Computing system for analyzing a factory and method for managing a factory using the computing system

By installing monitoring equipment in the real factory, collecting and analyzing data, and constructing a virtual factory, the problem of building a virtual factory that reflects the real factory situation and managing the real factory situation is solved, and real-time monitoring of the factory and production plan optimization are achieved.

CN112823317BActive Publication Date: 2024-10-18崔相守
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN201980066162.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-10-04
Publication Date
2024-10-18
Estimated Expiration
2039-10-04

AI Technical Summary

Technical Problem

It is difficult to build a virtual factory that reflects the real factory situation and effectively analyze and manage the real factory situation with existing technology.

Method used

By installing monitoring equipment in real factories, collecting data associated with facilities and processes, and using databases and virtual factory building modules to build virtual factories based on signal time differences, display and analyze factory conditions in real time, and achieve real-time monitoring and control of real factories. predict.

Benefits of technology

Real-time data collection and analysis of real factories can be achieved, which can improve the factory's production planning and management efficiency, enhance the visualization and prediction capabilities of factory conditions, and help users optimally manage their factories.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112823317B_ABST
    Figure CN112823317B_ABST
Patent Text Reader

Abstract

The computing system of the present invention includes a database and a virtual factory construction module. The database stores modeling data. The virtual factory construction module constructs a virtual factory based on the modeling data and the time difference between the output time of the first signal and the output time of the second signal, and displays the progress of the work performed from the first part to the second part in the virtual factory, the time difference is calculated based on the first signal output when the product is at the first part on one or more facilities and the second signal output when the product is at the second part on one or more facilities, the first part is monitored from a first position outside the one or more facilities used in the real factory, and the second part is monitored from a second position outside the one or more facilities. The first position is spaced apart from the second position, and the first part is spaced apart from the second part.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a computing system, and more particularly, to a computing system for analyzing a factory and a method of managing the factory using the computing system. Background Art

[0002] Factory automation refers to the automation of the entire process of control, management and operation of factories used to produce products by using robots, computers, etc. Nowadays, with the development of information technology (IT), smart factories have been introduced in addition to factory automation. A smart factory is an intelligent factory that can improve the productivity and product quality of a factory by applying information and communication technology to the entire process performed in the factory.

[0003] One of the technologies used in smart factories is to build a virtual factory. A virtual factory can be implemented in a virtual environment based on the results of modeling a real factory. The process performed in the real factory is modeled so as to be represented by the factory model implemented in the virtual environment. Therefore, when a virtual factory is used, even if the product is not actually produced in the real factory, the process of producing the product can be virtually realized or replicated by simulating it in the virtual environment. Summary of the invention

[0004] Technical issues

[0005] An object of the present invention is to provide a computing system for constructing a virtual factory reflecting the situation of a real factory and analyzing the situation of the real factory, and a method for managing the real factory by using the computing system.

[0006] Technical Solutions

[0007] According to an embodiment of the present invention, a computing system for building a virtual factory may include a database and a virtual factory building module. The database may store modeling data. The virtual factory building module may build a virtual factory based on the modeling data and the time difference between the output time of the first signal and the output time of the second signal, wherein the progress of the work performed from the first part to the second part is displayed in the virtual factory, the time difference is based on the first signal output when the product is at the first part of one or more facilities and the second signal output when the product is at the second part of one or more facilities. The first part is monitored from a first position outside the one or more facilities used in the real factory, and the second part is monitored from a second position outside the one or more facilities. The first position can be spaced apart from the second position, and the first part can be spaced apart from the second part.

[0008] According to an embodiment of the present invention, a method of using a computing system may include: when a product is at a first part of one or more facilities used to produce the product in a real factory, monitoring the first part from a first position outside the one or more facilities by a first monitoring device to output a first signal; when the product is at a second part of the one or more facilities that is different from the first part, monitoring the second part from a second position outside the one or more facilities by a second monitoring device to output a second signal; based on the first signal and the second signal, calculating the time difference between the time when the product is at the first part and the time when the product is at the second part by a data processing module; and analyzing the progress of the first work performed from the first part to the second part based on the time difference by the computing system.

[0009] Advantageous Effects of the Invention

[0010] The present invention can collect data associated with a real factory from a real factory. According to an embodiment of the present invention, a monitoring device can be installed on a facility to collect data associated with the facility. In addition, the monitoring device can be installed in a surrounding area adjacent to the facility to collect data associated with the facility and process.

[0011] The present invention can analyze and predict the situation of a real factory in real time by using data collected from the real factory.

[0012] According to an embodiment of the present invention, since the situation of a real factory is analyzed and predicted in real time, a user can refer to the analysis results and the prediction results to establish a production plan that can increase the output of the factory. In addition, the user can refer to the analysis results and the prediction results to manage the work performed in the factory and the products generated in the factory in the best state.

[0013] The present invention can construct a virtual factory reflecting the conditions of the real factory by using data collected from the real factory. Therefore, the conditions of the real factory can be displayed in real time in appearance.

[0014] In addition, the present invention can establish a virtual factory on the cloud and can analyze the situation of the real factory. Therefore, according to an embodiment of the present invention, a user can access the virtual factory through multiple servers and can check the analysis results of the real factory situation. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 is a conceptual diagram showing a real factory and an image displayed in the display panel of the present invention.

