Method for controlling pressure of multiple process chambers and semiconductor process equipment
By calculating and outputting the pressure control parameters based on the corresponding relationship between the target pressure value and the pressure control parameters, the problem of poor pressure consistency in multiple process chambers in the semiconductor process is solved, and higher pressure control accuracy and consistency are achieved.
Patent Information
- Application Number
- CN202110411361.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-04-16
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2041-04-16
AI Technical Summary
In the semiconductor process, due to differences in the air extraction devices, pressure detection devices and structures of multiple process chambers, pressure consistency is poor, which affects the process results.
By based on the same target pressure value of multiple process chambers and the preset corresponding relationship between pressure control parameters and pressure values, the pressure control parameters of each process chamber are obtained and output to the pressure control device to achieve control of each process chamber. Pressure control uses a linear fitting algorithm to calculate pressure control parameters to ensure that the pressure of each process chamber reaches the target value.
It improves the pressure consistency of multiple process chambers in the semiconductor process, avoids the problem of pressure inconsistency caused by the difference between the air extraction device and the pressure detection device, and improves the stability and consistency of the process.
Smart Images

Figure CN113515095B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of semiconductor process technology, and in particular to a method for controlling pressures of multiple process chambers in semiconductor process equipment and semiconductor process equipment. Background Art
[0002] When the semiconductor process processes the wafer by physical or chemical means, it needs to be carried out in a process chamber (PM) that can provide a certain vacuum environment. When the wafer enters the process chamber from the atmospheric environment, it usually enters the transfer chamber (TC) first and then enters the process chamber. The transfer chamber can be connected to multiple process chambers, and an on-off valve is provided between the transfer chamber and each process chamber to connect or isolate the two. With the development of semiconductor technology, the consistency requirements of semiconductor equipment in semiconductor technology are becoming more and more stringent. Since the pressure of the process chamber has an important influence on the results of the semiconductor process, it is very important to make the pressure of multiple process chambers consistent in the semiconductor process.
[0003] However, due to differences among the exhaust devices of the multiple process chambers, differences among the pressure detection devices of the multiple process chambers, and differences among the structures of the multiple process chambers, the pressure consistency of the multiple process chambers in the semiconductor process is poor. Summary of the invention
[0004] The present invention aims to solve at least one of the technical problems existing in the prior art, and proposes a method for controlling the pressure of multiple process chambers and a semiconductor process equipment, which can improve the pressure consistency of multiple process chambers in semiconductor processes.
[0005] To achieve the purpose of the present invention, a method for controlling the pressure of multiple process chambers in a semiconductor process equipment is provided, comprising the following steps:
[0006] S1, according to the same target pressure value of the plurality of process chambers and the preset corresponding relationship between the pressure control parameter and the pressure value of each process chamber, respectively obtaining the pressure control parameter corresponding to each process chamber and the target pressure value;
[0007] S2. Outputting the pressure control parameters corresponding to the target pressure value of each process chamber to the pressure control device of each process chamber.
[0008] Preferably, the corresponding relationship of each process chamber includes N sub-corresponding relationships, where N is an integer greater than 1; the N sub-corresponding relationships correspond one-to-one to N continuous and non-intersecting pressure ranges divided by the full range of a standard pressure detection device;
[0009] The step S1 comprises:
[0010] S11, determining a sub-corresponding relationship of each process chamber corresponding to a pressure range where the target pressure value is located;
[0011] S12, obtaining pressure control parameters corresponding to the target pressure value for each process chamber according to the target pressure value and the sub-corresponding relationship corresponding to the pressure range where the target pressure value is located for each process chamber.
[0012] Preferably, the corresponding relationship between the process chambers is obtained by the following steps:
[0013] S01, connecting each of the process chambers to the same transfer chamber, evacuating the transfer chamber, and after the pressure reading of the pressure detection device of the transfer chamber is stable, recording the pressure reading as the initial target pressure value;
[0014] S02, recording the first pressure reading of the pressure detection device of each process chamber at this time;
[0015] S03, introducing gas into the transmission chamber until the pressure reading of the pressure detection device of the transmission chamber reaches the upper limit value of its full range, and taking the upper limit value as the maximum target pressure value;
[0016] S04, recording the second pressure reading of the pressure detection device of each process chamber at this time;
[0017] S05 , using a linear fitting algorithm to calculate and obtain a fitting function representing the corresponding relationship for each of the process chambers according to the initial target pressure value, the maximum target pressure value, and the first pressure indication and the second pressure indication of each of the process chambers.
[0018] Preferably, the corresponding relationship between the process chambers is obtained by the following steps:
[0019] S001, connecting each of the process chambers to the same transfer chamber, evacuating the transfer chamber, and after the pressure reading of the pressure detection device of the transfer chamber is stable, recording the pressure reading as the initial target pressure value;
[0020] S002, recording the pressure reading of the pressure detection device of each process chamber at this time;
[0021] S003, introducing gas into the transmission chamber so that the pressure reading of the pressure detection device of the transmission chamber reaches N preset target pressure values in sequence, wherein the Nth preset target pressure value is the upper limit value of the full range of the pressure detection device of the transmission chamber, and the initial target pressure value and the N preset target pressure values divide the full range into N continuous and non-intersecting pressure ranges;
[0022] S004, every time the pressure reading of the pressure detection device of the transfer chamber reaches the preset target pressure value, the pressure reading of the pressure detection device of each process chamber at that time is recorded;
[0023] S005. A linear fitting algorithm is used to calculate and obtain a fitting function representing the sub-correspondence for each pressure range of each process chamber based on the initial target pressure value, the N preset target pressure values, and the pressure indications of the pressure detection devices of each process chamber corresponding to the initial target pressure value and the N preset target pressure values.
[0024] Preferably, for any process chamber among the process chambers, the corresponding relationship of the process chamber is obtained by the following steps:
[0025] S10, placing a standard pressure detection device on the process chamber, evacuating the process chamber, and recording the pressure reading after the pressure reading of the standard pressure detection device is stable, and taking it as the initial target pressure value;
[0026] S20, recording the first pressure reading of the pressure detection device of the process chamber itself at this time;
[0027] S30, introducing gas into the process chamber until the pressure reading of the standard pressure detection device reaches the upper limit value of its full range, and taking the upper limit value as the maximum target pressure value;
[0028] S40, recording the second pressure reading of the pressure detection device of the process chamber itself at this time;
[0029] S50, using a linear fitting algorithm to calculate a fitting function representing the corresponding relationship of the process chamber according to the initial target pressure value, the maximum target pressure value, the first pressure indication, and the second pressure indication.
[0030] Preferably, for any process chamber among the process chambers, the corresponding relationship of the process chamber is obtained by the following steps:
[0031] S100, placing a standard pressure detection device on the process chamber, evacuating the process chamber, and recording the pressure reading after the pressure reading of the standard pressure detection device is stable, and taking it as the initial target pressure value;
[0032] S200, recording the pressure reading of the pressure detection device of the process chamber itself at this time;
[0033] S300, introducing gas into the process chamber so that the pressure reading of the standard pressure detection device reaches N preset target pressure values in sequence, wherein the Nth target pressure value is the upper limit value of the full range of the standard pressure detection device, and the initial target pressure value and the N preset target pressure values divide the full range into N continuous and non-intersecting pressure ranges;
[0034] S400, each time the pressure reading of the standard pressure detection device reaches the preset target pressure value, recording the pressure reading of the pressure detection device of the process chamber itself at that time;
[0035] S500, using a linear fitting algorithm to calculate and obtain a fitting function representing the sub-correspondence for each pressure range of the process chamber based on the initial target pressure value, the N preset target pressure values, and the pressure indications of the pressure detection device of the process chamber itself corresponding to the initial target pressure value and the N preset target pressure values.
