A dual-extraction and condensing system based on steam ejector and its operation method
By introducing a steam ejector into a double-extraction condensing heating unit and using reheated steam for cascade heating, the problem of high heating costs and waste of resources when the unit is under low electrical load is solved, and flexible peak regulation and high-efficiency energy are achieved. use.
Patent Information
- Application Number
- CN202110602030.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-05-31
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2041-05-31
AI Technical Summary
Double extraction condensing steam heating units cannot flexibly adjust peak heat supply when the electric load is low, resulting in high heating costs and serious waste of resources.
Design a dual-extraction and condensing dual-purpose system based on steam ejector. The reheated steam from the boiler is injected into the steam turbine booster cylinder and ejector to achieve cascade utilization of steam, reduce heating costs, and through multi-stage The heater forms cascade heating to improve energy utilization.
It realizes flexible peak-shaving heating of the double-extraction condensing steam heating unit, reduces heating costs, improves energy utilization, and ensures the continuity and economy of heating.
Smart Images

Figure CN113187569B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of steam supply, and in particular to a double-extraction and condensation dual-purpose system based on a steam ejector and an operation method thereof. Background Art
[0002] Cogeneration is a technology that comprehensively utilizes energy, achieves energy conservation, improves environmental conditions, and improves the living standards of residents. In the process of urbanization in my country, it has played a positive role in solving the growing electricity supply and urban heating. With the rapid development of wind power, photovoltaic power, and nuclear power, and the country's increased efforts to absorb renewable energy, the problem of power grid peak regulation is very prominent due to excess power production capacity. For double-extraction condensing heating units, due to the constraints of heat and electricity loads, when the electricity load rate of the cogeneration unit is too low, the unit cannot participate in peak regulation and flexible heating, resulting in the heat load being difficult to meet user needs. It is necessary to increase the unit's electricity load to increase the heat load, thereby increasing the heating cost and increasing resource waste. Summary of the invention
[0003] In order to solve the problems existing in the prior art, the present invention provides a double-extraction condensing dual-purpose system and operation method based on a steam ejector to solve the problems that the current double-extraction condensing heating units cannot participate in peak-shaving flexible heating, the heating cost is high, and resources are seriously wasted.
[0004] To achieve the above-mentioned object, the present invention provides the following technical solution: a dual-extraction condensing system based on a steam ejector, comprising a boiler, a plurality of steam turbine booster cylinders, a plurality of ejectors and a plurality of heaters, the steam turbine booster cylinders and the ejectors corresponding to each other one by one, the reheater outlet of the boiler being connected to the steam inlet of the first steam turbine booster cylinder, and the reheater outlet of the boiler being also connected to the steam inlet of the first ejector;
[0005] The steam outlet of the current steam turbine booster cylinder is connected to the steam inlet of the next steam turbine booster wheel, and the steam outlet of the current steam turbine booster cylinder is also connected to the steam inlet of the current ejector, the steam outlet of the current ejector, and the steam inlet of the next ejector;
[0006] The steam outlet of the last steam turbine booster cylinder is connected to the steam inlet of the last ejector and the steam inlet of the next heater;
[0007] The steam outlet of the current ejector is connected to the steam inlet of the current heater, and the last heater is not connected to the ejector.
[0008] Further, the plurality of steam turbine booster cylinders include a steam turbine intermediate pressure cylinder, the plurality of ejectors include a first ejector, the plurality of heaters include a first heater and a second heater, the reheater outlet of the boiler is connected to the steam inlet of the steam turbine intermediate pressure cylinder, the reheater outlet of the boiler is also connected to the steam inlet of the first ejector,
[0009] The steam outlet of the intermediate pressure cylinder of the steam turbine is connected to the steam inlet of the first ejector, the steam outlet of the first ejector is connected to the first heater, and the steam outlet of the intermediate pressure cylinder of the steam turbine is also connected to the steam inlet of the second heater.
