A lightweight design method and structure of a loader boom
Through finite element analysis and force transmission path optimization methods, the problems of bulky structure and increased weight in the loader arm design are solved, lightweight design under multiple working conditions is achieved, the control flexibility and economic performance are improved, and the distance between the loader arm and the loader arm is reduced. The gap between international products.
Patent Information
- Application Number
- CN202110472910.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-04-29
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-04-29
AI Technical Summary
The existing loader arm design has the problems of bulky structure, increased weight, and poor operational flexibility, especially in ultra-large tonnage loaders, resulting in increased fuel consumption and reduced economic performance.
Finite element analysis and force transmission path optimization methods are used to achieve lightweight design under multiple working conditions through discretization of the boom structure geometric model, static analysis, and material density optimization, retaining necessary materials, removing non-essential materials, and optimizing force transmission. path, reducing the structural weight while ensuring rigidity.
It achieves a significant reduction in the weight of the boom structure on the basis of ensuring structural rigidity, improves the maneuverability of the entire machine, reduces user labor intensity and usage costs, solves the problem of too bulky loader arm design, and improves product competitiveness.
Smart Images

Figure CN113127996B_ABST
Abstract
Description
Technical Field
[0001] The invention discloses a lightweight design method for a loader boom and a structure thereof, and relates to the technical field of engineering machinery loaders. Background Art
[0002] A loader is a shoveling and transporting machine used to shovel or transport materials such as coal, ore, loose soil, corn, etc. It has the advantages of fast operating speed, high efficiency, good maneuverability and easy operation. Therefore, it has become one of the indispensable equipment in today's mechanized engineering.
[0003] The typical loader working device is mainly composed of bucket, boom, connecting rod, rocker arm, bucket cylinder and boom cylinder. The structure and performance of the working device directly affect the working size and performance parameters of the whole machine. Therefore, the rationality of the working device directly affects the production efficiency, workload, power and motion characteristics of the loader, the working effect under different working conditions, the working cycle time, engine power, etc. The boom is the main structural support in the working device, and its performance will have a direct impact on the working device.
[0004] There is still a certain gap in the lightweight design of loaders in my country. In the past, the design of booms mostly adopted the design method of experience and analogy. In order to ensure the safety of the boom structure, the overall structure is usually widened and thickened without the guidance of appropriate strength and stiffness calculation and verification. The direct consequence is that the boom structure is bulky, the structural strength ratio is not coordinated, and the weight of the working device is increased, which greatly affects the flexibility and loading capacity of the loader operation, increases fuel consumption, reduces the economic performance of the vehicle, and causes greater pollution to the environment. Therefore, it is imperative to lightweight the boom structure, especially the boom structure of super-large tonnage loaders, and various manufacturers are constantly exploring various lightweight methods.
[0005] In recent years, in order to cope with the increasingly fierce global competition, foreign engineering machinery manufacturers have further developed towards lightweighting. Most of them use high-strength wear-resistant materials to achieve lightweight structures, but this has greatly increased costs. The optimization of force transmission paths mainly involves opening holes in the structure and removing unnecessary materials to optimize the configuration of node connections and achieve a reasonable layout of materials in the design area. This adjustment of the number and position of materials can ensure that the structural support position can achieve lightweight design under the constraints of rigidity and strength when subjected to applied loads, but there are currently few studies on lightweight design methods for multiple working conditions. Summary of the invention
[0006] In view of the defects in the above-mentioned background technology, the present invention provides a lightweight design method and structure of a loader boom, which can significantly reduce the structural weight and improve the controllability of the whole machine while ensuring the structural strength.
[0007] To achieve the above object, the technical solution adopted by the present invention is as follows: A lightweight design method for a loader boom, comprising the following steps:
[0008] Step 1: Discretize the geometric model of the boom structure, use hexahedral solid units to mesh the boom structure, and establish a finite element analysis model;
[0009] Step 2: Under the above finite element analysis model, perform finite element static analysis on the initial structure of the boom structure under various working conditions, and obtain the initial value of the stiffness index;
[0010] Step 3: Based on the results of finite element statics analysis, the boom structure stiffness and material volume ratio under each working condition are iterated to optimize the force transmission path, and a boom structure lightweight design cloud diagram that meets the optimization target is obtained. The necessary materials on the force transmission path are retained, and unnecessary materials are removed to obtain the experimental lightweight boom structure.