[0036] Preferably, the N preset target pressure values satisfy the following formula:
[0037]
[0038] Wherein, P(i) is the i-th preset target pressure value, i=1, 2, ..., N; Pr is the upper limit value of the full range of the pressure detection device of the transmission chamber or the standard pressure detection device.
[0039] The present invention also provides a semiconductor process equipment, including a control device and a plurality of process chambers, each of the process chambers is provided with a pressure detection device, and each of the process chambers corresponds to a pressure control device, wherein:
[0040] The pressure detection device is used to detect the pressure of the process chamber, and the control device is communicatively connected with a plurality of the pressure control devices, and is used to control the pressure of the process chamber through the pressure control devices using the control method provided by the present invention.
[0041] Preferably, the semiconductor process equipment further comprises a transfer chamber, and a pressure detection device is also provided on the transfer chamber for detecting the pressure of the transfer chamber, and the transfer chamber can be selectively connected to the plurality of process chambers.
[0042] Preferably, each process chamber is provided with an interface for installing a standard pressure detection device.
[0043] The present invention has the following beneficial effects:
[0044] The method for controlling the pressures of multiple process chambers provided by the present invention is to obtain the pressure control parameters corresponding to the target pressure value of each process chamber according to the same target pressure value of the multiple process chambers and the preset corresponding relationship between the pressure control parameters and the pressure values of each process chamber, and output the pressure control parameters corresponding to the target pressure value of each process chamber to the pressure control devices of each process chamber, so that the pressure of each process chamber can be controlled according to the pressure control parameters corresponding to the target pressure value by means of the pressure control devices of each process chamber, so that the pressure of each process chamber is controlled at the target pressure value, thereby avoiding the problem of poor pressure consistency of the multiple process chambers in the semiconductor process caused by differences among the exhaust devices of the multiple process chambers, differences among the pressure detection devices of the multiple process chambers, and differences among the structures of the multiple process chambers, thereby improving the pressure consistency of the multiple process chambers in the semiconductor process.
[0045] The semiconductor process equipment provided by the present invention enables a control device to communicate with multiple pressure control devices, so that the pressure of the process chamber can be controlled by the pressure control device using the control method of multiple process chamber pressures provided by the present invention, thereby improving the pressure consistency of multiple process chambers in the semiconductor process. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 A schematic diagram of the structure of a semiconductor process equipment provided by an embodiment of the present invention;
[0047] Figure 2 A flow chart of a method for controlling pressures of multiple process chambers provided by an embodiment of the present invention;
[0048] Figure 3 Another flow chart of a method for controlling pressures of multiple process chambers provided by an embodiment of the present invention;
[0049] Figure 4 Another flow chart of a method for controlling pressures of multiple process chambers provided by an embodiment of the present invention;
[0050] Figure 5Another flow chart of a method for controlling pressures of multiple process chambers provided by an embodiment of the present invention;
[0051] Figure 6 Another flow chart of a method for controlling pressures of multiple process chambers provided by an embodiment of the present invention;
[0052] Figure 7 Another flow chart of a method for controlling pressures of multiple process chambers provided by an embodiment of the present invention;
[0053] Description of reference numerals:
[0054] 11-process chamber; 12-transfer chamber; 13-pressure detection device; 14-pressure detection device; 15-pressure control device; 16-first exhaust pipeline; 17-first exhaust device; 18-first air intake device; 19-second exhaust pipeline; 21-second exhaust device; 22-second air intake device; 23-on-off valve. DETAILED DESCRIPTION
[0055] In order to enable those skilled in the art to better understand the technical solution of the present invention, the method for controlling the pressure of multiple process chambers and the semiconductor process equipment provided by the present invention are described in detail below with reference to the accompanying drawings.
[0056] like Figure 1 and Figure 2 As shown, this embodiment provides a method for controlling the pressure of multiple process chambers in a semiconductor process equipment, comprising the following steps:
[0057] S1, according to the same target pressure value of multiple process chambers 11 and the preset corresponding relationship between the pressure control parameter and the pressure value of each process chamber 11, respectively obtain the pressure control parameter corresponding to each process chamber 11 and the target pressure value;
[0058] S2 . Outputting pressure control parameters corresponding to the target pressure value of each process chamber 11 to the pressure control device 15 of each process chamber 11 .
[0059] In order to better understand the method for controlling the pressure of multiple process chambers provided by the embodiment of the present invention, the method for controlling the pressure of multiple process chambers in the prior art is first introduced. In the prior art, the pressure consistency of the multiple process chambers 11 mainly depends on the consistency and accuracy of the pressure detection device 13 of each process chamber 11, and the consistency and accuracy of the pressure control device 15 of each process chamber 11. Before the start of the semiconductor process, the on-off valve 23 between each process chamber 11 and the transfer chamber 12 is closed to isolate each process chamber 11 from the transfer chamber 12, and then the opening of the pressure control device 15 of each process chamber 11 is opened to the maximum, and each process chamber 11 is evacuated through the exhaust component of each process chamber 11 to make the pressure indication of the pressure detection device 13 of each process chamber 11 basically remain unchanged, and the pressure indication of the pressure detection device 13 of each process chamber 11 at this time is used as the background pressure value. During the semiconductor process, gas is introduced into each process chamber 11 through the air intake device of each process chamber 11, and the pressure of each process chamber 11 is controlled by the pressure control device 15 of each process chamber 11 to make the pressure indication of the pressure detection device 13 of each process chamber 11 the same, so that the pressures of multiple process chambers 11 are consistent.
[0060] However, for example, due to errors in the exhaust capacity of the exhaust devices of each process chamber 11 and the different lengths and shapes of the exhaust pipelines of each process chamber 11, there are differences between the exhaust devices of the multiple process chambers 11. For another example, due to accuracy errors in the pressure detection devices 13 of each process chamber 11, there are differences between the pressure detection devices 13 of the multiple process chambers 11. As a result, although the pressure readings of the pressure detection devices 13 of each process chamber 11 are the same, the actual pressures of each process chamber 11 are not the same. For another example, due to volume errors in each process chamber 11, there are differences between the structures of the multiple process chambers 11. The differences between the exhaust devices of the multiple process chambers 11, the differences between the pressure detection devices 13 of the multiple process chambers 11, and the differences between the structures of the multiple process chambers 11 will all lead to poor pressure consistency among the multiple process chambers 11 in the semiconductor process.
[0061] The method for controlling the pressures of multiple process chambers provided in the present embodiment is to obtain pressure control parameters corresponding to the target pressure value of each process chamber 11 according to the same target pressure value of the multiple process chambers 11 and the preset corresponding relationship between the pressure control parameters and the pressure values of each process chamber 11, and output the pressure control parameters corresponding to the target pressure value of each process chamber 11 to the pressure control devices 15 of each process chamber 11, so that the pressure of each process chamber 11 can be controlled according to the pressure control parameters corresponding to the target pressure value of each process chamber 11 by means of the pressure control devices 15 of each process chamber 11, so that the pressure of each process chamber 11 is controlled at the target pressure value, thereby avoiding the problem of poor pressure consistency of the multiple process chambers 11 in the semiconductor process due to differences among the exhaust devices of the multiple process chambers 11, differences among the pressure detection devices 13 of the multiple process chambers 11, and differences among the structures of the multiple process chambers 11, thereby improving the pressure consistency of the multiple process chambers 11 in the semiconductor process.