[0010] Further, the plurality of steam turbine booster cylinders further include a steam turbine intermediate pressure cylinder and a steam turbine low pressure cylinder, the plurality of ejectors further include a first ejector and a second ejector, the plurality of heaters further include a first heater, a second heater and a third heater, the reheater outlet of the boiler is connected to the steam inlet of the steam turbine intermediate pressure cylinder, the reheater outlet of the boiler is also connected to the steam inlet of the first ejector,
[0011] The steam outlet of the intermediate pressure cylinder of the steam turbine is connected to the steam inlet of the first ejector and the steam outlet of the first ejector, and the steam outlet of the first ejector is connected to the first heater; the steam outlet of the intermediate pressure cylinder of the steam turbine is also connected to the steam inlet of the low pressure cylinder of the steam turbine and the steam inlet of the second ejector, and the steam outlet of the second ejector is connected to the second heater;
[0012] The steam outlet of the low-pressure cylinder of the steam turbine is connected to the steam inlet of the second ejector and the steam inlet of the third heater.
[0013] Furthermore, it also includes a turbine high-pressure cylinder, the main steam outlet of the boiler is connected to the steam inlet of the turbine high-pressure cylinder, the exhaust port of the turbine high-pressure cylinder is connected to pipeline A, and the reheater outlet of the boiler is connected to pipeline B.
[0014] Furthermore, it also includes a third ejector, the superheater outlet of the boiler is connected to the steam inlet of the third ejector, the reheater outlet of the boiler is also connected to the steam inlet of the third ejector, and the steam outlet of the third ejector is connected to pipeline C.
[0015] Furthermore, a first valve is provided on the pipeline connecting the exhaust port of the high-pressure cylinder of the steam turbine and pipeline A, a second valve is provided on the pipeline connecting the reheater outlet of the boiler and pipeline B, an eleventh valve is provided on the pipeline connecting the reheater outlet of the boiler and the third ejector, and a twelfth valve is provided on the pipeline connecting the main steam outlet of the boiler and the high-pressure cylinder of the steam turbine.
[0016] Furthermore, the steam outlet of the last steam turbine booster cylinder is also connected to a condenser, a condensate pump, a low-pressure heater group, a feed water pump and a high-pressure heater group in sequence. The outlet of the high-pressure heater group is connected to the boiler, and the feed water inlet of the condenser is connected to a water source pipeline.
[0017] Furthermore, a deaerator is connected between the low-pressure heater group and the water feed pump.
[0018] Furthermore, valves are provided on the pipeline connecting the reheater outlet of the boiler and the steam inlet of the first steam turbine booster cylinder, on the pipeline connecting the reheater outlet of the boiler and the steam inlet of the first ejector, on the pipeline connecting the steam outlet of the current steam turbine booster cylinder and the steam inlet of the next steam turbine booster, on the pipeline connecting the steam outlet of the current steam turbine booster cylinder and the steam inlet of the current ejector, on the pipeline connecting the steam outlet of the current steam turbine booster cylinder and the steam inlet of the current ejector, on the pipeline connecting the steam outlet of the current steam turbine booster cylinder and the steam inlet of the next ejector, on the pipeline connecting the steam outlet of the last steam turbine booster cylinder and the steam inlet of the last ejector, and on the pipeline connecting the steam outlet of the last steam turbine booster cylinder and the steam inlet of the next heater.
[0019] The present invention also provides an operation method of a dual-extraction condensing dual-purpose system based on a steam ejector, comprising the following steps: when the unit is running at a low load, the reheater outlet of the boiler outputs reheated steam to the first steam turbine booster cylinder and the first ejector, the first ejector receives the steam output by the first steam turbine booster cylinder, and ejects the steam output by the first steam turbine booster cylinder through the reheated steam of the boiler, and at the same time, the steam output by the first steam turbine booster cylinder and the steam output by the first ejector are jointly input into the first heater for heat release;
[0020] The current steam turbine booster cylinder outputs steam to the next steam turbine booster cylinder and the current ejector and the next ejector. The steam output by the previous steam turbine booster cylinder is ejected through the steam output by the current steam turbine booster cylinder and input into the heater for step-by-step heat release, and so on.