[0011] Step 4: Round off and check the lightweight boom structure, perform finite element static analysis again, calculate the optimized value of the rigidity index after lightweighting, evaluate the optimized value and initial value of the rigidity index, if the rigidity index evaluation meets the requirements, proceed to step 5, if the rigidity index evaluation does not meet the requirements, proceed to step 3.
[0012] Step 5: Output the experimental lightweight boom structure as the final lightweight solution.
[0013] Furthermore, the finite element statics analysis specifically includes the following steps:
[0014] Balance equation: KU=P
[0015] Geometric equations:
[0016] Constitutive equation {σ}=[D]{ε}
[0017] The boom structure stress index is calculated using the equivalent stress theory, and the principle is as follows:
[0018]
[0019] Among them, K is the stiffness matrix; U is the displacement matrix, and its displacements in the three directions x, y, and z are represented by u, v, and w respectively; P is the load matrix; ε is the structural strain, and its linear strains in the three directions are ε x , ε y , ε z , the shear strains in the three directions are τ xy , τ xz , τ yz; σ is the structural stress, [D] is the elastic coefficient matrix, whose value depends on the material parameters used, and the stress in the x, y, and z directions is σ x , σ y , σ z ;
[0020] Maximum displacement of boom structure
[0021] Maximum stress of boom structure s=max{σ i}
[0022] Where i, j, k = 1, 2...m, m is the total number of structural nodes.
[0023] Furthermore, the stiffness and strength indexes include: comprehensive stiffness and comprehensive strength, the comprehensive stiffness being the sum of the maximum displacement of the boom structure under the corresponding working condition and the corresponding weight coefficient, and the comprehensive strength being the sum of the maximum stress of the boom structure under the corresponding working condition and the corresponding weight coefficient.
[0024] Furthermore, the specific method for optimizing the force transmission path of the boom structure is: taking the material density of the boom plate as the design variable and taking the minimum structural strain energy of the boom structure as the objective function, optimizing the force transmission path, and removing the boom structure material under the condition of maximum rigidity and minimum displacement of the boom structure;
[0025] The optimization equation is as follows:
[0026]
[0027]
[0028] l min ≤l i ≤1 i=1,2,……,n
[0029] Among them, a is the design variable vector, which represents the relative density of the boom plate solid unit material; a i is the relative density of the i-th entity unit;
[0030] n is the total number of boom plate entity units;
[0031] c(a) is the structural strain energy of the boom plate;
[0032] k0 is the unit stiffness matrix of the solid element;
[0033] l i is the displacement vector of the i-th entity element;
[0034] l i T is the transpose of the displacement vector of the ith entity element;
[0035] (V0) i is the volume of the i-th solid unit material;
[0036] f V is the given material volume fraction ratio;
[0037] l min It is a positive real number much smaller than 1, indicating the lower limit of the relative density of the unit material;
[0038] p is the penalty function.
[0039] Furthermore, the working conditions include: digging normal load condition, digging eccentric load condition, traction normal load condition, traction eccentric load condition, combined normal load condition and combined eccentric load condition;
[0040] Digging positive load condition: When the loader is working on the ground, the vertical external load is evenly distributed on the main blade.
[0041] Digging and unbalanced load condition: When the loader is working on the ground, the vertical external load is distributed on one side of the main blade.
[0042] Towing positive load condition: When the loader is working on the ground, the horizontal external load is evenly distributed on the main blade.
[0043] Towing eccentric load condition: When the loader is working on the ground, the horizontal external load is distributed on one side of the main blade.
[0044] Combined positive load condition: When the loader is working on the ground, the vertical external load and the horizontal external load are evenly distributed on the main blade;
[0045] Combined eccentric load condition: When the loader is working on the ground, the vertical external load and the horizontal external load are distributed on one side of the main blade.
[0046] Furthermore, the weight coefficient is set according to the application of the working conditions, and the sum of the weight coefficients is equal to 1. The weight coefficient of the digging positive load condition is 0.05, the weight coefficient of the digging unbalanced load condition is 0.3, the weight coefficient of the traction positive load condition is 0.05, the weight coefficient of the traction unbalanced load condition is 0.1, the weight coefficient of the combined positive load condition is 0.3, and the weight coefficient of the combined unbalanced load condition is 0.2.
