Evaluation method and device for rail transit air conditioning operating status

Through self-organizing neural network and feature analysis technology, the health assessment model of rail transit air conditioners is constructed, which solves the problems of incomplete data and inaccurate assessment in the existing technology, achieves accurate assessment and fault warning of air conditioner operating status, and improves equipment reliability and comfort.

CN112700162BActive Publication Date: 2024-10-15SHANGHAI ELECTRICGROUP CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110033398.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-01-12
Publication Date
2024-10-15
Estimated Expiration
2041-01-12

AI Technical Summary

Technical Problem

In the health assessment of rail transit air conditioners, the existing technology input data is not comprehensive enough, resulting in low accuracy of assessment. There is a lack of analysis of data collected by air conditioning sensors and consideration of working condition information, and it is unable to provide effective health assessment and early warning.

Method used

A self-organizing neural network is used to train a health assessment model based on historical operating data and working condition information, combined with principal component analysis and Euclidean distance algorithm, to construct a weight vector of the current operating vector, perform health assessment through error values, and use the kernel density estimation algorithm Determine alarm thresholds to achieve real-time health assessment and fault warning.

Benefits of technology

It improves the accuracy of health assessment of rail transit air conditioners, enables early warning of air conditioner operating status, reduces fault occurrence and maintenance costs, and enhances equipment reliability and comfort.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112700162B_ABST
    Figure CN112700162B_ABST
Patent Text Reader

Abstract

The present application discloses a method and device for evaluating the operating status of rail transit air conditioners. The method includes: collecting the current operating data and corresponding operating condition information of the rail transit air conditioner to be evaluated; constructing a feature vector of the air conditioner to be evaluated based on the current operating data; inputting the current feature vector into a trained health assessment model to obtain a weight vector corresponding to the current operating vector; and performing a health assessment on the operating status of the rail transit air conditioner to be evaluated based on the error value between the current operating vector and the weight vector to obtain a health value of the rail transit air conditioner to be evaluated. The method improves the accuracy of the health assessment of rail transit air conditioners.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of equipment performance maintenance, and in particular to a method and device for evaluating the operating status of rail transit air conditioning. Background Art

[0002] In recent years, the urban rail transit industry has developed rapidly, and the number of new rail vehicles put into operation in major cities has increased year by year. How to improve the safety and availability of rail transit vehicles and reduce operation and maintenance costs has become a strategic issue for the sustainable development of the rail transit industry. The current model of mainly repairing faults and scheduled repairs is becoming less and less economical. The maintenance model of subway vehicles is gradually shifting to a more intelligent "condition-based repair" model based on health management and life prediction.

[0003] The air conditioning system is a Class A key component of subway vehicles, which has a direct impact on the normal operation and comfort of trains. Improving the health monitoring and management of rail transit air conditioning status has an impact on the reliability and comfort of vehicle operation, while reducing maintenance costs, which is an urgent problem to be solved in rail transit operation and maintenance.

[0004] At present, there are relatively few studies on the health (or "operating status") assessment of rail transit air conditioners. These studies are mainly based on the fault status information of air conditioner operation, such as cumulative usage time, failure rate, and replacement rate of parts, and use weighted and statistical methods to establish models to evaluate real-time operating data.

[0005] However, the inventors have discovered that the above evaluation method suffers from the problem that the input data of the model is not comprehensive enough, resulting in low evaluation accuracy. Summary of the invention

[0006] The embodiments of the present application provide a method and device for evaluating the operating status of rail transit air conditioners, which solve the above-mentioned problems existing in the prior art and improve the accuracy of health assessment of rail transit air conditioners.

[0007] In a first aspect, a method for evaluating the operating status of rail transit air conditioning is provided, and the method may include:

[0008] Collecting current operating data of the rail transit air conditioner to be evaluated and current operating condition information corresponding to the current operating data, wherein the current operating data includes control data, current state data and collected monitoring data received by the rail transit air conditioner to be evaluated;

[0009] Constructing a current operation vector of the rail transit air conditioner to be evaluated according to the current operation data;

[0010] The current operation vector is input into the trained health assessment model corresponding to the current operating condition information to obtain a weight vector corresponding to the current operation vector; the health assessment model is used to match the input operation vector with each neuron in the health assessment model to obtain the weight vector of the matching neuron; the health assessment model is obtained by training the self-organizing neural network to be trained based on historical operation data and historical operating condition information corresponding to the historical operation data;

[0011] According to the error value between the current operation vector and the weight vector, a health assessment is performed on the operation status of the rail transit air conditioner to be assessed to obtain a health assessment value of the rail transit air conditioner to be assessed.

[0012] In a possible implementation, before inputting the current operation vector into a trained health assessment model corresponding to the current operating condition information, the method further includes:

[0013] Using a principal component analysis algorithm, a principal component analysis is performed on the current operation vector to obtain a target operation vector whose contribution rate is greater than a preset ratio threshold; the contribution rate represents the proportion of the characteristic value of the target operation vector to the characteristic value of the current operation vector;

[0014] The step of inputting the current operation vector into a trained health assessment model corresponding to the current operating condition information to obtain a weight vector corresponding to the current operation vector includes:

[0015] The target operation vector is input into a trained health assessment model corresponding to the current operating condition information to obtain a weight vector corresponding to the current operation vector.

[0016] In a possible implementation, performing a health assessment on the operating state of the rail transit air conditioner to be assessed according to the error value between the current operating vector and the weight vector to obtain a health assessment value of the rail transit air conditioner to be assessed includes:

[0017] Using the Euclidean distance algorithm, the error value between the current running vector and the weight vector is calculated;

[0018] Normalizing the error value to obtain a processed error value;

[0019] The processed error value is determined as the health assessment value of the rail transit air-conditioning operating state to be assessed.

[0020] In a possible implementation, after performing a health assessment on the operating state of the rail transit air conditioner to be assessed according to the error value between the current operating vector and the weight vector to obtain a health assessment value of the rail transit air conditioner to be assessed, the method further includes:

[0021] Obtaining a time series-based health assessment value corresponding to the rail transit air conditioner to be assessed;

[0022] Obtaining an alarm threshold corresponding to the health assessment value based on the time series according to a preset kernel density estimation algorithm and the health assessment value based on the time series;

[0023] If the health assessment value at the target time is less than the alarm threshold, it is determined that the operating state of the rail transit air conditioner to be assessed is abnormal, and an alarm prompt is output; the target time is any time in the time series;

[0024] If the health assessment value at the target time is not less than the alarm threshold, it is determined that the operating status of the rail transit air conditioner to be assessed is normal.

