Anchor support structure and construction method for multi-standard high and deep foundation pits
By using two-way reinforced concrete cushions and reinforced concrete crown beams combined with the anchor pulling capacity of engineering piles in the construction of multi-standard deep foundation pits, a single-fulcrum plate support system is formed, which solves the problem of safety, economy and construction of the support structure. Complexity problems are solved, and deformation control and construction efficiency are improved.
Patent Information
- Application Number
- CN202110133579.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-02-01
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-02-01
AI Technical Summary
In the construction of deep foundation pits with multiple elevations, the existing technology is difficult to achieve the safety, economy and applicability of the supporting structure, and fails to effectively utilize the anchor pulling capacity of the engineering piles within the shallow elevation range, resulting in complex construction and high cost. .
A multi-level deep foundation pit anchor-tension support structure including anchor spindle structure, force transmission structure and retaining structure is adopted. Two-way reinforced concrete cushion and reinforced concrete crown beam are used, combined with the anchor-tension capacity of several engineering piles, to form a single Fulcrum plate support system improves the stability and safety of the support structure.
Effectively control the deformation of multi-elevation deep foundation pit supporting structures, reduce disturbance of foundation soil in shallow elevation range, shorten construction period, reduce cost, and improve the economic benefits and applicability of construction.
Smart Images

Figure CN112796333B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground space construction, and in particular to a multi-standard high and deep foundation pit anchor support structure and a construction method thereof. Background Art
[0002] The development of underground space not only needs to meet the needs of building and structure functions and processes, but is also often restricted by administrative regulations such as land use planning in the construction area, which makes the plane and spatial layout of underground space diverse and complex. In multi-layer underground structures, the inconsistent plane outlines of each underground layer is a relatively common complex underground space layout. This layout is mostly that the plane outline of the shallow basement is larger than the plane outline of the deep basement, that is, the deep basement is retracted compared to the shallow basement. This underground space layout causes a large height difference in the multi-layer underground plane, forming a multi-level high-deep foundation pit with a certain scale. The height difference of the deep foundation pit is usually the height of one or more basement floors, and the deep foundation pit usually does not have the conditions for slope excavation, so it is necessary to arrange the foundation pit support structure at the height difference to achieve vertical excavation. The excavation of the basement foundation pit usually adopts the open excavation method. The engineering piles have been constructed before the foundation pit excavation. Therefore, the shallow elevation side of the multi-level high-deep foundation pit support structure is the constructed engineering piles, and the deep elevation side is the basement structure to be built. In order to minimize the disturbance to the foundation soil in the shallow elevation range, the support structure must have sufficient rigidity to control deformation.
[0003] There are several measures to control the deformation of the support structure, generally increasing the diameter of the support piles, adding internal supports and adding prestressed anchor cables. Increasing the diameter of the support piles can achieve cantilever support, which is convenient for construction and quick for excavation, but this method increases the cost of the support, and the top deformation of the cantilever support structure is generally difficult to control; setting up internal supports can significantly control the deformation of the support structure, but the support hinders the progress of earth excavation, and the force transmission bearing of the internal support needs to be combined with the layout and construction sequence of the underground structure, making the support layout more complicated; although the prestressed anchor cables are economical and easy to construct, the layout of the anchor cables is greatly restricted due to the existence of constructed engineering piles behind the support piles.
[0004] On the other hand, previous foundation pit designs did not consider the horizontal bearing capacity of engineering piles during the construction stage. Engineering piles in the shallow elevation range have a certain horizontal anchoring capacity. If the reinforced cushion layer can be used as a conduction system to effectively utilize this capacity, it will not only be able to better control the deformation of the multi-elevation deep foundation pit support structure, but this method also has the characteristics of convenient construction and economical cost.
[0005] In summary, how to make the construction operation of multi-standard high and deep foundation pit support structures simpler, more economical in cost, and able to effectively utilize engineering pile anchors has become a technical problem that technical personnel in this field urgently need to solve. Summary of the invention
[0006] In view of the above-mentioned defects of the prior art, the present invention provides a multi-elevation high and deep foundation pit anchor support structure and a construction method thereof, the purpose of which is to ensure the safety, economy and applicability of the multi-elevation high and deep foundation pit support structure in complex underground spaces, and effectively utilize the anchoring capacity of engineering piles in the shallow elevation range, providing a practical technical means for the construction of complex underground spaces.