[0021] Compared with the prior art, the present invention has at least the following beneficial effects:
[0022] The present invention provides a dual-use system of double extraction and condensing based on steam ejectors, which is designed to connect the reheater outlet of the boiler with the steam inlet of the first steam turbine booster cylinder and the steam inlet of the first ejector, and the steam outlet of the current steam turbine booster cylinder is connected to the steam inlet of the next steam turbine booster, the steam inlet of the current ejector and the steam outlet of the current ejector and the steam inlet of the next ejector, so as to meet the requirements of the reheated steam output by the boiler to eject the steam output by the first steam turbine booster cylinder, and the steam output by the current steam turbine booster cylinder is ejected by the steam output by the previous steam turbine booster cylinder between each steam turbine booster cylinder, and a part of the high-grade steam is replaced by low-grade steam, and a plurality of steam turbine booster cylinders are used to achieve the purpose of cascade utilization of energy, so that the heater forms cascade heating, which ensures the heat supply while reducing the heat supply cost, has high heat supply economy, improves the energy utilization rate, and ensures the peak-shaving and flexible heat supply of the double extraction and condensing heating unit.
[0023] Furthermore, the present invention can complete the supply of industrial steam while completing the heating capacity. When the required industrial steam supply is small, the system preferentially supplies industrial steam through pipeline A. The steam source used is reheat cold section extraction steam, with good parameter matching and high heating economy. When the industrial gas supply is large, industrial steam can be provided jointly through pipeline B and pipeline A to meet the requirements of various industrial situations and have high energy utilization efficiency.
[0024] Furthermore, the superheated high-pressure steam of the boiler and the reheated steam of the boiler are simultaneously input into the third ejector, and the main steam is used as the high-pressure steam to eject the steam from the outlet of the boiler reheater. The system provided by the present invention can first supply industrial steam through pipeline A. If the supply is insufficient, the remaining required industrial steam is supplied by pipeline B. If the unit is running at low load and the pressure at pipelines A and B is insufficient, the No. 1 ejector is activated to meet the industrial steam supply to ensure the continuous supply of industrial steam.
[0025] Furthermore, the last steam turbine booster cylinder can continuously supply water to the entire system through the condenser, ensuring the steam production of the boiler and ensuring the reliable operation of the entire system.
[0026] Furthermore, the valves provided in the entire system can adjust the steam distribution of the booster cylinder according to the actual operation of the unit, thereby ensuring the reliable operation of the entire system.
[0027] The present invention also provides an operating method for a double-extraction condensing dual-purpose system based on a steam ejector, in which the boiler uses reheated steam to eject the steam of the first steam turbine booster cylinder, and the steam of the previous steam turbine booster cylinder ejects the steam of the current steam turbine booster cylinder, and low-grade steam is used to replace part of the high-grade steam, thereby reducing the heating cost and improving the heating economy. In addition, the exhaust steam of the steam turbine is utilized in a step-by-step manner, so that the hot water network is heated in a step-by-step manner, ensuring the continuity of heating and improving energy utilization. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a structural block diagram of the system of the present invention;
[0029] In the accompanying drawings: 1-boiler, 2-turbine high-pressure cylinder, 3-turbine medium-pressure cylinder, 4-turbine low-pressure cylinder, 5-condenser, 6-condensate pump, 7-low-pressure heater group, 8-deaerator, 9-feedwater pump, 10-high-pressure heater group, 11-third ejector, 12-first ejector, 13-second ejector, 14-first heater, 15-second heater, 16-third heater, 17-first valve, 18-second valve, 19-third valve, 20-fourth valve, 21-fifth valve, 22-sixth valve, 23-seventh valve, 24-eighth valve, 25-ninth valve, 26-tenth valve, 27-eleventh valve, 28-twelfth valve, 29-thirteenth valve. DETAILED DESCRIPTION
[0030] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0031] like Figure 1 As shown, the present invention provides a dual-extraction condensing system based on a steam ejector, comprising a boiler 1, a plurality of steam turbine booster cylinders, a plurality of ejectors and a plurality of heaters, the steam turbine booster cylinders and the ejectors correspond one to one, the total number of heaters and the number of ejectors differ by one, the reheater outlet of the boiler is connected to the steam inlet of the first steam turbine booster cylinder, and the reheater outlet of the boiler is also connected to the steam inlet of the first ejector;
[0032] The steam outlet of the current steam turbine booster cylinder is connected to the steam inlet of the next steam turbine booster wheel, and the steam outlet of the current steam turbine booster cylinder is also connected to the steam inlet of the current ejector, the steam outlet of the current ejector, and the steam inlet of the next ejector;
[0033] The steam outlet of the last steam turbine booster cylinder is connected to the steam inlet of the last ejector and the steam inlet of the next heater;
[0034] The steam outlet of the current ejector is connected to the steam inlet of the current heater, and the last heater is not connected to the ejector.
