Parameter change notification method, system, storage medium and electronic device
By introducing a message module into the parameter change system, analyzing the change information in the parameter change application form and determining the notification strategy based on the urgency, the problem of massive notification resource consumption is solved and the efficiency of notification resource usage is improved.
Patent Information
- Application Number
- CN202110836323.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-07-23
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2041-07-23
AI Technical Summary
The existing parameter change notification method results in excessive consumption of massive notification resources, affecting efficiency.
By introducing a message module into the parameter change system, analyzing the change information in the parameter change application form, determining the urgency level and determining the notification strategy based on the urgency level, and the control process nodes make corresponding parameter change notifications.
It reduces the use of notification resources by non-emergency parameter changes, improves the use efficiency of notification resources, and is in line with actual situation notification strategies.
Smart Images

Figure CN113506014B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of data transmission, and in particular to a parameter change notification method, system, storage medium and electronic device. Background Art
[0002] Parameter changes include parameter application, parameter change analysis, parameter customization, parameter approval, parameter maintenance, parameter review and other links, which are common processes in parameter operation and maintenance. At present, the more conventional way to send notifications to each link of the parameter change network is: the parameter centralized management platform sends notification messages in the form of emails, text messages, etc. to all personnel in a certain link to which the parameter change flows. Of course, before using the parameter change network of the parameter management platform, each department will configure the position permissions for the relevant personnel according to their respective positions, and the parameter change personnel with position permissions can receive notification messages about this position.
[0003] Parameter changes involve many components and systems, and the same component may have a few or dozens of parameter change applications in a day. As a result, a large number of parameter change notifications are received every day, occupying a large amount of notification resources, which consumes a lot of notification resources. Summary of the invention
[0004] In view of the above problems, the present invention provides a parameter change notification method, system, storage medium and electronic device that overcome the above problems or at least partially solve the above problems.
[0005] In a first aspect, a parameter change notification method is applied to a parameter change system, the system comprising a plurality of change networks and a message module, each of the change networks comprising a plurality of process nodes and each taking a parameter change application node in the process node as a start node;
[0006] The method comprises:
[0007] The message module obtains a parameter change application form submitted by the parameter change application node to the next process node of the parameter change application node, wherein the parameter change application form includes: change information of the target change parameter;
[0008] The message module analyzes the change information to determine the urgency of the change of the target change parameter;
[0009] The message module determines a corresponding notification strategy according to the urgency;
[0010] The message module controls at least one of the process nodes to perform corresponding parameter change notification according to the notification strategy.
[0011] In conjunction with the first aspect, in some optional implementations, the change information includes: at least one of process type information, time information, and impact scope information;
[0012] The emergency levels include: emergency level 1, emergency level 2 and emergency level 3;
[0013] The process type information includes: standard process type, conventional process type and major process type; the time information includes: the generation time of the parameter change application form and the effective time of the target change parameter; the impact range information includes: the number of bank outlets affected by the change of the target change parameter;
[0014] The urgency level of the first-level emergency is greater than the urgency level of the second-level emergency, and the urgency level of the second-level emergency is greater than the urgency level of the third-level emergency.
[0015] Optionally, in some optional implementations, parsing the change information to determine the urgency of the change of the target change parameter includes:
[0016] If the change information satisfies at least one of the first condition, the second condition and the third condition, the emergency level is determined to be the first-level emergency;
[0017] If the change information satisfies at least one of the fourth condition, the fifth condition and the sixth condition, the emergency level is determined to be the second-level emergency level;
[0018] If the change information satisfies at least one of condition seven, condition eight and condition nine, the emergency level is determined to be the third emergency level;
[0019] Among them, the first condition is that the process type information is the major process type; the second condition is that the time difference between the effective time and the generation time is not greater than the first preset time threshold; the third condition is that the number of bank outlets is greater than the first preset number threshold;
[0020] The fourth condition is that the process type information is the conventional process type; the fifth condition is that the time difference between the effective time and the generation time is greater than the first preset time threshold and not greater than the second preset time threshold; the sixth condition is that the number of bank outlets is not greater than the first preset number threshold and greater than the second preset number threshold;
[0021] The condition seven is that the process type information is the standard process type; the condition eight is that the time difference between the effective time and the generation time is greater than the second preset time threshold; the condition nine is that the number of bank outlets is not greater than the second preset number threshold.