[0016] Figure 2 It is shown for management Figure 1 Block diagram of the equipment and systems of a real factory.

[0017] Figure 3 Is used to describe Figure 2 Conceptual diagram of the operation of the data processing module.

[0018] Figure 4 It is shown from Figure 1 Conceptual image of data collection equipment that collects data from a real factory.

[0019] Figure 5 It is shown that the data collection equipment is Figure 4 Concept image of an image taken at the factory.

[0020] Figure 6 It is shown by Figure 4 A conceptual diagram of an example method for collecting data using a monitoring device.

[0021] Figure 7 It is shown by Figure 4 A conceptual diagram of an example method for collecting data using a monitoring device.

[0022] Figure 8 Is used to describe Figure 2 Conceptual diagram of the operation of the virtual factory building blocks.

[0023] Fig. 9 It is shown in Figure 2 A conceptual image of a virtual factory shown in the display panel of the .

[0024] Fig.10 Is used to describe Figure 2 Conceptual diagram of the operation of the data analysis module.

[0025] Fig.11 It is shown in Figure 2 Conceptual image of the analysis results of a real plant shown in the display panel.

[0026] Fig.12 is used to describe Figure 2 Flow chart of a method for displaying analysis results of virtual plant and real plant conditions in a display panel.

[0027] Fig.13 is used to describe Figure 2 A flowchart of a method for constructing a virtual factory at a virtual factory construction module. DETAILED DESCRIPTION

[0028] Hereinafter, embodiments of the present invention may be described in detail and clearly to such an extent that those skilled in the art can easily practice the present invention.

[0029] Figure 1 is a conceptual diagram showing a real factory and an image in the display panel of the present invention.

[0030] The real factory 1000 can be a physical workspace for producing, processing and / or packaging any object or product. To this end, for example, the real factory 1000 can include facilities 311, 312 and 313, vehicles 325, products 331a, 332a, 333a and 334a, shipping containers 331, 332, 333 and 334, and workers 341 and 342.

[0031] The real factory 1000 can be a physical workspace for producing, processing and / or packaging any object or product. To this end, for example, the real factory 1000 can include facilities 311, 312 and 313, vehicles 325, products 331a, 332a, 333a and 334a, shipping containers 331, 332, 333 and 334, and workers 341 and 342.

[0032] However, the real factory 1000 is shown by way of example to better understand the present invention, and the present invention is not limited thereto. The real factory 1000 may include one or more facilities, one or more vehicles, one or more transport containers, and one or more workers, and may also include components for operating the real factory 1000.

[0033] In the real factory 1000, products 331a, 332a, 333a, and 334a may be produced and managed by workers 341 and 342, facilities 311, 312, and 313, vehicles 325, and transport containers 331. For example, product 331a may be produced by facilities 311, 312, and 313. For another example, products 331a, 332a, 333a, and 334a may be stored or transported in a state of being placed in transport containers 331, 332, 333, and 334.

[0034] The term "work" used in the specification refers to an operation performed by workers 341 and 342, facilities 311, 312, and 313, and vehicle 325 in the real factory 1000. For example, one work may be moving product 332a by using vehicle 325.

[0035] The term "process" used in the specification refers to a series of work performed to produce a product. For example, a process may consist of one or more of the following work: work to produce product 332a by using facilities 311, 312, and 313, work to put product 332a into a transport container 332, and work to transport product 332a by using a vehicle 325.

[0036] The expression “data associated with a real factory” used in the specification refers to data collected from the real factory 1000. The data associated with the real factory may include data measured or observed (or monitored) from facilities 311, 312, and 313, vehicles 325, products 331a, 332a, 333a, and 334a, transport containers 331, 332, 333, and 334, and workers 341 and 342.

[0037] The expression "situation of the real factory" used in the specification refers to "structure of the real factory" and "progress situation of work performed in the real factory". The structure of the real factory refers to the positions of the facilities 311, 312 and 313, the vehicle 325, the transport containers 331, 332, 333 and 334, and the workers 341 and 342 in the real factory 1000. The progress situation of work performed in the real factory refers to whether the facilities 311, 312 and 313 are operating normally, how many products are produced, etc.

[0038] The present invention can collect data associated with the real factory 1000 from the real factory 1000, and can build a virtual factory reflecting the situation of the real factory 1000 by using the data associated with the real factory 1000. The present invention can analyze the situation of the real factory 1000 by using the data associated with the real factory 1000.

[0039] The present invention can display the analysis result 2200 and a two-dimensional (2D) image and / or a three-dimensional (3D) image of the virtual factory 2100 in the display panel 2000, the analysis result being obtained by analyzing the situation of the real factory 1000. Therefore, the user can manage the real factory 1000 with reference to the virtual factory 2100 and the analysis result 2200 displayed in the display panel 2000. The user can establish a production plan that can improve the productivity of the real factory 1000 with reference to the virtual factory 2100 and the analysis result 2200.

[0040] Reference Figures 2 to 13 The real factory 1000, the virtual factory 2100, and the analysis results 2200 are described in more detail.

[0041] Figure 2 It is shown for management Figure 1 Block diagram of the equipment and systems of a real factory.