[0062] In this embodiment, the same target pressure value of the multiple process chambers 11 may be a pressure value that each process chamber 11 needs to reach in order to meet the requirements of the semiconductor process during the semiconductor process. The pressure control parameter may refer to a set pressure value of the pressure control device 15 of each process chamber 11 in order to make each process chamber 11 reach the target pressure value, and the pressure control device 15 controls the pressure value of the process chamber 11 according to the set pressure value.
[0063] Due to the differences between the exhaust devices of the multiple process chambers 11, the differences between the pressure detection devices 13 of the multiple process chambers 11, and the differences between the structures of the multiple process chambers 11, the corresponding relationship between the preset pressure control parameters and the pressure values of the various process chambers 11 may be the same or different, which also makes it possible that the pressure control parameters corresponding to the target pressure value of each process chamber 11 obtained according to the same target pressure value of the multiple process chambers 11 and the preset corresponding relationship between the pressure control parameters and the pressure value of each process chamber 11 may be the same or different. In the semiconductor process, each process chamber 11 may have a pressure control parameter corresponding to the target pressure value. The pressure indications of the pressure detection devices 13 of the process chambers 11 may be the same or different, but since the pressure control parameters corresponding to the target pressure values of each process chamber 11 are obtained after avoiding the differences between the exhaust devices of the multiple process chambers 11, the differences between the pressure detection devices 13 of the multiple process chambers 11, and the differences between the structures of the multiple process chambers 11, therefore, regardless of whether the pressure indications of the pressure detection devices 13 of the multiple process chambers 11 are the same, the pressure of each process chamber 11 is at the target pressure value, thereby improving the pressure consistency of the multiple process chambers 11 in the semiconductor process.
[0064] like Figure 1 and Figure 3 As shown, in a preferred embodiment of the present invention, the correspondence between the pressure control parameter and the pressure value of each process chamber 11 may include N sub-correspondences, where N is an integer greater than 1; the N sub-correspondences correspond one-to-one to N continuous and non-intersecting pressure ranges divided by the full range of a standard pressure detection device;
[0065] On this basis, step S1 may include:
[0066] S11, determining a sub-corresponding relationship of each process chamber 11 corresponding to a pressure range where a target pressure value is located;
[0067] S12 , according to the target pressure value and the sub-corresponding relationship of each process chamber 11 corresponding to the pressure range where the target pressure value is located, respectively obtain the pressure control parameters of each process chamber 11 corresponding to the target pressure value.
[0068] For example, the correspondence between the pressure control parameters and the pressure values of each process chamber 11 may include 10 sub-correspondences, that is, N is 10, and the 10 sub-correspondences correspond one-to-one to 10 continuous and non-overlapping pressure ranges divided by the full range of a standard pressure testing device. For example, the 10 continuous and non-overlapping pressure ranges divided by the full range of the standard pressure testing device may be equal to 0 / 10 of the full range of the standard pressure testing device to less than 1 / 10 of the full range of the standard pressure testing device, equal to 1 / 10 of the full range of the standard pressure testing device to less than 2 / 10 of the full range of the standard pressure testing device, equal to 2 / 10 of the full range of the standard pressure testing device to less than 3 / 10 of the full range of the standard pressure testing device, and equal to 3 / 10 of the full range of the standard pressure testing device. The full scale of the pressure testing device is from the full scale of the standard pressure testing device to less than the full scale of the 4 / 10 standard pressure testing device, equal to the full scale of the 4 / 10 standard pressure testing device to less than the full scale of the 5 / 10 standard pressure testing device, equal to the full scale of the 5 / 10 standard pressure testing device to less than the full scale of the 6 / 10 standard pressure testing device, equal to the full scale of the 6 / 10 standard pressure testing device to less than the full scale of the 7 / 10 standard pressure testing device, equal to the full scale of the 7 / 10 standard pressure testing device to less than the full scale of the 8 / 10 standard pressure testing device, equal to the full scale of the 8 / 10 standard pressure testing device to less than the full scale of the 9 / 10 standard pressure testing device, and equal to the full scale of the 9 / 10 standard pressure testing device to less than or equal to the full scale of the 10 / 10 standard pressure testing device.
[0069] For example, if the pressure range of the target pressure value of each process chamber 11 is equal to 4 / 10 of the full scale of the standard pressure detection device to less than 5 / 10 of the full scale of the standard pressure detection device, then when executing step S1, the sub-correspondence relationship of each process chamber 11 corresponding to the pressure range of the target pressure value, which is equal to 4 / 10 of the full scale of the pressure detection device 13 to less than 5 / 10 of the full scale of the pressure detection device 13, is determined; thereafter, the pressure control parameters corresponding to the target pressure value of each process chamber 11 can be obtained respectively according to the target pressure value and the sub-correspondence relationship of each process chamber 11 corresponding to the pressure range of the target pressure value, which is equal to 4 / 10 of the full scale of the pressure detection device 13 to less than 5 / 10 of the full scale of the pressure detection device 13.
[0070] By making the correspondence between the pressure control parameters and the pressure value of each process chamber 11 include N sub-correspondences, and the N sub-correspondences correspond one-to-one with the N continuous and non-intersecting pressure ranges divided by the full range of a standard pressure detection device, the correspondence between the pressure control parameters and the pressure value of each process chamber 11 can be refined, so that the accuracy of each sub-correspondence relative to the correspondence is improved. Since the N sub-correspondences correspond one-to-one with the N continuous and non-intersecting pressure ranges divided by the full range of a standard pressure detection device, the target pressure value will only be in one pressure range, that is, it will only correspond to one sub-correspondence of each process chamber 11, and then according to the sub-correspondence of each process chamber 11 corresponding to the pressure range where the target pressure value is located, the pressure control parameters corresponding to each process chamber 11 and the target pressure value are obtained respectively, so that the accuracy of the obtained pressure control parameters corresponding to the target pressure value of each process chamber 11 can be improved, thereby further improving the pressure consistency of multiple process chambers 11 in semiconductor processes.
[0071] like Figure 1 and Figure 4 As shown, in a preferred embodiment of the present invention, the corresponding relationship between the pressure control parameters and the pressure value of each process chamber 11 can be obtained by the following steps:
[0072] S01, connect each process chamber 11 to the same transfer chamber 12, evacuate the transfer chamber 12, and after the pressure reading of the pressure detection device 14 of the transfer chamber 12 is stable, record the pressure reading as the initial target pressure value;
[0073] S02, recording the first pressure reading of the pressure detection device 13 of each process chamber 11 at this time;
[0074] S03, introducing gas into the transmission chamber 12 until the pressure reading of the pressure detection device 14 of the transmission chamber 12 reaches the upper limit value of its full range, and taking the upper limit value as the maximum target pressure value;
[0075] S04, recording the second pressure reading of the pressure detection device 13 of each process chamber 11 at this time;
[0076] S05 , using a linear fitting algorithm to calculate and obtain a fitting function representing the corresponding relationship of each process chamber 11 according to the initial target pressure value, the maximum target pressure value, and the first pressure indication and the second pressure indication of each process chamber 11 .
[0077] For example, the number of process chambers 11 may be M, and the fitting function may be Y=AX+B, wherein Y is the pressure indication of the pressure detection device 13 of each process chamber 11, and X is the pressure indication of the pressure detection device 14 of the transmission chamber 12. The pressure detection device 14 of the transmission chamber 12 is a standard pressure detection device, and A and B are both constants that can be solved by combining multiple fitting functions.
