Planning device, method and storage medium
By designing and formulating devices on the vehicle, predicting the demand for service electrical equipment and formulating a driving plan, the problem of insufficient energy supply of service electrical equipment in the prior art is solved, ensuring the continuity and efficiency of service.
Patent Information
- Application Number
- CN202011173388.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2019-11-01
- Filing Date
- 2020-10-28
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2040-10-28
AI Technical Summary
When formulating vehicle driving plans, the prior art only considers the energy needs of the vehicle itself, and fails to effectively ensure the energy supply of the electrical equipment for service, resulting in limited service provision.
A planning device was designed to ensure the supply of electricity and materials by predicting the electricity and materials needs of service electrical equipment, and to formulate a driving plan including power generation and replenishment.
The appropriate service provision is achieved, the situation of insufficient power is avoided, and the efficiency of service services is improved.
Smart Images

Figure CN112785028B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a device for making a travel plan for a vehicle or the like. Background Art
[0002] In recent years, various companies have proposed to provide services by effectively utilizing vehicles. In order to provide services, it is conceivable that companies install electrical equipment on vehicles and operate them using the power stored in batteries provided in the vehicles.
[0003] In order to provide services appropriately, it is desirable to secure not only energy for driving the vehicle but also energy for operating electrical equipment for the services.
[0004] Japanese Patent Application Laid-Open No. 2016-203706 discloses a vehicle energy management device for minimizing fuel consumption to a destination. The device formulates a target vehicle speed plan to a destination and a plan for whether to drive a motor, an engine, and a generator in a manner that minimizes fuel consumption to a destination based on vehicle information including at least information on the speed of an electric vehicle and the state of charge of a battery, and route information to a destination, and controls the vehicle based on the plan.
[0005] As described in Japanese Patent Application Laid-Open No. 2016-203706, if a travel plan is made focusing only on the energy used for the vehicle's own functions such as driving the vehicle, there is a concern that insufficient energy for electrical equipment used for services other than the vehicle's own functions may hinder provision of services. Summary of the invention
[0006] The present invention has been made in view of the above-mentioned problems, and an object of the present invention is to provide a plan making device capable of making a travel plan taking into account the operation of electric equipment mounted on a vehicle for service purposes other than the functions of the vehicle.
[0007] In order to solve the above-mentioned problems, one form of the present invention is a planning device, which comprises: a prediction unit, which obtains an operation plan of electrical equipment installed in a vehicle and used for services other than the functions of the vehicle itself, and predicts the power demand of the electrical equipment based on the operation plan; and a planning unit, which formulates a driving plan that can ensure the power supply to the electrical equipment for the service based on the power demand.
[0008] According to the present invention, since the operation plan of the electrical equipment for service purposes other than the functions of the vehicle is acquired to predict the power demand, it is possible to formulate a travel plan that takes the power demand into consideration. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Features, advantages, and technical and industrial significance of exemplary embodiments of the present invention are described below with reference to the accompanying drawings, in which like reference numerals represent like elements, wherein:
[0010] Figure 1 This is a functional block diagram of a planning device and its peripheral components according to one embodiment of the present invention.
[0011] Figure 2 This is a flowchart of demand forecast preparation according to one embodiment of the present invention.
[0012] Figure 3 This is a flowchart of travel plan preparation according to one embodiment of the present invention.
[0013] Figure 4 This is a functional block diagram of a planning device and its peripheral components according to an embodiment of the present invention.
[0014] Figure 5 This is a functional block diagram of a planning device and its peripheral components according to an embodiment of the present invention. DETAILED DESCRIPTION
[0015] (Implementation Method)
[0016] Hereinafter, an embodiment of the present invention will be described with reference to the accompanying drawings. The planning device involved in this embodiment can predict the demand for electricity, etc. of the electrical equipment based on the operation plan of the electrical equipment used to provide the service, and formulate a travel plan including power generation, replenishment, etc. in a manner that can supply the required power, so that the service can be provided appropriately without causing a situation such as power shortage. In addition, the demand for materials involved in the service can also be predicted in the same way, and a travel plan including power generation, replenishment, etc. can be formulated in a manner that can supply the demand.