[0025] In a possible implementation, the training process of the health assessment model includes:

[0026] Acquire training data of each rail transit air conditioner in the rail transit air conditioning unit within a preset historical time period, wherein the training data includes historical state data, historical operation data, and operating condition information corresponding to the historical operation data;

[0027] Classifying the training data according to the operating condition information corresponding to the historical operating data of each rail transit air conditioner to obtain training data corresponding to different operating condition information;

[0028] For each working condition information, the self-organizing neural network to be trained is iteratively trained based on the running vector corresponding to each training data, specifically including:

[0029] Calculate the Euclidean distance between the running vector corresponding to the training data and the weight vector of each neuron in the self-organizing neural network to be trained to obtain a current matching neuron, where the current matching neuron is a neuron corresponding to the minimum Euclidean distance;

[0030] Using a preset iterative tuning algorithm to tune the current matching neuron and the corresponding weight vector;

[0031] When a preset iterative stop condition is met, the iterative training ends, and a health assessment model corresponding to the trained working condition information is obtained, wherein the preset iterative stop condition is that the learning rate in the preset iterative tuning algorithm decays to a preset value;

[0032] The calculation formula of the preset iterative tuning algorithm is expressed as:

[0033] w i (t+1)=w i (t)+η(t)h j,i(x) (t)(xw i (t));

[0034] In the formula, w i (t) represents the weight vector of neuron i at time t, η(t) represents the learning rate, and h j,i(x) is the domain function.

[0035] In a possible implementation, the current operation data includes monitoring data collected by sensors in the rail transit air conditioner to be evaluated and control data received by the rail transit air conditioner to be evaluated;

[0036] The current operating condition information includes at least one of the compressor start-up status information of the rail transit air conditioner to be evaluated, equipment operation mode information, subway passenger flow information, holiday information, seasonal characteristic information and equipment maintenance status information.

[0037] In a second aspect, a device for evaluating the operating status of rail transit air conditioning is provided, and the device may include: a collection unit, a construction unit, an acquisition unit, and an evaluation unit;

[0038] The acquisition unit is used to acquire current operating data of the rail transit air conditioner to be evaluated and current operating condition information corresponding to the current operating data, wherein the current operating data includes control data, current state data and acquired monitoring data received by the rail transit air conditioner to be evaluated;

[0039] The construction unit is used to construct the current operation vector of the rail transit air conditioner to be evaluated according to the current operation data;

[0040] The acquisition unit is used to input the current operation vector into the trained health assessment model corresponding to the current operating condition information to obtain the weight vector corresponding to the current operation vector; the health assessment model is used to match the input operation vector with each neuron in the health assessment model to obtain the weight vector of the matching neuron; the health assessment model is obtained by training the self-organizing neural network to be trained based on historical operation data and historical operating condition information corresponding to the historical operation data;

[0041] The evaluation unit is used to perform a health evaluation on the operating state of the rail transit air conditioner to be evaluated according to the error value between the current operating vector and the weight vector, so as to obtain a health evaluation value of the rail transit air conditioner to be evaluated.

[0042] In a possible implementation, the device further includes an analysis unit;

[0043] The analysis unit is used to perform principal component analysis on the current operation vector using a principal component analysis algorithm to obtain a target operation vector whose contribution rate is greater than a preset ratio threshold; the contribution rate represents the proportion of the characteristic value of the target operation vector to the characteristic value of the current operation vector;

[0044] The acquisition unit is further used to input the target operation vector into a trained health assessment model corresponding to the current operating condition information to obtain a weight vector corresponding to the current operation vector.

[0045] In a possible implementation, the evaluation unit is specifically configured to calculate an error value between the current running vector and the weight vector by using a Euclidean distance algorithm;

[0046] Normalizing the error value to obtain a processed error value;

[0047] The processed error value is determined as the health assessment value of the rail transit air-conditioning operating state to be assessed.

[0048] In a possible implementation, the apparatus further includes a determining unit;

[0049] The acquisition unit is further used to acquire a time series-based health assessment value corresponding to the rail transit air conditioner to be evaluated;

[0050] And, according to a preset kernel density estimation algorithm and the health assessment value based on the time series, obtaining an alarm threshold value corresponding to the health assessment value based on the time series;

[0051] The determination unit is used to determine that the operating state of the rail transit air conditioner to be evaluated is abnormal and output an alarm prompt if the health assessment value at the target time is less than the alarm threshold; the target time is any time in the time series;

[0052] And, if the health assessment value at the target moment is not less than the alarm threshold, it is determined that the operating status of the rail transit air conditioner to be assessed is normal.

[0053] In a possible implementation, the device further includes a classification unit and a training unit;

[0054] The acquisition unit is further used to acquire training data of each rail transit air conditioner in the rail transit air conditioning unit within a preset historical time period, wherein the training data includes historical state data, historical operation data, and operating condition information corresponding to the historical operation data;

[0055] The classification unit is used to classify the training data according to the operating condition information corresponding to the historical operation data of each rail transit air conditioner to obtain training data corresponding to different operating condition information;

[0056] The training unit is used to:

[0057] For each operating condition information, the Euclidean distance between the running vector corresponding to the training data and the weight vector of each neuron in the self-organizing neural network to be trained is calculated to obtain a current matching neuron, where the current matching neuron is a neuron corresponding to the minimum Euclidean distance;

[0058] Using a preset iterative tuning algorithm to tune the current matching neuron and the corresponding weight vector;

[0059] When a preset iterative stop condition is met, the iterative training ends, and a health assessment model corresponding to the trained working condition information is obtained, wherein the preset iterative stop condition is that the learning rate in the preset iterative tuning algorithm decays to a preset value;

[0060] The calculation formula of the preset iterative tuning algorithm is expressed as:

[0061] w i (t+1)=w i (t)+η(t)h j,i(x) (t)(xw i (t));

[0062] In the formula, w i (t) represents the weight vector of neuron i at time t, η(t) represents the learning rate, and h j,i(x) is the domain function.

