A short-term power outage maintenance method for ring network units based on temporary power supply application

By using medium voltage temporary mobile power supply in a radial cable network for one-time grid connection and system mains cooling inversion, the large-scale power outage problem during ring network unit maintenance is solved, and the power supply reliability and power business environment are improved. , significantly reduce the number of households lost during power outages.

CN113541294BActive Publication Date: 2024-11-22ZHEJIANG DAYOU INDUSTRIAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110600350.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-05-31
Publication Date
2024-11-22
Estimated Expiration
2041-05-31

AI Technical Summary

Technical Problem

In a radial cable network, the maintenance of the ring network unit will cause large-scale power outages, affecting the reliability of power supply and user power satisfaction.

Method used

The medium voltage temporary mobile power supply is used to connect to the backend non-maintenance ring network unit of the maintenance section. Through the system's mains power supply, the ring network unit to be repaired is isolated through the method of connecting to the system's mains and cooling inverted access, maintaining normal power supply to its backend, reducing Loss of households during power outage.

Benefits of technology

This greatly reduces the number of households during power outages caused by the maintenance of radial cable networks, improves power supply reliability and power business environment, and brings economic and social benefits to enterprises.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113541294B_ABST
    Figure CN113541294B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for short-term power outage maintenance of a ring network unit based on temporary power supply application. A medium-voltage temporary mobile power supply is adopted to access the non-maintenance ring network unit at the rear end of the maintenance section. The ring network unit to be repaired on the radial cable network is isolated by means of primary grid connection of the medium-voltage temporary mobile power supply and cold reverse connection of the system mains. The rear end of the ring network unit to be repaired is kept normally powered by the temporary mobile power supply, which greatly reduces the loss of households caused by the power outage maintenance of the ring network unit and the cable lines on both sides thereof, effectively improves the power supply reliability and the power business environment, and brings huge economic and social benefits to the enterprise.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of maintenance of a ring network unit in a distribution network, and in particular to a short-time power outage maintenance method for a ring network unit based on temporary power supply application. Background Art

[0002] With the continuous development of the national economy and the continuous advancement of urbanization, in municipal construction projects, roads within the red line of the construction plan are often excavated and repaired. At this time, the cable trenches under these roads and the power facilities such as the ring network units on the roads also need to be shut down for maintenance to cooperate with the relocation and transformation of municipal projects. In addition, there are some cases where the ring network units on the cable network need to be shut down for maintenance. For example, after a certain period of operation of normal power cable lines, in order to avoid equipment failure, it is also necessary to regularly shut down and repair the power facilities such as the ring network units and rotate them regularly. For example, when there are new user access needs around the ring network unit and the switch cabinets in the original ring network unit are insufficient, the ring network unit also needs to be shut down for maintenance and connection and assembly of the switch cabinet.

[0003] Since these ring network units are usually in a live operating state, the ring network units must be powered off when performing the above-mentioned maintenance. For single-ring or double-ring cable networks with ring network connection, when performing the above-mentioned maintenance, the user loads connected to other ring network units on both sides of the ring network unit can maintain power supply through the opposite power supply or another busbar with a bus-connecting cable.

[0004] like Figure 1 In the single-ring cable network shown, when any of the ring network units is displaced, replaced or reconnected, the open-loop point of the entire single-ring cable network can be changed to maintain normal power supply to the ring network units in the non-maintenance sections on both sides of the maintenance ring network unit. For example, if the A1 ring network unit needs to be replaced, the open-loop point can be set at the incoming switch of the A2 ring network unit, so that all the ring network units between the A2 ring network unit and the B1 ring network unit are powered by the busbar of the B substation. Therefore, when the A1 ring network unit is repaired, it will not affect the normal power consumption of other ring network units in the single-ring cable network.

[0005] Another example Figure 2 In the double-ring cable network shown in the figure, when any of the ring network units is under maintenance, the opening point of the double-ring cable network can be changed to ensure the normal power supply of the ring network units in the non-maintenance sections on both sides of the maintenance ring network unit. For example, if the A1 ring network unit on the cable line AⅠ needs to be replaced, the opening point can be set at the A2 ring network unit. At this time, all the ring network units between the A2 ring network unit and the B1 ring network unit can be powered by the B substation I busbar or by the interconnection cable 2 and the interconnection cable 3 through the B substation II busbar and the A substation II busbar. Therefore, when the A1 ring network unit on the cable line AⅠ is replaced, it will not affect the normal power consumption of other ring network units on the cable network.