[0078] Specifically, each process chamber 11 can be connected to the same transfer chamber 12, and the transfer chamber 12 can be evacuated. After the pressure reading of the pressure detection device 14 of the transfer chamber 12 is stable, the pressure reading is recorded as the initial target pressure value X. i At the same time, record the first pressure reading 1Y of the pressure detection device 13 of each process chamber 11 at this time i -MY i Then, gas is introduced into the transmission chamber 12 until the pressure reading of the pressure detection device 14 of the transmission chamber 12 reaches the upper limit of its full range, and the upper limit is taken as the maximum target pressure value X m At the same time, record the second pressure reading 1Y of the pressure detection device 13 of each process chamber 11 at this time m -MY m ; Finally, according to the initial target pressure value X i , Maximum target pressure value X m and the ground pressure indication 1Y of the first process chamber 11 i And the second pressure indication 1Y m , a linear fitting algorithm is used to calculate and obtain a fitting function representing the corresponding relationship of the first process chamber 11, which can be specifically a simultaneous fitting function of 1Y i =AX i +B and 1Y m =AX m +B, the constant A is (1Y m -1Y i ) / (X m -X i ), constant B is (X m 1Y i -X i 1Y m ) / (Xm -X i ), constants A and B are substituted into the fitting function Y=AX+B, so that the fitting function representing the corresponding relationship of the first process chamber 11 can be obtained as Y=(1Y m -1Y i )X / (X m -X i )+(X m 1Y i -X i 1Y m ) / (X m -X i ).
[0079] According to the initial target pressure value X i , Maximum target pressure value X m and the first pressure indication 2Y of the second to Mth process chamber 11 i -MY i and the second pressure indication 2Y m -MY m The method of using a linear fitting algorithm to calculate the fitting function representing the corresponding relationship of the second to Mth process chambers 11 is similar to the above method, which will not be repeated here. For each process chamber 11, its respective constant A and constant B can be solved respectively, and then the fitting function of the respective corresponding relationship can be determined.
[0080] like Figure 1 and Figure 5 As shown, in a preferred embodiment of the present invention, the corresponding relationship between the pressure control parameters and the pressure values of each process chamber 11 can also be obtained by the following steps:
[0081] S001, connect each process chamber 11 to the same transfer chamber 12, evacuate the transfer chamber 12, and after the pressure reading of the pressure detection device 14 of the transfer chamber 12 is stable, record the pressure reading as the initial target pressure value;
[0082] S002, recording the pressure reading of the pressure detection device 13 of each process chamber 11 at this time;
[0083] S003, introducing gas into the transmission chamber 12, so that the pressure reading of the pressure detection device 14 of the transmission chamber 12 reaches N preset target pressure values in sequence, wherein the Nth preset target pressure value is the upper limit value of the full range of the pressure detection device 14 of the transmission chamber 12, and the initial target pressure value and the N preset target pressure values divide the full range into N continuous and non-intersecting pressure ranges;
[0084] S004, when the pressure reading of the pressure detection device 14 of the transfer chamber 12 reaches a preset target pressure value, the pressure reading of the pressure detection device 13 of each process chamber 11 at that time is recorded;
[0085] S005. A linear fitting algorithm is used to calculate a fitting function representing the correspondence between each pressure range of each process chamber 11 based on the initial target pressure value, N preset target pressure values, and the pressure readings of the pressure detection device 13 of each process chamber 11 corresponding to the initial target pressure value and the N preset target pressure values.
[0086] For example, the number of process chambers 11 may be M, and the correspondence between the pressure control parameters and the pressure values of each process chamber 11 may include 10 sub-correspondences, that is, N is 10, and the recorded initial target pressure value, 10 preset target pressure values, and the pressure indications of the pressure detection device 13 of each process chamber 11 corresponding to the initial target pressure value and the 10 preset target pressure values may be as shown in the following table.
[0087]
[0088] In the above table, P represents the full range of the pressure detection device 14 of the transfer chamber 12, X represents the pressure indication of the pressure detection device 14 of the transfer chamber 12, the pressure detection device 14 of the transfer chamber 12 is used as a standard pressure detection device, 1Y represents the pressure indication of the pressure detection device 13 of the first process chamber 11 itself, and MY represents the pressure indication of the pressure detection device 13 of the Mth process chamber 11 itself.
[0089] Specifically, each process chamber 11 can be connected to the same transfer chamber 12, and the transfer chamber 12 can be evacuated. After the pressure reading of the pressure detection device 14 of the transfer chamber 12 is stable, the pressure reading can be recorded, and the initial target pressure value can be X0; at the same time, the pressure readings of the pressure detection devices 13 of each process chamber 11 at this time can be 1Y0-MY0 respectively; then, gas can be introduced into the transfer chamber 12, so that the pressure readings of the pressure detection devices 14 of the transfer chamber 12 can reach the preset target pressure values X1-X1 in sequence. 10 , where the Nth preset target pressure value X 10 is the upper limit value of the full range of the pressure detection device 14 of the transmission chamber 12, the initial target pressure value X0 and 10 preset target pressure values X1-X 10 The full range is divided into 10 continuous and non-intersecting pressure ranges; the pressure reading of the pressure detection device 14 of the transmission chamber 12 reaches a preset target pressure value, that is, each time it reaches X1-X 10The pressure reading of the pressure detection device 13 of each process chamber 11 at this time is recorded, and 10 preset target pressure values X1-X 10 The pressure readings of the pressure detection devices 13 of the corresponding process chambers 11 can be 1Y1-MY1, 1Y2-MY2, 1Y3-MY3, 1Y4-MY4, 1Y5-MY5, 1Y6-MY6, 1Y7-MY7, 1Y8-MY8, 1Y9-MY9 and 1Y 10 -MY 10 Finally, a linear fitting algorithm is used to calculate and obtain the fitting function representing the corresponding relationship of each process chamber 11.
[0090] For example, the fitting function may be Y=AX+B, where Y is the pressure reading of the pressure detection device 13 of each process chamber 11, X is the pressure reading of the pressure detection device 14 of the transfer chamber 12, and A and B are both constants that can be solved by combining multiple fitting functions. The fitting function representing the first sub-correspondence relationship of the first pressure range of the first process chamber 11 calculated by the linear fitting algorithm may be: the combined fitting functions are 1Y0=AX0+B and 1Y1=AX1+B, and the constant A is (1Y1-1Y0) / (X1-X0), and the constant B is (X11Y0-X01Y1) / (X1-X0). The constant A and the constant B are brought into the fitting function Y=AX+B, so that the fitting function representing the first sub-correspondence relationship of the first pressure range of the first process chamber 11 may be Y=(1Y1-1Y0)X / (X1-X0)+(X1Y0-X01Y1) / (X1-X0).
[0091] The method of using a linear fitting algorithm to calculate the fitting function of the 2nd to 10th sub-correspondence corresponding to the second to tenth pressure range of the first process chamber 11 is similar to the above method, which will not be repeated here. Similarly, the method of using a linear fitting algorithm to calculate the fitting function of the 1st to 10th sub-correspondence corresponding to the first to tenth pressure range of the second to Mth process chamber 11 is similar to the above method, which will not be repeated here.