[0063] In a possible implementation, the current operation data includes monitoring data collected by sensors in the rail transit air conditioner to be evaluated and control data received by the rail transit air conditioner to be evaluated;

[0064] The current operating condition information includes at least one of the compressor start-up status information of the rail transit air conditioner to be evaluated, equipment operation mode information, subway passenger flow information, holiday information, seasonal characteristic information and equipment maintenance status information.

[0065] In a third aspect, an electronic device is provided, the electronic device comprising a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other via the communication bus;

[0066] Memory, used to store computer programs;

[0067] The processor is used to implement any method step described in the first aspect when executing the program stored in the memory.

[0068] In a fourth aspect, a computer-readable storage medium is provided, wherein a computer program is stored in the computer-readable storage medium, and when the computer program is executed by a processor, any method step described in the first aspect is implemented.

[0069] The method for evaluating the operating status of a rail transit air conditioner provided by an embodiment of the present invention collects the current operating data of the rail transit air conditioner to be evaluated and the current operating condition information corresponding to the current operating data, wherein the current operating data includes the control data, current status data and the collected monitoring data received by the rail transit air conditioner to be evaluated; constructs the current operating vector of the rail transit air conditioner to be evaluated according to the current operating data; inputs the current operating vector into the trained health assessment model corresponding to the current operating condition information to obtain the weight vector corresponding to the current operating vector; the health assessment model is used to match the input operating vector with each neuron in the health assessment model to obtain the weight vector of the matching neuron; the health assessment model is obtained by training the self-organizing neural network to be trained based on the historical operating data and the historical operating condition information corresponding to the historical operating data; performs a health assessment on the operating status of the rail transit air conditioner to be evaluated according to the error value between the current operating vector and the weight vector to obtain the health assessment value of the rail transit air conditioner to be evaluated. The method improves the accuracy of the health assessment of the rail transit air conditioner. BRIEF DESCRIPTION OF THE DRAWINGS

[0070] Figure 1 A schematic diagram of a flow chart of an existing method for evaluating the operating status of rail transit air conditioning;

[0071] Figure 2A A schematic flow chart of a method for evaluating the operating status of rail transit air conditioning provided by an embodiment of the present invention;

[0072] Figure 2B A schematic flow chart of another method for evaluating the operating status of rail transit air conditioning provided by an embodiment of the present invention;

[0073] Figure 3 A schematic diagram of the structure of a device for evaluating the operating status of rail transit air conditioning provided by an embodiment of the present invention;

[0074] Figure 4 A schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0075] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments of the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0076] like Figure 1 As shown in the figure, the existing evaluation scheme for the operation status of rail transit air conditioning mainly includes:

[0077] Step 110: parse the received air conditioner health assessment request to obtain the target rail transit air conditioner to be assessed for health.

[0078] Step 120: Obtain current operating status information of the target rail transit air conditioner.

[0079] The current operating status information includes the cumulative usage time, failure rate, and replacement rate of parts to date.

[0080] Step 130: Input the current operating status information into the target air conditioning health assessment model.

[0081] Among them, the target air-conditioning health assessment model is obtained by iteratively correcting the pre-established time equipment health basic model based on the target operating status information of the target rail transit air-conditioning obtained according to a preset period.

[0082] Step 140: Use the target air conditioning health assessment model to perform a health assessment on the target track air conditioning according to the current operating status information.

[0083] However, the above scheme mainly uses the status information of rail transit air conditioners, such as failure rate, cumulative usage time, and parts replacement rate, to establish a model through weighted and statistical methods. This method evaluates the health of general equipment based on status information and has a certain degree of accuracy. However, for air conditioning analysis, there is a lack of research on the original data collected by air conditioners, such as exhaust temperature, high pressure, low pressure, passenger compartment temperature, passenger compartment humidity, average current, etc. At the same time, the modeling process lacks consideration of the impact of operating condition information: such as the difference in air conditioning cooling mode and heating mode, which has a great impact on the results. Therefore, it is one-sided to establish a health assessment model based only on a small amount of status information. The main problems with the above scheme include:

[0084] (1) Input data is not comprehensive enough: Since monitoring data can reflect the healthy evolution of equipment and the law of fault development, early fault characteristics of equipment can be discovered in time, thus avoiding or reducing the occurrence of faults.

[0085] However, the above scheme lacks analysis of the monitoring data collected by the air-conditioning sensor, resulting in low reliability of the evaluation.

[0086] (2) Statistical modeling: Based on statistical methods, the common characteristics of air-conditioning equipment can be analyzed, but there is a lack of understanding of the real-time health characteristics of specific equipment. The selection of statistical indicators lacks theoretical basis and has a certain degree of subjectivity. The model established by this method is somewhat one-sided and has a low accuracy rate.

[0087] (3) Lack of health assessment warning: The above model only provides the calculation results of the health assessment, and does not construct a suitable health assessment alarm threshold. Based on the above, it is difficult to give accurate judgment indicators and take maintenance measures in time.

[0088] Based on the problems existing in the above scheme, the evaluation method of the running status of rail transit air conditioners provided in the embodiment of the present invention not only combines the equipment's historical fault conditions, maintenance history, compressor start and stop, working mode and other status data and received control data, but also analyzes the collected monitoring data of the sensor. The monitoring data may include low pressure, return air temperature, fresh air temperature, unit average current and unit average voltage, etc. Based on the collected status data, control data and monitoring data, data preprocessing, working condition segmentation, feature screening, and a health assessment model based on self-organizing map (SOM) are performed on the rail transit air conditioner. Based on the minimum quantization error (Mean Quantization Error, MQE), a health assessment index (or "health value") CV is established, so that the degree of deviation between the real-time operating data of the rail transit air conditioner and the health assessment index of the rail transit air conditioner can be calculated. It realizes the early monitoring of the health status deterioration trend of the rail transit air conditioner, can realize the early warning of equipment failure, avoid the occurrence of serious failures, and provide a basis for precise maintenance and preventive maintenance.

[0089] The preferred embodiments of the present application are described below in conjunction with the drawings in the specification. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention. In addition, the embodiments in the present application and the features in the embodiments may be combined with each other if there is no conflict.

[0090] Figure 2A The present invention provides a flow chart of a method for evaluating the operating status of rail transit air conditioning. Figure 2A As shown, the method may include:

[0091] Step 210: Collect current operating data of the rail transit air conditioner to be evaluated and current operating condition information corresponding to the current operating data.

