AI Technical Summary
In the existing large-slope inclined shaft track laying scheme, the welding of rails and channel steel is prone to problems such as uneven settlement, deformation, and weld fracture, resulting in difficulty in repair.
The rail is supported by reinforced concrete support blocks distributed along its longitudinal intervals, and connected to the rail sections through gauge pull rods. After the track is initially laid, the linearity and elevation are adjusted during operation, and finally the gaps and gaps are filled by spraying concrete to form a stable Track structure.
It effectively avoids the impact of the final form of the track due to uneven settlement and installation size problems, ensures the linearity and elevation of the track, and improves the laying quality and maintenance convenience of large-slope inclined shaft tracks.
Smart Images

Figure CN112796288B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building construction, and in particular to a steep slope inclined shaft track structure and a laying method. Background Art
[0002] In some projects (such as the construction of branch tunnels for water diversion projects), it is necessary to lay tracks in inclined shafts with large slopes to facilitate construction. Currently, most of them use the method of connecting rails and channel steels. However, the track effect of rails and channel steels welded together is not ideal. The track is prone to uneven settlement, deformation, weld fracture, and difficulty in maintenance. Summary of the invention
[0003] The present invention aims to provide a steep slope inclined shaft track structure and a laying method to solve the problem that the track of the existing steep slope inclined shaft track laying scheme is prone to uneven settlement, which affects the use of the track.
[0004] The embodiment of the present invention is achieved as follows:
[0005] A method for laying tracks in a steeply inclined shaft, wherein each rail is supported on a bottom plate of the steeply inclined shaft by a plurality of reinforced concrete support blocks spaced apart in the longitudinal direction thereof, wherein the rail is connected to the reinforced concrete support blocks by rail connectors;
[0006] Two parallel rails are connected together through a gauge tie rod to form a rail section;
[0007] Connect multiple rail sections longitudinally to cover the required laying range in the steeply inclined shaft to form a preliminary track;
[0008] After the initial track operation has been in use for a set period of time, the uneven settlement is basically stable. After the track linearity and elevation are adjusted to meet the construction requirements, shotcrete is used to spray the gaps between the reinforced concrete support blocks and the gaps between the reinforced concrete support blocks and the base plate to form the final track.
[0009] The method for laying tracks in steep inclined shafts in this scheme adopts the method of supporting the rails adjustably on reinforced concrete support blocks, connecting them into track sections through gauge rods, and then longitudinally connecting the track sections to adapt to the steep inclined shaft. After the uneven settlement is basically stabilized through preliminary track operation, the linearity and elevation adjustments of the track are completed, and finally the gaps are filled with concrete to form the final track. This method has the beneficial effect of being able to adapt well to the laying of tracks in steep inclined shafts, and being able to avoid the final track being affected by the installation size or uneven settlement after forming. It has great engineering value and room for promotion and use.
[0010] In one embodiment:
[0011] The rails are processed into 6.25m / section in the factory, and bolt holes are drilled at the ends of the rails;
[0012] When the rail sections are connected longitudinally, adjacent rail sections are longitudinally connected together using rail connecting plates and bolts through the bolt holes.
[0013] In one embodiment:
[0014] The rails are connected to the reinforced concrete support blocks through rail connectors in the following ways:
[0015] Spike bolts are anchored in the reinforced concrete support block and are located on both sides of the rail. Then, the rail supported on the upper end of the reinforced concrete support block is adjustably pressed against the reinforced concrete support block through nuts and pressure plates connected to the spike bolts.
[0016] In one embodiment:
[0017] The methods for adjusting the track linearity and elevation include at least:
[0018] An elastically deformable rubber pad is set between the reinforced concrete support block and the rail, and the elevation of the track is adjusted by screwing the nut up or down. Alternatively, for areas with large elevation differences due to uneven settlement, additional pads of appropriate thickness are placed under the reinforced concrete support block to achieve the desired effect.
