Double split synchronous repair tension equipment

By using double split synchronous repair of tension-resistant equipment in tension-resistant equipment, the combined structure of the conical fastening sleeve and threaded cone sleeve is solved, and the problem of mechanical tension-reducing of tension-resistant wire clamps is achieved. The stable fixation of cables and Stability during long-term use reduces maintenance costs and rework risks.

CN112653054BActive Publication Date: 2024-11-12SHENZHEN FAMER IND DEV CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011527811.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-22
Publication Date
2024-11-12
Estimated Expiration
2040-12-22

AI Technical Summary

Technical Problem

Existing tension clamps are prone to weakening of mechanical tension after long-term use, resulting in unstable cable fixation and ineffective protection of optical cables.

Method used

Design a double split synchronous repair tension-resistant device, fix the cable socket by setting the left cone sleeve and the right cone sleeve, and use the conical structure of the fastening sleeve to squeeze the cable and clamp the trough surface during rotation to achieve tightness. Fitting, combining the threaded cone sleeve and bolt adjustment mechanism to ensure stable fixation of the cable.

Benefits of technology

Improves the stability and fixing effect of the cable, avoids mechanical force loss, reduces the risk of rework, extends the service life of the equipment, improves work efficiency and reduces maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112653054B_ABST
    Figure CN112653054B_ABST
Patent Text Reader

Abstract

The invention discloses a double-split synchronous repair tension-resistant device, comprising a triple plate and a cone sleeve body, wherein the cone sleeve body is fixedly installed on the top of the triple plate, wherein the cone sleeve body comprises a left cone sleeve and a right cone sleeve, wherein a wire clamping groove is arranged on the inner wall of the left cone sleeve, and the wire clamping groove is evenly distributed, and the right outer wall of the left cone sleeve is fixedly connected to a tension ear plate, and a movable block is arranged on the inner wall of the tension ear plate, and a bolt is fixedly installed on the inner wall of the top of the movable block, and the top of the movable block is movably installed on the inner wall of the tension ear plate by bolt one. The beneficial effect of the invention is as follows: the cable is then passed through the bottom through a tightening sleeve, and the top of the tightening sleeve is set to a cone shape, and when the tightening sleeve is rotated and moved upward, the tightening sleeve is tightly fitted with the surface of the wire clamping groove by squeezing the cable, so that the fixing stability of the cable to the left cone sleeve and the inner wall of the right cone is better.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cables, and in particular to double-split synchronous repairing tension-resistant equipment. Background Art

[0002] Strain clamps are used to fix conductors to withstand the tension of the conductors and hang the conductors on the hardware on the tension string group or pole tower. Strain clamps are used for corners, splices, and terminal connections. The spiral aluminum-clad steel wire has extremely strong tensile strength. The tension clamp has no concentrated stress, which protects the optical cable and assists in vibration reduction. The clamp grip is not less than 95% of the rated tensile strength of the optical cable. The installation is convenient and quick, which reduces the construction cost. Strain clamps can be roughly divided into two categories according to their structure and installation conditions. The first category: The tension clamp must withstand the full tension of the conductor or lightning conductor. The clamp grip is not less than 90% of the rated tensile strength of the installed conductor or lightning conductor, but it does not serve as a conductor. This type of clamp can also be removed after the conductor is installed and used separately. This type of wire clamp includes bolt-type tension wire clamp and wedge-shaped tension wire clamp. The second type is the tension wire clamp, which not only bears the full tension of the conductor or lightning conductor, but also serves as a conductor. Therefore, once this type of wire clamp is installed, it cannot be removed. It is also called a dead wire clamp. Since it is a conductor, the installation of the wire clamp must comply with the relevant installation operating procedures and be carried out carefully.

[0003] The prior art has the following deficiencies: the existing tension clamps which have been installed for a long time are prone to mechanical tension reduction, thereby reducing the stability of the tension clamps and failing to properly fix the cables.