[0022] Optionally, in some optional implementations, determining a corresponding notification strategy according to the urgency level includes:
[0023] If the emergency level is the first-level emergency, determining that the notification strategy is an emergency notification strategy;
[0024] The emergency notification strategy is: after the parameter change application form flows to any of the process nodes after the parameter change application node, the process node is controlled to execute at least one of the first, second, third and fourth methods;
[0025] Method 1: Send corresponding email notifications to the preset message recipients multiple times in a row;
[0026] Method 2: Send corresponding SMS notifications to the message recipient multiple times in succession;
[0027] Method 3: Pop up corresponding pop-up reminders multiple times in a row;
[0028] Method 4: Play the corresponding voice reminder multiple times continuously.
[0029] Optionally, in some optional implementations, determining a corresponding notification strategy according to the urgency level includes:
[0030] If the emergency level is the second level emergency, determining that the notification strategy is a regular notification strategy;
[0031] Wherein, the conventional notification strategy is: after the parameter change application form flows to any of the process nodes after the parameter change application node, the process node is controlled to execute at least one of the fifth, sixth, seventh and eighth modes;
[0032] Method 5: Send a corresponding email notification to the preset message recipient;
[0033] Method 6: Send a corresponding SMS notification to the message recipient once;
[0034] Method 7: A corresponding pop-up window will pop up once;
[0035] Method eight: broadcast the corresponding voice reminder once.
[0036] Optionally, in some optional implementations, determining a corresponding notification strategy according to the urgency level includes:
[0037] If the emergency level is the third emergency level, determining that the notification strategy is a simple notification strategy;
[0038] The simple notification strategy is: after the parameter change application form flows to the last process node of the standard process type, the process node is controlled to send one email notification or one SMS notification to a preset message recipient.
[0039] In a second aspect, a parameter change system includes a plurality of change networks and a message module, each of the change networks includes a plurality of process nodes and each of the change networks uses a parameter change application node in the process node as a start node;
[0040] The message module specifically includes: an application form obtaining unit, a parsing unit, a determining unit and a notifying unit;
[0041] The application form obtaining unit is configured to obtain a parameter change application form submitted by the parameter change application node to the next process node of the parameter change application node, wherein the parameter change application form includes: change information of the target change parameter;
[0042] The parsing unit is configured to parse the change information to determine the urgency of the change of the target change parameter;
[0043] The determining unit is configured to determine a corresponding notification strategy according to the urgency level;
[0044] The notification unit is configured to execute control of at least one of the process nodes to perform corresponding parameter change notification according to the notification strategy.
[0045] In conjunction with the second aspect, in some optional implementations, the change information includes: at least one of process type information, time information, and impact scope information;
[0046] The emergency levels include: emergency level 1, emergency level 2 and emergency level 3;
[0047] The process type information includes: standard process type, conventional process type and major process type; the time information includes: the generation time of the parameter change application form and the effective time of the target change parameter; the impact range information includes: the number of bank outlets affected by the change of the target change parameter;
[0048] The urgency level of the first-level emergency is greater than the urgency level of the second-level emergency, and the urgency level of the second-level emergency is greater than the urgency level of the third-level emergency.
[0049] In a third aspect, a computer-readable storage medium stores a program, wherein the program, when executed by a processor, implements any of the parameter change notification methods described above.
[0050] In a fourth aspect, an electronic device comprises at least one processor, and at least one memory and a bus connected to the processor; wherein the processor and the memory communicate with each other through the bus; and the processor is used to call program instructions in the memory to execute any of the parameter change notification methods described above.
[0051] By means of the above technical scheme, a parameter change notification method, system, storage medium and electronic device provided by the present invention are applied to a parameter change system, wherein the system includes multiple change networks and a message module, each of the change networks includes multiple process nodes and each uses the parameter change application node in the process node as the starting node; the parameter change application form of the next process node submitted by the parameter change application node to the parameter change application node can be obtained through the message module, and the parameter change application form includes: the change information of the target change parameter; the message module parses the change information to determine the urgency of the change of the target change parameter; the message module determines the corresponding notification strategy according to the urgency; the message module controls at least one node in the process node to perform the corresponding parameter change notification according to the notification strategy. It can be seen from this that the present invention determines the corresponding notification strategy by parsing the change information in the parameter change application form, and controls the corresponding node to notify according to the notification strategy. The notification methods, notification times, and notification intervals used by different notification strategies may be different, and need to be determined based on the importance of the specific parameter changes, so that the importance of the parameter changes corresponds to the notification strategy, which is more in line with the actual situation. To a certain extent, it can reduce the occupation of notification resources (such as text messages and emails) by unimportant parameter changes, and improve the efficient use of notification resources. The present invention does not impose any restrictions on this.