[0042] The data collection device 100 may include a device data collection device 110, a vehicle data collection device 120, a container data collection device 130, a worker data collection device 140, and a factory data collection device 150. The data collection devices 110, 120, 130, 140, and 150 may collect data d01, d02, d03, d04, and d05 associated with the real factory 1000 from the real factory 1000. Figures 4 to 6 The data d01, d02, d03, d04, and d05 are described in detail.

[0043] The data collection devices 110, 120, 130, 140 and 150 can respectively output data do1, d02, d03, d04 and d05 to the middleware system 200 through interfaces 111, 121, 131, 141 and 151. Hereinafter, in order to better understand the present invention, the expression "devices and modules output and / or receive data" may be used, but it may refer to real devices and modules outputting and / or receiving signals including data.

[0044] In the present invention, a "module" may be implemented using a hardware circuit (e.g., an analog circuit and a logic circuit) configured to perform given and / or reconfigurable operations and functions. Alternatively, a "module" may be implemented by a program code of software configured to perform given and / or programmable operations and functions, and an instruction set of the program code may be executed by a processing device (e.g., a central processing unit (CPU) or a graphics processing unit (GPU)). In some cases, a "module" may be implemented in a hybrid form of hardware and software.

[0045] The middleware system 200 may include interfaces 210 and 230 and a data processing module 220. The data collection device 100 and the computing system 300 may communicate with each other through the middleware system 200. The middleware system 200 may use communication technologies such as TCP / IP (Transmission Control Protocol / Internet Protocol), database access middleware, DCOM (Distributed Component Object Model), CORBA (Common Object Request Broker Architecture), Bluetooth, 3G, 4G, 5G, Wi-Fi (Wireless Fidelity), etc.

[0046] The middleware system 200 may receive data d01, d02, d03, d04, and d05 through the interface 210. The data processing module 220 may receive data d01, d02, d03, d04, and d05 from the interface 210. The data processing module 220 may process the data d01, d02, d03, d04, and d05 to generate data d1.

[0047] The data d1 may include information for analyzing the real factory 1000. For example, the data d01 may include information about an image captured by the equipment data collection device 110. The data processing module 220 may calculate the processing time taken to perform work in the real factory 1000 by using the data d01. The data d1 may include information about the processing time. Figures 3 to 6 The data d01, d02, d03, d04, and d05 as well as the data d1 are described in detail.

[0048] When data is processed by data processing module 220, the amount of data to be transmitted to computing system 300 is reduced. This may mean that the amount of data to be processed by computing system 300 is reduced. The reduction in the amount of data to be processed by computing system 300 may also increase the speed at which computing system 300 processes data.

[0049] The data processing module 220 may output the data d1 to the interface 230. The middleware system 200 may output the data d1 to the computing system 300 through the interface 230.

[0050] The computing system 300 may include an interface 310, a database 320, a modeling module 330, a virtual factory construction module 340, a display device 350, and a data analysis module 360. In some embodiments, the computing system 300 may also include: a processing (or computing) device configured to execute an instruction set of a program code implemented by software for certain operations and functions; and a memory for storing data to be used by the processing device. Some modules described below may be implemented by program code and may be executed by a processing device.

[0051] The computing system 300 may receive the data d1 through the interface 310. The computing system 300 may construct a virtual factory 2100 reflecting the situation of the real factory 1000 by using the data d1, and may analyze the situation of the real factory 1000.

[0052] For example, the computing system 300 may be connected to the data collection device 100 via a short-distance network or a long-distance network. The middleware system 200 may arbitrate the communication between the data collection device 100 and the computing system 300 on the network, and may perform appropriate data processing for the computing system 300 by using the data processing module 220.

[0053] For example, the computing system 300 may be implemented within the real plant 1000 and may be directly accessed by a user present in the real plant 1000. Alternatively, all or part of the components of the computing system 300 may be separated from the real plant 1000 and may be remotely accessed by a user present in the real plant 1000. The middleware system 200 may be separate from the computing system 300 and may be implemented inside or outside the real plant 1000.

[0054] For example, the computing system 300 may construct a virtual factory 2100 driven in a cloud environment, and may analyze the situation of the real factory 1000. For example, the computing system 300 may use AWS (Amazon Web Service), Microsoft Azure, etc., or the computing system 300 may automatically construct and use a cloud server or a network server. Therefore, the user may access the virtual factory 2100 through one or more servers, and may check the analysis results of the situation of the real factory 1000 by accessing the virtual factory 2100.

[0055] The display device 350 may be Figure 1 As shown in FIG. 2 , an analysis result 2200 and a 2D image and / or a 3D image of a virtual factory 2100 are displayed on a display panel 2000 , the analysis result being obtained by analyzing the situation of the real factory 1000 .

[0056] The database 320 may store data such as the location and size of each facility, the number of workers, and the type of processing to be performed in the factory. The database 320 may store data pre-entered by a user. For example, in order to build a virtual factory, the user may enter data into the database 320 before operating the computing system. For another example, before the data collection device 100 collects data d01, d02, d03, d04, and d05 from the real factory 1000, the user may enter data into the database 320.

[0057] In addition, the database 320 may store data indicating the situation of the real factory 1000. For example, the database 320 may receive data d2 from the interface 310 and may store the data d2.

[0058] The modeling module 330 may generate modeling data by using data stored in the database 320. For example, the modeling module 330 may include 2D, 3D modeling programs and QUEST, such as AutoCAD, 3D MAX or Pro-E, simulation programs such as eM-Plant or ARENA, and the like.