[0092] The current operating data may include control data received by the rail transit air conditioner to be evaluated, current status data, and monitoring data collected by sensors.

[0093] Among them, the status data may include failure rate, historical maintenance information, frequency of parts replacement, etc.; the control data may include the received control data of the compressor status, the control data of the equipment operation mode, etc.; the monitoring data collected by the sensor may include the monitoring data of the exhaust temperature, the monitoring data of the high pressure, the monitoring data of the low pressure, the monitoring data of the passenger compartment temperature, the monitoring data of the passenger compartment humidity, the monitoring data of the average current, etc.

[0094] Considering the complexity and variability of the working conditions of the rail transit air conditioner to be evaluated, it is necessary to classify the operating data corresponding to the different working conditions of the rail transit air conditioner to be evaluated. In other words, the current operating data corresponds to the current working condition information of the rail transit air conditioner to be evaluated, that is, when the current operating data is collected, the corresponding current working condition information is also collected.

[0095] Among them, the operating condition information may include at least one of the compressor switch status, such as on or off, air conditioning operation mode, such as heating mode or cooling mode, passenger flow, such as passenger flow during rush hour or rush hour in the subway, holidays, seasonal characteristics and air conditioning maintenance status.

[0096] It should be noted that the operating data and corresponding operating condition information of the rail transit air conditioner to be evaluated can be collected in real time, so as to evaluate the operating status of the rail transit air conditioner to be evaluated in real time.

[0097] Step 220: construct a current operation vector of the rail transit air conditioner to be evaluated based on the collected current operation data.

[0098] According to the data of each data type in the collected current operation data, a corresponding current operation vector is constructed, wherein the rows of the current operation vector represent the characteristic data of each data type, and the columns represent the data values ​​of the corresponding characteristic data.

[0099] Furthermore, in order to reduce the coupling and redundancy between high-dimensional data, avoid excessive data volume, and optimize the number of sensor installations in the future, it is necessary to reduce the dimension of the operation data matrix X, such as using the principal component analysis (PCA) algorithm to reduce the dimension of the current operation vector.

[0100] The principal component analysis algorithm is used to perform principal component analysis on the current operation vector to obtain a target operation vector whose contribution rate is greater than a preset ratio threshold. The contribution rate represents the proportion of the eigenvalue of the target operation vector to the current eigenvalue. The preset ratio threshold may be 0.95.

[0101] Step 230: Input the current operation vector into the trained health assessment model corresponding to the current operating condition information to obtain a weight vector corresponding to the current operation vector.

[0102] The health assessment model is used to match the input operation vector with each neuron in the health assessment model to obtain the weight vector of the matching neuron.

[0103] In an optional embodiment, the training process of the health assessment model may include:

[0104] Acquire training data of each rail transit air conditioner in the rail transit air conditioning unit within a preset historical time period, where the training data may include historical state data, historical operation data, and operating condition information corresponding to the historical operation data;

[0105] According to the working condition information corresponding to the historical operation data of each rail transit air conditioner, the training data is classified to obtain the training data corresponding to different working condition information;

[0106] For each operating condition information, the self-organizing neural network to be trained is trained according to the training data corresponding to the operating condition information to obtain the trained health assessment model corresponding to the operating condition information. In this way, the health assessment model can better adapt to different operating environments and operating conditions of the air conditioner and obtain better analysis results.

[0107] Among them, the self-organizing neural network SOM is an unsupervised artificial neural network. Different from the general neural network training based on the back propagation of the loss function, it uses a competitive learning strategy to gradually optimize the network by relying on the competition between neurons.

[0108] Each neuron in the self-organizing neural network SOM is activated in a competitive manner. Only the winning neuron can adjust its own weight vector and influence the neighboring neurons to adjust their weight vectors to varying degrees. The neurons in the SOM are trained to adjust their weight vectors, so that the self-organizing neural network converges to a representation form in which the weight vector of the neuron can indirectly represent the distribution of the input data.

[0109] In a specific implementation, for each type of operating condition information, the self-organizing neural network to be trained is trained according to the training data corresponding to the operating condition information to obtain a health assessment model corresponding to the trained operating condition information, including:

[0110] (1) Calculate the Euclidean distance between the training vector corresponding to the training data and the initial weight vector of each neuron in the SOM. The neuron corresponding to the initial weight vector with the smallest distance is called the matching neuron.

[0111] In order to improve the accuracy of the health assessment model and enhance the generalization ability of the health assessment model, the training data can be data after dimension reduction using the PCA algorithm.

[0112] In the specific implementation, it is assumed that the SOM has L input nodes, and the training vector x corresponding to the training data is x = (x1, x2, ..., x L ) L , the input node j is passed through the initial weight vector w ij (i=1,2…,M;j=1,2,…,L) is connected to M neurons. The matching neurons of training vector x are calculated as follows:

[0113] ||xw c ||=min{||xw i ||}; i = 1, 2, ..., M;

[0114] Among them, w c is the matching neuron for the training vector x, and |||| is the Euclidean distance operator.

[0115] (2) Using a preset iterative tuning algorithm, the current matching neuron and the corresponding weight vector are tuned, that is, the weight vector of the matching neuron is adjusted.

[0116] In a specific implementation, the calculation formula of the preset iterative tuning algorithm is expressed as:

[0117] w i (t+1)=w i (t)+η(t)h j,i(x) (t)(xw i (t));

[0118] In the formula, w i (t) represents the weight vector of neuron i at time t, η(t) represents the learning rate, and h j,i(x) is the domain function.

[0119] (3) By continuously training by inputting the training vectors corresponding to the training data at other times, when the preset iteration stop condition is met, the iterative training ends, and the health assessment model corresponding to the trained working condition information is obtained; the preset iteration stop condition may be that η(t) decays to a preset value, such as the preset value may be zero or a preset positive decimal, otherwise, continue steps (1) to (2) to update the weight vector. Finally, the weight vector of the updated neuron tends to the distribution of the training data.

[0120] Step 240 : Perform a health assessment on the operating status of the rail transit air conditioner to be assessed according to the error value between the current operating vector and the weight vector to obtain a health assessment value of the rail transit air conditioner to be assessed.

[0121] The Euclidean distance algorithm is used to calculate the error value between the current operation vector and the weight vector. The error value can be the minimum quantized error MQE value or other values ​​indicating the degree to which the air conditioner deviates from the health status.