[0047] Furthermore, the optimized value of the evaluation stiffness index has an increase or decrease ratio of less than 8% compared with the initial value.
[0048] A lightweight design structure of a loader boom, comprising two symmetrically arranged boom plates and a seat beam connecting the two boom plates, symmetrical rocker arm ear seats welded on the seat beam, a first hinge hole and a third hinge hole are respectively arranged at both ends of the boom plate, and a second hinge hole is arranged on the cylinder flange on the boom plate, characterized in that four groups of symmetrical weight reduction holes, namely a first weight reduction hole, a second weight reduction hole, a third weight reduction hole and a fourth weight reduction hole, are distributed on the boom plate; the third weight reduction hole is located at the center of the connection position between the boom plate and the seat beam, the first weight reduction hole, the second weight reduction hole and the fourth weight reduction hole are distributed on the left and right sides of the third weight reduction hole, and the fourth weight reduction hole is close to the cylinder flange side; the first weight reduction hole is close to the third hinge hole side, and the second weight reduction hole is close to the seat beam side.
[0049] Furthermore, the third weight-reducing hole is elliptical and concentric with the cross section of the seat beam; the first weight-reducing hole is circular; the second weight-reducing hole and the fourth weight-reducing hole are both trapezoidal, and their two intersecting edges are chamfered, and their trapezoidal bottom edges are close to the third weight-reducing hole; all weight-reducing holes pass through the entire boom in the thickness direction.
[0050] Beneficial effects: The invention provides a lightweight design method and structure for a loader boom based on multiple working conditions, which can quickly and accurately optimize the force transmission path of the boom structure under multiple working conditions, realize a reasonable layout of materials, and greatly reduce the structural weight while ensuring the structural rigidity. It improves the controllability of the whole machine, reduces the labor intensity and use cost of users, solves the current design status of the overly bulky design of the boom of super-large tonnage loaders, narrows the gap with international products, and improves product competitiveness. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Figure 1 is a flow chart of the present invention;
[0052] Figure 2 The lightweight front boom structure of the present invention is intended;
[0053] Figure 3 The working conditions of the present invention are intended (a is the digging positive load working condition, b is the digging unbalanced load working condition, c is the traction positive load working condition, d is the traction unbalanced load working condition, e is the combined positive load working condition, and f is the combined unbalanced load working condition);
[0054] Figure 4 This is the intention of the lightweight boom structure of the present invention;
[0055] Figure 5 This is the structural intention of the rounded movable arm of the present invention. DETAILED DESCRIPTION
[0056] The implementation of the technical solution is further described in detail below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.
[0057] like Figures 1 to 3 An embodiment shown in the figure is a lightweight design method for a loader boom, wherein the boom plate material is Q550D, whose yield limit is 550MPa, and the maximum stress of the boom after lightweighting is 420MPa based on a single working condition evaluation; the method comprises the following steps:
[0058] Step 1: Discretize the geometric model of the boom structure, use hexahedral solid units to mesh the boom structure, and establish a finite element analysis model;
[0059] Step 2: Under the above finite element analysis model, perform finite element static analysis on the initial structure of the boom structure under various working conditions, and obtain the initial value of the stiffness index;
[0060] Step 3: Based on the results of finite element statics analysis, the force transmission path of the boom structure under each working condition is optimized to obtain the experimental lightweight boom structure;
[0061] Step 4: Round off and check the lightweight boom structure, perform finite element static analysis again, calculate the optimized value of the rigidity index after lightweighting, evaluate the optimized value and initial value of the rigidity index, if the rigidity index evaluation meets the requirements, proceed to step 5, if the rigidity index evaluation does not meet the requirements, proceed to step 3.
[0062] Step 5: Output the experimental lightweight boom structure as the final lightweight solution.
[0063] Furthermore, the finite element statics analysis specifically includes the following steps:
[0064] Balance equation: KU=P
[0065] Geometric equations:
[0066] Constitutive equation {σ}=[D]{ε}
[0067] The boom structure stress index is calculated using the equivalent stress theory, and the principle is as follows:
[0068]
[0069] Among them, K is the stiffness matrix; U is the displacement matrix, and its displacements in the three directions x, y, and z are represented by u, v, and w respectively; P is the load matrix; ε is the structural strain, and its linear strains in the three directions are ε x , ε y , ε z , the shear strains in the three directions are τ xy , τ xz , τ yz; σ is the structural stress, [D] is the elastic coefficient matrix, whose value depends on the material parameters used, and the stress in the x, y, and z directions is σ x , σ y , σ z ,
[0070] Maximum displacement of boom structure
[0071] Maximum stress of boom structure s=max{σ i}
[0072] Where i, j, k = 1, 2...m, m is the total number of structural nodes.