[0092] In a preferred embodiment of the present invention, by connecting each process chamber 11 to the same transfer chamber 12 and evacuating the transfer chamber 12, the pressure of each process chamber 11 can be reduced at the same time, so that when the pressure reading of the pressure detection device 14 of the transfer chamber 12 is stable, the pressure reading of the pressure detection device 13 of each process chamber 11 can be recorded at the same time. In addition, by introducing gas into the transfer chamber 12, the pressure of each process chamber 11 can be increased at the same time, so that when the pressure reading of the pressure detection device 14 of the transfer chamber 12 reaches the upper limit of its full range, or when the pressure reading of the pressure detection device 14 of the transfer chamber 12 reaches a preset target pressure value, the pressure reading of the pressure detection device 13 of each process chamber 11 can be recorded at the same time, thereby shortening the time for recording the pressure reading of each process chamber 11, thereby improving the efficiency of recording the pressure reading of each process chamber 11, and further improving the efficiency of obtaining the corresponding relationship between the pressure control parameter and the pressure value of each process chamber 11.
[0093] In a preferred embodiment of the present invention, the pressure detection device 14 of the transfer chamber 12 can be used as a standard pressure detection device, and the pressure measurement accuracy of the pressure detection device 14 of the transfer chamber 12 can be higher than the pressure measurement accuracy of the pressure detection device 13 of each process chamber 11 itself. This is because in the semiconductor process, corrosive process gases may be introduced into each process chamber 11, and the corrosive process gases may contact with the pressure detection device 13 of each process chamber 11 itself, causing corrosion to the pressure detection device 13 of each process chamber 11 itself, affecting the pressure measurement accuracy and service life of the pressure detection device 13 of each process chamber 11 itself, but will not contact with the pressure detection device 14 of the transfer chamber 12 disconnected from each process chamber 11, and because the cost of the pressure detection device increases with the increase of its pressure measurement accuracy. Therefore, in the semiconductor process, the pressure measurement accuracy of the pressure detection device 13 of each process chamber 11 itself is relatively low, while the pressure measurement accuracy of the pressure detection device 14 of the transfer chamber 12 is relatively high, so as to avoid the semiconductor process from corroding the pressure detection device with higher pressure measurement accuracy, and reduce the use cost of semiconductor process equipment. Since the transfer chamber 12 is connected to each process chamber 11 , when the transfer chamber 12 is connected to each process chamber 11 , the pressure detection device 14 of the transfer chamber 12 can also detect the pressure of the transfer chamber 12 and each process chamber 11 at the same time.
[0094] Furthermore, by recording the pressure indication of the pressure detection device 14 of the transfer chamber 12 with higher recording accuracy as one or more of the initial target pressure value, the maximum target pressure value and the preset target pressure value, the accuracy of one or more of the recorded initial target pressure value, the maximum target pressure value and the preset target pressure value can be improved, thereby improving the accuracy of the corresponding relationship between the pressure control parameters and the pressure values of each process chamber 11, and then improving the accuracy of the pressure control parameters corresponding to the target pressure value obtained for each process chamber 11 according to the same target pressure value of multiple process chambers 11 and the preset correspondence between the pressure control parameters and the pressure values of each process chamber 11, thereby further improving the pressure consistency of multiple process chambers 11 in the semiconductor process.
[0095] like Figure 1 and Figure 6 As shown, in another preferred embodiment of the present invention, for any process chamber 11 in each process chamber 11, the corresponding relationship between the pressure control parameter and the pressure value of the process chamber 11 can be obtained by the following steps:
[0096] S10, placing a standard pressure detection device on the process chamber 11, evacuating the process chamber 11, and recording the pressure reading after the pressure reading of the standard pressure detection device is stable, and taking it as the initial target pressure value;
[0097] S20, recording the first pressure reading of the pressure detection device 13 of the process chamber 11 at this time;
[0098] S30, introducing gas into the process chamber 11 until the pressure reading of the standard pressure detection device reaches the upper limit value of its full range, and taking the upper limit value as the maximum target pressure value;
[0099] S40, recording the second pressure reading of the pressure detection device 13 of the process chamber 11 at this time;
[0100] S50 , using a linear fitting algorithm to calculate a fitting function representing the corresponding relationship of the process chamber 11 according to the initial target pressure value, the maximum target pressure value, the first pressure indication, and the second pressure indication.
[0101] Compared with the method of simultaneously obtaining the correspondence of each process chamber 11 as mentioned above, the method of obtaining the correspondence of each process chamber 11 by obtaining the correspondence of each process chamber 11 one by one differs in that the pressure of each process chamber 11 is detected one by one by a standard pressure detection device, each process chamber 11 is evacuated one by one, and gas is introduced into each process chamber 11 one by one. For example, a standard pressure detection device can be set on the first process chamber 11 to detect the pressure of the first process chamber 11, and a linear fitting algorithm can be used to calculate the fitting function representing the corresponding relationship of the first process chamber 11 based on the initial target pressure value, maximum target pressure value, first pressure indication and second pressure indication of the first process chamber 11. After that, the standard pressure detection device can be removed from the first process chamber 11 and installed on the next process chamber 11 to detect the pressure of the next process chamber 11, and a linear fitting algorithm can be used to calculate the fitting function representing the corresponding relationship of the next process chamber 11 based on the initial target pressure value, maximum target pressure value, first pressure indication and second pressure indication of the next process chamber 11. By repeating this process, the fitting function representing the corresponding relationship of each process chamber 11 can be obtained one by one.
[0102] The corresponding relationship of each process chamber 11 is obtained one by one, and a linear fitting algorithm is used to calculate the fitting function representing the corresponding relationship of each process chamber 11 according to the initial target pressure value, the maximum target pressure value, the first pressure indication and the second pressure indication in the method of obtaining the corresponding relationship of each process chamber 11. The calculation method is similar to the calculation method of using a linear fitting algorithm to calculate the fitting function representing the corresponding relationship of each process chamber 11 according to the initial target pressure value, the maximum target pressure value, the first pressure indication and the second pressure indication in the method of simultaneously obtaining the corresponding relationship of each process chamber 11, and will not be repeated here.
[0103] like Figure 1 and Figure 7 As shown, in a preferred embodiment of the present invention, for any process chamber 11 in each process chamber 11, the corresponding relationship between the pressure control parameter and the pressure value of the process chamber 11 can be obtained by the following steps:
[0104] S100, a standard pressure detection device is installed on the process chamber 11, and the process chamber 11 is evacuated. After the pressure reading of the standard pressure detection device is stable, the pressure reading is recorded and used as the initial target pressure value;
[0105] S200, recording the pressure reading of the pressure detection device 13 of the process chamber 11 at this time;
[0106] S300, introducing gas into the process chamber 11 so that the pressure reading of the standard pressure detection device reaches N preset target pressure values in sequence, wherein the Nth target pressure value is the upper limit value of the full range of the standard pressure detection device, and the initial target pressure value and the N preset target pressure values divide the full range into N continuous and non-intersecting pressure ranges;
[0107] S400, whenever the pressure reading of the standard pressure detection device reaches a preset target pressure value, the pressure reading of the pressure detection device 13 of the process chamber 11 at that time is recorded;
[0108] S500, a linear fitting algorithm is used to calculate a fitting function representing the correspondence between the pressure ranges of the process chamber 11 according to the initial target pressure value, N preset target pressure values, and the pressure readings of the pressure detection device 13 of the process chamber 11 corresponding to the initial target pressure value and the N preset target pressure values.