[0059] The modeling module 330 may generate modeling data associated with facilities, vehicles, products, workers, processes, and factories by using 3D computer-aided design (CAD) information of the facilities, vehicles, products, and workers. The modeling data may include information for displaying a configuration corresponding to the modeling data in the display panel 2000 in the form of a 2D and / or 3D model. For example, the computing system 300 may display a 2D and / or 3D facility model in the display panel 2000 by using the facility modeling data. The database 320 may store the generated modeling data.

[0060] The virtual factory construction module 340 may receive data d2 from the interface 310. The data d2 may include a portion of the information included in the data d1. For example, the data d2 may include information about the size and location of each facility, the speed of vehicles, the speed of transport containers, the number of workers, and the number and type of processes.

[0061] The virtual factory construction module 340 can construct a virtual factory 2100 reflecting the situation of the real factory 1000 by using the data d2. The virtual factory construction module 340 can detect the modeling data corresponding to the data d2 from the database 320. Fig.13 A case where the database 320 generates modeling data in real time by using the data d2 is described in detail.

[0062] The virtual factory construction module 340 may generate data d3 by using the data d2 and the modeling data. The data d3 may include information about the virtual factory 2100 reflecting the situation of the real factory 1000. The virtual factory construction module 340 may output the data d3 to the display device 350.

[0063] The display device 350 may receive the data d3. The display device 350 may Figure 1 As shown in FIG. 2 , a 2D image and / or a 3D image of a virtual factory 2100 is displayed in a display panel 2000 by using data d3 .

[0064] The data analysis module 360 ​​may receive data d4 from the interface 310. The data d4 may include a portion of the information included in the data d1. For example, the data d4 may include information about processing time, mean time to repair (MTTR), and mean time between failures (MTBF).

[0065] The data analysis module 360 ​​may generate data d5 by using the data d4. The data d5 may include information on analysis results of the current situation of the real factory 1000 and / or prediction results of the future situation of the real factory 1000. The data analysis module 360 ​​may output the data d5 to the display device 350.

[0066] The display device 350 may receive the data d5. The display device 350 may Figure 1 2 shows an analysis result 2200 of displaying the current situation of the real factory 1000 and / or analyzing and predicting the future situation of the real factory 1000 in the display panel 2000 by using the data d5.

[0067] Figure 3 Is used to describe Figure 2 Conceptual diagram of the operation of the data processing module.

[0068] The data processing module 220 may generate data d1 by using data d01, d02, d03, d04, and d05. The data processing module 220 may generate data d1 by processing a portion of information included in the data d01, d02, d03, d04, and d05. Therefore, the data d0 may include the same information as the portion of information included in the data d01, d02, d03, d04, and d05, or may include information obtained by converting the portion of information included in the data d01, d02, d03, d04, and d05. Figures 4 to 6 Describe together Figure 3 .

[0069] Figure 4 It is shown from Figure 1 Conceptual image of data collection equipment that collects data from a real factory.

[0070] The data collection device 100 may include a device data collection device 110 , a vehicle data collection device 120 , a container data collection device 130 , a worker data collection device 140 , and a factory data collection device 150 .

[0071] The vehicle data collection device 120, the container data collection device 130, and the worker data collection device 140 may include various sensors. The vehicle data collection device 120, the container data collection device 130, and the worker data collection device 140 may be attached to the vehicle 325, the transport containers 331, 332, 333, and 334, and the workers 341 and 342 by using magnets or adhesive materials. The vehicle data collection device 120, the container data collection device 130, and the worker data collection device 140 may operate based on power supplied from an external power source or based on power supplied by batteries respectively included in the vehicle data collection device 120, the container data collection device 130, and the worker data collection device 140.

[0072] The vehicle data collection device 120 may collect data d02 associated with the position, speed, acceleration, and movement direction of the vehicle 325 , and the noise intensity, vibration intensity, temperature, illumination, and humidity at the location of the vehicle 325 through sensors.

[0073] The container data collection device 130 may collect data d03 associated with the location of each transport container 331, 332, 333, and 334, and noise intensity, vibration intensity, temperature, illumination, and humidity at each location where the transport containers 331, 332, 333, and 334 are located through sensors.

[0074] The worker data collection device 140 can collect data d04 associated with the blood pressure and body temperature of each worker 341 and 342, the position of each worker 341 and 342, and the noise intensity, vibration intensity, temperature, illumination and humidity at each position where the workers 341 and 342 are located through sensors.

[0075] refer to Figure 3 , the data processing module 220 may calculate the number of workers 341 and 342 by using information about the blood pressure of the workers 341 and 342. The data d1 may include information about the number of workers 341 and 342, and may include information about the speeds of the vehicle 325 and the transport containers 331, 332, 333, and 334.

[0076] The equipment data collection device 110 may include a plurality of monitoring devices 110a and 110b. The monitoring devices 110a and 110b may monitor a portion of the facilities 311 and 313 from outside the facilities 311 and 313. The facilities 311 and 313 may be used to perform a process. The facilities 311 and 313 may be used to perform a work included in the process. The monitoring devices 110a and 110b may be installed in the real factory 1000 and components included in the real factory 1000 to monitor a portion of the facilities 311 and 313. For example, the monitoring devices 110a and 110b may be installed in the facilities 311 and 313, respectively. For another example, the equipment data collection device 110 may be installed in a surrounding area adjacent to the facility. Reference will be made to Figure 7 A case where the equipment data collecting device 110 is installed in a surrounding area adjacent to a facility is described in detail.