[0122] Optionally, the calculation formula of MQE value is: MQE=||xw BMU ||;

[0123] Where x represents the input vector, w BMU Represents the weight vector of the matching neuron BMU.

[0124] The error value is normalized to obtain a processed error value.

[0125] Specifically, if the error value is an MQE value, normalization is performed to obtain a normalized MQE value.

[0126] Afterwards, the processed MQE value is determined as the health assessment value of the rail transit air conditioning operation status to be evaluated, that is, the CV value. In other words, the normalized MQE value is converted into a health CV value (or "health index"), the value range of which is 0 to 1. The closer the CV value is to 1, the healthier the equipment is. On the contrary, the lower the CV value is, the healthier the equipment is.

[0127] It can be seen that the embodiments of the present invention avoid the problem that traditional statistical methods and weighted model corrections are overly dependent on expert experience, and improve the robustness and prediction accuracy of the model.

[0128] Furthermore, an alarm is issued when the operating status of the rail transit air conditioner is unhealthy, thereby realizing early warning of failure of the rail transit air conditioner.

[0129] After obtaining the health assessment value of the rail transit air conditioner to be assessed, the health assessment value based on the time series corresponding to the rail transit air conditioner to be assessed can be obtained;

[0130] According to the preset kernel density estimation algorithm and the health assessment value based on the time series, an alarm threshold corresponding to the health assessment value based on the time series is obtained;

[0131] The calculation formula of the preset kernel density estimation algorithm can be expressed as:

[0132]

[0133] Among them, x i is the normalized sample point, n is the number of samples, K(.) is the Gaussian kernel function, and its formula is as follows:

[0134]

[0135] Wherein, h represents the window width, i.e., the preset first time period;

[0136] The formula for calculating the one-dimensional optimal window width is: h = 1.059εn (-1 / 5) ;in,

[0137] If the selected confidence level is 99%, where the sum of the missed alarm rate and the false alarm rate is 1%, the independent variable x is calculated when f(x) = 0.99, and then normalized to obtain the alarm threshold δ. The calculation method of the adaptive alarm threshold makes the determination of the alarm threshold more scientific and reasonable, and can predict the deterioration trend of the air conditioner operation status in advance, providing a reliable basis for accurate maintenance and preventive repair.

[0138] It is understandable that the number of m should be as large as possible in order to obtain an accurate window width, thereby determining the number of samples in the accurate window width, that is, the number of m needs to be greater than the number of n.

[0139] If the health assessment value at the target time is less than the alarm threshold, the operating state of the rail transit air conditioner to be assessed is determined to be abnormal, and an alarm prompt is output, that is, an alarm prompt is issued when the health state of the air conditioner deteriorates, indicating that appropriate maintenance measures need to be taken for the air conditioner, so as to achieve early warning of air conditioner failure; the target time is any time in the time series;

[0140] If the health assessment value at the target time is not less than the alarm threshold, it is determined that the operating status of the rail transit air conditioner to be assessed is normal.

[0141] It can be seen that based on the CV value of the time series and the determination of the adaptive alarm threshold, early warning prompts can be issued according to the performance degradation trend of the rail transit air conditioner to be evaluated, reserving a critical time window for equipment maintenance and reducing losses for the enterprise.

[0142] In one possible embodiment, the state trend of the operating state of the rail transit air conditioner to be evaluated can be plotted based on the CV value sequence within a preset time length to predict the health assessment value at a future moment after the preset time length, or a time series prophet prediction model can be established based on the calculated CV value, operating data and corresponding operating condition information. The prophet prediction model is used to predict the CV value at a future moment, and the time required for the operating state to degenerate to the alarm threshold can also be obtained and displayed to the management personnel. Similarly, the occurrence of failures of the rail transit air conditioner to be evaluated can be prevented, the reliability of the operation of the rail transit air conditioner to be evaluated is improved, and a time window is reserved for its maintenance, thereby reducing losses for the enterprise.

[0143] In one example, the process of evaluating the operating status of each air conditioner in a subway air conditioning unit is as follows: Figure 2B As shown, including:

[0144] Step 2001: Acquire the collected monitoring data, received control data, current status data and current working condition information of each air conditioner in the air conditioning unit to be evaluated, such as the peak period after get off work in summer.

[0145] Step 2002: Using the PCA algorithm, the key features of the current operation vector corresponding to the data obtained from each air conditioner are screened, and finally 12 feature parameters with a cumulative contribution rate greater than 90% are obtained to form a feature vector X for each air conditioner.

[0146] Step 2003: Based on the air conditioning evaluation model trained with the historical operation data and the corresponding operating condition information, the feature vector X of each air conditioning is processed respectively to obtain the weight vector of the BMU of the feature vector X of each air conditioning.

[0147] The air conditioning assessment model is the health assessment model described above.

[0148] Step 2004: Calculate the distance between the feature vector X of each air conditioner and the weight vector of the corresponding BMU, obtain the MQE value corresponding to each air conditioner, and normalize the MQE value to calculate the health value of each air conditioner, such as the current CV value of the target air conditioner = 0.61.

[0149] Step 2005: Based on the CV value of the time series, an adaptive threshold determination method is used to calculate an alarm threshold, such as δ=0.78.

[0150] Since the current CV value of the target air conditioner is less than δ, an alarm signal is output and a prompt is given to take appropriate maintenance measures for the target air conditioner. The operation and maintenance personnel promptly repair and maintain the target air conditioner, thus avoiding further deterioration of the air conditioner fault.

[0151] The method for evaluating the operating status of a rail transit air conditioner provided by an embodiment of the present invention collects the current operating data of the rail transit air conditioner to be evaluated and the current operating condition information corresponding to the current operating data, wherein the current operating data includes the control data, current status data and the collected monitoring data received by the rail transit air conditioner to be evaluated; constructs the current operating vector of the rail transit air conditioner to be evaluated according to the current operating data; inputs the current operating vector into the trained health assessment model corresponding to the current operating condition information to obtain the weight vector corresponding to the current operating vector; the health assessment model is used to match the input operating vector with each neuron in the health assessment model to obtain the weight vector of the matching neuron; the health assessment model is obtained by training the self-organizing neural network to be trained based on the historical operating data and the historical operating condition information corresponding to the historical operating data; performs a health assessment on the operating status of the rail transit air conditioner to be evaluated according to the error value between the current operating vector and the weight vector to obtain the health assessment value of the rail transit air conditioner to be evaluated. The method improves the accuracy of the health assessment of the rail transit air conditioner.