[0007] To achieve the above-mentioned purpose, the present invention discloses a multi-standard high and deep foundation pit anchor support structure, comprising an anchor structure, a force transmission structure and a retaining structure.
[0008] The force transmission structure is a bidirectional reinforced concrete cushion; the retaining structure is a reinforced concrete cap beam and supporting piles; the anchor structure is a number of engineering piles outside the soil failure surface;
[0009] The horizontal anchoring force of a single engineering pile is determined according to the allowable horizontal displacement of the pile top and the pile diameter;
[0010] A plurality of said engineering piles are grouped in the form of one column and four piles to form a plurality of groups of anchor structures;
[0011] The plurality of steel bars in the bidirectionally reinforced concrete cushion layer are arranged in a single layer and in a bidirectional manner, the plurality of steel bars orthogonal to the length direction of the crown beam are arranged at a reinforcement ratio of 0.2%, and the plurality of steel bars parallel to the length direction of the crown beam are distributed in a manner of φ8@250;
[0012] The anchorage length of each of the steel bars orthogonal to the length direction of the crown beam and entering the crown beam is more than 40 times the diameter of the corresponding steel bar;
[0013] The distance between every two adjacent steel bars perpendicular to the length direction of the crown beam is no more than 150 mm.
[0014] Preferably, the allowable horizontal displacement of the top of the engineering pile is 10 mm; the pile diameter of the engineering pile is 0.5 m; the horizontal anchor tension of a single engineering pile is 70 kN; the column spacing of each group of engineering piles including one column and four piles is 8 meters, and the anchor tension provided is 30 to 40 kN / m.
[0015] Preferably, the bidirectionally reinforced concrete cushion layer uses concrete with a strength grade of C25.
[0016] Preferably, the steel bars of the bidirectionally reinforced concrete cushion layer in the pile foundation cap drop depth area are laid in a 1:6 slope manner.
[0017] Preferably, in the bidirectionally reinforced concrete cushion layer, the internal steel bars are disconnected in the opening area with a larger drop depth, and at least two reinforcing steel bars are arranged on each of the four sides of the opening.
[0018] More preferably, the hole area with a larger drop depth is the area where the water collection well and / or the elevator shaft are located.
[0019] More preferably, the diameter of each of the reinforcing steel bars is greater than the diameter of each of the steel bars.
[0020] The present invention also provides a construction method for a multi-standard high and deep foundation pit anchor support structure, the steps are as follows:
[0021] Step 1: Construction engineering piles and support piles;
[0022] Step 2: excavate earth to the bottom of the shallow pit;
[0023] Step 3: Clean the heads of engineering piles and supporting piles;
[0024] Step 4: Tie the crown beam and the steel bars in the reinforcement cushion layer;
[0025] Step 5: pouring concrete, and connecting the bidirectional reinforced concrete cushion with the crown beam by integral pouring;
[0026] Step 6: Excavate the deep elevation foundation pit.
[0027] Preferably, in step 2, if the engineering pile is a prestressed pipe pile, the pile head needs to be treated by core pouring.
[0028] Beneficial effects of the present invention:
[0029] The application of the present invention can improve the safety and stability of the multi-elevation deep foundation pit support structure, and can effectively control the deformation of the multi-elevation deep foundation pit support structure and reduce the disturbance of the foundation soil in the shallow elevation range.
[0030] The present invention more effectively utilizes the anchoring capacity of engineering piles within a shallow elevation range, shortens the construction period, and has significant economic benefits.
[0031] The present invention further saves the arrangement of anchor cables and internal supports, cooperates with the open-cut construction method, and has good applicability.
[0032] The concept, specific structure and technical effects of the present invention will be further described below in conjunction with the accompanying drawings to fully understand the purpose, characteristics and effects of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 A cross-sectional view of a reinforcement cushion anchor support structure according to an embodiment of the present invention is shown.
[0034] Figure 2 A plan view of a reinforcement cushion anchor support structure according to an embodiment of the present invention is shown.