[0004] Therefore, it is necessary to invent double-split synchronous repair tension equipment. Summary of the invention

[0005] To this end, the present invention provides a double-split synchronous repair tension-resistant equipment, which fixes two groups of cables by setting a left cone sleeve and a right cone sleeve, and then passes the cables through the bottom through a fastening sleeve. By setting the top of the fastening sleeve to be conical, when the fastening sleeve is rotated and moved upward, the fastening sleeve squeezes the cable and fits with the surface of the wire clamping groove, so as to solve the problem of facilitating the fixation of the cables and improving the stability of the tension-resistant wire clamp.

[0006] In order to achieve the above-mentioned purpose, the present invention provides the following technical solutions: a double-split synchronous repair tension-resistant equipment, comprising a triple plate and a cone sleeve body, the cone sleeve body is fixedly installed on the top of the triple plate, the cone sleeve body comprises a left cone sleeve and a right cone sleeve, the inner wall of the left cone sleeve is provided with a wire clamping groove, the wire clamping grooves are evenly distributed, the right outer wall of the left cone sleeve is fixedly connected to the tension ear plate, the inner wall of the tension ear plate is provided with a movable block, the inner wall of the top of the movable block is fixedly installed with a bolt one, the top of the movable block is movably installed on the inner wall of the tension ear plate by bolt one, the inner wall of the left cone sleeve is fixedly installed with an inner sleeve, the inner wall of the inner sleeve is fixedly connected with a cable, the bottom of the inner sleeve is provided with a fastening sleeve, the fastening sleeve is arranged in a cone shape, the fastening sleeve is sleeved on the outer wall of the cable, the outer wall of the fastening sleeve is threadedly connected to the inner wall of the inner sleeve, the right cone sleeve and the left cone sleeve are symmetrically arranged, and the right cone sleeve and the left cone sleeve are configured the same.

[0007] Preferably, the bottom of the left cone sleeve and the bottom of the right cone sleeve are both provided with bolts 2, and the left cone sleeve and the right cone sleeve are fixedly mounted on the top of the left and right ends of the triple plate by the bolts 2.

[0008] Preferably, a limiting hole is opened at the center position of the outer wall at the top of the triple plate, a bolt column 1 is provided at the bottom of the triple plate, a hexagon socket bolt is provided on the inner wall at the top of the bolt column 1, and the top of the bolt column 1 is fixedly installed on the bottom of the triple plate by the hexagon socket bolt.

[0009] Preferably, the outer wall of the bolt column is provided with an external thread, the bottom of the bolt column is provided with a threaded cone sleeve, the top and bottom of the threaded cone sleeve are both configured to be conical, the inner wall of the threaded cone sleeve is provided with an internal thread, and the inner wall of the top of the threaded cone sleeve is fixedly connected to the bolt column by threads.

[0010] Preferably, a ball is provided on the inner wall of the threaded cone sleeve, and the diameter of the ball is consistent with the inner diameter of the inner wall of the fastening sleeve.

[0011] Preferably, a second bolt column is provided at the bottom of the threaded cone sleeve, and the second bolt column is fixedly installed on the inner wall of the threaded cone sleeve by bolts.

[0012] Preferably, bolt four is provided on the inner wall at the bottom of the bolt column two, a triangular fixing plate is provided at the bottom of the bolt column two, the triangular fixing plate is arranged as a double-layer structure, and the top center position of the triangular fixing plate is fixedly connected to the bolt column two by bolt four.

[0013] Preferably, connecting rods are provided at both ends of the bottom of the triangular fixing plate, bolts five are provided on the top inner wall of the connecting rod, the connecting rod is fixedly installed on the bottom of the triangular fixing plate by bolts five, and an anti-dropping pin is fixedly installed on the bottom inner wall of the connecting rod.