[0035] Specifically, valves are provided on the pipeline connecting the reheater outlet of boiler 1 and the steam inlet of the first steam turbine booster cylinder, on the pipeline connecting the reheater outlet of the boiler and the steam inlet of the first ejector, on the pipeline connecting the steam outlet of the current steam turbine booster cylinder and the steam inlet of the next steam turbine booster, on the pipeline connecting the steam outlet of the current steam turbine booster cylinder and the steam inlet of the current ejector, on the pipeline connecting the steam outlet of the current steam turbine booster cylinder and the steam inlet of the current ejector, on the pipeline connecting the steam outlet of the current steam turbine booster cylinder and the steam inlet of the next ejector, on the pipeline connecting the steam outlet of the last steam turbine booster cylinder and the steam inlet of the last ejector, and on the pipeline connecting the steam outlet of the last steam turbine booster cylinder and the steam inlet of the next heater.
[0036] In this embodiment, an operation method of a dual-extraction condensing dual-purpose system based on a steam ejector is provided, comprising the following steps: when the unit is running at a low load, the reheater outlet of the boiler 1 outputs reheated steam to the first steam turbine booster cylinder and the first ejector, the first ejector receives the steam output by the first steam turbine booster cylinder, and ejects the steam output by the first steam turbine booster cylinder through the reheated steam of the boiler 1, and at the same time, the steam output by the first steam turbine booster cylinder and the steam output by the first ejector are jointly input into the first heater for heat release;
[0037] The current steam turbine booster cylinder outputs steam to the next steam turbine booster cylinder and the current ejector and the next ejector. The steam output by the previous steam turbine booster cylinder is ejected through the steam output by the current steam turbine booster cylinder and input into the heater for step-by-step heating, and so on.
[0038] In a certain embodiment of the present invention, a dual-extraction condensing dual-purpose system based on a steam ejector includes a heating system and an industrial steam supply system, wherein the heating system includes a plurality of ejectors and a plurality of heaters, wherein the plurality of ejectors use a first ejector 12, and the plurality of heaters use two heaters, namely a first heater 14 and a second heater 15, respectively; the industrial steam supply system includes a boiler 1, a steam turbine high-pressure cylinder 2, a plurality of steam turbine booster cylinders, a condenser 5, a condensate pump 6, a low-pressure heater group 7, a feed water pump 9 and a high-pressure heater group 10; wherein the plurality of steam turbine booster cylinders use a steam turbine intermediate-pressure cylinder 3,
[0039] Specifically, the structure of the heating system is as follows: the reheater outlet of the boiler 1 is connected to the steam inlet of the intermediate pressure cylinder 3 of the steam turbine, and the reheater outlet of the boiler is also connected to the steam inlet of the first ejector 12;
[0040] The steam outlet of the steam turbine intermediate pressure cylinder 3 is connected to the steam inlet of the first ejector 12, the steam outlet of the first ejector 12 is connected to the first heater 14, and the steam outlet of the steam turbine intermediate pressure cylinder 3 is also connected to the steam inlet of the second heater 15;
[0041] Specifically, the steam outlet of the intermediate pressure cylinder 3 of the steam turbine is also connected in sequence to a condenser 5, a condensate pump 6, a low-pressure heater group 7, a deaerator 8, a feed water pump 9 and a high-pressure heater group 10, the outlet of the high-pressure heater group 10 is connected to the boiler 1, and the water supply inlet of the condenser 5 is connected to a water source pipeline.