[0152] Corresponding to the above method, an embodiment of the present invention further provides a device for evaluating the operating status of rail transit air conditioning, such as Figure 3 As shown, the rail transit air conditioning operation status evaluation device includes: a collection unit 310, a construction unit 320, an acquisition unit 330 and an evaluation unit 340;

[0153] The collecting unit 310 is used to collect the current operation data of the rail transit air conditioner to be evaluated and the current working condition information corresponding to the current operation data, wherein the current operation data includes the control data, current state data and collected monitoring data received by the rail transit air conditioner to be evaluated;

[0154] A construction unit 320, configured to construct a current operation vector of the rail transit air conditioner to be evaluated according to the current operation data;

[0155] The acquisition unit 330 is used to input the current operation vector into the trained health assessment model corresponding to the current operating condition information to obtain a weight vector corresponding to the current operation vector; the health assessment model is used to match the input operation vector with each neuron in the health assessment model to obtain the weight vector of the matching neuron; the health assessment model is obtained by training the self-organizing neural network to be trained based on the historical operation data and the historical operating condition information corresponding to the historical operation data;

[0156] The evaluation unit 340 is used to perform a health evaluation on the operating state of the rail transit air conditioner to be evaluated according to the error value between the current operating vector and the weight vector, so as to obtain a health evaluation value of the rail transit air conditioner to be evaluated.

[0157] In a possible implementation, the apparatus further includes an analyzing unit 350;

[0158] An analysis unit 350 is configured to perform a principal component analysis on the current operation vector using a principal component analysis algorithm to obtain a target operation vector having a contribution rate greater than a preset ratio threshold; the contribution rate represents a ratio of a characteristic value of the target operation vector to a characteristic value of the current operation vector;

[0159] The acquisition unit 330 is further used to input the target operation vector into the trained health assessment model corresponding to the current operating condition information to obtain a weight vector corresponding to the current operation vector.

[0160] In a possible implementation, the evaluation unit 340 is specifically configured to calculate an error value between the current running vector and the weight vector using a Euclidean distance algorithm;

[0161] Normalizing the error value to obtain a processed error value;

[0162] The processed error value is determined as the health assessment value of the rail transit air-conditioning operating state to be assessed.

[0163] In a possible implementation, the apparatus further includes a determining unit 360;

[0164] The acquisition unit 330 is further used to acquire a time series-based health assessment value corresponding to the rail transit air conditioner to be assessed;

[0165] And, according to a preset kernel density estimation algorithm and the health assessment value based on the time series, obtaining an alarm threshold value corresponding to the health assessment value based on the time series;

[0166] The determination unit 360 is used to determine that the operating state of the rail transit air conditioner to be evaluated is abnormal and output an alarm prompt if the health assessment value at the target time is less than the alarm threshold; the target time is any time in the time series;

[0167] And, if the health assessment value at the target moment is not less than the alarm threshold, it is determined that the operating status of the rail transit air conditioner to be assessed is normal.

[0168] In a possible implementation, the apparatus further includes a classification unit 370 and a training unit 380;

[0169] The acquisition unit 330 is further used to acquire the training data of each rail transit air conditioner in the rail transit air conditioning unit within a preset historical time period, wherein the training data includes historical state data, historical operation data, and working condition information corresponding to the historical operation data;

[0170] A classification unit 370, configured to classify the training data according to the operating condition information corresponding to the historical operating data of each rail transit air conditioner, to obtain training data corresponding to different operating condition information;

[0171] The training unit 380 is used to:

[0172] For each operating condition information, the Euclidean distance between the running vector corresponding to the training data and the weight vector of each neuron in the self-organizing neural network to be trained is calculated to obtain a current matching neuron, where the current matching neuron is a neuron corresponding to the minimum Euclidean distance;

[0173] Using a preset iterative tuning algorithm to tune the current matching neuron and the corresponding weight vector;

[0174] When a preset iterative stop condition is met, the iterative training ends, and a health assessment model corresponding to the trained working condition information is obtained, wherein the preset iterative stop condition is that the learning rate in the preset iterative tuning algorithm decays to a preset value;

[0175] The calculation formula of the preset iterative tuning algorithm is expressed as:

[0176] w i (t+1)=w i (t)+η(t)h j,i(x) (t)(xw i (t));

[0177] In the formula, w i (t) represents the weight vector of neuron i at time t, η(t) represents the learning rate, and h j,i(x) is the domain function.

[0178] In a possible implementation, the current operation data includes monitoring data collected by sensors in the rail transit air conditioner to be evaluated and control data received by the rail transit air conditioner to be evaluated;

[0179] The current operating condition information includes at least one of the compressor start-up status information of the rail transit air conditioner to be evaluated, equipment operation mode information, subway passenger flow information, holiday information, seasonal characteristic information and equipment maintenance status information.

[0180] The functions of the various functional units of the device for evaluating the operating status of rail transit air conditioning provided in the above-mentioned embodiments of the present invention can be realized through the above-mentioned method steps. Therefore, the specific working process and beneficial effects of each unit in the device for evaluating the operating status of rail transit air conditioning provided in the embodiment of the present invention will not be repeated here.

[0181] The embodiment of the present invention further provides an electronic device, such as Figure 4 As shown, it includes a processor 410 , a communication interface 420 , a memory 430 and a communication bus 440 , wherein the processor 410 , the communication interface 420 , and the memory 430 communicate with each other via the communication bus 440 .

[0182] Memory 430, for storing computer programs;

[0183] The processor 410 is used to execute the program stored in the memory 430 to implement the following steps:

[0184] Collecting current operating data of the rail transit air conditioner to be evaluated and current operating condition information corresponding to the current operating data, wherein the current operating data includes control data, current state data and collected monitoring data received by the rail transit air conditioner to be evaluated;

[0185] Constructing a current operation vector of the rail transit air conditioner to be evaluated according to the current operation data;

[0186] The current operation vector is input into the trained health assessment model corresponding to the current operating condition information to obtain a weight vector corresponding to the current operation vector; the health assessment model is used to match the input operation vector with each neuron in the health assessment model to obtain the weight vector of the matching neuron; the health assessment model is obtained by training the self-organizing neural network to be trained based on historical operation data and historical operating condition information corresponding to the historical operation data;

[0187] According to the error value between the current operation vector and the weight vector, a health assessment is performed on the operation status of the rail transit air conditioner to be assessed to obtain a health assessment value of the rail transit air conditioner to be assessed.