[0014] The beneficial effects of the present invention are:

[0015] 1. The two groups of cables are fixed by setting the left cone sleeve and the right cone sleeve, and then the cables are passed through the fastening sleeve from the bottom. By setting the top of the fastening sleeve to be conical, when the fastening sleeve is rotated and moved upward, the fastening sleeve squeezes the cable and fits tightly with the surface of the clamping groove, so that the cable is fixed to the left cone sleeve and the inner wall of the right cone with better stability;

[0016] 2. By setting a threaded cone sleeve to connect bolt column one and bolt column two, the length can be adjusted according to actual usage, so as to facilitate the adjustment of the spacing between the left and right groups of cables, facilitate fixation, and improve the stability of cable fixation. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 The front view provided by the present invention;

[0018] Figure 2 A side view provided for the present invention;

[0019] Figure 3 A rear view provided for the present invention;

[0020] Figure 4 A cross-sectional view of the present invention.

[0021] In the figure: triple plate 100, bolt hole 1 110, bolt hole 2 120, limit hole 130,

[0022] Cone sleeve body 200, left cone sleeve 210, right cone sleeve 220, tension ear plate 211, movable block 212, bolt one 213, bolt two 214, bolt three 215, wire clamping groove 216, inner sleeve 217, fastening sleeve 230, hexagon socket bolt 240, bolt column one 250, threaded cone sleeve 260, ball 261, bolt column two 270, bolt four 271, triangular fixing plate 280, connecting rod 290, bolt five 291, anti-drop pin 292. DETAILED DESCRIPTION

[0023] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0024] See attached Figure 1-4The double-split synchronous repair tension-resistant equipment provided by the present invention comprises a triple-joint plate 100 and a cone sleeve body 200. Specifically, the cone sleeve body 200 is fixedly installed on the top of the triple-joint plate 100. The cone sleeve body 200 comprises a left cone sleeve 210 and a right cone sleeve 220. A wire clamping groove 216 is provided on the inner wall of the left cone sleeve 210. The wire clamping groove 216 is evenly distributed. The right outer wall of the left cone sleeve 210 is fixedly connected to a tension ear plate 211. A movable block 212 is provided on the inner wall of the tension ear plate 211. A bolt 213 is fixedly installed on the inner wall of the top of the movable block 212. The top of the movable block 212 is movably mounted on the inner wall of the tension ear plate 211 by a bolt 213, the inner wall of the left cone sleeve 210 is fixedly mounted with an inner sleeve 217, the inner wall of the inner sleeve 217 is fixedly connected with a cable, a fastening sleeve 230 is provided at the bottom of the inner sleeve 217, the fastening sleeve 230 is set to be conical, the fastening sleeve 230 is sleeved on the outer wall of the cable, the outer wall of the fastening sleeve 230 is threadedly connected with the inner wall of the inner sleeve 217, the right cone sleeve 220 is symmetrically arranged with the left cone sleeve 210, and the right cone sleeve 220 and the left cone sleeve 210 are configured in the same manner;

[0025] The triple plate 100 has a cone sleeve body 200 for installing to fix two groups of existing cables and provide tensioning force for the cables. The cone sleeve body 200 has the function of wrapping and fixing the cables. The left cone sleeve 210 and the right cone sleeve 220 have the function of wrapping and fixing the cables. The wire clamping groove 216 has the function of providing resistance to the cables. The surface of the wire clamping groove 216 is provided with anti-skid edges, which have the function of anti-skid and easy installation of the cables. The tension ear plate 211 has the function of movably installing the movable block 212, which is movably connected to the tension ear plate 211 through the movable block 212, so as to facilitate the limiting of the two groups of cables. The tension ear plate 211 is movably connected to the two ends of the top of the triple plate 100 through the movable block 212, so that the force at both ends is the same when the equipment is subjected to force, which is convenient for pulling in use to cause damage to the cables and improves the safety of use. The inner sleeve 217 is used in conjunction with the cone sleeve body 200 to improve the tightness of the cable installation. The top of the fastening sleeve 230 is set to a cone, which is conducive to the fastening sleeve 230 to move on the inner wall of the inner sleeve 217 when rotating, so as to facilitate the fixing of the cable, improve the stability of the cable, avoid the loss of mechanical force during long-term use, thereby affecting the fixation of the cable, reduce the risk of rework, and improve the durability of the equipment. The outer wall of the fastening sleeve 230 and the inner sleeve 217 are mechanically connected in the form of threads, and the connection performance is more stable. It can still maintain sufficient stability during long-term use. There is basically no tension loss when it is not affected by external forces. One-time construction basically avoids the need to repair the connection part in the later stage, improves work efficiency, and reduces the cost of use.

