes:
[0087] Obtain the facial information of the person to be pursued, which can be manually uploaded by the staff or retrieved from a storage unit;
[0088] Determine whether there is facial information of the person to be traced in each real-time monitoring screen. If yes, perform a trace process. The trace process includes: obtaining the coordinates of the person to be traced according to the coordinate system and the real-time monitoring screen. For example, if the person is in which monitoring screen, the coordinates of the camera corresponding to the monitoring screen are used as the coordinates of the person;
[0089] After obtaining the coordinates of the person to be pursued, the coordinate system and the three-dimensional model of the construction site are combined to obtain the work area and work point where the person to be pursued is located and output it, which can facilitate the staff to find the relevant personnel.
[0090] Furthermore, the method further comprises:
[0091] Obtaining destination coordinates (e.g., receiving manually entered information); and,
[0092] The reference moving path information is obtained and outputted according to the three-dimensional model of the construction site, the coordinates of the destination and the coordinates of the person to be pursued; for example: in the three-dimensional model of the construction site, calibration points are set at the turning points of each passable road section, and the coordinates of the destination and the coordinates of the person to be pursued are used as the starting points of the line segment to obtain multiple line segments, and the line segment with the smallest total length is selected as the reference moving path information; at the same time, when performing the above processing, the segments of the same line segment cannot cross or overlap.
[0093] The output forms of the reference mobile path information include: user interface display, confirmation by staff and then sent to the designated person's mobile phone, which can effectively assist the person to be traced to move quickly within the construction site; in order to enhance the accuracy of the reference mobile path information, the staff updates the three-dimensional model of the construction site according to the construction progress and work area adjustments of the construction site.
[0094] In summary, this method can facilitate the staff to check the monitoring screens of each work area and work point, facilitate guidance to personnel in each work area and work point, facilitate understanding the distribution of personnel on the construction site for personnel deployment, facilitate understanding the distribution trend of personnel at each stage, facilitate tracing relevant personnel from the construction site, and provide mobile guidance for relevant personnel, thereby achieving relatively better real-time supervision of the construction site.
[0095] The present application also discloses a BIM-based intelligent construction site management system. Figure 1 The BIM-based intelligent construction site management and control system includes:
[0096] Information acquisition module 1, used to acquire videos / images of multiple areas in the construction site and use them as real-time monitoring screens;
[0097] The monitoring three-dimensional linkage module 2 is used to determine whether the user's display instruction is received. If so, the monitoring three-dimensional linkage processing in the above method is performed; and the personnel positioning three-dimensional linkage module 3 is used to obtain the identity information of the personnel entering and leaving the construction site; determine whether there are personnel in each monitoring screen, and if so, perform the personnel positioning three-dimensional linkage processing in the above method.
[0098] Based on the above content, it is convenient for the staff to check the monitoring screens of each work area and work point, and it is also convenient for the staff to understand the distribution of personnel at various locations on the construction site, which serves as a basis for personnel deployment.
[0099] The system also includes: a remote guidance module 4 for use with the monitoring three-dimensional linkage module 2, a personnel quantity change trend analysis module 5 for use with the three-dimensional linkage module 3 for personnel positioning, a personnel tracing module 6 based on the monitoring three-dimensional linkage module 2 and the personnel positioning three-dimensional linkage module 3, and a mobile guidance module 7.
[0100] The remote guidance module 4 is used to determine whether remote guidance trigger information is received, and if so, perform the remote guidance in the above method.
[0101] The personnel quantity change trend analysis module 5 is used to take the time period T1 as the sampling node; obtain the number of personnel in each work area and work point once at each sampling node; and summarize the changes in the number of personnel in each work area and work point within the time period T2, and obtain a personnel quantity change trend graph.
[0102] The personnel tracing module 6 is used to obtain the facial information of the person to be traced; determine whether the facial information of the person to be traced exists in each real-time monitoring screen, and if so, perform the tracing process of the above method.
[0103] The mobile guidance module 7 is used to obtain the destination coordinates; obtain the reference mobile path information and output it according to the three-dimensional model of the construction site, the destination coordinates and the coordinates of the person to be traced.
[0104] The embodiment of the present application also discloses a BIM-based intelligent construction site control device. The BIM-based intelligent construction site control device includes a memory and a processor, and the memory stores a computer program that can be loaded by the processor and execute the above method.
[0105] The embodiment of the present application also discloses a computer storage medium, which stores a computer program that can be loaded by a processor and execute the above method.