[0109] Compared with the method of simultaneously obtaining the correspondence of each process chamber 11 as mentioned above, the method of obtaining the correspondence of each process chamber 11 by obtaining the correspondence of each process chamber 11 one by one differs in that the pressure of each process chamber 11 is detected one by one by a standard pressure detection device, each process chamber 11 is evacuated one by one, and gas is introduced into each process chamber 11 one by one. For example, a standard pressure detection device can be set on the first process chamber 11 to detect the pressure of the first process chamber 11, and a linear fitting algorithm can be used to calculate the fitting function representing the corresponding relationship of the first process chamber 11 based on the initial target pressure value of the first process chamber 11, N preset target pressure values, and the pressure indication of the process chamber's own pressure detection device corresponding to the initial target pressure value and the N preset target pressure values. After that, the standard pressure detection device can be removed from the first process chamber 11 and installed on the next process chamber 11 to detect the pressure of the next process chamber 11, and a linear fitting algorithm can be used to calculate the fitting function representing the corresponding relationship of the next process chamber 11 based on the initial target pressure value of the next process chamber 11, N preset target pressure values, and the pressure indication of the process chamber's own pressure detection device corresponding to the initial target pressure value and the N preset target pressure values. By repeating this process, the fitting function representing the corresponding relationship of each process chamber 11 can be obtained one by one.
[0110] The corresponding relationship of each process chamber 11 is obtained one by one, and a linear fitting algorithm is used to calculate the fitting function representing the corresponding relationship of each process chamber 11 according to the initial target pressure value, N preset target pressure values, and the pressure indication of the pressure detection device of the process chamber itself corresponding to the initial target pressure value and the N preset target pressure values in the method of obtaining the corresponding relationship of each process chamber 11. This is similar to the method of simultaneously obtaining the corresponding relationship of each process chamber 11, and a linear fitting algorithm is used to calculate the fitting function representing the corresponding relationship of each process chamber 11 according to the initial target pressure value, N preset target pressure values, and the pressure indication of the pressure detection device of the process chamber itself corresponding to the initial target pressure value and the N preset target pressure values, and it will not be repeated here.
[0111] In a preferred embodiment of the present invention, the pressure measurement accuracy of the standard pressure detection device can be higher than the pressure measurement accuracy of the pressure detection device 13 of each process chamber 11 itself. This is because in the semiconductor process, corrosive process gases may be introduced into each process chamber 11, and the corrosive process gases may contact the pressure detection devices 13 of each process chamber 11 itself, causing corrosion to the pressure detection devices 13 of each process chamber 11 itself, affecting the pressure measurement accuracy and service life of the pressure detection devices 13 of each process chamber 11 itself, while in the semiconductor process, the standard pressure detection device is removed from the process chamber 11, so the corrosive process gas will not contact the standard pressure detection device, and because the cost of the pressure detection device increases with the increase of its pressure measurement accuracy. Therefore, in the semiconductor process, the pressure measurement accuracy of the pressure detection device 13 of each process chamber 11 itself is relatively low, while the pressure measurement accuracy of the standard pressure detection device is relatively high, so as to avoid the corrosion of the standard pressure detection device with higher pressure measurement accuracy caused by the semiconductor process, and reduce the use cost of semiconductor process equipment.
[0112] Furthermore, by recording the pressure indication of a standard pressure detection device with higher accuracy as one or more of the initial target pressure value, the maximum target pressure value and the preset target pressure value, the accuracy of one or more of the recorded initial target pressure value, the maximum target pressure value and the preset target pressure value can be improved, thereby improving the accuracy of the corresponding relationship between the pressure control parameters and the pressure values of each process chamber 11, and then improving the accuracy of the pressure control parameters corresponding to the target pressure value obtained for each process chamber 11 based on the same target pressure value of multiple process chambers 11 and the preset correspondence between the pressure control parameters and the pressure values of each process chamber 11, thereby further improving the pressure consistency of multiple process chambers 11 in the semiconductor process.
[0113] In a preferred embodiment of the present invention, the N preset target pressure values may satisfy the following formula:
[0114]
[0115] Among them, P (i) is the i-th preset target pressure value, i=1, 2, ..., N; P r It is the upper limit value of the full range of the pressure detection device 14 of the transmission chamber 12 or the standard pressure detection device.
[0116] For example, each process chamber 11 correspondence may include 10 sub-correspondences, and the first preset target pressure value is P (1) =1 / 10P r .
[0117] In a preferred embodiment of the present invention, after each process chamber 11 is connected to the same transfer chamber 12 and before gas is introduced into the transfer chamber 12, the overall leakage rate of the transfer chamber 12 and the multiple process chambers 11 can be checked to determine whether the overall leakage rate of the transfer chamber 12 and the multiple process chambers 11 meets the semiconductor process requirements. If the overall leakage rate of the transfer chamber 12 and the multiple process chambers 11 meets the semiconductor process requirements, gas is introduced into the transfer chamber 12.
[0118] In this way, on the premise that the overall leakage rate of the transfer chamber 12 and the multiple process chambers 11 meets the semiconductor process requirements, the pressure indications of each process chamber 11 can be recorded, avoiding the recorded pressure indications of each process chamber 11 being affected by the leakage of the transfer chamber 12 and the various process chambers 11, thereby improving the accuracy of the recorded pressure indications of each process chamber 11, and then improving the accuracy of the corresponding relationship between the pressure control parameters and the pressure values of each process chamber 11, thereby further improving the pressure consistency of multiple process chambers 11 in the semiconductor process.
[0119] In a preferred embodiment of the present invention, before connecting each process chamber 11 with the same transfer chamber 12, the transfer chamber 12 can be disconnected from each process chamber 11, and the leakage rates of the transfer chamber 12 and each process chamber 11 can be detected respectively to determine whether the leakage rates of the transfer chamber 12 and each process chamber 11 meet the semiconductor process requirements. If the leakage rates of the transfer chamber 12 and each process chamber 11 meet the semiconductor process requirements, each process chamber 11 can be connected with the same transfer chamber 12.
[0120] In this way, on the premise that the leakage rates of the transfer chamber 12 and each process chamber 11 meet the semiconductor process requirements, the pressure indications of each process chamber 11 can be recorded, avoiding the recorded pressure indications of each process chamber 11 being affected by the leakage of the transfer chamber 12 and each process chamber 11, thereby improving the accuracy of the recorded pressure indications of each process chamber 11, and then improving the accuracy of the corresponding relationship between the pressure control parameters and the pressure values of each process chamber 11, thereby further improving the pressure consistency of multiple process chambers 11 in the semiconductor process.
[0121] In a preferred embodiment of the present invention, after the transfer chamber 12 is disconnected from each process chamber 11, before the leakage rates of the transfer chamber 12 and each process chamber 11 are detected respectively, the temperature of each process chamber 11 can also be made to reach the semiconductor process temperature.
[0122] In this way, under the premise that the temperature of the transfer chamber 12 and each process chamber 11 reaches the semiconductor process temperature, the pressure indication of each process chamber 11 can be recorded, thereby avoiding the recorded pressure indication of each process chamber 11 being affected by the temperature of the transfer chamber 12 and each process chamber 11, so that the pressure indication of each process chamber 11 recorded at this time is closer to the actual situation of the pressure of each process chamber 11 in the semiconductor process, thereby improving the accuracy of the recorded pressure indication of each process chamber 11, and then improving the accuracy of the corresponding relationship between the pressure control parameters and the pressure values of each process chamber 11, thereby further improving the pressure consistency of multiple process chambers 11 in the semiconductor process.