[0188] In a possible implementation, before inputting the current operation vector into a trained health assessment model corresponding to the current operating condition information, the method further includes:

[0189] Using a principal component analysis algorithm, a principal component analysis is performed on the current operation vector to obtain a target operation vector whose contribution rate is greater than a preset ratio threshold; the contribution rate represents the proportion of the characteristic value of the target operation vector to the characteristic value of the current operation vector;

[0190] The step of inputting the current operation vector into a trained health assessment model corresponding to the current operating condition information to obtain a weight vector corresponding to the current operation vector includes:

[0191] The target operation vector is input into a trained health assessment model corresponding to the current operating condition information to obtain a weight vector corresponding to the current operation vector.

[0192] In a possible implementation, performing a health assessment on the operating state of the rail transit air conditioner to be assessed according to the error value between the current operating vector and the weight vector to obtain a health assessment value of the rail transit air conditioner to be assessed includes:

[0193] Using the Euclidean distance algorithm, the error value between the current running vector and the weight vector is calculated;

[0194] Normalizing the error value to obtain a processed error value;

[0195] The processed error value is determined as the health assessment value of the rail transit air-conditioning operating state to be assessed.

[0196] In a possible implementation, after performing a health assessment on the operating state of the rail transit air conditioner to be assessed according to the error value between the current operating vector and the weight vector to obtain a health assessment value of the rail transit air conditioner to be assessed, the method further includes:

[0197] Obtaining a time series-based health assessment value corresponding to the rail transit air conditioner to be assessed;

[0198] Obtaining an alarm threshold corresponding to the health assessment value based on the time series according to a preset kernel density estimation algorithm and the health assessment value based on the time series;

[0199] If the health assessment value at the target time is less than the alarm threshold, it is determined that the operating state of the rail transit air conditioner to be assessed is abnormal, and an alarm prompt is output; the target time is any time in the time series;

[0200] If the health assessment value at the target time is not less than the alarm threshold, it is determined that the operating status of the rail transit air conditioner to be assessed is normal.

[0201] In a possible implementation, the training process of the health assessment model includes:

[0202] Acquire training data of each rail transit air conditioner in the rail transit air conditioning unit within a preset historical time period, wherein the training data includes historical state data, historical operation data, and operating condition information corresponding to the historical operation data;

[0203] Classifying the training data according to the operating condition information corresponding to the historical operating data of each rail transit air conditioner to obtain training data corresponding to different operating condition information;

[0204] For each working condition information, the self-organizing neural network to be trained is iteratively trained based on the running vector corresponding to each training data, specifically including:

[0205] Calculate the Euclidean distance between the running vector corresponding to the training data and the weight vector of each neuron in the self-organizing neural network to be trained to obtain a current matching neuron, where the current matching neuron is a neuron corresponding to the minimum Euclidean distance;

[0206] Using a preset iterative tuning algorithm to tune the current matching neuron and the corresponding weight vector;

[0207] When a preset iterative stop condition is met, the iterative training ends, and a health assessment model corresponding to the trained working condition information is obtained, wherein the preset iterative stop condition is that the learning rate in the preset iterative tuning algorithm decays to a preset value;

[0208] The calculation formula of the preset iterative tuning algorithm is expressed as:

[0209] w i (t+1)=w i (t)+η(t)h j,i(x) (t)(xw i (t));

[0210] In the formula, w i (t) represents the weight vector of neuron i at time t, η(t) represents the learning rate, and h j,i(x) is the domain function.

[0211] In a possible implementation, the current operation data includes monitoring data collected by sensors in the rail transit air conditioner to be evaluated and control data received by the rail transit air conditioner to be evaluated;

[0212] The current operating condition information includes at least one of the compressor start-up status information of the rail transit air conditioner to be evaluated, equipment operation mode information, subway passenger flow information, holiday information, seasonal characteristic information and equipment maintenance status information.

[0213] The communication bus mentioned above can be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. The communication bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, only one thick line is used in the figure, but it does not mean that there is only one bus or one type of bus.

[0214] The communication interface is used for communication between the above electronic device and other devices.

[0215] The memory may include a random access memory (RAM) or a non-volatile memory (NVM), such as at least one disk memory. Optionally, the memory may also be at least one storage device located away from the aforementioned processor.

[0216] The above-mentioned processor can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components.

[0217] The implementation methods and beneficial effects of the components of the electronic device in the above embodiments to solve the problems can be seen in Figure 2A The various steps in the illustrated embodiment are implemented, therefore, the specific working process and beneficial effects of the electronic device provided by the embodiment of the present invention are not repeated here.

[0218] In another embodiment provided by the present invention, a computer-readable storage medium is also provided, in which instructions are stored. When the computer-readable storage medium is executed on a computer, the computer executes the method for evaluating the operating status of rail transit air conditioning described in any of the above embodiments.

[0219] In another embodiment provided by the present invention, a computer program product including instructions is also provided, which, when executed on a computer, enables the computer to execute the method for evaluating the operating status of rail transit air conditioning described in any of the above embodiments.

[0220] Those skilled in the art will appreciate that the embodiments in the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt a complete hardware embodiment, a complete software embodiment, or a form of an embodiment combining software and hardware. Moreover, the present application may adopt a form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0221] The embodiments of the present application are described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0222] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0223] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0224] Although the preferred embodiments of the present application have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the embodiments of the present application.

[0225] Obviously, those skilled in the art can make various changes and modifications to the embodiments in the present application without departing from the spirit and scope of the embodiments in the present application. Thus, if these modifications and variations of the embodiments in the present application fall within the scope of the claims and their equivalents in the embodiments of the present application, the embodiments of the present application are also intended to include these modifications and variations.