[0052] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention, it can be implemented according to the contents of the specification. In order to make the above and other purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0054] Figure 1A schematic diagram of a process flow of a parameter change notification method provided by the present invention is shown;
[0055] Figure 2 A schematic diagram of the structure of a parameter changing system provided by the present invention is shown;
[0056] Figure 3 A structural schematic diagram of an electronic device provided by the present invention is shown. DETAILED DESCRIPTION
[0057] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.
[0058] like Figure 1 As shown, the present invention provides a parameter change notification method, which should be applied to a parameter change system, the system comprising a plurality of change networks and a message module, each of the change networks comprising a plurality of process nodes and each taking a parameter change application node in the process node as a start node;
[0059] The method comprises: S100, S200, S300 and S400;
[0060] S100, the message module obtains a parameter change application form submitted by the parameter change application node to the next process node of the parameter change application node, the parameter change application form including: change information of the target change parameter;
[0061] Optionally, the parameter change system provided by the present invention may include 3 change networks, wherein the first change network is a standard process, and the process nodes covered by the standard process are, in order: parameter change application node -> parameter change review node -> parameter change acceptance node -> parameter change maintenance node -> parameter change review node.
[0062] Article 2 The change network is a regular process, and the process nodes covered by this regular process are: parameter change application node -> parameter change review node -> parameter change acceptance node -> parameter change customization node -> parameter change approval node -> parameter change maintenance node -> parameter change review node.
[0063] Article 3 The change network is a major process, and the process nodes covered by this major process are: parameter change application node -> parameter change review node -> parameter change acceptance node -> parameter change analysis node -> parameter change customization node -> parameter change review node -> parameter change approval node -> parameter change maintenance node -> parameter change review node.
[0064] Optionally, for the above three network changes, “->” indicates the flow direction of the network change, that is, the flow direction of the parameter change application form, and the present invention does not impose any limitation on this.
[0065] Optionally, the parameter change application node serves as the starting node of any change network. It constructs a parameter change application form and transmits the parameter change application form to the next process node so that the parameter change application form circulates in the corresponding change network. The present invention does not impose any restrictions on this.
[0066] Optionally, the present invention can construct a parameter change application form at a parameter change application node to actively obtain the parameter change application form, or the parameter change application node can send the parameter change application form to the next process node, such as a parameter change review node, and also send it to the execution entity that executes the present invention, thereby obtaining the parameter change application form. The present invention does not limit this.
[0067] That is, it can be understood that: when the parameter change application node constructs the parameter change application form or the parameter change application node issues the parameter change application form, the solution of the present invention is triggered, and the present invention does not limit this.
[0068] Optionally, in the change network provided by the present invention, when the parameter change application form flows to any process node, a notification can be sent to the corresponding personnel, including the parameter change application node, but how to send the notification specifically needs to be determined according to the change information of the target change parameter in the parameter change application form. That is, the notification strategy finally obtained by the present invention can be applied to each process node of the entire change network, the difference is that the message receiving personnel of each process node may be different, and the present invention does not limit this.
[0069] Optionally, the change information may be input and configured by relevant personnel through the parameter change system, and the present invention does not impose any limitation on this.
[0070] S200, the message module parses the change information to determine the urgency of the change of the target change parameter;
[0071] Optionally, the change information includes specific detailed information of each target change parameter. The urgency of the parameter change application form can be determined by parsing the change information. The urgency corresponds to the subsequent notification strategy, and the present invention does not limit this.
[0072] Optionally, the present invention does not limit the specific content of the change information, and any feasible manner belongs to the protection scope of the present invention. For example, please refer to the optional embodiment 1 provided by the present invention, and the present invention does not limit this.
[0073] Optionally, the present invention does not limit the specific process of parsing the change information to obtain the urgency, and any feasible method belongs to the protection scope of the present invention. For example, please refer to the optional embodiment 2 provided by the present invention, and the present invention does not limit this.