[0026] Further, the bottom of the left cone sleeve 210 and the right cone sleeve 220 are both provided with bolts 214, and the left cone sleeve 210 and the right cone sleeve 220 are fixedly installed on the top of the left and right ends of the triple plate 100 by bolts 214. Specifically, bolts 214 have the function of conveniently fixing the left cone sleeve 210 and the right cone sleeve 220. The left cone sleeve 210 and the right cone sleeve 220 are symmetrically arranged at both ends to balance the force, improve the durability of the equipment, and also make the two groups of cables subject to the same force during use, so that the directions of the two groups of cables are consistent, which is convenient for laying the cables;

[0027] Furthermore, a limiting hole 130 is provided at the center of the outer wall at the top of the triple-jointed plate 100, a bolt column 250 is provided at the bottom of the triple-jointed plate 100, and a hexagon socket bolt 240 is provided on the inner wall at the top of the bolt column 250. The top of the bolt column 250 is fixedly installed at the bottom of the triple-jointed plate 100 by the hexagon socket bolt 240. Specifically, the limiting hole 130 is convenient for fixing the triple-jointed plate 100, thereby fixing the cables at both ends of the top of the triple-jointed plate 100. In the triangular structure of the triple-jointed plate 100, the shape is stable and the force is balanced. The hexagon socket bolt 240 is convenient for fixing the bolt column 250 at the bottom of the triple-jointed plate 100. The connection is made by the hexagon socket bolt 240, so that the connection is more stable and the durability of the equipment is improved. The material of the hexagon socket bolt 240 is set to Q235 wire, which has the advantages of easy fastening, disassembly and not easy to slip, and is convenient for long-term use. The outer wall of the bolt column 250 is provided with an external thread, which is convenient for adjusting the exposed length of the bolt column 250 by screw adjustment, so as to facilitate the adjustment of the installation position of the triple plate 100 and the equal distance adjustment of the cables at both ends of the top of the triple plate 100. The force of the cables at both ends is balanced. When adjusting the single adjustment bolt column 250, the synchronization of the movement of the two ends of the cable can also be maintained, and the whole will not be offset.

[0028] Further, the outer wall of the bolt column 250 is provided with an external thread (not marked in the figure), and the bottom of the bolt column 250 is provided with a threaded cone sleeve 260, the top and bottom of the threaded cone sleeve 260 are both set to be conical, and the inner wall of the threaded cone sleeve 260 is provided with an internal thread, and the inner wall of the top of the threaded cone sleeve 260 is fixedly connected to the bolt column 250 by threads. Specifically, the threaded cone sleeve 260 is convenient for docking the bolt column 250 and the bolt column 270, and the bolt column 250 and the bolt column 270 are respectively connected by the two ends of the threaded cone sleeve 260, thereby increasing the adjustable length range of the bolt column 250 and the bolt column 270, increasing the custom adjustment distance of the equipment, and improving the applicability of the equipment. It is also convenient to adjust the exposed length of the bolt column 250 and the bolt column 270 in time according to the actual usage after installation, thereby adjusting the tension of the triple plate 100;

[0029] Furthermore, a ball 261 is provided on the inner wall of the threaded cone sleeve 260, and the diameter of the ball 261 is consistent with the inner diameter of the inner wall of the fastening sleeve 230. Specifically, the ball 261 has the function of facilitating the adjustment of the length of the bolt column 1 250 and the bolt column 270. Under the action of the ball 261, it is prevented that one of the bolt column 1 250 and the bolt column 270 extends too long into the inner wall of the fastening sleeve 230 during adjustment, resulting in the inability to accurately install the other set of bolt columns, or affecting the force in the later stage, resulting in damage to the equipment and being unable to be disassembled again. The diameter of the ball 261 is consistent with the inner diameter of the inner wall of the fastening sleeve 230, which facilitates the rolling of the ball 261 on the fastening sleeve 230 and has a certain damping effect, thereby preventing the ball 261 from being accidentally lost during operation, thereby affecting the use.