[0019] In one embodiment:
[0020] A connecting seat is connected below the lower end surface of the rail, the gauge rod is connected between the connecting seats corresponding to the two rails, and the gauge rod is located below the lower end surface of the rail. After spraying concrete, the gauge rod is wrapped in the sprayed concrete.
[0021] In one embodiment:
[0022] At least one group of track gauge rods is arranged between each group of adjacent reinforced concrete support blocks along the longitudinal direction of the rail.
[0023] In one embodiment:
[0024] The cross section of the reinforced concrete support block is a trapezoidal shape with a larger bottom and a smaller top, so that after being wrapped by the formed shotcrete, the reinforced concrete support block cannot move upward due to the restriction of the formed shotcrete.
[0025] In one embodiment:
[0026] The initial orbital operation is set to take place over a period of 20 to 30 days.
[0027] In one embodiment:
[0028] The shotcrete used is C20 concrete.
[0029] The present embodiment also provides a steep inclined shaft track structure, which includes a plurality of rail sections spliced along the longitudinal direction, each rail section includes two steel rails arranged side by side and connected together by a track gauge rod, and each steel rail is supported on the bottom plate of the steep inclined shaft by a plurality of reinforced concrete support blocks distributed at intervals along the longitudinal direction thereof; wherein the steel rails are connected to the reinforced concrete support blocks by rail connectors; and shotcrete is filled in the gaps between adjacent reinforced concrete support blocks and the gaps between the reinforced concrete support blocks and the bottom plate, so that the formed shotcrete wraps the reinforced concrete support blocks and the track gauge rod to form a whole connected to the bottom plate of the steep inclined shaft. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings mentioned in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0031] Figure 1 It is a front view of a steep inclined shaft track structure in an embodiment of the present invention;
[0032] Figure 2 for Figure 1 A-direction view.
[0033] Icons: rail section 11, gauge rod 12, rail 13, reinforced concrete support block 14, base plate 15, rail connector 16, gap 17, gap 18, connecting seat 19, bolt hole 20, spike bolt 21, insulating block 22, pressure plate 23, spring bar 24, nut 25, rubber pad 26, gasket 27. DETAILED DESCRIPTION
[0034] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0035] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] Example
[0037] See also Figure 1 and Figure 2 This embodiment proposes a method for laying a track in a steeply inclined shaft, which includes the following steps:
[0038] Each rail 13 is supported on the bottom plate 15 of the steeply inclined shaft by a plurality of reinforced concrete support blocks 14 spaced apart along the longitudinal direction thereof, wherein the rail 13 is connected to the reinforced concrete support blocks 14 by rail connectors 16;
[0039] Two parallel rails 13 are connected together through a gauge tie rod 12 to form a rail section 11;
[0040] Connect multiple rail sections 11 longitudinally to cover the required laying range in the large-slope inclined shaft to form a preliminary track;
[0041] After the initial track operation is set for a set period of time (e.g., 20 to 30 days), the uneven settlement is basically stable, and the track linearity and elevation are adjusted to meet the construction requirements. Then, shotcrete (e.g., C20 concrete) is used to spray the gaps 17 between the reinforced concrete support blocks 14 and the gaps 18 between the reinforced concrete support blocks 14 and the bottom plate 15 to form the final track.
[0042] The steep slope in this embodiment may refer to an inclined shaft with a slope of 15 to 30 degrees. The steep slope in this embodiment is a track laying method in which the steel rail 13 is adjustably supported on a reinforced concrete support block 14, and connected to form a track section 11 through a gauge tie rod 12, and then the track section 11 is longitudinally connected to adapt to the steep slope incline, and after the uneven settlement is basically stabilized through preliminary track operation, the linearity and elevation of the track are adjusted, and finally the gap is filled with sprayed concrete to form the final track, which has the beneficial effect of being able to adapt well to the track laying of steep slope incline shafts, and being able to avoid the final track being affected by the installation size or uneven settlement after forming, and has great engineering value and room for promotion and use.