[0074] S300, the message module determines a corresponding notification strategy according to the urgency level;
[0075] Optionally, the urgency and notification strategies mentioned in the present invention may be in a one-to-one correspondence. Of course, the urgency may be divided in more detail so that the urgency and notification strategies are in a many-to-one relationship. The present invention does not impose any limitation on this.
[0076] Optionally, the present invention does not specifically limit the process of determining the corresponding notification strategy according to the urgency, and any feasible method belongs to the protection scope of the present invention. For example, please refer to Optional Embodiment 3, Optional Embodiment 4 and Optional Embodiment 5 provided by the present invention, and the present invention does not limit this.
[0077] S400. The message module controls at least one of the process nodes to perform corresponding parameter change notification according to the notification strategy.
[0078] Optionally, since different parameter changes have different impact scopes, different urgency levels, different importance levels, and even different change networks, corresponding parameter change notifications can be made according to the notification strategy obtained through analysis, and the present invention does not limit this.
[0079] Optionally, the present invention does not limit the process of controlling at least one of the process nodes to perform corresponding parameter change notification according to the notification strategy, and any feasible method belongs to the protection scope of the present invention. For example, the specific content of the notification strategy in Optional Embodiment 3, Optional Embodiment 4 and Optional Embodiment 5 provided by the present invention can be referred to, and the present invention does not limit this.
[0080] It can be seen from this that the present invention determines the corresponding notification strategy by parsing the change information in the parameter change application form, and controls the corresponding node to notify according to the notification strategy. The notification method, number of notifications, and notification interval length used by different notification strategies can be different. The specific need is determined according to the importance of the change in the specific parameter, so that the importance of the parameter change corresponds to the notification strategy, which is more in line with the actual situation. To a certain extent, it can reduce the occupation of notification resources (such as text messages and mailboxes) by unimportant parameter changes, and improve the efficient use of notification resources. The present invention does not limit this.
[0081] Furthermore, the present invention can reduce the workload of message receivers, as they do not need to distinguish important notification messages from a large number of notification messages, which can improve the work efficiency of relevant personnel to a certain extent, and the present invention does not impose any limitation on this.
[0082] Optional embodiment 1:
[0083] Combination Figure 1 In the illustrated implementation, in certain optional implementations, the change information includes: at least one of process type information, time information, and impact scope information;
[0084] The emergency levels include: emergency level 1, emergency level 2 and emergency level 3;
[0085] The process type information includes: standard process type, conventional process type and major process type; the time information includes: the generation time of the parameter change application form and the effective time of the target change parameter; the impact range information includes: the number of bank outlets affected by the change of the target change parameter;
[0086] The urgency level of the first-level emergency is greater than the urgency level of the second-level emergency, and the urgency level of the second-level emergency is greater than the urgency level of the third-level emergency.
[0087] Optionally, the process type information can characterize the significance of the change network that the parameter change application needs to go through. Generally speaking, the more significant the change network, the more process nodes it goes through. That is, the first change network mentioned above can correspond to the standard process type here; the second change network mentioned above can correspond to the conventional process type here; the third change network mentioned above can correspond to the significant process type here, and the present invention does not limit this.
[0088] Optionally, the time information can represent the urgency of the change of the parameters involved in the parameter change application form. That is, if a specific parameter needs to be changed, the time when the corresponding parameter is changed needs to be filled in the parameter change application form, which is the effective time mentioned in this article. The time difference between the generation time and the effective time of the parameter change application form reflects the urgency to a certain extent. The smaller the time difference, the more urgent it is. The present invention does not limit this.
[0089] Optionally, the impact scope information can characterize the impact scope of the change parameter involved in the parameter change application form. The impact scope can be characterized by the number of bank outlets affected, or by the administrative area covered by the affected bank outlets, or by the hierarchical division of bank outlets within the bank. For example, the impact scope can be characterized by: the entire bank, certain first-level banks, a certain first-level bank, certain branches, a certain branch, certain outlets, and a certain outlet, etc., and the present invention does not limit this.