[0042] Furthermore, a thirteenth valve 29 is provided on the pipeline connecting the reheater outlet of the boiler 1 and the steam inlet of the turbine intermediate pressure cylinder 3, a third valve 19 is provided on the pipeline connecting the reheater outlet of the boiler 1 and the steam inlet of the first ejector 12, an eighth valve 24 is provided on the pipeline connecting the steam outlet of the turbine intermediate pressure cylinder 3 and the steam inlet of the first ejector 12, and a valve is also provided on the pipeline connecting the steam outlet of the turbine intermediate pressure cylinder 3 and the steam inlet of the second heater 15.
[0043] Specifically, the structure of the industrial steam supply system is as follows: the main steam outlet of the boiler 1 is connected to the steam inlet of the high-pressure cylinder 2 of the steam turbine, the exhaust port of the high-pressure cylinder 2 of the steam turbine is connected to the pipeline A, and the reheater outlet of the boiler 1 is connected to the pipeline B;
[0044] The superheater outlet of the boiler 1 is connected to the steam inlet of the third ejector 11, and the reheater outlet of the boiler 1 is also connected to the steam inlet of the third ejector 11. The steam outlet of the third ejector 11 is connected to the pipeline C.
[0045] Furthermore, a first valve 17 is provided on the pipeline connecting the exhaust port of the turbine high-pressure cylinder 2 and the pipeline A, a second valve 18 is provided on the pipeline connecting the reheater outlet of the boiler 1 and the pipeline B, an eleventh valve 27 is provided on the pipeline connecting the reheater outlet of the boiler 1 and the third ejector 11, and a twelfth valve 28 is provided on the pipeline connecting the main steam outlet of the boiler 1 and the turbine high-pressure cylinder 2.
[0046] In this embodiment, an operation method of a dual-extraction condensing dual-purpose system based on a steam ejector includes the following steps: the system preferentially supplies industrial steam through pipeline A. If the supply is insufficient, the remaining required industrial steam is supplied by pipeline B. If the unit is running at low load and the pressure at pipelines A and B is insufficient, the third ejector 11 is activated to meet the industrial steam supply; the function of the third ejector 11 is: the main steam is used as high-pressure steam to eject the steam from the outlet of the boiler reheater to form steam that meets the industrial steam supply pressure requirement.
[0047] Specifically, the boiler 1 outputs main steam to the high-pressure cylinder 2 of the steam turbine, and the exhaust port of the high-pressure cylinder 2 of the steam turbine outputs steam to pipeline A, wherein the maximum steam supply on pipeline A is 5% of the reheat steam flow before steam supply, and the reheat steam of the boiler 1 is input to pipeline B. If the unit is running at low load and the pressure at pipelines A and B is insufficient, the superheated steam and reheated steam of the boiler 1 are both input to the third ejector 11, and a part of the high-grade steam is replaced by low-grade steam to form steam that meets the industrial steam supply pressure requirements;
[0048] When the unit load is low and the heating supply is insufficient, the first ejector 12 is activated to meet the industrial steam demand. The function of the first ejector 12 is as follows: the reheated steam is used as high-pressure steam to eject the steam from the outlet of the intermediate pressure cylinder of the steam turbine to form steam that meets the heating pressure demand. The reheated steam of the boiler 1 is output to the intermediate pressure cylinder 3 of the steam turbine and the first ejector 12. The steam of the intermediate pressure cylinder 3 of the steam turbine is input to the first ejector 12 and the second heater 15. The low-grade steam of the intermediate pressure cylinder 3 of the steam turbine replaces a part of the high-grade reheated steam output by the boiler to form steam that meets the heating pressure demand. The hot network water absorbs heat in the second heater 15 and the first heater 14 in turn and then provides external heating.
[0049] The boiler 1 then inputs water resources through the condenser 5, the condensate pump 6, the low-pressure heater group 7, the deaerator 8, the feed water pump 9 and the high-pressure heater group 10.