[0043] In this embodiment, the rail 13 can be processed into 6.25m / section in the factory, and a bolt hole 20 can be punched at the end of the rail 13. In this way, when the rail sections 11 are longitudinally connected, the adjacent rail sections 11 can be longitudinally connected together using the rail 13 connecting plate and bolts through the bolt hole 20. Second, the rail is assembled and reconnected in sections to reduce the construction time in the tunnel and avoid affecting the progress of tunnel construction.
[0044] In this embodiment, the rail 13 is connected to the reinforced concrete support block 14 through the rail connector 16 in the following manner: spike bolts 21 are anchored in the reinforced concrete support block 14 and are respectively located on both sides of the rail 13. Then, the rail 13 supported on the upper end of the reinforced concrete support block 14 is adjustably pressed against the reinforced concrete support block 14 through nuts 25 and a pressure plate 23 connected to the spike bolts 21. A gasket 27 may be provided under the nut 25. Generally, an elastic bar 24 may also be provided on the pressure plate 23 to achieve elastic downward pressure on the rail. An insulating block 22 or other structure may also be provided between the reinforced concrete support block 14 and the rail connector 16. A rubber pad 26 may also be provided between the rail 13 and the reinforced concrete support block 14 to reduce friction damage caused by relative motion and absorb a certain amount of energy. In this embodiment, the method for adjusting the linearity and elevation of the track at least includes: setting an elastically deformable rubber pad 26 between the reinforced concrete support block 14 and the rail 13, and adjusting the elevation of the track by screwing up or down the nut 25, or, for places where the elevation difference is large due to uneven settlement, additional pads of appropriate thickness are placed under the reinforced concrete support block 14. Adjusting the track elevation refers to adjusting the standard height of each part of the track, and adjusting the linearity of the track means that after the height of each part is adjusted appropriately, the upper surface (working surface) of the track does not fluctuate up and down or swing left and right in the longitudinal direction, but is on a straight line. See Figure 2 In this embodiment, a connection seat 19 is connected below the lower end surface of the rail 13, and the gauge rod 12 is connected between the connection seats 19 corresponding to the two rails 13, and the gauge rod 12 is located below the lower end surface of the rail 13. After the concrete is sprayed, the gauge rod 12 is wrapped in the sprayed concrete. In order to further improve the connection strength, at least one set of gauge rods 12 is provided between each set of adjacent reinforced concrete support blocks 14 in the longitudinal direction of the rail 13.
[0045] In this embodiment, the cross section of the reinforced concrete support block 14 is a trapezoidal shape with a larger bottom and a smaller top, so that after being wrapped by the formed shotcrete, the reinforced concrete support block 14 cannot move upward due to the restriction of the formed shotcrete.
[0046] The present embodiment provides a track structure for a steep inclined shaft, which includes a plurality of track sections 11 (only one track section 11 is shown in the figure) spliced along the longitudinal direction, each track section 11 includes two steel rails 13 arranged side by side and connected together by a gauge rod 12, and each steel rail 13 is supported on a bottom plate 15 of the steep inclined shaft by a plurality of reinforced concrete support blocks 14 distributed at intervals along the longitudinal direction thereof; wherein the steel rails 13 are connected to the reinforced concrete support blocks 14 by rail connectors 16; and shotcrete is filled in the gaps 17 between adjacent reinforced concrete support blocks 14 and the gaps 18 between the reinforced concrete support blocks 14 and the bottom plate 15, so that the formed shotcrete wraps each reinforced concrete support block 14 and the gauge rod 12 to form a whole connected to the bottom plate 15 of the steep inclined shaft.
[0047] Optionally, a bolt hole 20 is provided at the end of each rail 13 ; the corresponding rails 13 of adjacent rail sections 11 are connected together via a rail 13 connecting plate and bolts passing through the bolt holes 20 .
[0048] Optionally, the rail connector 16 includes spike bolts 21 anchored in the reinforced concrete support block 14 and located on both sides of the rail 13, and the insulating block 22, the pressure plate 23, and the spring bar 24 are sequentially passed through the spike bolts 21 and the nuts 25 threadedly connected to the spike bolts 21 are pressed downward on both sides of the rail 13.