[0035] Figure 3A schematic diagram showing the processing of the position of the reinforcement cushion layer encountering the opening according to an embodiment of the present invention is shown. DETAILED DESCRIPTION
[0036] Example
[0037] like Figures 1 to 3 , multi-standard high and deep foundation pit anchor support structure, characterized by: including anchor structure, force transmission structure and retaining structure;
[0038] The force transmission structure is a bidirectional reinforced concrete cushion; the retaining structure is a reinforced concrete cap beam and a supporting structure; the anchor structure is a plurality of retaining piles outside the soil failure surface;
[0039] The anchor tension horizontal force of a single retaining pile is determined according to the allowable horizontal displacement of the pile top and the pile diameter;
[0040] A plurality of the retaining piles are grouped into a plurality of engineering piles with four piles per column as a group;
[0041] The plurality of steel bars in the bidirectionally reinforced concrete cushion layer are arranged in a single layer and in a bidirectional manner, the plurality of steel bars orthogonal to the length direction of the crown beam are arranged at a reinforcement ratio of 0.2%, and the plurality of steel bars parallel to the length direction of the crown beam are distributed in a manner of φ8@250;
[0042] The anchorage length of each of the steel bars orthogonal to the length direction of the crown beam and entering the crown beam is more than 40 times the diameter of the corresponding steel bar;
[0043] The distance between every two adjacent steel bars perpendicular to the length direction of the crown beam is no more than 150 mm.
[0044] The working principle of the present invention is as follows:
[0045] The engineering piles in the shallow elevation range within the soil failure surface cannot be used as the anchor structure of the present invention, while the engineering piles outside the failure surface can be used as the anchor structure;
[0046] Several of the aforementioned retaining piles form engineering piles in a group of four piles per column, which can contribute effective anchor stiffness to the top of the multi-standard high-deep foundation pit support structure, making the support structure a single-support plate support system, thereby improving the stability and safety of the support structure.
[0047] Several steel bars parallel to the length direction of the crown beam adopt a distribution method of φ8@250, several steel bars orthogonal to the length direction of the crown beam adopt an anchorage length of more than 40 times the diameter of the corresponding steel bar, and the spacing between adjacent steel bars is less than 150 mm, which can ensure the economy and rationality of the reinforced cushion layer.
[0048] In some embodiments, the allowable horizontal displacement of the top of the engineering pile is 10 mm; the pile diameter of the engineering pile is 0.5 m; the horizontal anchor tension of a single engineering pile is 70 kN; the column spacing of each group of engineering piles including one column and four piles is 8 meters, and the anchor tension provided is 30 to 40 kN / m.
[0049] In some embodiments, the bidirectionally reinforced concrete cushion layer uses concrete with a strength grade of C25.
[0050] In some embodiments, the steel bars of the bidirectionally reinforced concrete cushion layer in the pile foundation cap drop depth area are laid in a 1:6 slope manner.
[0051] In practical applications, the above structure can ensure further effective transmission of the internal force of the reinforcement cushion layer of the bidirectionally reinforced concrete cushion layer.
[0052] In certain embodiments, the bidirectionally reinforced concrete cushion layer has internal steel bars disconnected in the opening area with a larger drop depth, and at least two reinforcing steel bars are arranged on each of the four sides of the opening.
[0053] In practical applications, the above structure can ensure further effective transmission of the internal force of the reinforcement cushion layer of the bidirectionally reinforced concrete cushion layer.
[0054] In some embodiments, the hole area with a larger drop depth is the area where the water collection well and / or the elevator shaft are located.
[0055] In some embodiments, the diameter of each of the reinforcing steel bars is greater than the diameter of each of the steel bars.
[0056] The present invention also provides a construction method for a multi-standard high and deep foundation pit anchor support structure, the steps are as follows:
[0057] Step 1: Construction engineering piles and support piles;
[0058] Step 2: excavate earth to the bottom of the shallow pit;
[0059] Step 3: Clean the heads of engineering piles and supporting piles;
[0060] Step 4: Tie the crown beam and the steel bars in the reinforcement cushion layer;
[0061] Step 5: pouring concrete, and connecting the bidirectional reinforced concrete cushion with the crown beam by integral pouring;
[0062] Step 6: Excavate the deep elevation foundation pit.