[0090] Optional embodiment 2:
[0091] In conjunction with optional embodiment 1, in some optional implementations, the S200 includes: step 1.1, step 1.2 and step 1.3;
[0092] Step 1.1: If the change information satisfies at least one of the conditions 1, 2 and 3, the emergency level is determined to be the first-level emergency level;
[0093] Step 1.2: If the change information satisfies at least one of the fourth condition, the fifth condition and the sixth condition, the emergency level is determined to be the second-level emergency level;
[0094] Step 1.3: If the change information satisfies at least one of conditions 7, 8 and 9, the emergency level is determined to be the third emergency level;
[0095] Among them, the first condition is that the process type information is the major process type; the second condition is that the time difference between the effective time and the generation time is not greater than the first preset time threshold; the third condition is that the number of bank outlets is greater than the first preset number threshold;
[0096] Optionally, the present invention does not impose any specific restrictions on the first preset time threshold, which can be set according to actual conditions, and the present invention does not impose any restrictions on this.
[0097] Optionally, the present invention does not impose any specific restrictions on the first preset quantity threshold, which can be set according to actual conditions, and the present invention does not impose any restrictions on this.
[0098] The fourth condition is that the process type information is the conventional process type; the fifth condition is that the time difference between the effective time and the generation time is greater than the first preset time threshold and not greater than the second preset time threshold; the sixth condition is that the number of bank outlets is not greater than the first preset number threshold and greater than the second preset number threshold;
[0099] Optionally, the present invention does not impose any specific restrictions on the second preset time threshold, and it can be set according to actual conditions. However, if the first preset time threshold is smaller than the second preset time threshold, the present invention does not impose any restrictions on this.
[0100] Optionally, the present invention does not impose any specific restrictions on the second preset quantity threshold, which can be set according to actual conditions. However, the first preset quantity threshold is greater than the second preset quantity threshold, and the present invention does not impose any restrictions on this.
[0101] The condition seven is that the process type information is the standard process type; the condition eight is that the time difference between the effective time and the generation time is greater than the second preset time threshold; the condition nine is that the number of bank outlets is not greater than the second preset number threshold.
[0102] Optional embodiment 3:
[0103] In combination with optional embodiment 1, in some optional implementations, the S300 includes: if the emergency level is the first-level emergency, determining that the notification strategy is an emergency notification strategy;
[0104] The emergency notification strategy is: after the parameter change application form flows to any of the process nodes after the parameter change application node, the process node is controlled to execute at least one of the first, second, third and fourth methods;
[0105] Method 1: Send corresponding email notifications to the preset message recipients multiple times in a row;
[0106] Method 2: Send corresponding SMS notifications to the message recipient multiple times in succession;
[0107] Method 3: Pop up corresponding pop-up reminders multiple times in a row;
[0108] Method 4: Play the corresponding voice reminder multiple times continuously.
[0109] Optionally, after the parameter change application form flows to any of the process nodes after the parameter change application node, the process node is controlled to execute at least one of method one, method two, method three and method four. It can be understood that: for all process nodes, after the parameter change application form flows to, the process node can be controlled to notify and remind in accordance with all or part of method one, method two, method three and method four. The present invention does not limit this.
[0110] Optionally, the present invention does not impose any restrictions on the specific number of times the corresponding email notifications are sent consecutively, nor on the time interval between each email notification, which can be set according to actual needs, and the present invention does not impose any restrictions on this. Similarly, there is no specific restriction on the number and time interval of SMS notifications, pop-up reminders, and voice reminders.
[0111] Optional embodiment 4:
[0112] In combination with optional embodiment 1, in some optional implementations, the S300 includes: if the urgency level is the second-level urgency, determining that the notification strategy is a regular notification strategy;
[0113] Wherein, the conventional notification strategy is: after the parameter change application form flows to any of the process nodes after the parameter change application node, the process node is controlled to execute at least one of the fifth, sixth, seventh and eighth modes;
[0114] Method 5: Send a corresponding email notification to the preset message recipient;
[0115] Method 6: Send a corresponding SMS notification to the message recipient once;
[0116] Method 7: A corresponding pop-up window will pop up once;
[0117] Method eight: broadcast the corresponding voice reminder once.
[0118] Optionally, after the parameter change application form flows to any of the process nodes after the parameter change application node, the process node is controlled to execute at least one of method five, method six, method seven and method eight. It can be understood that: for all process nodes, after the parameter change application form flows to, the process node can be controlled to notify and remind in accordance with all or part of the methods five, method six, method seven and method eight. The present invention is not limited to this.