[0017] <Outline>
[0018] exist Figure 11 shows the functional modules of the planning device 10 and its peripheral parts involved in this embodiment, and the flow of information, control, power, etc. between the functional modules. The planning device 10 is mounted on the vehicle 1. In addition, the vehicle 1 is also equipped with a planning execution unit 20, an actuator 30, a power generation unit 40, a material generation unit 50, a sensor 60, a battery 70, a material storage unit 80, a map information storage unit 90, and an electrical device 110. The vehicle 1 can communicate with an external device 100 managed by a service company or the like through wireless or the like, and can send and receive information with the external device 100. The electrical device 110 is a device that the service company uses to provide goods and conveniences to customers as a business and operates. Devices that provide basic functions such as driving, turning, stopping, etc. of the vehicle 1 itself, and functions related thereto are typically not included in the electrical device 110.
[0019] In order to provide the service, the service company provides the vehicle 1 with an operation plan indicating at least one or both of the position and the timing for operating the electrical device 110. The plan making device 10 makes a travel plan in a manner that enables the operation plan to be realized based on the operation plan and the map information stored in the map information storage unit 90. The plan execution unit 20 gives the actuator 30, the power generation unit 40, and the material generation unit 50 of the vehicle 1 a travel instruction, a power generation instruction, and a material generation instruction of the vehicle 1, respectively, based on the travel plan.
[0020] The actuator 30 is an engine (motor), a power steering, a brake, etc., which operates according to the driving instruction to perform functions such as driving, turning, and stopping. When the actuator 30 is operated, the speed, tilt, etc. of the vehicle 1 change. The behavior of the vehicle 1 is detected by the sensor 60 such as a vehicle speed sensor and an acceleration sensor, and is provided to the plan making device 10, the plan execution unit 20, and the electrical device 110.
[0021] The power generation unit 40 includes a generator or a fuel cell, etc., and can generate electricity. The generator is, for example, an engine and an AC generator that generates electricity by the output of the engine, or a motor that recovers the kinetic energy of the vehicle by regenerative power generation. That is, the engine and the motor are the actuator 30 mentioned above, but can also be included in the power generation unit 40. When the power generation unit 40 operates according to the power generation instruction, the generated electricity is stored in the battery 70. The power of the battery 70 is provided to the electrical device 110, and can also be provided to the actuator 30 etc. provided in the vehicle 1. Figure 1 The parts shown and the equipment not shown are provided.
[0022] The material production unit 50 is a device for producing materials for service. When the material production unit 50 operates according to the production instruction, the produced materials are stored in the material storage unit 80. The materials stored in the material storage unit 80 are provided to the electric device 110.
[0023] Furthermore, the vehicle 1 may be an unmanned automatic driving vehicle or may be driven by a person. When driven by a person, the vehicle 1 may be driven automatically according to the driving instructions as described above, or may be driven by a person according to the driving plan instead.
[0024] <Details>
[0025] The external device 100 generates an operation plan based on input from the enterprise. In order to enable the provision of services, the operation plan includes the location, timing, action settings, etc. of the electrical device 110 to operate. The operation plan is acquired by the plan making device 10. The external device 100 generates an operation instruction for operating the electrical device 110 according to the operation plan. The operation instruction is, for example, a separate action instruction such as power on / off, action setting, and reservation setting of the electrical device 110. The operation instruction is acquired by the electrical device 110.
[0026] The plan making device 10 includes a forecasting unit 11 and a planning unit 12. The forecasting unit 11 makes a demand forecast of the power supplied to the electrical equipment 110, i.e., a power demand forecast, based on the operation plan and provides it to the planning unit 12. In addition, the forecasting unit 11 makes a demand forecast of the materials supplied during the operation of the electrical equipment 110, i.e., a materials demand forecast, in order to realize the operation plan. These demand forecasts include the location, timing, and amount of power and materials that should be supplied to the electrical equipment 110 in order to provide the service.