Claims

1. A method for evaluating the operating status of rail transit air conditioning, characterized in that: The method comprises: Collecting current operating data of the rail transit air conditioner to be evaluated and current operating condition information corresponding to the current operating data, wherein the current operating data includes control data, current state data and collected monitoring data received by the rail transit air conditioner to be evaluated; Constructing a current operation vector of the rail transit air conditioner to be evaluated according to the current operation data; Determine a trained health assessment model corresponding to the current operating condition information from multiple trained health assessment models, and input the current operation vector into the determined trained health assessment model to obtain a weight vector corresponding to the current operation vector; wherein the health assessment model is used to match the input operation vector with each neuron in the health assessment model to obtain the weight vector of the matching neuron; the health assessment model corresponding to each operating condition information is obtained by training the self-organizing neural network to be trained according to the training data corresponding to the operating condition information after classifying the historical operating data and the training data of the historical operating condition information corresponding to the historical operating data; the operating condition information includes the compressor start-up status information of the rail transit air conditioner to be evaluated, equipment operation mode information, subway passenger flow information, holiday information, seasonal characteristic information and equipment maintenance status information; According to the error value between the current operation vector and the weight vector, a health assessment is performed on the operation status of the rail transit air conditioner to be assessed to obtain a health assessment value of the rail transit air conditioner to be assessed.

2. The method according to claim 1, characterized in that Before inputting the current operation vector into the determined trained health assessment model, the method further includes: Using a principal component analysis algorithm, a principal component analysis is performed on the current operation vector to obtain a target operation vector whose contribution rate is greater than a preset ratio threshold; the contribution rate represents the proportion of the characteristic value of the target operation vector to the characteristic value of the current operation vector; The target operation vector is input into a determined trained health assessment model to obtain a weight vector corresponding to the current operation vector.

3. The method according to claim 1, characterized in that The step of performing a health assessment on the operating state of the rail transit air conditioner to be assessed according to the error value between the current operating vector and the weight vector to obtain a health assessment value of the rail transit air conditioner to be assessed includes: Using the Euclidean distance algorithm, the error value between the current running vector and the weight vector is calculated; Normalizing the error value to obtain a processed error value; The processed error value is determined as the health assessment value of the rail transit air-conditioning operating state to be assessed.

4. The method according to claim 1 or 3, characterized in that After performing a health assessment on the operating state of the rail transit air conditioner to be assessed according to the error value between the current operating vector and the weight vector to obtain a health assessment value of the rail transit air conditioner to be assessed, the method further includes: Obtaining a time series-based health assessment value corresponding to the rail transit air conditioner to be assessed; Obtaining an alarm threshold corresponding to the health assessment value based on the time series according to a preset kernel density estimation algorithm and the health assessment value based on the time series; If the health assessment value at the target time is less than the alarm threshold, it is determined that the operating state of the rail transit air conditioner to be assessed is abnormal, and an alarm prompt is output; the target time is any time in the time series; If the health assessment value at the target time is not less than the alarm threshold, it is determined that the operating status of the rail transit air conditioner to be assessed is normal.

5. The method according to claim 1, characterized in that The training process of the health assessment model includes: Acquire training data of each rail transit air conditioner in the rail transit air conditioning unit within a preset historical time period, wherein the training data also includes historical status data; Classifying the training data according to the operating condition information corresponding to the historical operating data of each rail transit air conditioner to obtain training data corresponding to different operating condition information; For each working condition information, the self-organizing neural network to be trained is iteratively trained based on the running vector corresponding to each training data, specifically including: Calculate the Euclidean distance between the running vector corresponding to the training data and the weight vector of each neuron in the self-organizing neural network to be trained to obtain a current matching neuron, where the current matching neuron is a neuron corresponding to the minimum Euclidean distance; Using a preset iterative tuning algorithm to tune the current matching neuron and the corresponding weight vector; When a preset iterative stop condition is met, the iterative training ends, and a health assessment model corresponding to the trained working condition information is obtained, wherein the preset iterative stop condition is that the learning rate in the preset iterative tuning algorithm decays to a preset value; The calculation formula of the preset iterative tuning algorithm is expressed as: w i (t+1)=w i (t)+η(t)h j,i(x) (t)(x-w i (t)); In the formula, w i (t) represents the weight vector of neuron i at time t, η(t) represents the learning rate, and h j,i(x) is the domain function.

6. A device for evaluating the operating status of rail transit air conditioning, characterized in that: The device comprises: a collection unit, a construction unit, an acquisition unit and an evaluation unit; The acquisition unit is used to acquire current operating data of the rail transit air conditioner to be evaluated and current operating condition information corresponding to the current operating data, wherein the current operating data includes control data, current state data and acquired monitoring data received by the rail transit air conditioner to be evaluated; The construction unit is used to construct the current operation vector of the rail transit air conditioner to be evaluated according to the current operation data; The acquisition unit is used to determine a trained health assessment model corresponding to the current operating condition information from multiple trained health assessment models, and input the current operation vector into the determined trained health assessment model to obtain a weight vector corresponding to the current operation vector; wherein the health assessment model is used to match the input operation vector with each neuron in the health assessment model to obtain the weight vector of the matching neuron; the health assessment model corresponding to each operating condition information is obtained by training the self-organizing neural network to be trained based on the training data corresponding to the operating condition information after classification based on historical operating data and training data of historical operating condition information corresponding to the historical operating data; the operating condition information includes the compressor start-up status information of the rail transit air conditioner to be evaluated, equipment operation mode information, subway passenger flow information, holiday information, seasonal characteristic information and equipment maintenance status information; The evaluation unit is used to perform a health evaluation on the operating state of the rail transit air conditioner to be evaluated according to the error value between the current operating vector and the weight vector, so as to obtain a health evaluation value of the rail transit air conditioner to be evaluated.

7. The device according to claim 6, characterized in that The device also includes an analysis unit; The analysis unit is used to perform principal component analysis on the current operation vector using a principal component analysis algorithm to obtain a target operation vector whose contribution rate is greater than a preset ratio threshold; the contribution rate represents the proportion of the characteristic value of the target operation vector to the characteristic value of the current operation vector; The acquisition unit is further used to input the target operation vector into a trained health assessment model corresponding to the current operating condition information to obtain a weight vector corresponding to the current operation vector.

8. An electronic device, characterized in that: The electronic device comprises a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other via the communication bus; Memory, used to store computer programs; A processor, for implementing the method steps described in any one of claims 1 to 5 when executing a program stored in a memory.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method steps described in any one of claims 1 to 5 are implemented.