A new energy vehicle charging interoperability consistency test system and test method
By designing a new energy vehicle charging interoperability consistency test system, the problem of insufficient openness of the hardware platform in the existing technology is solved, the standard and non-standard testing requirements for the charging and discharging functions of new energy vehicles are realized, and user-defined test items are supported. , which improves the flexibility and scalability of the test system.
Patent Information
- Application Number
- CN202110432591.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-04-21
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2041-04-21
AI Technical Summary
The existing new energy vehicle test system hardware platform is not open enough to meet the needs of users to add, edit or delete test items and test procedures independently, which limits the comprehensive testing of vehicle charging and discharging functions.
A new energy vehicle charging interoperability consistency test system is designed, including a test database module, a charging vehicle battery management module, an alarm protection module, a test report generation module, a charging test module and a communication unit, supporting standard and non-standard test modes. Users can customize test items and control hardware components through API software interfaces to implement customized test functions.
It realizes the standard and non-standard testing requirements for the charging and discharging functions of new energy vehicles, supports user-defined test items, improves the flexibility and scalability of the test system, and meets the comprehensive testing requirements for the vehicle charging and discharging functions.
Smart Images

Figure CN113219280B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of new energy vehicles, and in particular to a new energy vehicle charging interoperability consistency testing system and testing method. Background Art
[0002] The existing new energy vehicle testing system has the problem that the hardware platform is not open and expandable enough, and cannot meet the needs of users to arbitrarily add, edit or delete test items and test programs. The test items and test programs preloaded in the system cannot be arbitrarily redeveloped, which limits the user's independent testing. Therefore, it cannot meet the requirements for comprehensive testing of the vehicle's charging and discharging functions. Summary of the invention
[0003] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a new energy vehicle charging interoperability consistency test system, including a test database module, a charging vehicle battery management module, an alarm protection module, a test report generation module, a charging test module, a communication unit, and an offline scene playback module; the test database module, the charging vehicle battery management module, the alarm protection module, the test report generation module, the charging test module, and the offline scene playback module are respectively connected to the communication unit for communication;
[0004] The test database module includes a standard test database, a non-standard test database and a historical test database; the standard test database stores multiple sets of standard new energy vehicle charging test schemes; the non-standard test database stores parameters of different new energy vehicle charging test devices; the historical test database is used to store historical test data schemes;
[0005] The charging vehicle battery management module includes a charging management module and a discharging management module; the charging management module is used to charge the vehicle battery according to the charging protocol; the discharging management module is used to adjust the vehicle to a discharging state according to the discharging protocol to discharge the vehicle battery;
[0006] The offline scene playback module is used to play back the charging test process corresponding to the historical test data scheme according to the historical test data scheme.
[0007] Preferably, the alarm protection module includes an alarm device and an active protection module; the alarm device and the active protection module are respectively connected to the communication unit.
[0008] A new energy vehicle charging interoperability consistency test method comprises the following steps:
[0009] Step 1: Select the new energy vehicle charging test mode. When the standard test mode is selected, go to step 2. When the non-standard mode is selected, go to step 4.
[0010] Step 2: According to the charging parameters of the tested new energy vehicle, a standard new energy vehicle charging test scheme corresponding to the charging parameters of the tested new energy vehicle is matched in the standard test database, and a charging test is performed on the tested new energy vehicle according to the matched standard new energy vehicle charging test scheme;
[0011] Step 3: After the standard test mode charging test is completed, the test data obtained during the test, the standard new energy vehicle charging test scheme used, the charging parameters of the tested new energy vehicle, and the time point and duration of the test are stored in the historical test database as a historical test data scheme, and a test report is generated through the test report generation module to complete the standard test;
[0012] Step 4: Set the test items to form a non-standard new energy vehicle charging test plan. According to the non-standard new energy vehicle charging test plan, select the test equipment corresponding to the test items from the non-standard test database to test the new energy vehicle under test;
[0013] Step 5. After the non-standard test charging test is completed, the test data obtained during the test process, the test equipment used, the charging parameters of the tested new energy vehicle, and the time point and duration of the test are stored in the historical test database as a historical test data plan. At the same time, a test report is generated through the test report generation module to complete the non-standard test.
[0014] Furthermore, the setting of test items described in step 4 to form a non-standard new energy vehicle charging test plan includes: a non-standard new energy vehicle charging test plan obtained by changing the test items in the standard new energy vehicle charging test plan, and a non-standard new energy vehicle charging test plan formed by setting test items by oneself.