[0073] The stiffness and strength indexes include: comprehensive stiffness and comprehensive strength. The comprehensive stiffness is the sum of the maximum displacement of the boom structure under the corresponding working condition and the corresponding weight coefficient. The comprehensive strength is the sum of the maximum stress of the boom structure under the corresponding working condition and the corresponding weight coefficient.
[0074] The specific method for optimizing the force transmission path of the boom structure is as follows: taking the material density of the boom plate as the design variable and taking the minimum structural strain energy of the boom structure as the objective function, optimizing the force transmission path, and removing the boom structure material under the condition of maximum rigidity and minimum displacement of the boom structure;
[0075] The optimization equation is as follows:
[0076]
[0077]
[0078] l min ≤l i ≤1 i=1,2,……,n
[0079] Among them, a is the design variable vector, which represents the relative density of the boom plate solid unit material, a i is the relative density of the i-th entity unit;
[0080] n is the total number of boom plate entity units;
[0081] c is the structural strain energy of the boom plate;
[0082] k0 is the unit stiffness matrix of the solid element;
[0083] l i is the displacement vector of the i-th entity element;
[0084] l i T is the transpose of the displacement vector of the ith entity element;
[0085] V0) i is the volume of the i-th solid unit material;
[0086] f V is the given material volume fraction ratio;
[0087] l min It is a positive real number much smaller than 1, indicating the lower limit of the relative density of the unit material;
[0088] p is the penalty function.
[0089] like Figure 3 As shown, the working conditions include: digging normal load condition, digging eccentric load condition, traction normal load condition, traction eccentric load condition, combined normal load condition and combined eccentric load condition;
[0090] Digging positive load condition: When the loader is working on the ground, the vertical external load is evenly distributed on the main blade.
[0091] Digging and unbalanced load condition: When the loader is working on the ground, the vertical external load is distributed on one side of the main blade.
[0092] Towing positive load condition: When the loader is working on the ground, the horizontal external load is evenly distributed on the main blade.
[0093] Towing eccentric load condition: When the loader is working on the ground, the horizontal external load is distributed on one side of the main blade.
[0094] Combined positive load condition: When the loader is working on the ground, the vertical external load and the horizontal external load are evenly distributed on the main blade;
[0095] Combined unbalanced load condition: When the loader is working on the ground, the vertical external load and the horizontal external load are distributed on one side of the main blade. The weight coefficients are set according to the application of the working conditions, and the sum of the weight coefficients is equal to 1. The weight coefficient w1 of the digging positive load condition is 0.05, the weight coefficient w2 of the digging unbalanced load condition is 0.3, the weight coefficient w3 of the traction positive load condition is 0.05, the weight coefficient w4 of the traction unbalanced load condition is 0.1, the weight coefficient w5 of the combined positive load condition is 0.3, and the weight coefficient w6 of the combined unbalanced load condition is 0.2.
[0096] Calculate the strength index data,
[0097] Comprehensive stiffness D = w1 d1 + w2 d2 + w3 d3 + w4 d4 + w5 d5 + w6 d6,
[0098] Comprehensive strength S = w1 s1 + w2 s2 + w3 s3 + w4 s4 + w5 s5 + w6 s6,
[0099] Among them, d1~d6 are the maximum displacement of the boom structure under the corresponding working conditions, and s1~s6 are the maximum stress of the boom structure under the corresponding working conditions;
[0100] The initial finite element static analysis data is shown in Table 1:
[0101]
[0102] Table 1
[0103] Assuming that the initial structural material volume fraction ratio f V is 1, and the volume distribution ratio of the optimized material is set to 0.4-0.5, selectively removing Figure 4 The part with lower material density is rounded and checked to obtain the lightweight model structure as shown in Figure 5 As shown, a 10% structural weight reduction can be achieved;
[0104] The finite element static analysis data is shown in Table 2:
[0105]
[0106] Table 2
[0107] The comparison of comprehensive strength index results of lightweight front and rear boom plates is shown in Table 3:
[0108] Initial structure Lightweight construction contrast Comprehensive stiffness 44.25mm 46.46mm Increase by 5% Comprehensive strength 277.75 271.9 2% reduction
[0109] Table 3
[0110] As shown in Table 3, after lightweighting, the overall strength of the structure is reduced by 2%, and the overall stiffness of the structure is increased by 5%. While ensuring the structural strength and stiffness, the weight of the structure is reduced by 10%.