[0123] like Figure 1 As shown, as another technical solution, an embodiment of the present invention further provides a semiconductor process equipment, including a control device (not shown in the figure) and multiple process chambers 11, each process chamber 11 is provided with a pressure detection device 13, each process chamber 11 corresponds to a pressure control device 15, wherein the pressure detection device 13 is used to detect the pressure of the process chamber 11, and the control device is communicatively connected with the multiple pressure control devices 15, and is used to control the pressure of the process chamber 11 through the pressure control device 15 using the control method provided in the embodiment of the present invention.
[0124] The semiconductor process equipment provided by the embodiment of the present invention enables the control device to communicate with multiple pressure control devices 15, so that the control device adopts the control method of multiple process chamber pressures provided by the embodiment of the present invention to control the pressure of the process chamber 11 through the pressure control device 15, thereby improving the pressure consistency of the multiple process chambers 11 in the semiconductor process.
[0125] Optionally, the pressure detection device 13 may include a pressure gauge.
[0126] Optionally, the pressure control device 15 may include a pressure regulating valve.
[0127] like Figure 1 As shown, in a preferred embodiment of the present invention, the semiconductor process equipment may also include a transfer chamber 12, and a pressure detection device 14 may also be provided on the transfer chamber 12 for detecting the pressure of the transfer chamber 12, and the transfer chamber 12 may be selectively connected to multiple process chambers 11.
[0128] By making the transfer chamber 12 and the plurality of process chambers 11 selectively connectable, when the transfer chamber 12 and the plurality of process chambers 11 are connected, the pressure of each process chamber 11 can be reduced at the same time by evacuating the transfer chamber 12, so that when the pressure indication of the pressure detection device 14 of the transfer chamber 12 is stable, the pressure indication of the pressure detection device 13 of each process chamber 11 can be recorded at the same time. And by introducing gas into the transfer chamber 12, the pressure of each process chamber 11 can be increased at the same time, so that when the pressure indication of the pressure detection device 14 of the transfer chamber 12 reaches the upper limit of its full range, or when the pressure indication of the pressure detection device 14 of the transfer chamber 12 reaches a preset target pressure value, the pressure indication of the pressure detection device 13 of each process chamber 11 can be recorded at the same time, so that the time of recording the pressure indication of each process chamber 11 can be shortened, thereby improving the efficiency of recording the pressure indication of each process chamber 11, and further improving the efficiency of obtaining the corresponding relationship of each process chamber 11.
[0129] In a preferred embodiment of the present invention, each process chamber 11 may be provided with an interface for installing a standard pressure detection device, so that the standard pressure detection device can be connected to each process chamber 11 through the interface provided on each process chamber 11 .
[0130] like Figure 1 As shown, in a preferred embodiment of the present invention, the semiconductor process equipment may further include a plurality of on-off valves 23, and the plurality of on-off valves 23 are arranged one-to-one with the plurality of process chambers 11 between the corresponding process chambers 11 and the transfer chambers 12, and each on-off valve 23 is used to control the on-off between the corresponding process chambers 11 and the transfer chambers 12. That is, by controlling the opening or closing of each on-off valve 23, the corresponding process chambers 11 and the transfer chambers 12 can be connected or disconnected.
[0131] like Figure 1As shown, in a preferred embodiment of the present invention, the semiconductor process equipment may also include a plurality of first gas inlet devices 18, and the plurality of first gas inlet devices 18 are arranged on the corresponding process chambers 11 in a one-to-one correspondence with the plurality of process chambers 11, and each gas inlet device is used to transport semiconductor process gas into the corresponding process chamber 11.
[0132] like Figure 1 As shown, in a preferred embodiment of the present invention, the semiconductor process equipment may further include a second gas inlet device 22 , which is disposed on the transfer chamber 12 and is used to transport gas into the transfer chamber 12 .
[0133] Optionally, the gas delivered into the transmission chamber 12 by the second gas inlet device 22 may be nitrogen.
[0134] like Figure 1 As shown, in a preferred embodiment of the present invention, the semiconductor process equipment may further include a plurality of first gas exhaust pipes 16 and a plurality of first gas exhaust devices 17, wherein the plurality of first gas exhaust pipes 16 are connected to the plurality of process chambers 11 in a one-to-one correspondence, and the plurality of first gas exhaust devices 17 are connected to the plurality of first gas exhaust pipes 16 in a one-to-one correspondence, and each first gas exhaust device 17 is used to exhaust the corresponding process chamber 11 through the corresponding first gas exhaust pipe 16, and the pressure control device 15 of each process chamber 11 is arranged on the corresponding first gas exhaust pipe 16 for adjusting the flow rate of the gas flowing through the corresponding first gas exhaust pipe 16.
[0135] For example, when the first exhaust device 17 exhausts the corresponding process chamber 11, the pressure control parameters corresponding to each process chamber 11 are output to the pressure control devices 15 of each process chamber 11 respectively. With the help of the pressure control device 15, the flow rate of the gas extracted from the corresponding process chamber 11 by the first exhaust device 17 through the corresponding first exhaust pipeline 16 can be adjusted, thereby controlling the pressure of the corresponding process chamber 11 with the help of the pressure control device 15.
[0136] When the first gas inlet device 18 delivers semiconductor process gas into the corresponding process chamber 11, the pressure control parameters corresponding to each process chamber 11 are output to the pressure control devices 15 of each process chamber 11 respectively. With the help of the pressure control device 15, the flow rate of the semiconductor process gas flowing out of the corresponding process chamber 11 through the corresponding first exhaust pipeline 16 can be adjusted, so that the pressure of the corresponding process chamber 11 can be controlled with the help of the pressure control device 15.
[0137] like Figure 1As shown, in a preferred embodiment of the present invention, the semiconductor process equipment may also include a second gas pumping line 19 and a second gas pumping device 21, wherein the second gas pumping line 19 is connected to the transfer chamber 12, and the second gas pumping device 21 is connected to the second gas pumping line 19, and the second gas pumping device 21 is used to pump air from the corresponding process chamber 11 through the corresponding second gas pumping line 19, and the pressure control device 15 of the transfer chamber 12 is arranged on the second gas pumping line 19, for adjusting the flow rate of the gas flowing through the second gas pumping line 19.
[0138] When the transfer chamber 12 is connected to each process chamber 11, the transfer chamber 12 can be evacuated by means of the second exhaust device 21, so that the pressure of each process chamber 11 is reduced at the same time. In this way, on the one hand, it is not necessary to evacuate the corresponding process chamber 11 by means of the first exhaust device 17 of each process chamber 11, thereby reducing the difficulty of operation. On the other hand, since the transfer chamber 12 is connected to each process chamber 11, the efficiency of evacuating the transfer chamber 12 and each process chamber 11 can be improved. The pressure of the transfer chamber 12 can be adjusted by adjusting the flow rate of the gas flowing through the second exhaust pipeline 19 by means of the pressure control device 15 of the transfer chamber 12.
[0139] When each process chamber 11 is connected to the same transfer chamber 12, the second gas inlet device 22 can be used to transport gas into the transfer chamber 12, and then transport gas into each process chamber 11, thereby reducing the difficulty of operation and improving the efficiency of gas transportation.
[0140] In summary, the method for controlling the pressure of multiple process chambers and the semiconductor process equipment provided by the present invention can improve the pressure consistency of multiple process chambers 11 in the semiconductor process.
[0141] It is understood that the above embodiments are merely exemplary embodiments used to illustrate the principles of the present invention, but the present invention is not limited thereto. For those skilled in the art, various modifications and improvements can be made without departing from the spirit and essence of the present invention, and these modifications and improvements are also considered to be within the scope of protection of the present invention.