[0106] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A BIM-based smart construction site management and control method, characterized in that: include: Obtain videos / images of multiple areas in the construction site and use them as real-time monitoring screens; Determining whether a display instruction from a user is received, wherein the display instruction includes triggering information of a certain work area and work point on a preset three-dimensional model of the construction site, and defining the triggered certain work area and work point of the three-dimensional model of the construction site as a display position; If yes, perform monitoring three-dimensional linkage processing; The monitoring three-dimensional linkage processing includes: Retrieve the coordinate system of the construction site; obtain the coordinates of the display position according to the coordinate system and the three-dimensional model of the construction site; determine whether there is an area of a real-time monitoring screen containing the coordinates of the display position, and if so, retrieve the corresponding monitoring screen and output it to the display unit for display; Also includes: Obtaining identity information of people entering and leaving the construction site; wherein the identity information includes facial information; Determine whether there are people in each monitoring screen. If yes, perform three-dimensional linkage processing of personnel tracing management and personnel positioning; The personnel tracing management includes: obtaining facial information of the person to be traced, and determining whether the facial information of the person to be traced exists in each real-time monitoring screen; if so, obtaining the coordinates of the person to be traced according to the coordinate system and the real-time monitoring screen; obtaining the workstation where the person to be traced is located based on the coordinates of the person to be traced, in combination with the coordinate system and the three-dimensional model of the construction site, and outputting the location information of the workstation, so as to facilitate the staff to quickly find the person to be traced; and setting up calibration points at the turning points of each passable road section in the three-dimensional model of the construction site, taking the coordinates of the person to be traced as the starting point and the coordinates of the destination as the end point, planning to obtain multiple line segment paths, and selecting the line segment path with the smallest total length as the reference moving path information; sending the reference moving path information to the mobile phone of the person to be traced to assist the person to be traced to move quickly in the construction site; The three-dimensional linkage processing of personnel positioning includes: calling the coordinate system of the construction site; obtaining the coordinates of the personnel according to the coordinate system and the monitoring screen, wherein the coordinates of the personnel are the coordinates of the camera corresponding to the monitoring screen; obtaining the number of personnel in each work area and work point of the construction site according to the coordinates of the personnel, the coordinate system and the three-dimensional model of the construction site; and analyzing the change trend of the number of personnel in each work area and work point, including: Take time period T1 as sampling node; obtain the number of personnel in each work area and work point once at each sampling node; summarize the changes in the number of personnel in each work area and work point within time period T2, and obtain a trend chart of the number of personnel changes; the trend chart has the X-axis as time and the Y-axis as the number of personnel; wherein, the time period T2 is greater than 2*T1.
2. The BIM-based smart construction site management and control method according to claim 1, characterized in that: Also includes: Determine whether remote guidance trigger information is received, and if so, provide remote guidance; wherein the remote guidance trigger information includes a trigger instruction; and the remote guidance includes: Acquire remote guidance information; wherein the remote guidance information includes guidance instructions and guidance coordinates; Retrieve the coordinate system of the construction site, combine it with the guidance coordinates, and output guidance instructions to the workstation in the work area to which the guidance coordinates belong.
3. A BIM-based intelligent construction site management and control system, characterized in that: include: An information acquisition module (1) is used to acquire videos / images of multiple areas in the construction site and use them as real-time monitoring images respectively; A monitoring three-dimensional linkage module (2) is used to perform monitoring three-dimensional linkage processing when it is determined that a display instruction from a user is received, including calling a coordinate system of the construction site; and obtaining the coordinates of the display position according to the coordinate system and the three-dimensional model of the construction site; Determine whether there is an area of a real-time monitoring screen containing the coordinates of the display position. If so, retrieve the corresponding monitoring screen and output it to the display unit for display; The personnel tracing module (6) is used to obtain the identity information of personnel entering and leaving the construction site; the identity information includes facial information; And determine whether there is a person in each monitoring screen. If so, conduct personnel tracing management, including: obtaining the facial information of the person to be traced, and determining whether the facial information of the person to be traced exists in each real-time monitoring screen; if so, obtaining the coordinates of the person to be traced according to the coordinate system and the real-time monitoring screen; based on the coordinates of the person to be traced, combining the coordinate system and the three-dimensional model of the construction site, obtaining the work station where the person to be traced is located, and outputting the location information of the work station, so that the staff can quickly find the person to be traced; The mobile guidance module (7) is used to set up calibration points at the turning points of each passable road section in the three-dimensional model of the construction site, take the coordinates of the person to be traced as the starting point, take the coordinates of the destination as the end point, plan to obtain multiple line segment paths, select the line segment path with the smallest total length as reference mobile path information; send the reference mobile path information to the mobile phone of the person to be traced, so as to assist the person to be traced to move quickly within the construction site; A personnel positioning three-dimensional linkage module (3) is used to perform three-dimensional linkage processing of personnel positioning, including retrieving the coordinate system of the construction site; obtaining the coordinates of the personnel according to the coordinate system and the monitoring screen, wherein the coordinates of the personnel are the coordinates of the camera corresponding to the monitoring screen; and obtaining the number of personnel at each work area and work point of the construction site according to the coordinates of the personnel, the coordinate system and the three-dimensional model of the construction site; The personnel quantity change trend analysis module (5) is used to analyze the personnel quantity change trend of each work area and work point, including: Take time period T1 as sampling node; obtain the number of personnel in each work area and work point once at each sampling node; summarize the changes in the number of personnel in each work area and work point within time period T2, and obtain a trend chart of the number of personnel changes; the trend chart has the X-axis as time and the Y-axis as the number of personnel; wherein, the time period T2 is greater than 2*T1.
4. A BIM-based intelligent construction site control device, characterized by: The method comprises a memory and a processor, wherein the memory stores a computer program that can be loaded by the processor and executes any one of the methods as claimed in claims 1 to 2.
5. A computer storage medium, characterized in that: A computer program is stored which can be loaded by a processor and executes the method according to any one of claims 1 to 2.