[0030] Further, a second bolt column 270 is provided at the bottom of the threaded cone sleeve 260, and the second bolt column 270 is fixedly installed on the inner wall of the threaded cone sleeve 260 by bolts. Specifically, the second bolt column 270 has the function of conveniently connecting the triangular fixing plate 280 with the threaded cone sleeve 260. By adjusting the depth of the second bolt column 270 inserted into the inner wall of the threaded cone sleeve 260, the tension between the triangular fixing plate 280 and the triple plate 100 is adjusted, which is convenient for the operator to adjust the tension.

[0031] Furthermore, a bolt 4 271 is provided on the inner wall at the bottom of the bolt column 270, and a triangular fixing plate 280 is provided at the bottom of the bolt column 270. The triangular fixing plate 280 is set to a double-layer structure, and the top center position of the triangular fixing plate 280 is fixedly connected to the bolt column 270 through the bolt 4 271. Specifically, the bolt 4 271 has the function of fixing the bolt column 270 on the top of the triangular fixing plate 280. The triangular fixing plate 280 is set to a double-layer structure to prevent the end of the bolt column 270 from being exposed to the outside for a long time, which is easy to be corroded by rainwater, resulting in inconvenience in disassembly in the later stage and affecting the later adjustment of the length of the bolt column 270.

[0032] Furthermore, connecting rods 290 are provided at both ends of the bottom of the triangular fixing plate 280, and bolts 291 are provided on the top inner wall of the connecting rod 290. The connecting rod 290 is fixedly installed on the bottom of the triangular fixing plate 280 by the bolts 291, and an anti-slip pin 292 is fixedly installed on the bottom inner wall of the connecting rod 290. Specifically, the connecting rod 290 has the function of facilitating the fixing of the triangular fixing plate 280, and the anti-slip pin 292 has the function of fixing the triangular fixing plate 280, thereby improving the stability of the cable.

[0033] The use process of the present invention is as follows: when using the present invention, the technicians in this field wrap the two groups of cables to be fixed on the inner wall of the inner sleeve 217 respectively, and then install the inner sleeve 217 on the inner wall of the left cone sleeve 210 and the right cone sleeve 220, and then sleeve the fastening sleeve 230 on the outer wall of the cable, and move the inner sleeve 217 inward from the bottom of the spiral. After the cable is spirally squeezed by the fastening sleeve 230, it will fit tightly on the clamping groove 216 for fixing, and then the left cone sleeve 210 and the right cone sleeve 220 are moved through the movable block 2 12 is installed on the top of the left and right ends of the triple plate 100, and then the bolt column 1 250 is fixedly installed on the bottom of the triple plate 100, and then the threaded cone sleeve 260 is threadedly connected to the outer wall of the bolt column 1 250, and then the bolt column 270 is threadedly connected to the bottom of the threaded cone sleeve 260, and then the top of the triangular fixing plate 280 is fixed to the bottom of the bolt column 270, and then the connecting rod 290 is installed at both ends of the bottom of the triangular fixing plate 280, and then the anti-drop pin 292 is fixed to the bottom of the connecting rod 290 to fix the connecting rod 290.

[0034] The above is only a preferred embodiment of the present invention. Any person skilled in the art may modify the present invention by using the above technical solution or modify it into an equivalent technical solution. Therefore, any simple modification or equivalent replacement made according to the technical solution of the present invention shall fall within the scope of protection claimed by the present invention.