[0063] During the above construction process, the shallow elevation engineering piles work together with the supporting structure under the tension of the reinforced cushion layer.
[0064] In some embodiments, in step 2, if the engineering pile is a prestressed pipe pile, the pile head needs to be treated by core pouring.
[0065] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.
Claims
1. Anchor support structure for multi-standard high and deep foundation pits, characterized by: Including anchor structure, force transmission structure and retaining structure; The force transmission structure is a bidirectional reinforced concrete cushion; the retaining structure is a reinforced concrete cap beam and a supporting structure; the anchor structure is a plurality of retaining piles outside the soil failure surface; The anchor tension horizontal force of a single retaining pile is determined according to the allowable horizontal displacement of the pile top and the pile diameter; A plurality of the retaining piles are grouped into a plurality of engineering piles with four piles per column as a group; The plurality of steel bars in the bidirectionally reinforced concrete cushion layer are arranged in a single layer and in a bidirectional manner, the plurality of steel bars orthogonal to the length direction of the crown beam are arranged at a reinforcement ratio of 0.2%, and the plurality of steel bars parallel to the length direction of the crown beam are distributed in a manner of φ8@250; The anchorage length of each of the steel bars orthogonal to the length direction of the crown beam and entering the crown beam is more than 40 times the diameter of the corresponding steel bar; The distance between every two adjacent steel bars perpendicular to the length direction of the crown beam is no more than 150 mm.
2. The anchor support structure for multi-standard high and deep foundation pits according to claim 1 is characterized in that: The allowable horizontal displacement of the top of the engineering pile is 10 mm; the pile diameter of the engineering pile is 0.5 m; the horizontal anchor tension of a single engineering pile is 70 kN; the column spacing of each group of engineering piles including one column and four piles is 8 meters, and the anchor tension provided is 30 to 40 kN / m.
3. The anchor support structure for multi-standard high and deep foundation pits according to claim 1 is characterized in that: The bidirectionally reinforced concrete cushion layer adopts concrete with strength grade C25.
4. The anchor support structure for multi-standard high and deep foundation pits according to claim 1 is characterized in that: The steel bars of the bidirectional reinforced concrete cushion layer in the deep drop area of the pile foundation pedestal are laid in a 1:6 slope manner.
5. The anchor support structure for multi-standard high and deep foundation pits according to claim 1 is characterized in that: In the bidirectionally reinforced concrete cushion layer, the internal steel bars are disconnected in the opening area with a larger drop depth, and at least two reinforcing steel bars are arranged on each of the four sides of the opening.
6. The anchor support structure for multi-standard high and deep foundation pits according to claim 5 is characterized in that: The hole area with a larger drop depth is the area where the water collection well and / or the elevator shaft are located.
7. The anchor support structure for multi-standard high and deep foundation pits according to claim 5 is characterized in that: The diameter of each of the reinforcing steel bars is greater than the diameter of each of the steel bars.
8. The construction method of the multi-standard high and deep foundation pit anchor support structure according to claim 1, the steps are as follows: Step 1: Construction engineering piles and support piles; Step 2: excavate earth to the bottom of the shallow pit; Step 3: Clean the heads of engineering piles and supporting piles; Step 4: Tie the crown beam and the steel bars in the reinforcement cushion layer; Step 5: pouring concrete, and connecting the bidirectional reinforced concrete cushion with the crown beam by integral pouring; Step 6: Excavate the deep elevation foundation pit.
9. The construction method of the multi-standard high and deep foundation pit anchor support structure according to claim 8 is characterized in that: In step 2, if the engineering pile is a prestressed pipe pile, the pile head needs to be treated by core pouring.
Citation Information
Patent Citations
Method for reinforcing soft soil foundation pit by combination of upturning cushion layer ring beams (concealed beam) and vertical anchor pipes
CN105839663A
Single pile high-position bearing table and anchor cable tower crane base structure and construction method thereof
CN106759442A
Equivalent anchor support method for staged basement support and support system
CN108385693A
Early system of pulling out of compound SMW worker method stake shaped steel of mao bamboo stake
CN205776251U
Supporting structure of foundation pit
CN208309592U