[0050] In a preferred embodiment of the present invention, a dual-extraction condensing system based on a steam ejector includes a heating system and an industrial steam supply system, wherein the heating system includes a plurality of ejectors and a plurality of heaters, wherein the plurality of ejectors use a first ejector 12 and a second ejector 13, and the plurality of heaters use three heaters, namely a first heater 12, a second heater 13 and a third heater 11, respectively; the industrial steam supply system includes a boiler 1, a steam turbine high-pressure cylinder 2, a plurality of steam turbine booster cylinders, a condenser 5, a condensate pump 6, a low-pressure heater group 7, a feedwater pump 9 and a high-pressure heater group 10; wherein the plurality of steam turbine booster cylinders use a steam turbine intermediate-pressure cylinder 3 and a steam turbine low-pressure cylinder 4;
[0051] Specifically, the structure of the industrial steam supply system is as follows: a twelfth valve 28 is installed on the pipeline connecting the main steam outlet of the boiler 1 to the inlet of the high-pressure cylinder 2 of the steam turbine, the exhaust port of the high-pressure cylinder of the steam turbine is connected to the pipeline A, the first valve 17 is installed on the pipeline A, the boiler reheater outlet is connected to the third ejector 11 through the pipeline, the boiler superheater outlet is connected to the third ejector 11 The pipeline is installed with an eleventh valve 27, the boiler reheater outlet is connected to the pipeline B, and the second valve 18 is installed on the pipeline B;
[0052] The maximum steam supply on pipeline A is 5% of the reheat steam flow before steam supply.
[0053] Specifically, the structure of the heating system is as follows: a thirteenth valve 29 is installed on the pipeline connecting the reheat steam at the boiler outlet to the inlet of the intermediate pressure cylinder 3 of the steam turbine, and a third valve 19 is installed on the pipeline connecting the boiler reheat outlet to the first ejector 12.
[0054] A tenth valve 26 is installed on the pipeline connecting the first ejector 12 to the steam inlet of the first heater 14, an eighth valve 24 is installed on the pipeline connecting the steam outlet of the intermediate pressure cylinder 3 of the steam turbine to the first ejector 12, a ninth valve 25 is installed on the pipeline connecting the steam outlet of the intermediate pressure cylinder 3 of the steam turbine to the steam inlet of the first heater 14, a fourth valve 20 is installed on the pipeline connecting the steam outlet of the intermediate pressure cylinder 3 of the steam turbine to the second ejector 13, and a fifth valve 21 is installed on the pipeline connecting the steam outlet of the intermediate pressure cylinder 3 of the steam turbine to the inlet of the low pressure cylinder 4 of the steam turbine;
[0055] A sixth valve 22 is installed on the pipeline connecting the steam outlet of the low-pressure cylinder 4 of the steam turbine to the second ejector 13. The second ejector 13 is connected to the steam inlet of the second heater 15. A seventh valve 23 is installed on the pipeline connecting the steam outlet of the low-pressure cylinder 4 of the steam turbine to the steam inlet of the third heater 16.
[0056] The hot network water is connected to the third heater 16, the second heater 15 and the first heater 14 through pipelines in sequence, so as to absorb heat in the third heater 16, the second heater 15 and the first heater 14 in sequence and then provide heat to the outside.
[0057] In this embodiment, an operation method of a dual-extraction condensing dual-purpose system based on a steam ejector includes the following steps: the system preferentially supplies industrial steam through pipeline A. If the supply is insufficient, the remaining required industrial steam is supplied by pipeline B. If the unit is running at low load and the pressure at pipelines A and B is insufficient, the third ejector 11 is activated to meet the industrial steam supply; the function of the third ejector 11 is: the main steam is used as high-pressure steam to eject the steam from the outlet of the boiler reheater to form steam that meets the industrial steam supply pressure requirement.
[0058] Specifically, the boiler 1 outputs main steam to the high-pressure cylinder 2 of the steam turbine, and the exhaust port of the high-pressure cylinder 2 of the steam turbine outputs steam to pipeline A, wherein the maximum steam supply on pipeline A is 5% of the reheat steam flow before steam supply, and the reheat steam of the boiler 1 is input to pipeline B. If the unit is running at low load and the pressure at pipelines A and B is insufficient, the superheated steam and reheated steam of the boiler 1 are both input to the third ejector 11, and a part of the high-grade steam is replaced by low-grade steam to form steam that meets the industrial steam supply pressure requirements;
[0059] When the unit load is low and the heat supply is insufficient, the first ejector 12 is activated to meet the industrial steam demand. The first ejector 12 has the following functions: the reheated steam is used as high-pressure steam to eject the steam from the outlet of the intermediate pressure cylinder 3 of the steam turbine to form steam that meets the heating pressure demand. The reheated steam of the boiler 1 is output to the intermediate pressure cylinder 3 of the steam turbine and the first ejector 12.