[0119] Optional embodiment 5:
[0120] In combination with optional embodiment 1, in some optional implementations, the S300 includes: if the emergency level is the third emergency level, determining that the notification strategy is a simple notification strategy;
[0121] The simple notification strategy is: after the parameter change application form flows to the last process node of the standard process type, the process node is controlled to send one email notification or one SMS notification to a preset message recipient.
[0122] Optionally, the simple notification strategy can be understood as: no notification is made during the process of the parameter change application form circulating in the corresponding change network. Only after the parameter change application form flows to the last process node of the change network, the process node is controlled to send the corresponding notification.
[0123] Of course, in addition to sending email notifications and SMS notifications, corresponding pop-up reminders and voice reminders can also be made, and the present invention does not limit this.
[0124] like Figure 2 As shown, the present invention provides a parameter change system SYS, the system SYS includes multiple change networks and a message module 100, each of the change networks includes multiple process nodes and each takes the parameter change application node 10 in the process node as the starting node;
[0125] The message module 100 specifically includes: an application form obtaining unit 101, a parsing unit 102, a determining unit 103 and a notifying unit 104;
[0126] The application form obtaining unit 101 is configured to obtain a parameter change application form submitted by the parameter change application node to the next process node of the parameter change application node, wherein the parameter change application form includes: change information of the target change parameter;
[0127] The parsing unit 102 is configured to parse the change information to determine the urgency of the change of the target change parameter;
[0128] The determining unit 103 is configured to determine a corresponding notification strategy according to the urgency level;
[0129] The notification unit 104 is configured to execute control of at least one of the process nodes to perform corresponding parameter change notification according to the notification strategy.
[0130] Optional embodiment A, combined with Figure 2 In the illustrated implementation, in certain optional implementations, the change information includes: at least one of process type information, time information, and impact scope information;
[0131] The emergency levels include: emergency level 1, emergency level 2 and emergency level 3;
[0132] The process type information includes: standard process type, conventional process type and major process type; the time information includes: the generation time of the parameter change application form and the effective time of the target change parameter; the impact range information includes: the number of bank outlets affected by the change of the target change parameter;
[0133] The urgency level of the first-level emergency is greater than the urgency level of the second-level emergency, and the urgency level of the second-level emergency is greater than the urgency level of the third-level emergency.
[0134] Optional embodiment B, in combination with optional embodiment A, in some optional implementations, the parsing unit 102 includes: a first parsing subunit, a second parsing subunit and a third parsing subunit;
[0135] The first parsing subunit is configured to determine that the emergency level is the first-level emergency if the change information satisfies at least one of the first condition, the second condition, and the third condition;
[0136] The second parsing subunit is configured to determine that the emergency level is the second emergency level if the change information satisfies at least one of the fourth condition, the fifth condition and the sixth condition;
[0137] The third parsing subunit is configured to determine that the emergency level is the third emergency level if the change information satisfies at least one of condition seven, condition eight and condition nine;
[0138] Among them, the first condition is that the process type information is the major process type; the second condition is that the time difference between the effective time and the generation time is not greater than the first preset time threshold; the third condition is that the number of bank outlets is greater than the first preset number threshold;
[0139] The fourth condition is that the process type information is the conventional process type; the fifth condition is that the time difference between the effective time and the generation time is greater than the first preset time threshold and not greater than the second preset time threshold; the sixth condition is that the number of bank outlets is not greater than the first preset number threshold and greater than the second preset number threshold;
[0140] The condition seven is that the process type information is the standard process type; the condition eight is that the time difference between the effective time and the generation time is greater than the second preset time threshold; the condition nine is that the number of bank outlets is not greater than the second preset number threshold.
[0141] Optional embodiment C, in combination with optional embodiment A, in some optional implementations, the determining unit 103 includes: a first determining subunit;
[0142] The first determining subunit is configured to determine that the notification strategy is an emergency notification strategy if the emergency level is the first-level emergency;
[0143] The emergency notification strategy is: after the parameter change application form flows to any of the process nodes after the parameter change application node, the process node is controlled to execute at least one of the first, second, third and fourth methods;
[0144] Method 1: Send corresponding email notifications to the preset message recipients multiple times in a row;
[0145] Method 2: Send corresponding SMS notifications to the message recipient multiple times in succession;
[0146] Method 3: Pop up corresponding pop-up reminders multiple times in a row;
[0147] Method 4: Play the corresponding voice reminder multiple times continuously.