[0015] The beneficial effect of the present invention is that the system and testing method provided by the present invention can support the user's requirements for standard test items and non-standard test items for the charging and discharging functions of electric vehicles. The user can implement customized test items and is not limited to standard tests. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the principle of a new energy vehicle charging interoperability consistency test system;
[0017] Figure 2 The figure is a flow chart of a new energy vehicle charging interoperability consistency test method. DETAILED DESCRIPTION
[0018] The technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following.
[0019] like Figure 1 As shown, a new energy vehicle charging interoperability consistency test system includes a test database module, a charging vehicle battery management module, an alarm protection module, a test report generation module, a charging test module, a communication unit, and an offline scene playback module; the test database module, the charging vehicle battery management module, the alarm protection module, the test report generation module, the charging test module, and the offline scene playback module are respectively connected to the communication unit for communication;
[0020] The test database module includes a standard test database, a non-standard test database and a historical test database; the standard test database stores multiple sets of standard new energy vehicle charging test schemes; the non-standard test database stores parameters of different new energy vehicle charging test devices; the historical test database is used to store historical test data schemes;
[0021] The charging vehicle battery management module includes a charging management module and a discharging management module; the charging management module is used to charge the vehicle battery according to the charging protocol; the discharging management module is used to adjust the vehicle to a discharging state according to the discharging protocol to discharge the vehicle battery;
[0022] The offline scene playback module is used to play back the charging test process corresponding to the historical test data scheme according to the historical test data scheme.
[0023] The alarm protection module comprises an alarm device and an active protection module; the alarm device and the active protection module are respectively connected to the communication unit.
[0024] The test method for the interoperability conformance test of new energy vehicle charging includes the following steps:
[0025] Step 1: Select the new energy vehicle charging test mode. When the standard test mode is selected, go to step 2. When the non-standard mode is selected, go to step 4.
[0026] Step 2: According to the charging parameters of the tested new energy vehicle, a standard new energy vehicle charging test scheme corresponding to the charging parameters of the tested new energy vehicle is matched in the standard test database, and a charging test is performed on the tested new energy vehicle according to the matched standard new energy vehicle charging test scheme;
[0027] Step 3: After the standard test mode charging test is completed, the test data obtained during the test, the standard new energy vehicle charging test scheme used, the charging parameters of the tested new energy vehicle, and the time point and duration of the test are stored in the historical test database as a historical test data scheme, and a test report is generated through the test report generation module to complete the standard test;
[0028] Step 4: Set the test items to form a non-standard new energy vehicle charging test plan. According to the non-standard new energy vehicle charging test plan, select the test equipment corresponding to the test items from the non-standard test database to test the new energy vehicle under test;
[0029] Step 5. After the non-standard test charging test is completed, the test data obtained during the test process, the test equipment used, the charging parameters of the tested new energy vehicle, and the time point and duration of the test are stored in the historical test database as a historical test data plan. At the same time, a test report is generated through the test report generation module to complete the non-standard test.
[0030] The setting of test items described in step 4 to form a non-standard new energy vehicle charging test plan includes: a non-standard new energy vehicle charging test plan obtained by changing the test items in the standard new energy vehicle charging test plan, and a non-standard new energy vehicle charging test plan formed by setting test items by oneself.
[0031] Specifically, the test system has built-in test functions for vehicle AC / DC interoperability (GB / T 34657.2-2017) and vehicle DC protocol consistency (GB / T 34658-2017). Users can select the sub-items to be tested according to their needs;
[0032] The system software is an open platform that provides API software interface to control hardware components. The hardware includes but is not limited to power supply, switching devices, insulation switching, discharge module, oscilloscope, etc. Users can control the hardware according to their needs to realize customized test functions;
[0033] The test system can load the historical charging CAN messages of electric vehicles, and control the high-voltage power supply, switching devices, auxiliary power supply, electronic lock, and realize the charging scene playback function in accordance with the national standard GBT27930 / 18487.
[0034] The charging functions of the test system include: GB / T 2015 DC charging function, GB / T 2011 DC charging function, compatible with GB / T 2015 and GB / T 2011 DC charging function, HPC interface CHAOJI standard charging function. Users configure the charging function through the host computer.
[0035] The user can load the vehicle's discharge protocol into the device, adjust the vehicle to the discharge state, set the discharge voltage, current, discharge power, protection parameters, etc., and realize discharge from the power battery through the DC charging interface.