[0077] For example, monitoring devices 110a and 110b can monitor a part of facilities 311 and 313 and / or a work of a process by photographing a part of facility 311 and a part of facility 313, respectively. In this case, monitoring devices 110a and 110b can be photographic devices, such as digital cameras.

[0078] For another example, in the case where the product is located at a portion of the facility 311 and a portion of the facility 313, the monitoring devices 110a and 110b can monitor a portion of each of the facilities 311 and 313 and / or a work of the process by monitoring the product. In this case, the monitoring devices 110a and 110b can be sensors capable of identifying objects, such as depth sensors or visual sensors.

[0079] The monitoring devices 110a and 110b may identify the container data collection device 130 and / or the product 331a. In the case where the product 331a is located at the position P1, the monitoring device 110a may identify the container data collection device 130 and / or the product 331a attached to the transport container 331. In the case where the product 331a is identified to be located at the position P1, the monitoring device 110a may output a signal. For example, the signal may include information indicating that the product 331a is detected at the position P1. For another example, the signal may include information about an image taken by the monitoring device 110a when the product 331a is located at the position P1.

[0080] In the case where the product 331a moves from the position P1 and then is located at the position P2, the monitoring device 110b can identify the container data collection device 130 and / or the product 331a attached to the transport container 331. In the case where the product 331a is located at the position P2, the monitoring device 110b can output a signal. For example, the signal may include information indicating that the product 331a is detected at the position P2. For another example, the signal may include information about an image taken by the monitoring device 110a when the product 331a is located at the position P2.

[0081] Each signal output from monitoring devices 110a and 110b may include time information about the time when the corresponding signal is output. Data processing module 220 can calculate the time difference between the time when monitoring device 110a outputs the signal and the time when monitoring device 110b outputs the signal by using the time information included in the signal. Therefore, data processing module 220 can calculate the time taken for product 331a to move from position P1 to position P2.

[0082] However, the present invention is not limited thereto. For example, each of the monitoring devices 110a and 110b may continuously capture images of the positions P1 and P2. Each of the monitoring devices 110a and 110b may transmit a signal to the data processing module 220 in real time, the signal including information about the images obtained by capturing the positions P1 and P2. The signal may include information about the time when the images were captured. The data processing module 220 may process the signal to obtain time information about the time when the product 331a was captured at the positions P1 and P2.

[0083] Monitoring devices 110a and 110b may be installed at opposite ends of a facility, or may be installed at the beginning and end of a process, which will be referred to as Figure 6 Describe in detail.

[0084] However, the present invention is not limited thereto. For example, the equipment data collection device 110 may include sensors. In this case, these sensors may be attached to the facilities 311, 312, and 313 to collect data associated with noise intensity, vibration intensity, temperature, illumination, and humidity at each of the locations where the facilities 311, 312, and 313 are located.

[0085] The factory data collection device 150 may collect data associated with the entire structure of the real factory 1000 and the overall situation of the real factory 1000. The factory data collection device 150 may monitor the overall appearance of the real factory 1000. The factory data collection device 150 may be installed on the inner wall of the real factory 1000 to monitor the overall appearance of the real factory 1000. The factory data collection device 150 may be one of devices such as a digital camera, a depth camera, and a visual sensor.

[0086] The data processing module 220 can calculate the size and position of each of the facilities 311, 312, and 313 by using the image captured by the factory data collection device 150 and / or the signal output from the factory data collection device 150. The data processing module 220 can calculate the type, number, and scale of the process by using the image captured by the factory data collection device 150 and / or the signal output from the factory data collection device 150.

[0087] Figure 5 It is shown Figure 4 Conceptual image of an image captured by data collection equipment at a factory.

[0088] The factory data collection device 150 may present the overall appearance of the real factory 1000. The image 3000 captured by the factory data collection device 150 may include information about the structure of the real factory 1000 and the overall situation of the real factory 1000. For example, the image 3000 may include information about the size and location of each of the facilities 311, 312, 313, 314, and 315 and the offices 351 and 352.

[0089] refer to Figure 3 , the data processing module 220 may calculate the size and position of each of the facilities 311, 312, 313, 314, and 315 by using the image 3000. The data d1 may include information about the size and position of each of the facilities 311, 312, 313, 314, and 315 instead of the image 3000. The data processing module 220 may convert the information about the image 3000 into information about the size and position of each of the facilities 311, 312, 313, 314, and 315, so that the amount of data d1 output from the data processing module 220 is reduced.

[0090] Figure 6 It is shown by Figure 4 A conceptual diagram of an example method for collecting data using a monitoring device.

[0091] The equipment data collection device 110 can monitor a part of the facilities 311, 312, 313, 314, and 315 by using the monitoring devices 111a, 111b, 111c, and 111d. In the case where the facilities 311, 312, 313, 314, and 315 are used in one process, the equipment data collection device 110 can monitor one work of the process by using the monitoring devices 111a, 111b, 111c, and 111d. Figure 3 , the data processing module 220 may calculate the processing time, mean time to repair (MTTR), and mean time between failures (MTBF) by using the signal output from the equipment data collecting device 110. The data processing module 220 may convert the information included in the signal into information about the processing time, mean time to repair, and mean time between failures, so that the amount of data d1 output from the data processing module 220 is reduced.