[0148] Optional embodiment D, in combination with optional embodiment A, in some optional implementations, the determining unit 103 includes: a second determining subunit;
[0149] The second determining subunit is configured to determine that the notification strategy is a regular notification strategy if the urgency level is the second-level urgency;
[0150] Wherein, the conventional notification strategy is: after the parameter change application form flows to any of the process nodes after the parameter change application node, the process node is controlled to execute at least one of the fifth, sixth, seventh and eighth modes;
[0151] Method 5: Send a corresponding email notification to the preset message recipient;
[0152] Method 6: Send a corresponding SMS notification to the message recipient once;
[0153] Method 7: A corresponding pop-up window will pop up once;
[0154] Method eight: broadcast the corresponding voice reminder once.
[0155] Optional embodiment E, in combination with optional embodiment A, in some optional implementations, the determining unit 103 includes: a third determining subunit;
[0156] The third determining subunit is configured to determine that the notification strategy is a simple notification strategy if the emergency level is the third emergency level;
[0157] The simple notification strategy is: after the parameter change application form flows to the last process node of the standard process type, the process node is controlled to send one email notification or one SMS notification to a preset message recipient.
[0158] The present invention provides a computer-readable storage medium having a program stored thereon, wherein when the program is executed by a processor, any of the above-mentioned parameter change notification methods is implemented.
[0159] like Figure 3 As shown, the present invention provides an electronic device 70, which includes at least one processor 701, and at least one memory 702 and a bus 703 connected to the processor 701; wherein the processor 701 and the memory 702 communicate with each other through the bus 703; the processor 701 is used to call the program instructions in the memory 702 to execute any of the parameter change notification methods described above.
[0160] In this application, relational terms such as first and second, etc. are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "comprise", "include" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0161] Each embodiment in this specification is described in a related manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0162] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
[0163] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention are included in the protection scope of the present invention.
Claims
1. A parameter change notification method, characterized in that: Applied to a parameter change system, the system includes a plurality of change networks and a message module, each of the change networks includes a plurality of process nodes and each takes a parameter change application node in the process node as a start node; The method comprises: The message module obtains a parameter change application form submitted by the parameter change application node to the next process node of the parameter change application node, wherein the parameter change application form includes: change information of the target change parameter; The message module analyzes the change information to determine the urgency of the change of the target change parameter; The message module determines a corresponding notification strategy according to the urgency; The message module controls at least one of the process nodes to perform corresponding parameter change notification according to the notification strategy, wherein the change information includes: at least one of process type information, time information and impact scope information; The emergency levels include: emergency level 1, emergency level 2 and emergency level 3; The process type information includes: standard process type, conventional process type and major process type; the time information includes: the generation time of the parameter change application form and the effective time of the target change parameter; the impact range information includes: the number of bank outlets affected by the change of the target change parameter; The urgency of the first-level emergency is greater than the urgency of the second-level emergency, and the urgency of the second-level emergency is greater than the urgency of the third-level emergency; The parsing of the change information to determine the urgency of the change of the target change parameter includes: If the change information satisfies at least one of the first condition, the second condition and the third condition, the emergency level is determined to be the first-level emergency; If the change information satisfies at least one of the fourth condition, the fifth condition and the sixth condition, the emergency level is determined to be the second-level emergency level; If the change information satisfies at least one of condition seven, condition eight and condition nine, the emergency level is determined to be the third emergency level; Among them, the first condition is that the process type information is the major process type; the second condition is that the time difference between the effective time and the generation time is not greater than the first preset time threshold; the third condition is that the number of bank outlets is greater than the first preset number threshold; The fourth condition is that the process type information is the conventional process type; the fifth condition is that the time difference between the effective time and the generation time is greater than the first preset time threshold and not greater than the second preset time threshold; the sixth condition is that the number of bank outlets is not greater than the first preset number threshold and greater than the second preset number threshold; The condition seven is that the process type information is the standard process type; the condition eight is that the time difference between the effective time and the generation time is greater than the second preset time threshold; the condition nine is that the number of bank outlets is not greater than the second preset number threshold.