[0006] However, for a radial cable network, when one of the ring network units needs maintenance, the remaining ring network units at the rear of the ring network unit will lose power because the power supply from the opposite side cannot be transferred as in the single-ring and double-ring cable network structures mentioned above.

[0007] like Figure 3 In the radial cable network shown in the figure, when the A ring network unit is overhauled and replaced, the B ring network unit and all the ring network units at the rear end will lose power supply, resulting in the loss of power supply for the user load connected to the above ring network unit. Since the maintenance of the ring network unit, such as relocation, replacement, and reconnection, often takes a long time, for the radial cable network, in addition to the power outage for users on the A ring network unit, all the ring network units from the B ring network unit to the rear end will also be out of service, resulting in a large number of household losses during the power outage, seriously affecting the normal power consumption of users in the non-maintenance section at the rear end of the A ring network unit, seriously affecting the power supply reliability and the power business environment, as well as user satisfaction with power consumption. Summary of the invention

[0008] In view of the problem that large-scale power outages may occur when a ring network unit in a radial cable network is overhauled in the prior art, the present invention provides a short-term power outage maintenance method for ring network units based on temporary power supply application, in which a medium-voltage temporary mobile power supply is used to access the non-maintenance ring network unit at the rear end of the maintenance section, and the ring network units to be repaired on the radial cable network are isolated by means of primary grid connection of the medium-voltage temporary mobile power supply and cold reverse connection of the system mains. The rear end of the ring network unit to be repaired is maintained with normal power supply by the temporary mobile power supply, which greatly reduces the loss of households caused by the power outage for maintenance of the ring network unit and the cable lines on both sides thereof, effectively improves the power supply reliability and the power business environment, and brings huge economic and social benefits to enterprises.

[0009] The following is the technical solution of the present invention.

[0010] A method for short-time power outage maintenance of a ring network unit based on temporary power application comprises the following steps:

[0011] Connect the temporary mobile power supply to the ring network unit immediately adjacent to the rear end of the faulty or under-repair ring network unit, start the temporary mobile power supply and charge the flexible cable for connection;

[0012] Check the phase sequence and adjust the output power of the temporary mobile power supply, connect the mains power and the temporary mobile power supply to the grid once, and after the grid connection is successful once, change all the ring network units at the rear of the faulty or under-repair ring network unit to the temporary mobile power supply;

[0013] According to the dispatching instructions, all the ring network cabinet switches, upper incoming line switches and incoming line ring network cabinets of the ring network units adjacent to the rear end in the faulty or to-be-maintained ring network unit are changed to the maintenance state, and the faulty or to-be-maintained ring network unit and the cable incoming lines on both sides are shut down for maintenance;

[0014] After the inspection and maintenance is completed, the temporary mobile power supply is shut down and each ring network unit is gradually switched to AC power supply.

[0015] In the method adopted by the present invention, the ring network unit in the non-maintenance section will only produce a short power outage of several minutes when the system mains power supply is connected back. Compared with the power outage maintenance of the ring network unit, which takes at least several hours at a time, it greatly reduces the loss of households during the power outage caused by the maintenance of the radial cable network ring network unit, and greatly improves the power supply reliability and power business environment. The temporary mobile power supply is connected to and exited from the grid cable once, and the switch cabinet switch in the ring network unit is disconnected and changed to the maintenance state, which will not cause power outages to other user loads on the ring network unit and cause household losses.

[0016] Preferably, the temporary mobile power supply is connected to the ring network unit adjacent to the rear end of the faulty or to-be-repaired ring network unit, comprising: selecting an idle ring network cabinet in the first ring network unit adjacent to the rear end of the faulty or to-be-repaired ring network unit as a temporary access ring network cabinet, and on the premise that the temporary access ring network cabinet is changed to a maintenance state through a switching operation, a temporary mobile power supply primary grid-connected cable is connected to the temporary access ring network cabinet by a power outage method.

[0017] Preferably, the starting and charging of the temporary mobile power supply comprises: starting the temporary mobile power supply, placing the primary grid-connected switch of the temporary mobile power supply in the disconnected position, and then changing the temporary access ring main unit to the operating state through a switching operation, and charging the primary grid-connected cable with system AC power.

[0018] Preferably, the phase sequence check and adjustment of the output power of the temporary mobile power supply include: if the phase sequence is inconsistent, it is necessary to adjust the connection sequence of phases A and C of the primary grid-connected cable of the medium-voltage temporary mobile power supply in the primary grid-connected ring network cabinet connected to the ring network unit, and perform the phase sequence check again; if the phase sequence is consistent, adjust the output power of the temporary mobile power supply, and when the temporary mobile power supply is synchronized with the system mains power supply, the primary grid-connected switch on the temporary mobile power supply is closed and connected to the grid, and the radial cable network is now powered by both the temporary mobile power supply and the system mains.