[0092] The monitoring devices 111a and 111b may be installed at opposite ends P11 and P12 of the facility 311. During the movement of the transport container 331 from the position P11 to the position P12, the facility 311 may perform a job. The data processing module 220 may calculate the processing time taken for the facility 311 to perform the job, the mean repair time of the facility 311, and the mean time between failures of the facility 311 by using the signals output from the monitoring devices 111a and 111b.

[0093] Monitoring devices 111a and 111c may be installed at ends P11 and P13 of facilities 311 and 313, respectively, as shown in FIG. Figure 4 During the movement of the transport container 331 from the position P11 to the position P13, the facilities 311, 312, and 313 may perform a job. The data processing module 220 may calculate the processing time taken by the facilities 311, 312, and 313 to perform the job by using the signals output from the monitoring devices 111a and 111c.

[0094] The monitoring devices 111a and 111d may be installed at the ends P11 and P14 of the facilities 311 and 315, respectively. During the movement of the transport container 331 from the position P11 to the position P14, the facilities 311 to 315 may perform a work. The data processing module 220 may calculate the processing time taken for the facilities 311 to 315 to perform the process by using the signals output from the monitoring devices 111a and 111d.

[0095] The equipment data collection device 110 may include a plurality of monitoring devices to monitor products moving over time. According to an embodiment of the present invention, a plurality of monitoring devices can be easily attached or installed to a facility or a facility. Therefore, even in the case where a facility that cannot automatically measure the processing time is used in the real factory 1000, the present invention can easily collect data associated with the processing time of the facility by using a plurality of monitoring devices.

[0096] Figure 7 It is shown by Figure 4 A conceptual diagram of an example method for collecting data using monitoring equipment.

[0097] Can be Figure 7 A process 1500a is performed in the factory 1000a shown. Facilities 311a to 314a and 311b to 314b, workers 343 and 344, and vehicles 326 and 327 may be required to perform process 1500a. Process 1500a may include a series of work. These works may be performed by facilities 311a to 314a and 311b to 314b. However, the present invention is not limited to this. For example, multiple processes may be performed in the factory 1000a, and process 1500a may be performed by one or more facilities, one or more workers, one or more vehicles, and one or more transport containers.

[0098] The equipment-use data collecting device 110 may monitor work performed by the process 1500a and / or the facilities 311a to 314a and 311b to 314b by using monitoring devices 111e, 111f, 111g, and 111h.

[0099] Process 1500a can start from facility 311a and can be completed at facility 314b. Facilities 311a and 314b can include loading equipment 319a and unloading equipment 319b, respectively. However, the present invention is not limited to this. For example, loading equipment 319a and unloading equipment 319b can be independent of facilities 311a and 314b. Loading equipment 319a can be used to load product 331a onto facility 311a. Unloading equipment 319b can be used to unload product 331a from facility 314b.

[0100] Monitoring devices 111e and 111f can monitor the start portion of process 1500a and the completion portion of process 1500a, respectively. In detail, monitoring devices 111e and 111f can monitor loading device 319a and unloading device 319b, respectively. For example, monitoring devices 111e and 111f can be installed in the surrounding area adjacent to facilities 311a and 314b. For another example, monitoring devices 111e and 111f can be installed in the surrounding area adjacent to loading device 319a and the surrounding area adjacent to unloading device 319b.

[0101] The data processing module 220 can calculate the takt time, bottleneck time, cycle time of each process, and net cycle time of each process by using the signals output from the monitoring devices 111e and 111f. The monitoring devices 111g and 111h can correspond to Figure 4 Monitoring devices 110a and 110b shown in FIG. Monitoring devices 111g and 111h may be installed in surrounding areas adjacent to facilities 311a and 311b. Hereinafter, the description given above is omitted to avoid redundancy.

[0102] That is, the equipment data collection device 110 can collect data associated with the process 1500a, as well as data associated with the facilities 311a to 314a and 311b to 314b. The present invention can obtain highly reliable analysis results about the process 1500a and the factory 1000a by collecting data associated with the process 1500a independently of the facilities 311a to 314a and 311b to 314b.

[0103] In addition, it is possible to directly install in the facilities 311a to 314a and 311b to 314b and the equipment 319a and 319b, and further, it is possible to easily install in the surrounding area adjacent to the facilities 311a to 314a and 311b to 314b and the equipment 319a and 319b. Therefore, even in the case where a part of the facilities 311a to 314a and 311b to 314b fails, highly reliable data associated with the facilities 311a to 314a and 311b to 314b and the process 1500a can be collected.

[0104] Figure 8 Is used to describe Figure 2 Conceptual diagram of the operation of the virtual factory building blocks. Fig. 9 It is shown in Figure 2 A conceptual diagram of a virtual factory shown in the display panel of . For a better understanding, we will refer to Figure 1 , Figure 8 and Fig. 9 .

[0105] refer to Figure 8 , the virtual factory construction module 340 can receive data d2 from the interface 310. Figure 2 As shown in , data d2 may include a portion of the information included in data d1. Data d2 may include only information required for building the virtual factory 2100 among the information included in data d1. For example, data d2 may include information about the size, location and processing time of each facility, vehicle speed, shipping container speed, and the number of workers.