[0027] In the above description, the forecasting unit 11 formulates the demand forecast, but it may also be used as Figure 1 As indicated by the dotted line, the electric device 110 has a function of acquiring an operation plan from the external device 100 and creating a demand forecast based on the operation plan, and provides the created demand forecast to the planning unit 12. Changes to the demand forecast method will be described later.
[0028] The planning unit 12 obtains the demand forecast. In addition, the planning unit 12 can also refer to the map information stored in the map information storage unit 90. The map information storage unit 90 can also be set as a part of the navigation system, for example. The map information includes the location information of the supply point where fuel, materials, etc. can be supplied respectively in order to ensure electricity and materials, and the information of the energy consumed or recovered by driving. The information of the energy consumed or recovered by driving is, for example, information indicating the energy required or obtained when driving in the section according to the slope of each road section, the road surface condition, etc.
[0029] The planning unit 12 formulates a driving plan based on the demand forecast and map information. The driving plan includes a driving route, a replenishment position, a replenishment amount, a power generation amount of the power generation unit 40, a material generation amount of the material generation unit 50, etc., which are determined in a manner that can ensure the demand (position, timing, amount) predicted by the demand forecast, or the timing of passing through, replenishment, power generation, material generation, etc. at each position on the driving route. The driving plan may also include a driving method of the vehicle 1. The driving method stipulates the driving style of the vehicle 1, such as a normal mode in which the allowable range of acceleration and deceleration of the vehicle 1 is within a certain range, a mode in which the allowable range is narrower or wider than the normal mode. Such a driving plan includes not only driving, but also a supply plan and a generation plan for electricity and materials.
[0030] The planning unit 12 prepares a travel plan in a manner that optimizes (maximizes or minimizes) given indicators. Optimization of indicators includes minimizing indicators such as fuel consumption, travel distance, travel time, or replenishment amount and replenishment time, thereby improving the efficiency of service operations.
[0031] The planning unit 12 performs such optimization so that various constraints are satisfied in addition to the demand forecast and map information. Constraints include, for example, the capacity of the material storage unit 80, the capacity of the battery 70, the power generation efficiency, the material generation efficiency, and the correlation between the power generation amount and the material generation amount. In addition, the planning unit 12 also considers the current material storage amount, the storage amount, the fuel consumption of the vehicle 1 itself, the current amount of fuel, and the demand for electricity to formulate a driving plan. The specific algorithm for planning is not limited, and a general optimization method can be appropriately adopted.
[0032] In the above description, the planning unit 12 formulates the driving plan, but a part of the driving plan, such as the driving route, the replenishment position, the driving mode, etc., may also be used as Figure 1 As indicated by the dotted line, the external device 100 provides the planning unit 12. Changes to the method of creating a travel plan will be described later.
[0033] Here, refer to Figure 2 The flowchart shown illustrates the change in demand forecasting method.
[0034] (Step S101): The planning device 10 registers the electrical device 110. For example, by performing pairing in accordance with a predetermined wireless communication standard, the planning device 10 obtains an ID (identifier) for identifying the electrical device 110. The registration process may be performed automatically by the planning device 10 or manually by a company or the like.
[0035] (Step S102 ): When the demand forecast can be obtained from the electrical device 110 , the planning device 10 proceeds to step S103 . For example, when the electrical device 110 does not have a demand forecast preparation function and the demand forecast cannot be obtained from the electrical device 110 , the planning device 10 proceeds to step S104 .
[0036] (Step S103): The planning device 10 uses the demand forecast obtained from the electric equipment 110. This ends the flow.