Claims
1. A method for controlling the pressure of multiple process chambers in a semiconductor process equipment, characterized in that: The following steps are involved: S1, according to the same target pressure value of the plurality of process chambers and the preset corresponding relationship between the pressure control parameter and the pressure value of each process chamber, respectively obtaining the pressure control parameter corresponding to each process chamber and the target pressure value; S2, outputting the pressure control parameters corresponding to the target pressure value of each process chamber to the pressure control device of each process chamber respectively; The corresponding relationship between the process chambers is obtained by the following steps: S01, connecting each of the process chambers to the same transfer chamber, evacuating the transfer chamber, and after the pressure reading of the pressure detection device of the transfer chamber is stable, recording the pressure reading as the initial target pressure value; S02, recording the first pressure reading of the pressure detection device of each process chamber at this time; S03, introducing gas into the transmission chamber until the pressure reading of the pressure detection device of the transmission chamber reaches the upper limit value of its full range, and taking the upper limit value as the maximum target pressure value; S04, recording the second pressure reading of the pressure detection device of each process chamber at this time; S05 , using a linear fitting algorithm to calculate and obtain a fitting function representing the corresponding relationship for each of the process chambers according to the initial target pressure value, the maximum target pressure value, and the first pressure indication and the second pressure indication of each of the process chambers.
2. The control method according to claim 1, characterized in that: The corresponding relationship of each process chamber includes N sub-corresponding relationships, where N is an integer greater than 1; the N sub-corresponding relationships correspond one-to-one to N continuous and non-intersecting pressure ranges divided by the full range of a standard pressure detection device; The step S1 comprises: S11, determining a sub-corresponding relationship of each process chamber corresponding to a pressure range where the target pressure value is located; S12, obtaining pressure control parameters corresponding to the target pressure value for each process chamber according to the target pressure value and the sub-corresponding relationship corresponding to the pressure range where the target pressure value is located for each process chamber.
3. The control method according to claim 2, characterized in that: The corresponding relationship between the process chambers is obtained by the following steps: S001, connecting each of the process chambers to the same transfer chamber, evacuating the transfer chamber, and after the pressure reading of the pressure detection device of the transfer chamber is stable, recording the pressure reading as the initial target pressure value; S002, recording the pressure reading of the pressure detection device of each process chamber at this time; S003, introducing gas into the transmission chamber so that the pressure reading of the pressure detection device of the transmission chamber reaches N preset target pressure values in sequence, wherein the Nth preset target pressure value is the upper limit value of the full range of the pressure detection device of the transmission chamber, and the initial target pressure value and the N preset target pressure values divide the full range into N continuous and non-intersecting pressure ranges; S004, every time the pressure reading of the pressure detection device of the transfer chamber reaches the preset target pressure value, the pressure reading of the pressure detection device of each process chamber at that time is recorded; S005. A linear fitting algorithm is used to calculate and obtain a fitting function representing the sub-correspondence for each pressure range of each process chamber based on the initial target pressure value, the N preset target pressure values, and the pressure indications of the pressure detection devices of each process chamber corresponding to the initial target pressure value and the N preset target pressure values.
4. The control method according to claim 3, characterized in that: The N preset target pressure values satisfy the following formula: Among them, P (i) is the i-th preset target pressure value, i=1, 2, ..., N; P r It is the upper limit value of the full range of the pressure detection device of the transmission chamber.
5. A method for controlling the pressure of multiple process chambers in a semiconductor process equipment, characterized in that: The following steps are involved: S1, according to the same target pressure value of the plurality of process chambers and the preset corresponding relationship between the pressure control parameter and the pressure value of each process chamber, respectively obtaining the pressure control parameter corresponding to each process chamber and the target pressure value; S2, outputting the pressure control parameters corresponding to the target pressure value of each process chamber to the pressure control device of each process chamber respectively; For any process chamber among the process chambers, the corresponding relationship of the process chamber is obtained by the following steps: S10, placing a standard pressure detection device on the process chamber, evacuating the process chamber, and recording the pressure reading after the pressure reading of the standard pressure detection device is stable, and taking it as the initial target pressure value; S20, recording the first pressure reading of the pressure detection device of the process chamber itself at this time; S30, introducing gas into the process chamber until the pressure reading of the standard pressure detection device reaches the upper limit value of its full range, and taking the upper limit value as the maximum target pressure value; S40, recording the second pressure reading of the pressure detection device of the process chamber itself at this time; S50, using a linear fitting algorithm to calculate a fitting function representing the corresponding relationship of the process chamber according to the initial target pressure value, the maximum target pressure value, the first pressure indication, and the second pressure indication.
6. The control method according to claim 5, characterized in that: The corresponding relationship of each process chamber includes N sub-corresponding relationships, where N is an integer greater than 1; the N sub-corresponding relationships correspond one-to-one to N continuous and non-intersecting pressure ranges divided by the full range of a standard pressure detection device; The step S1 comprises: S11, determining a sub-corresponding relationship of each process chamber corresponding to a pressure range where the target pressure value is located; S12, obtaining pressure control parameters corresponding to the target pressure value for each process chamber according to the target pressure value and the sub-corresponding relationship corresponding to the pressure range where the target pressure value is located for each process chamber.
7. The control method according to claim 6, characterized in that: For any process chamber among the process chambers, the corresponding relationship of the process chamber is obtained by the following steps: S100, placing a standard pressure detection device on the process chamber, evacuating the process chamber, and recording the pressure reading after the pressure reading of the standard pressure detection device is stable, and taking it as the initial target pressure value; S200, recording the pressure reading of the pressure detection device of the process chamber itself at this time; S300, introducing gas into the process chamber so that the pressure reading of the standard pressure detection device reaches N preset target pressure values in sequence, wherein the Nth target pressure value is the upper limit value of the full range of the standard pressure detection device, and the initial target pressure value and the N preset target pressure values divide the full range into N continuous and non-intersecting pressure ranges; S400, each time the pressure reading of the standard pressure detection device reaches the preset target pressure value, recording the pressure reading of the pressure detection device of the process chamber itself at that time; S500, using a linear fitting algorithm to calculate and obtain a fitting function representing the sub-correspondence for each pressure range of the process chamber based on the initial target pressure value, the N preset target pressure values, and the pressure indications of the pressure detection device of the process chamber itself corresponding to the initial target pressure value and the N preset target pressure values.
8. The control method according to claim 7, characterized in that: The N preset target pressure values satisfy the following formula: Among them, P (i) is the i-th preset target pressure value, i=1, 2, ..., N; P r It is the upper limit value of the full range of the standard pressure detection device.
9. A semiconductor process equipment, characterized in that: It includes a control device and a plurality of process chambers, each of which is provided with a pressure detection device, and each of which corresponds to a pressure control device, wherein: The pressure detection device is used to detect the pressure of the process chamber, and the control device is communicatively connected with a plurality of the pressure control devices, and is used to control the pressure of the process chamber through the pressure control devices using the control method described in any one of claims 1 to 8.
10. The semiconductor process equipment according to claim 9, characterized in that: The semiconductor process equipment also includes a transfer chamber, and a pressure detection device is also provided on the transfer chamber for detecting the pressure of the transfer chamber. The transfer chamber can be selectively connected to the plurality of process chambers.
11. The semiconductor process equipment according to claim 9, characterized in that: Each process chamber is provided with an interface for installing a standard pressure detection device.