[0019] Preferably, the method of changing the power supply of all the ring network units at the rear end of the faulty or under-repaired ring network unit to a temporary mobile power supply includes: disconnecting the switch of the incoming ring network cabinet in the first ring network unit immediately adjacent to the rear end of the faulty or under-repaired ring network unit, and changing it to a hot standby state, so that the first ring network unit and other ring network units at the rear end are powered by a temporary mobile power supply.

[0020] Preferably, the stepwise changing each ring network unit to be powered by the mains comprises: first changing the ring network unit after maintenance to be powered by the mains, and then changing the remaining ring network units to be powered by the mains.

[0021] Preferably, the ring network unit after maintenance is changed to AC power supply, including: changing the incoming switch and the outgoing switch of the ring network cabinet that has been repaired from the maintenance state to the hot standby state, and changing the incoming ring network cabinet in the first ring network unit adjacent to the rear end of the ring network unit that has been repaired to the hot standby state; changing the upper incoming switch from the maintenance state to the operating state, and then closing the incoming switch and the outgoing switch of the ring network cabinet after maintenance in turn, removing the grounding wires of the user ring network cabinets remaining in the maintenance state in the ring network unit, and changing the switches of the user switch cabinets from the maintenance state to the operating state one by one. At this time, the ring network unit after maintenance is powered by the system AC power.

[0022] Preferably, the remaining ring network units are changed to AC power supply, including: checking the phase sequence between the incoming switch cabinet in the first ring network unit adjacent to the rear end of the overhauled ring network unit and the switch cabinet adjacent to the primary grid-connected cable, if the phase sequence is incorrect, finding the reverse phase of the line and correcting the phase; after the phase sequence is correct, disconnecting the temporary mobile power supply primary grid-connected switch, and shutting down the temporary mobile power supply, adjusting the incoming ring network cabinet switch of the ring network unit connected to the primary grid-connected cable to the operating state, restoring the system AC power supply of the entire radial cable network, and then changing the ring network cabinet connected to the primary grid-connected cable to the maintenance state, removing the primary grid-connected cable in a power outage manner, the temporary mobile power supply is shut down, and finally changing the ring network cabinet connected to the primary grid-connected cable to the hot standby state.

[0023] The substantial effects of the present invention include: isolating the ring network unit to be repaired on the radial cable network by means of temporary mobile power supply once connected to the grid and cold reverse connection of the system mains, and maintaining normal power supply at the rear end of the ring network unit to be repaired by a temporary mobile power supply, which greatly reduces the loss of households caused by power outages for repairing the ring network unit and the cable lines on both sides thereof, effectively improves the power supply reliability and the power business environment, and brings huge economic and social benefits to enterprises.

[0024] Compared with the existing complete power outage maintenance method, the use of this method to repair radial cable network ring network units will only cause a short power outage of several minutes when the system mains power supply is connected back to the ring network units in the non-maintenance section. Compared with the single power outage maintenance of the ring network units, which takes at least several hours, it greatly reduces the loss of households caused by the power outage caused by the maintenance of radial cable network ring network units, and greatly improves the power supply reliability and power business environment. The access and exit of the medium-voltage temporary mobile power supply is carried out when the switch cabinet switch in the ring network unit is disconnected and changed to the maintenance state, which will not cause power outages to other user loads on the ring network unit and cause household losses. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 This is a wiring diagram of a single-ring cable network;

[0026] Figure 2 It is a wiring diagram of a double-ring cable network with limited interconnection;

[0027] Figure 3 This is a schematic diagram of the wiring of the radial cable network;

[0028] Figure 4 A wiring diagram for preparing a radial cable network for grid connection;

[0029] Figure 5 This is a wiring diagram of a temporary mobile power supply after it is successfully connected to the grid;

[0030] Figure 6 A wiring diagram for the ring network unit to be repaired to exit the radial cable network for power outage maintenance;

[0031] Figure 7 A schematic diagram of the system's mains power supply wiring after the repair is completed;

[0032] Figure 8 This is the wiring diagram after the medium voltage temporary mobile power supply is disconnected. DETAILED DESCRIPTION

[0033] The technical scheme of the present application will be described below in conjunction with the embodiments. In addition, in order to better illustrate the present invention, numerous specific details are provided below. It should be understood by those skilled in the art that the present invention can be implemented without certain specific details. In some instances, methods, means, components and circuits well known to those skilled in the art are not described in detail in order to highlight the gist of the present invention.