[0037] (Step S104): The planning device 10 determines whether the ID of the electrical device 110 is an ID whose parameters have been learned. Parameters are, for example, information such as the consumption rate of electricity and materials of the electrical device 110 that can be used for demand forecasting. In the case where the electrical device 110 has been operated in the past, the planning device 10, for example, corrects the manufacturer's nominal specification value based on the actual operating performance, and associates the parameters with improved accuracy with the ID for learning. In addition, the planning device 10 can inquire other vehicles or servers outside the vehicle about the learning content of the parameters of electrical devices of the same manufacturer and the same model that can be determined based on the ID. If the ID of the electrical device 110 is the ID of an electrical device whose parameters have been learned in the vehicle 1, other vehicles or a server, the process proceeds to step S105, otherwise the process proceeds to step S106.
[0038] (Step S105): The plan making device 10 makes a demand forecast based on the operation plan and the learned parameters of the electrical equipment 110. This ends the flow.
[0039] (Step S106): The plan making device 10 makes a demand forecast based on the operation plan and the specification values of the parameters of the electric device 110. The specification parameters can be determined based on the ID of the electric device 110, for example, by inquiring a server or a manufacturer. This ends the process.
[0040] Here, refer to Figure 3 The flowchart shown explains a change in the method of creating a travel plan.
[0041] (Step S201 ): When the travel route and the like are acquired from the external device 100 , the planning unit 12 proceeds to step S202 . When the travel route and the like are not acquired, the planning unit 12 proceeds to step S206 .
[0042] (Step S202 ): The planning unit 12 adds the acquired travel route and the like to the constraint conditions to create a travel plan.
[0043] (Step S203): If a travel plan that satisfies the restriction condition can be formulated, the process proceeds to step S204; if not, the process proceeds to step S205.
[0044] (Step S204): The planning unit 12 adopts the travel plan prepared in step S202. This process ends.
[0045] (Step S205): The planning unit 12 changes the acquired driving route etc. to create a driving plan. When changing the driving route etc., the planning unit 12 creates a driving plan in a manner that minimizes the amount of change and satisfies the constraints after the change such as demand forecast and driving route etc. This ends the process.
[0046] (Step S206 ): The planning unit 12 does not obtain the travel route from the external device 100 , and therefore creates a travel plan including the travel route. This process ends.
[0047] Furthermore, when the travel route or the like acquired from the external device 100 is changed or when the travel route or the like is not acquired from the external device 100 , the planning unit 12 transmits and notifies the external device 100 of the prepared travel plan.
[0048] The plan execution unit 20 obtains a driving plan. Based on the driving plan, the plan execution unit 20 generates a driving instruction for controlling the driving of the vehicle 1, thereby controlling the actuator 30. The sensor 60 detects the behavior of the actuator 30 and the vehicle 1. The detection result is provided to the plan formulation device 10 and the plan execution unit 20, for example, and is used for the learning of the above-mentioned parameters and feedback control of driving. In addition, the detection result is provided to the electrical device 110, and the electrical device 110 can start operating after confirming that the vehicle 1 is stopped on a flat road.
[0049] In addition, the plan execution unit 20 generates a power generation instruction for controlling the power generation of the power generation unit 40 based on the driving plan, thereby controlling the power generation unit 40. The generated power is temporarily stored in the battery 70 and supplied to the electrical equipment 110 and the like. In addition, the information on the storage amount of the battery 70 is provided to the plan formulation device 10 and the plan execution unit 20, and is used for the above-mentioned parameter learning and feedback control of power generation.
[0050] In addition, the plan execution unit 20 generates a generation instruction for controlling the generation of the material generation unit 50 based on the driving plan, thereby controlling the material generation unit 50. The generated materials are temporarily stored in the material storage unit 80 and supplied to the electrical equipment 110. In addition, the information on the storage amount of the material storage unit 80 is provided to the plan formulation device 10 and the plan execution unit 20, and is used for the learning and feedback control of the above-mentioned parameters.