[0049] Optionally, an elastically deformable rubber pad 26 is provided between the reinforced concrete support block 14 and the rail 13 .
[0050] Optionally, a connecting seat 19 is connected below the lower end surface of the rail 13, and the gauge rod 12 is connected between the connecting seats 19 corresponding to the two rails 13, and the gauge rod 12 is located below the lower end surface of the rail 13. After spraying concrete, the gauge rod 12 is wrapped in the sprayed concrete.
[0051] Optionally, at least one group of track gauge rods 12 is provided between each group of adjacent reinforced concrete support blocks 14 along the longitudinal direction of the rail 13 .
[0052] Optionally, the cross section of the reinforced concrete support block 14 is a trapezoidal shape with a larger bottom and a smaller top, so that after being wrapped by the formed shotcrete, it cannot move upward due to the restriction of the formed shotcrete.
[0053] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for laying track in a steeply inclined shaft, characterized in that: Each rail is supported on the bottom plate of the steeply inclined shaft by a plurality of reinforced concrete support blocks spaced apart in the longitudinal direction thereof, wherein the rail is connected to the reinforced concrete support blocks by rail connectors; Two parallel rails are connected together through a gauge tie rod to form a rail section; Connect multiple rail sections longitudinally to cover the required laying range in the steeply inclined shaft to form a preliminary track; After the initial track is in operation for a set period of time, the uneven settlement is basically stable, and the track linearity and elevation are adjusted to meet the construction requirements. Then, shotcrete is used to spray the gaps between the reinforced concrete support blocks and the gaps between the reinforced concrete support blocks and the bottom plate to form the final track; The rails are processed into 6.25m / section in the factory, and bolt holes are drilled at the ends of the rails; When the rail sections are connected longitudinally, adjacent rail sections are longitudinally connected together using rail connection plates and bolts through the bolt holes; The rails are connected to the reinforced concrete support blocks through rail connectors in the following ways: Anchoring spike bolts respectively located on both sides of the steel rail in the reinforced concrete support block, and then adjustingly pressing the steel rail supported on the upper end of the reinforced concrete support block to the reinforced concrete support block through nuts and pressure plates connected to the spike bolts; The methods for adjusting the track linearity and elevation include at least: An elastically deformable rubber pad is arranged between the reinforced concrete support block and the rail, and the track elevation is adjusted by screwing up or down the nut, or, for areas with large elevation differences due to uneven settlement, an additional pad of appropriate thickness is arranged under the reinforced concrete support block; It also includes a steep inclined shaft track structure, which includes a plurality of rail sections spliced along the longitudinal direction, each rail section includes two steel rails arranged side by side and connected together by a gauge rod, and each steel rail is supported on the bottom plate of the steep inclined shaft by a plurality of reinforced concrete support blocks distributed at intervals along the longitudinal direction; wherein the steel rails are connected to the reinforced concrete support blocks through rail connectors; shotcrete is filled in the gaps between adjacent reinforced concrete support blocks and the gaps between the reinforced concrete support blocks and the bottom plate, so that the formed shotcrete wraps the reinforced concrete support blocks and the gauge rod to form a whole connected to the bottom plate of the steep inclined shaft.
2. The method for laying track in a steeply inclined shaft according to claim 1, characterized in that: A connecting seat is connected below the lower end surface of the rail, the gauge rod is connected between the connecting seats corresponding to the two rails, and the gauge rod is located below the lower end surface of the rail. After spraying concrete, the gauge rod is wrapped in the sprayed concrete.
3. The method for laying track in a steeply inclined shaft according to claim 2, characterized in that: At least one group of track gauge rods is arranged between each group of adjacent reinforced concrete support blocks along the longitudinal direction of the rail.
4. The method for laying track in a steep inclined shaft according to any one of claims 1 to 3, characterized in that: The cross section of the reinforced concrete support block is a trapezoidal shape with a larger bottom and a smaller top, so that after being wrapped by the formed shotcrete, the reinforced concrete support block cannot move upward due to the restriction of the formed shotcrete.