[0111] like Figure 5 As shown, a lightweight design structure of a loader boom comprises two symmetrically arranged boom plates 3 and a seat beam 4 connecting the two boom plates 3, symmetrical rocker arm ear seats 5 are welded on the seat beam 4, first hinge holes 1 and third hinge holes 6 are respectively arranged at two ends of the boom plate 3, a second hinge hole 11 is arranged on the cylinder flange 2 on the boom plate, and the first hinge hole 1, the second hinge hole 11 and the third hinge hole 6 are used to connect with other structures to complete the force transmission; four groups of symmetrical weight-reducing holes, namely, a first weight-reducing hole 7, a second weight-reducing hole 8, a third weight-reducing hole 9 and a fourth weight-reducing hole 20 are distributed on the boom plate 3; the third weight-reducing hole 9 is located at the center of the connection position between the boom plate 3 and the seat beam 4, the first weight-reducing hole 7, the second weight-reducing hole 8 and the fourth weight-reducing hole 10 are distributed on the left and right sides of the third weight-reducing hole 9, and the fourth weight-reducing hole 10 is close to the cylinder flange 2 side; the first weight-reducing hole 7 is close to the third hinge hole 6 side, and the second weight-reducing hole 8 is close to the seat beam 4 side.
[0112] Furthermore, the third weight-reducing hole 9 is elliptical and concentric with the cross section of the seat beam 4; the first weight-reducing hole 7 is circular; the second weight-reducing hole 8 and the fourth weight-reducing hole 10 are both trapezoidal, and their two intersecting edges are chamfered, and their trapezoidal bottom edges are close to the third weight-reducing hole 9; all weight-reducing holes pass through the entire boom in the thickness direction.
[0113] The present invention provides a lightweight design method and structure for a loader boom based on multiple working conditions, which can quickly and accurately optimize the force transmission path of the boom structure under multiple working conditions, realize a reasonable layout of materials, and greatly reduce the structural weight while ensuring the structural rigidity requirement, thereby improving the controllability of the entire machine, reducing the labor intensity and use cost of users, and solving the current design status of the overly bulky design of the boom of an ultra-large tonnage loader, thereby narrowing the gap with international products and improving product competitiveness.
[0114] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A lightweight design method for a loader boom, characterized in that: The following steps are involved: Step 1: Discretize the geometric model of the boom structure, use hexahedral solid units to mesh the boom structure, and establish a finite element analysis model; Step 2: Under the above finite element analysis model, perform finite element static analysis on the initial structure of the boom structure under various working conditions, and obtain the initial value of the stiffness index; Step 3: Based on the results of finite element statics analysis, the force transmission path of the boom structure under each working condition is optimized to obtain the experimental lightweight boom structure; Step 4: Round off and check the lightweight boom structure, perform finite element static analysis again, calculate the optimized value of the rigidity index after lightweighting, evaluate the optimized value and initial value of the rigidity index, if the rigidity index evaluation meets the requirements, proceed to step 5, if the rigidity index evaluation does not meet the requirements, proceed to step 3; Step 5: Output the experimental lightweight boom structure as the final lightweight solution; The finite element static analysis specifically comprises the following steps: Balance equation: KU=P Geometric equations: Constitutive equation {σ}=[D]{ε} The boom structure stress index is calculated using the equivalent stress theory, and the principle is as follows: Among them, K is the stiffness matrix; U is the displacement matrix, and its displacements in the three directions x, y, and z are represented by u, v, and w respectively; P is the load matrix; ε is the structural strain, and its linear strains in the three directions are ε x , ε y , ε z , the shear strains in the three directions are τ xy , τ xz , τ yz ; σ is the structural stress, [D] is the elastic coefficient matrix, whose value depends on the material parameters used; the stress in the x, y, and z directions is σ x , σ y , σ z ; Maximum displacement of boom structure Maximum stress of boom structure Where i, j, k = 1, 2...m, m is the total number of structure nodes, The rigidity index includes: comprehensive rigidity and comprehensive strength. The comprehensive rigidity is the sum of the maximum displacement of the boom structure under the corresponding working condition and the corresponding weight coefficient. The comprehensive strength is the sum of the maximum stress of the boom structure under the corresponding working condition and the corresponding weight coefficient. The weight coefficient is set according to the application of the working condition, and the sum of the weight coefficients is equal to 1. The weight coefficient of the digging positive load condition is 0.05, the weight coefficient of the digging unbalanced load condition is 0.3, the weight coefficient of the traction positive load condition is 0.05, the weight coefficient of the traction unbalanced load condition is 0.1, the weight coefficient of the combined positive load condition is 0.3, and the weight coefficient of the combined unbalanced load condition is 0.