[0051] In addition, the above structure and processing can be appropriately changed according to the structure of the vehicle, the content of the service, the characteristics of the electrical equipment 110 and the materials. The items specified in the driving plan, the various information used for the formulation of the driving plan, and the restrictions can be appropriately omitted or added. In particular, when the service does not require materials, it is also possible not to perform the demand forecast of materials and to formulate a driving plan that takes into account the demand forecast of materials. In addition, the function of the plan execution unit 20 can also be integrated with the plan formulation device 10.
[0052] Reference Figure 4 , Figure 5 A specific example will be shown. Figure 4 The structure shown is an example of a case where a visit-based laundry service is provided as a service. In this service, laundry is collected from a customer at a designated location and time, washed, and returned to the customer at a designated location and time. The washing machine is an electrical device 110, and water is a material. In addition, the vehicle 1 is a gasoline vehicle.
[0053] In this example, the engine generator 40 is a power generation unit. The engine is also an actuator 30 for driving. A material generation unit for generating water is not provided, and water is supplied from a supply point to a material storage unit as a water tank 80. In this example, based on the operation plan of the washing machine, and the setting content and parameters of the washing machine, a demand forecast for electricity and water is formulated. In addition, based on the location of the supply point for gasoline, electricity, and water, the power generation rate generated by gasoline consumption, the full capacity of the battery 70, the storage capacity, the full capacity of the water tank, the storage amount, the place and time of storage, and the place and time of return, a driving plan including a driving route, a replenishment plan, a power generation plan, and a driving method is formulated. In addition, as for the driving method, for example, a driving method is selected in which the water in the water tank is not shaken, for example, by narrowing the allowable range of acceleration and deceleration. In addition, the plan execution unit 20 performs driving instructions and power generation instructions based on the driving plan, but does not generate water, so no generation instruction is performed.
[0054] for Figure 5 The service is the same on-call washing service as in the above-mentioned example in terms of the structure shown. The vehicle 1 is different from the above-mentioned example in that it is a FCV (Fuel Cell Vehicle) using a hydrogen fuel cell.
[0055] In this example, the fuel cell 40 is a power generation unit and a material generation unit. Water is generated from the fuel cell 40, and water is supplied from a supply point, and stored in a material storage unit as a water tank 80. In this example, based on the operation plan of the washing machine and the setting content and parameters of the washing machine, a demand forecast for electricity and water is formulated. In addition, based on the location of the supply point of hydrogen, electricity, and water, the power generation rate and water generation rate generated by hydrogen consumption, the full capacity of the battery 70, the storage capacity, the full capacity of the water tank, the storage amount, the place and time of storage, and the place and time of return, a driving plan including a driving route, a replenishment plan, a power generation plan, a water generation plan, and a driving method is formulated. In addition, the driving method is the same as the above example, and a driving method is selected in which the water in the water tank is not shaken, for example, by narrowing the allowable range of acceleration and deceleration. In addition, the plan execution unit 20 performs the power generation instruction and the water generation instruction as the operation instruction for the fuel cell 40.
[0056] Examples of services include, in addition to the above examples, the supply of food materials as supplies, the use of cooking equipment as electrical equipment to cook and sell, etc. The types and quantities of electrical equipment and the types and quantities of supplies are not limited. In addition to electrical equipment and supplies, for example, in the case of storing heat generated by gasoline combustion in water and providing it for bathing services, a heat demand forecast can be made and used for the formulation of driving plans.
[0057] Furthermore, in the above-described embodiment, the planning device 10 is described as a device mounted on a vehicle, but the present invention is not limited thereto, and the planning device 10 may be provided by a server capable of communicating with the vehicle wirelessly or by wire.
[0058] <Effect>
[0059] In this embodiment, the demand for electricity and the like of electrical equipment can be predicted based on the operation plan of the electrical equipment used to provide the service, and a driving plan including power generation and replenishment can be formulated in a manner that can meet the demand, so that the service can be provided appropriately without causing power shortages.
[0060] The present invention is not only a planning device, but can also be understood as a planning method executed by a planning device having a processor and a memory, a planning program, a computer-readable non-temporary storage medium storing the planning program, a vehicle having a planning device, etc.