2. The method according to claim 1, characterized in that Determining a corresponding notification strategy according to the urgency level includes: If the emergency level is the first-level emergency, determining that the notification strategy is an emergency notification strategy; The emergency notification strategy is: after the parameter change application form flows to any of the process nodes after the parameter change application node, the process node is controlled to execute at least one of the first, second, third and fourth methods; Method 1: Send corresponding email notifications to the preset message recipients multiple times in a row; Method 2: Send corresponding SMS notifications to the message recipient multiple times in succession; Method 3: Pop up corresponding pop-up reminders multiple times in a row; Method 4: Play the corresponding voice reminder multiple times continuously.
3. The method according to claim 1, characterized in that Determining a corresponding notification strategy according to the urgency level includes: If the emergency level is the second-level emergency, determining that the notification strategy is a regular notification strategy; Wherein, the conventional notification strategy is: after the parameter change application form flows to any of the process nodes after the parameter change application node, the process node is controlled to execute at least one of the fifth, sixth, seventh and eighth modes; Method 5: Send a corresponding email notification to the preset message recipient; Method 6: Send a corresponding SMS notification to the message recipient once; Method 7: A corresponding pop-up window will pop up once; Method eight: broadcast the corresponding voice reminder once.
4. The method according to claim 1, characterized in that: Determining a corresponding notification strategy according to the urgency level includes: If the emergency level is the third emergency level, determining that the notification strategy is a simple notification strategy; The simple notification strategy is: after the parameter change application form flows to the last process node of the standard process type, the process node is controlled to send one email notification or one SMS notification to a preset message recipient.
5. A parameter changing system, characterized in that: The system includes a plurality of change networks and a message module, each of the change networks includes a plurality of process nodes and each of the change networks uses a parameter change application node in the process node as a start node; The message module specifically includes: an application form obtaining unit, a parsing unit, a determining unit and a notifying unit; The application form obtaining unit is configured to obtain a parameter change application form submitted by the parameter change application node to the next process node of the parameter change application node, wherein the parameter change application form includes: change information of the target change parameter; The parsing unit is configured to parse the change information to determine the urgency of the change of the target change parameter; The determining unit is configured to determine a corresponding notification strategy according to the urgency level; The notification unit is configured to execute control of at least one of the process nodes to perform corresponding parameter change notification according to the notification strategy, wherein the change information includes: at least one of process type information, time information and impact scope information; The emergency levels include: emergency level 1, emergency level 2 and emergency level 3; The process type information includes: standard process type, conventional process type and major process type; the time information includes: the generation time of the parameter change application form and the effective time of the target change parameter; the impact range information includes: the number of bank outlets affected by the change of the target change parameter; The urgency of the first-level emergency is greater than the urgency of the second-level emergency, and the urgency of the second-level emergency is greater than the urgency of the third-level emergency; The parsing of the change information to determine the urgency of the change of the target change parameter includes: If the change information satisfies at least one of the first condition, the second condition and the third condition, the emergency level is determined to be the first-level emergency; If the change information satisfies at least one of the fourth condition, the fifth condition and the sixth condition, the emergency level is determined to be the second-level emergency level; If the change information satisfies at least one of condition seven, condition eight and condition nine, the emergency level is determined to be the third emergency level; Among them, the first condition is that the process type information is the major process type; the second condition is that the time difference between the effective time and the generation time is not greater than the first preset time threshold; the third condition is that the number of bank outlets is greater than the first preset number threshold; The fourth condition is that the process type information is the conventional process type; the fifth condition is that the time difference between the effective time and the generation time is greater than the first preset time threshold and not greater than the second preset time threshold; the sixth condition is that the number of bank outlets is not greater than the first preset number threshold and greater than the second preset number threshold; The condition seven is that the process type information is the standard process type; the condition eight is that the time difference between the effective time and the generation time is greater than the second preset time threshold; the condition nine is that the number of bank outlets is not greater than the second preset number threshold.
6. A computer-readable storage medium having a program stored thereon, characterized in that: When the program is executed by a processor, the parameter change notification method according to any one of claims 1 to 4 is implemented.
7. An electronic device, characterized in that: The electronic device includes at least one processor, and at least one memory and a bus connected to the processor; wherein the processor and the memory communicate with each other through the bus; and the processor is used to call program instructions in the memory to execute the parameter change notification method as described in any one of claims 1 to 4.