[0060] The steam of the steam turbine intermediate pressure cylinder 3 is input into the first ejector 12, the second ejector 13, the steam turbine low pressure cylinder 4 and the pipeline between the first ejector 12 and the first heater 14. The flow direction of the steam of the steam turbine intermediate pressure cylinder 3 is specifically controlled by the valve. The low-grade steam outputted by the steam turbine intermediate pressure cylinder 3 can replace a part of the high-grade steam outputted by the boiler through the first ejector 12, and then inputted into the first heater 14.
[0061] At the same time, the second ejector 13 is activated. The function of the second ejector 13 is: the steam at the outlet of the intermediate pressure cylinder 3 of the steam turbine is used as high-pressure steam to eject the steam from the outlet 4 of the low-pressure cylinder of the steam turbine, so as to form steam with a higher pressure than the steam at the outlet of the low-pressure cylinder. The steam of the low-pressure cylinder 4 of the steam turbine is input into the second ejector 13 and the third heater 16. The low-grade steam outputted by the low-pressure cylinder 4 of the steam turbine replaces a part of the high-grade steam outputted by the intermediate pressure cylinder 3 of the steam turbine, and is thus inputted into the second heater 15. A part of the steam of the pressure cylinder of the steam turbine is directly sent into the third heater 16. The steam flow direction of the low-pressure cylinder 4 of the steam turbine is specifically controlled by a valve.
[0062] The hot network water absorbs heat in the third heater 16, the second heater 15 and the first heater 14 in turn and then provides external heating. The steam source of the third heater 16 is the steam at the outlet of the low-pressure cylinder of the steam turbine, the steam source of the second heater 15 is the steam at the outlet of the second ejector 13, and the steam source of the first heater 14 is the steam at the outlet of the intermediate-pressure cylinder of the steam turbine. When the industrial steam supply is excessive or the unit load is low, resulting in insufficient steam pressure at the outlet of the intermediate-pressure cylinder 3 of the steam turbine, the steam source of the first heater 14 is switched to the steam at the outlet of the first ejector 12.
[0063] The boiler 1 then inputs water resources through the condenser 5, the condensate pump 6, the low-pressure heater group 7, the deaerator 8, the feed water pump 9 and the high-pressure heater group 10.
[0064] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope described in the claims.
Claims
1. A dual-use system of double extraction and condensation based on steam ejector, characterized in that: It comprises a boiler (1), a plurality of steam turbine booster cylinders, a plurality of ejectors and a plurality of heaters, the steam turbine booster cylinders and the ejectors correspond to each other one by one, the reheater outlet of the boiler (1) is connected to the steam inlet of the first steam turbine booster cylinder, and the reheater outlet of the boiler (1) is also connected to the steam inlet of the first ejector; The steam outlet of the current steam turbine booster cylinder is connected to the steam inlet of the next steam turbine booster wheel, and the steam outlet of the current steam turbine booster cylinder is also connected to the steam inlet of the current ejector, the steam outlet of the current ejector, and the steam inlet of the next ejector; The steam outlet of the last steam turbine booster cylinder is connected to the steam inlet of the last ejector and the steam inlet of the next heater; The steam outlet of the current ejector is connected to the steam inlet of the current heater, and the last heater is not connected to the ejector; The plurality of steam turbine booster cylinders further include a steam turbine intermediate pressure cylinder (3) and a steam turbine low pressure cylinder (4); the plurality of ejectors further include a first ejector (12) and a second ejector (13); the plurality of heaters further include a first heater (14), a second heater (15) and a third heater (16); the reheater outlet of the boiler (1) is connected to the steam inlet of the steam turbine intermediate pressure cylinder (3); the reheater outlet of the boiler (1) is also connected to the steam inlet of the first ejector (12); The steam outlet of the steam turbine intermediate pressure cylinder (3) is connected to the steam inlet of the first ejector (12) and the steam outlet of the first ejector (12), and the steam outlet of the first ejector (12) is connected to the first heater (14); the steam outlet of the steam turbine intermediate pressure cylinder (3) is also connected to the steam inlet of the steam turbine low pressure cylinder (4) and the steam inlet of the second ejector (13), and the steam outlet of the second ejector (13) is connected to the second heater (15); The steam outlet of the low-pressure cylinder (4) of the steam turbine is connected to the steam inlet of the second ejector (13) and the steam inlet of the third heater (16); It also includes a steam turbine high-pressure cylinder (2), the main steam outlet of the boiler (1) is connected to the steam inlet of the steam turbine high-pressure cylinder (2), the exhaust port of the steam turbine high-pressure cylinder (2) is connected to the pipeline A, and the reheater outlet of the boiler (1) is connected to the pipeline B.