[0106] The virtual factory construction module 340 can construct a virtual factory 2100 reflecting the structure and working conditions of the real factory 1000 by using the data d2. For example, the virtual factory construction module 340 can construct the virtual factory 2100 by setting a facility model at the virtual factory 2100 using the information about the location of each facility included in the data d2.

[0107] The database 320 may store information about the data d2 and / or the constructed virtual factory 2100. The modeling module 330 may support visualization of the virtual factory 2100 based on the information stored in the database 320. Fig. 9 , the display device 350 can provide the user with a visualized shape of the virtual factory 2100 through the display panel 2000 .

[0108] Fig.10 Is used to describe Figure 2 Conceptual diagram of the operation of the data analysis module. Fig.11 It is shown in Figure 2 A conceptual diagram of the analysis results of a real plant displayed in the display panel of Figure 1 , Fig.10 and Fig.11 .

[0109] refer to Fig.10 , the data analysis module 360 ​​may receive data d4 from the interface 310. The data d4 may include a portion of the information included in the data d1. The data d4 may include only the information required to analyze the current situation of the real factory 1000 and predict the future situation of the real factory 1000 from the information included in the data d1. For example, the data d4 may include information about processing time, mean repair time, mean time between failures, vehicle speed, speed of transport containers, and the number of workers.

[0110] The data analysis module 360 ​​may generate data d5 by using the data d4. The data d5 may include information useful for a user to make a decision about a real plant.

[0111] For example, data d5 may include information about the main KPIs (Key Performance Indicators) of the factory.

[0112] For another example, the data d5 may include information on analysis results of the current situation of the real factory 1000 and / or results of predicting the future situation of the real factory 1000. Figure 6, based on the signals output from the monitoring devices 111a and 111c, the data analysis module 360 ​​may analyze the progress of the first work performed during the movement of the transport container 331 from the position P11 to the position P13. After the first work starts, the second work may start from the facility 311. The second work may be performed by the facilities 311, 312, and 313. The data analysis module 360 ​​may predict the progress of the second work based on the signals output from the monitoring devices 111a and 111c.

[0113] For another example, the data d5 may include information about product production, facility operation status, process progress, etc. In detail, the data d5 may include information about the following items: the current lead time of the product, the predicted lead time of the product, the current output of the product, the predicted output of the product, the output trend, the current inventory of the product, the predicted inventory of the product, the product inventory trend, the takt time, the bottleneck time, the cycle time of each process, the net cycle time of each process, the current capacity of each process, the predicted capacity of each process, the current work-in-process inventory of each process, the predicted work-in-process inventory of each process, the current capacity of each facility, the predicted operation, congestion, waiting and failure of each facility, the current capacity of each transportation equipment, the predicted operation, congestion, waiting and failure of each transportation equipment, the congestion interval of the current process, and the intensity of each bottleneck process.

[0114] The information included in the data d5 may be displayed in the display panel 2000. Fig.11 The display device 350 can display the analysis result 2200 of the current situation of the real factory 1000 and the future situation of the real factory 1000 in the form of a graph or chart through the display panel 2000. For example, the analysis result 2200 can display the current output of the real factory 1000, the predicted output, the current capacity of the facility, and the predicted capacity of the facility.

[0115] The user may refer to the analysis result 2200 displayed in the display panel 2000 to grasp the current situation and the predicted situation of the real factory 1000. Referring to the analysis result 2200, the user may establish a production plan capable of optimally maintaining the real factory 1000.

[0116] Fig.12 is used to describe Figure 2 Flow chart of a method for displaying the analysis results of the virtual plant and the real plant conditions in the display panel of Figure 2 .

[0117] In operation S410 , the data collecting device 100 may collect data d01 , d02 , d03 , d04 , and d05 associated with the real factory 1000 .

[0118] In operation S420 , the data collection device 100 may transmit the collected data d01 , d02 , d03 , d04 , and d05 to the middleware system 200 .

[0119] In operation S430 , the middleware system 200 may receive the collected data d01 , d02 , d03 , d04 , and d05 . The middleware system 200 may generate data d1 by processing the collected data d01 , d02 , d03 , d04 , and d05 using the data processing module 220 .

[0120] In operation S440, the middleware system 200 may transmit the data d1 to the computing system 300. The computing system 300 may receive the data d1.

[0121] In operation S450, the virtual factory construction module 340 may receive the data d2. The virtual factory construction module 340 may generate data d3 by using the data d2. The data d3 may include information about the virtual factory. The virtual factory construction module 340 may output the data d3 to the display device 350. Fig.13 Operation S450 is described in detail.

[0122] In operation S460, the data analysis module 360 ​​may receive the data d4. The data analysis module 360 ​​may generate data d5 by using the data d4. The data d5 may include information about the result of analyzing the real factory situation. The data analysis module 360 ​​may output the data d5 to the display device 350.

[0123] In operation S470, the display device 350 may receive the data d3 and the data d5. The display device 350 may display a 2D image and / or a 3D image of the virtual factory 2100 and the analysis result 2200 of the situation of the real factory 1000 in the display panel 2000 by using the data d3 and d5.