[0036] The test system can automatically display the test process data. After the test is completed, all test results can be read and displayed. At the same time, a test report is automatically generated, which includes test judgment results, test data, waveforms, tables, etc.
[0037] Each test case is open source, and users can edit, modify, copy and create their own test cases.
[0038] Users can edit, save, export and load test items, and can subsequently load existing test configuration items. Once a test configuration item is created, it can be used for a long time.
[0039] The test system includes administrator mode and operator mode. In administrator mode, you can add, delete, and modify users, and configure the operation permissions of different users, such as whether the user has the test permission, charging permission, etc. In operator mode, you can configure the test vehicle BMS configuration, test system configuration, and test items.
[0040] The test system processes the detection and abnormal protection of equipment information such as emergency stop, circuit breaker, contactor, temperature, voltage, current, leakage, lightning protection, door opening, hardware communication offline, etc. The test system includes an active safety protection model, which customers can turn on or off. When the model is turned on, it will automatically stop and alarm if it detects abnormal charging of the vehicle, ensuring the safety of the charging test process.
[0041] The above is only a preferred embodiment of the present invention. It should be understood that the present invention is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art shall not deviate from the spirit and scope of the present invention, and shall be within the scope of protection of the claims attached to the present invention.
Claims
1. A new energy vehicle charging interoperability consistency test method, characterized in that: Applied to a new energy vehicle charging interoperability consistency test system, including a test database module, a charging vehicle battery management module, an alarm protection module, a test report generation module, a charging test module, a communication unit, and an offline scene playback module; the test database module, the charging vehicle battery management module, the alarm protection module, the test report generation module, the charging test module, and the offline scene playback module are respectively connected to the communication unit for communication; The test database module includes a standard test database, a non-standard test database and a historical test database; the standard test database stores multiple sets of standard new energy vehicle charging test schemes; the non-standard test database stores parameters of different new energy vehicle charging test devices; the historical test database is used to store historical test data schemes; The charging vehicle battery management module includes a charging management module and a discharging management module; The charging management module is used to charge the vehicle battery according to the charging protocol; the discharging management module is used to adjust the vehicle to a discharging state and discharge the vehicle battery according to the discharging protocol; The offline scene playback module is used to play back the charging test process corresponding to the historical test data scheme according to the historical test data scheme; The alarm protection module includes an alarm device and an active protection module; the alarm device and the active protection module are respectively connected to the communication unit; It also includes administrator mode and operator mode; the administrator mode is used to add, delete and modify users, and configure the operation permissions of different users; the operator mode is used to configure the BMS, test system and test items of the test vehicle; The test system processes the detection and abnormal protection of emergency stop, circuit breaker, contactor, temperature, voltage, current, leakage, lightning protection, door opening, and hardware communication offline device information; the test system includes an active safety protection model. When the active safety protection model is turned on, it will automatically stop and alarm when detecting abnormalities in vehicle charging to ensure the safety of the charging test process; The steps include: Step 1: Select the new energy vehicle charging test mode. When the standard test mode is selected, go to step 2. When the non-standard mode is selected, go to step 4. Step 2: According to the charging parameters of the tested new energy vehicle, a standard new energy vehicle charging test scheme corresponding to the charging parameters of the tested new energy vehicle is matched in the standard test database, and a charging test is performed on the tested new energy vehicle according to the matched standard new energy vehicle charging test scheme; Step 3: After the standard test mode charging test is completed, the test data obtained during the test, the standard new energy vehicle charging test scheme used, the charging parameters of the tested new energy vehicle, and the time point and duration of the test are stored in the historical test database as a historical test data scheme, and a test report is generated through the test report generation module to complete the standard test; Step 4: Set the test items to form a non-standard new energy vehicle charging test plan. According to the non-standard new energy vehicle charging test plan, select the test equipment corresponding to the test items from the non-standard test database to test the new energy vehicle under test; Step 5: After the non-standard test charging test is completed, the test data obtained during the test, the test equipment used, the charging parameters of the tested new energy vehicle, and the time point and duration of the test are stored in the historical test database as a historical test data plan, and a test report is generated through the test report generation module to complete the non-standard test; The setting of test items described in step 4 to form a non-standard new energy vehicle charging test plan includes: a non-standard new energy vehicle charging test plan obtained by changing the test items in the standard new energy vehicle charging test plan, and a non-standard new energy vehicle charging test plan formed by setting test items by oneself.