2. A dual-extraction and condensing system based on a steam ejector according to claim 1, characterized in that: It also includes a third ejector (11), the superheater outlet of the boiler (1) is connected to the steam inlet of the third ejector (11), the reheater outlet of the boiler (1) is also connected to the steam inlet of the third ejector (11), and the steam outlet of the third ejector (11) is connected to the pipeline C.
3. A dual-extraction and condensing system based on a steam ejector according to claim 2, characterized in that: A first valve (17) is provided on the pipeline connecting the exhaust port of the high-pressure cylinder (2) of the steam turbine and the pipeline A, a second valve (18) is provided on the pipeline connecting the reheater outlet of the boiler (1) and the pipeline B, an eleventh valve (27) is provided on the pipeline connecting the reheater outlet of the boiler (1) and the third ejector (11), and a twelfth valve (28) is provided on the pipeline connecting the main steam outlet of the boiler (1) and the high-pressure cylinder (2) of the steam turbine.
4. The dual-extraction and condensing system based on steam ejector according to claim 1 is characterized in that: The steam outlet of the last steam turbine booster cylinder is also connected in sequence to a condenser (5), a condensate pump (6), a low-pressure heater group (7), a feed water pump (9) and a high-pressure heater group (10); the outlet of the high-pressure heater group (10) is connected to the boiler (1); and the feed water inlet of the condenser (5) is connected to a water source pipeline.
5. A dual-use system for steam extraction and condensation based on a steam ejector according to claim 4, characterized in that: A deaerator (8) is connected between the low-pressure heater group (7) and the water feed pump (9).
6. The dual-extraction and condensing system based on steam ejector according to claim 1 is characterized in that: Valves are provided on the pipeline connecting the reheater outlet of the boiler (1) and the steam inlet of the first steam turbine booster cylinder, on the pipeline connecting the reheater outlet of the boiler (1) and the steam inlet of the first ejector, on the pipeline connecting the steam outlet of the current steam turbine booster cylinder and the steam inlet of the next steam turbine booster, on the pipeline connecting the steam outlet of the current steam turbine booster cylinder and the steam inlet of the current ejector, on the pipeline connecting the steam outlet of the current steam turbine booster cylinder and the steam inlet of the current ejector, on the pipeline connecting the steam outlet of the current steam turbine booster cylinder and the steam inlet of the next ejector, on the pipeline connecting the steam outlet of the last steam turbine booster cylinder and the steam inlet of the last ejector, and on the pipeline connecting the steam outlet of the last steam turbine booster cylinder and the steam inlet of the next heater.
7. The method for operating a dual-extraction and condensing system based on a steam ejector according to any one of claims 1 to 6, characterized in that: The following steps are involved: When the unit is running at low load, the reheater outlet of the boiler (1) outputs reheated steam to the first steam turbine booster cylinder and the first ejector, the first ejector receives the steam output by the first steam turbine booster cylinder, and ejects the steam output by the first steam turbine booster cylinder through the reheated steam of the boiler, and at the same time, the steam output by the first steam turbine booster cylinder and the steam output by the first ejector are jointly input into the first heater for heat release; The current steam turbine booster cylinder outputs steam to the next steam turbine booster cylinder and the current ejector and the next ejector. The steam output by the previous steam turbine booster cylinder is ejected through the steam output by the current steam turbine booster cylinder and input into the heater for step-by-step heat release, and so on.