[0061] The present invention is applicable to a planning device used in a vehicle or the like.
Claims
1. A planning device, wherein: The planning device comprises: a prediction unit that predicts power demand of the electrical equipment and material demand for the service based on an operation plan of the electrical equipment that can be obtained from the electrical equipment installed in the vehicle and used for services other than the vehicle's own functions; and a planning unit that formulates a travel plan capable of ensuring the location, timing, and amount of power and materials to be supplied to the electrical equipment for the service based on the power demand and the material demand, When a demand forecast cannot be obtained from the electrical device, the forecasting unit forecasts the power demand based on learned parameters associated with the identifier of the electrical device and usable for power demand forecasting of the electrical device and the operation plan, The driving plan includes a method for driving the vehicle in a normal mode in which an allowable range of acceleration and deceleration of the vehicle is set to a certain range and a mode in which the allowable range is narrower or wider than the normal mode. The planning unit formulates the travel plan in a manner to optimize given indices, wherein the indices optimization is to minimize indices of fuel consumption, travel distance, travel time, refueling amount, and refueling time.
2. The planning device according to claim 1, wherein: The planning unit also creates a travel plan including a travel route of the vehicle based on the map information.
3. The planning device according to claim 1, wherein: The planning unit further acquires a travel route of the vehicle and creates a travel plan for traveling on the acquired travel route based on map information.
4. The planning device according to claim 3, wherein: When it is impossible to formulate a travel plan for traveling on the acquired travel route, the planning unit formulates a travel plan for traveling on a different travel route.
5. The planning device according to claim 2, wherein: The map information includes the location of a refueling point and information on energy consumed or recovered due to driving.
6. The planning device according to claim 5, wherein: The planning unit creates a travel plan including a refueling plan and a production plan at the refueling place.
7. A plan making method is a plan making method executed by a plan making device, wherein: The planning method includes: A step of determining whether an operation plan of an electrical device installed in a vehicle and used for services other than the vehicle's own functions can be obtained; When the operation plan can be obtained from the electrical equipment, a step of predicting the power demand of the electrical equipment and the material demand for the service based on the obtained operation plan; If a demand forecast cannot be obtained from the electrical device, a step of predicting the power demand based on learned parameters associated with the identifier of the electrical device and usable for power demand forecasting of the electrical device and the operation plan; and The step of formulating a travel plan capable of ensuring the location, timing, and amount of power and materials to be supplied to the electrical equipment for the service based on the power demand and the material demand, The driving plan includes a method for driving the vehicle in a normal mode in which an allowable range of acceleration and deceleration of the vehicle is set to a certain range and a mode in which the allowable range is narrower or wider than the normal mode. The travel plan is prepared in a manner to optimize given indices, and the indices optimization refers to minimizing indices of fuel consumption, travel distance, travel time, refueling amount, and refueling time.
8. A storage medium storing a planning program, the planning program being a planning program executed by a computer of a planning device, wherein: The planning process includes: A step of determining whether an operation plan of an electrical device installed in a vehicle and used for services other than the vehicle's own functions can be obtained; When the operation plan can be obtained from the electrical equipment, a step of predicting the power demand of the electrical equipment and the material demand for the service based on the obtained operation plan; If a demand forecast cannot be obtained from the electrical device, a step of predicting the power demand based on learned parameters associated with the identifier of the electrical device and usable for power demand forecasting of the electrical device and the operation plan; and The step of formulating a travel plan capable of ensuring the location, timing, and amount of power and materials to be supplied to the electrical equipment for the service based on the power demand and the material demand, The driving plan includes a method for driving the vehicle in a normal mode in which an allowable range of acceleration and deceleration of the vehicle is set to a certain range and a mode in which the allowable range is narrower or wider than the normal mode. The travel plan is prepared in a manner to optimize given indices, and the indices optimization refers to minimizing indices of fuel consumption, travel distance, travel time, refueling amount, and refueling time.