[0124] Fig.13 is used to describe Figure 2 A flowchart of a method for constructing a virtual factory at a virtual factory construction module. Fig.13 Operations S515 to S560 shown in FIG. 5 correspond to those in reference Fig.12 Operation S450 is described.

[0125] In operation S510 , the interface 310 may receive data d1 from the middleware system 200 .

[0126] In operation S515 , the interface 310 may transmit data d2 to the virtual factory construction module 340 based on the received data d1 .

[0127] In operation S520 , the interface 310 may transmit the data d2 to the database 320 .

[0128] In operation S525 , the database 320 may store the data d2 .

[0129] In operation S530 , the database 320 may transmit the data d2 to the modeling module 330 .

[0130] In operation S535 , the modeling module 330 may generate modeling data corresponding to the data d2 by using the data d2 .

[0131] In operation S540 , the modeling module 330 may transmit the modeling data to the database 320 .

[0132] In operation S545, the database 320 may store the modeling data. The database 320 may store information about the correspondence between the modeling data and the data d2. Through operations S525 to S545, the database 320 may store the modeling data, the data d2, and the information about the correspondence between the modeling data and the data d2. When the modeling data, the data d2, and the information about the correspondence between the modeling data and the data d2 are stored in the database 320, the virtual factory construction module 340 may detect the modeling data corresponding to the data d2 from the database 320.

[0133] In operation S550 , the database 320 may transmit the modeling data to the virtual plant construction module 340 .

[0134] In operation S555 , the virtual factory construction module 340 may generate data d3 by using the data d2 and the modeling data. The data d3 may include information about the virtual factory 2100 reflecting the situation of the real factory 1000 .

[0135] In operation S560 , the virtual factory construction module 340 may transmit the data d3 to the display device 350 .

[0136] In operation S565 , the display device 350 may output a visualized shape of the virtual factory 2100 through the display panel 2000 based on the data d3 .

[0137] The above description relates to detailed embodiments for carrying out the invention.

[0138] As with the above-described embodiment, embodiments in which the design is simply changed or easily changed can be included in the present invention.

[0139] Furthermore, techniques that can be easily changed and implemented by using the embodiments of the present invention may be included.

[0140] While the inventive concept has been described with reference to exemplary embodiments thereof, it will be apparent to those skilled in the art that various changes and modifications can be made thereto without departing from the spirit and scope of the present invention as set forth in the following claims.

Claims

1. A computing system for building a virtual factory, comprising: a database, configured to store modeling data; Data analysis module; as well as A virtual factory building module, wherein the virtual factory building module is configured to: The virtual factory is constructed based on a time difference between an output time of a first signal and an output time of a second signal and the modeling data, wherein a progress of a first work performed from a first part to a second part is displayed in the virtual factory, the time difference being calculated based on the first signal output when a product is at the first part on one or more facilities and the second signal output when the product is at the second part on the one or more facilities, the first part is monitored from a first location outside the one or more facilities used in a real factory, and the second part is monitored from a second location outside the one or more facilities, wherein the first position is spaced apart from the second position, wherein the first portion is spaced apart from the second portion, The data analysis module is configured to analyze the progress of the first task based on the time difference, and The computing system is configured to predict a progress of a second job based on the time difference, wherein the second job is performed from the first part to the second part after the first job is performed.

2. The computing system of claim 1 , wherein the first signal comprises information about an image of the first portion taken from the first position when the product is at the first portion, and Wherein the second signal comprises information about an image of the second portion taken from the second position when the product is at the second portion. 3 . The computing system according to claim 1 , wherein the virtual factory construction module is configured to construct the virtual factory reflecting the situation of the real factory based on the data collected from the real factory and the modeling data.

4. A method for analyzing the situation of a real factory using a computing system to construct a virtual factory, in which the progress of work performed from a first part to a second part is displayed, the method comprising: When the product is at the first portion on one or more facilities for producing the product in the real factory, monitoring the first portion from a first location outside the one or more facilities by a first monitoring device to output a first signal; When the product is at the second portion of the one or more facilities that is different from the first portion, monitoring the second portion from a second location outside the one or more facilities by a second monitoring device to output a second signal; Based on the first signal and the second signal, calculating, by a data processing module, a time difference between a time when the product is at the first portion and a time when the product is at the second portion; analyzing, by the computing system, the progress of the first work executed from the first part to the second part based on the time difference; as well as The progress of a second job is predicted based on the time difference by the computing system, wherein the second job is performed from the first part to the second part after the first job is performed.

5. The method according to claim 4, further comprising: When the first part and the second part are located at one of the one or more facilities, the operation status of the one facility is analyzed based on the time difference by the computing system.

6. The method of claim 5, wherein the time difference is a processing time of the one facility, The method further comprises: calculating, by the computing system, a mean time to repair (MTTR) and a mean time between failures (MTBF) of the facility based on the processing time, The analyzing the operating status of the one facility includes: analyzing the operating status of the one facility based on the processing time, the mean repair time and the mean time between failures through the computing system.

7. The method according to claim 4, further comprising: When the product is produced through a process that starts at a first facility among the one or more facilities and is completed at a second facility among the one or more facilities, when the first part is at the first facility and the second part is at the second facility, the progress of the process is analyzed based on the time difference by the computing system, wherein the process is a series of work performed to produce a product.

Citation Information

Patent Citations

  • System and method of monitoring and quantifying performance of an automated manufacturing facility

    US7379782B1