2. The specific method for optimizing the force transmission path of the boom structure is as follows: taking the material density of the boom plate as the design variable and taking the minimum structural strain energy of the boom structure as the objective function, optimizing the force transmission path, and removing the boom structure material under the condition of maximum rigidity and minimum displacement of the boom structure; The optimization equation is as follows: l min ≤l i ≤1=1,2,……,n Among them, a is the design variable vector, which represents the relative density of the boom plate solid unit material; a i is the relative density of the ith entity unit; n is the total number of entity units of the boom plate; c(a) is the structural strain energy of the boom plate; k0 is the unit stiffness matrix of the entity unit; l i is the displacement vector of the ith entity element; l i T is the transpose of the displacement vector of the ith entity element; (V0) i is the volume of the i-th solid unit material; f V is the given material volume fraction ratio; l min It is a positive real number much smaller than 1, indicating the lower limit of the relative density of the unit material; p is the penalty function.
2. A lightweight design method for a loader boom according to claim 1, characterized in that: The working conditions include: digging normal load condition, digging eccentric load condition, traction normal load condition, traction eccentric load condition, combined normal load condition and combined eccentric load condition; Digging positive load condition: When the loader is working on the ground, the vertical external load is evenly distributed on the main blade. Digging and unbalanced load condition: When the loader is working on the ground, the vertical external load is distributed on one side of the main blade. Towing positive load condition: When the loader is working on the ground, the horizontal external load is evenly distributed on the main blade. Towing eccentric load condition: When the loader is working on the ground, the horizontal external load is distributed on one side of the main blade. Combined positive load condition: When the loader is working on the ground, the vertical external load and the horizontal external load are evenly distributed on the main blade; Combined eccentric load condition: When the loader is working on the ground, the vertical external load and the horizontal external load are distributed on one side of the main blade.
3. The lightweight design method for a loader boom according to claim 1, characterized in that: The ratio of increase or decrease of the optimized value of the evaluation stiffness index compared with the initial value is less than 8%.
4. A lightweight design structure of a loader boom based on the lightweight design method of a loader boom according to any one of claims 1 to 3, comprising two symmetrically arranged boom plates and a seat beam connecting the two boom plates, symmetrical rocker ears welded on the seat beam, a first hinge hole and a third hinge hole are respectively arranged at both ends of the boom plate, and a second hinge hole is arranged on the cylinder flange on the boom plate, characterized in that: The boom plate is provided with four groups of symmetrical weight reduction holes, namely the first weight reduction hole, the second weight reduction hole, the third weight reduction hole and the fourth weight reduction hole; the third weight reduction hole is located at the center of the connection position between the boom plate and the seat beam, the first weight reduction hole, the second weight reduction hole and the fourth weight reduction hole are distributed on the left and right sides of the third weight reduction hole, and the fourth weight reduction hole is close to the cylinder flange side; the first weight reduction hole is close to the third hinge hole side, and the second weight reduction hole is close to the seat beam side.
5. The lightweight design structure of a loader boom according to claim 4, characterized in that: The third weight-reducing hole is elliptical and concentric with the cross section of the seat beam; the first weight-reducing hole is circular; the second weight-reducing hole and the fourth weight-reducing hole are both trapezoidal, and their two intersecting edges are chamfered, and their trapezoidal bottom edges are both close to the third weight-reducing hole.
Citation Information
Patent Citations
Loader movable arm
CN203393760U