Claims

1. A double-split synchronous repair tension-resistant device, comprising a triple-joint plate (100) and a cone sleeve body (200), characterized in that: A cone sleeve body (200) is fixedly installed on the top of the triple plate (100), and the cone sleeve body (200) includes a left cone sleeve (210) and a right cone sleeve (220). The inner wall of the left cone sleeve (210) is provided with a wire clamping groove (216), and the wire clamping grooves (216) are evenly distributed. The right outer wall of the left cone sleeve (210) is fixedly connected to the tension ear plate (211), and the inner wall of the tension ear plate (211) is provided with a movable block (212). The inner wall of the top of the movable block (212) is fixedly installed with a bolt (213). The top of the movable block (212) is movably installed on the inner wall of the tension ear plate (211) through a bolt (213). An inner sleeve (217) is fixedly installed on the inner wall of the left cone sleeve (210), and the inner wall of the inner sleeve (217) is fixedly connected to a cable. A fastening sleeve (230) is provided at the bottom of the inner sleeve (217), and the fastening sleeve (230) is configured to be conical. The fastening sleeve (230) is sleeved on the outer wall of the cable, the outer wall of the fastening sleeve (230) is threadedly connected to the inner wall of the inner sleeve (217), the right cone sleeve (220) and the left cone sleeve (210) are symmetrically arranged, the right cone sleeve (220) and the left cone sleeve (210) are configured the same, the bottoms of the left cone sleeve (210) and the right cone sleeve (220) are both provided with bolts 214, and the left cone sleeve (210) and the right cone sleeve (220) are connected by a screw thread. Bolt 2 (214) is fixedly installed at the top of the left and right ends of the triple-jointed plate (100), a limiting hole (130) is provided at the center of the outer wall of the top of the triple-jointed plate (100), a bolt column 1 (250) is provided at the bottom of the triple-jointed plate (100), a hexagon socket bolt (240) is provided on the inner wall of the top of the bolt column 1 (250), and the top of the bolt column 1 (250) is fixedly installed at the bottom of the triple-jointed plate (100) by the hexagon socket bolt (240).

2. The double-splitting synchronous repair tension equipment according to claim 1 is characterized in that: The outer wall of the bolt column 1 (250) is provided with an external thread, the bottom of the bolt column 1 (250) is provided with a threaded cone sleeve (260), the top and bottom of the threaded cone sleeve (260) are both configured to be conical, the inner wall of the threaded cone sleeve (260) is provided with an internal thread, and the inner wall of the top of the threaded cone sleeve (260) is fixedly connected to the bolt column 1 (250) by means of threads.

3. The double-splitting synchronous repair tension equipment according to claim 2 is characterized in that: A ball (261) is provided on the inner wall of the threaded cone sleeve (260), and the diameter of the ball (261) is consistent with the inner diameter of the inner wall of the fastening sleeve (230).

4. The double-splitting synchronous repair tension equipment according to claim 3 is characterized in that: A second bolt column (270) is provided at the bottom of the threaded cone sleeve (260), and the second bolt column (270) is fixedly mounted on the inner wall of the threaded cone sleeve (260) by means of bolts.

5. The double-splitting synchronous repair tension equipment according to claim 4 is characterized in that: A fourth bolt (271) is provided on the inner wall of the bottom of the second bolt column (270), and a triangular fixing plate (280) is provided at the bottom of the second bolt column (270). The triangular fixing plate (280) is configured as a double-layer structure, and the top center position of the triangular fixing plate (280) is fixedly connected to the second bolt column (270) by means of the fourth bolt (271).

6. The double-splitting synchronous repair tension equipment according to claim 5 is characterized in that: Connecting rods (290) are provided at both ends of the bottom of the triangular fixing plate (280), and a fifth bolt (291) is provided on the inner wall of the top of the connecting rod (290). The connecting rod (290) is fixedly mounted on the bottom of the triangular fixing plate (280) by means of the fifth bolt (291), and an anti-dropping pin (292) is fixedly mounted on the inner wall of the bottom of the connecting rod (290).