[0034] Example:

[0035] A method for short-time power outage maintenance of a ring network unit based on temporary power application comprises the following steps:

[0036] Connect the temporary mobile power supply to the ring network unit immediately adjacent to the rear end of the faulty or under-repair ring network unit, start the temporary mobile power supply and charge the flexible cable for connection; specifically, it includes: selecting an idle ring network cabinet in the first ring network unit immediately adjacent to the rear end of the faulty or under-repair ring network unit as the temporary access ring network cabinet, and on the premise that the temporary access ring network cabinet is changed to the maintenance state through the switching operation, the temporary mobile power supply primary grid-connected cable is connected to the temporary access ring network cabinet by power outage. Start the temporary mobile power supply, put the primary grid-connected switch of the temporary mobile power supply in the disconnected position, and then change the temporary access ring network cabinet to the operating state through the switching operation, and charge the primary grid-connected cable with the system mains.

[0037] Check the phase sequence and adjust the output power of the temporary mobile power supply, connect the mains and temporary mobile power supply to the grid once, and after the grid connection is successful, change all the ring network units at the rear of the faulty or under-repair ring network unit to the temporary mobile power supply; specifically, if the phase sequence is inconsistent, it is necessary to adjust the connection sequence of the A and C phases of the medium-voltage temporary mobile power supply primary grid-connected cable in the primary grid-connected ring network cabinet of the ring network unit, and check the phase sequence again; if the phase sequence is consistent, adjust the output power of the temporary mobile power supply, and when the temporary mobile power supply is synchronized with the system mains power supply, the primary grid-connected switch on the temporary mobile power supply is closed and connected to the grid, and the radial cable network is now powered by the temporary mobile power supply and the system mains at the same time. Disconnect the incoming ring network cabinet switch in the first ring network unit immediately adjacent to the rear of the faulty or under-repair ring network unit, and change it to hot standby mode, so that the first ring network unit and other ring network units at the rear are powered by the temporary mobile power supply.

[0038] According to the dispatching instructions, all the ring network cabinet switches, upper incoming line switches and incoming line ring network cabinets of the ring network units adjacent to the rear end in the faulty or to-be-maintained ring network unit are changed to the maintenance state, and the faulty or to-be-maintained ring network unit and the cable incoming lines on both sides are shut down for maintenance;

[0039] After the overhaul is completed, the temporary mobile power supply is shut down, and each ring network unit is gradually changed to be powered by the mains. This includes: first changing the overhauled ring network unit to be powered by the mains, and then changing the remaining ring network units to be powered by the mains. Changing the overhauled ring network unit to be powered by the mains includes: changing the incoming switch and outgoing switch of the overhauled ring network cabinet from the overhaul state to the hot standby state, changing the incoming ring network cabinet in the first ring network unit immediately adjacent to the rear end of the overhauled ring network unit to the hot standby state; changing the upper incoming switch from the overhaul state to the operating state, and then closing the incoming switch and outgoing switch of the overhauled ring network cabinet in turn, removing the grounding wires of the remaining user ring network cabinets in the overhaul state in the ring network unit, and changing the switches of the user switch cabinets from the overhaul state to the operating state one by one. At this time, the overhauled ring network unit is powered by the system mains. Check the phase sequence between the incoming switch cabinet in the first ring network unit adjacent to the rear end of the overhauled ring network unit and the adjacent switch cabinet connected to the primary grid-connected cable. If the phase sequence is incorrect, find the reverse phase of the line and correct the phase; after the phase sequence is correct, disconnect the temporary mobile power supply primary grid-connected switch, and shut down the temporary mobile power supply, adjust the incoming ring network cabinet switch of the ring network unit connected to the primary grid-connected cable to the operating state, restore the system AC power supply of the entire radial cable network, and then change the ring network cabinet connected to the primary grid-connected cable to the maintenance state, remove the primary grid-connected cable in a power outage, shut down the temporary mobile power supply, and finally change the ring network cabinet connected to the primary grid-connected cable to the hot standby state.

[0040] The solution of this embodiment is further explained below in conjunction with the accompanying drawings.

[0041] like Figure 4As shown: Due to the needs of municipal construction or equipment operation and maintenance, it is necessary to shut down the ring network unit A in the radial cable network for maintenance (replacement, relocation, reconnection, etc.). At this time, the medium-voltage temporary mobile power supply is connected to the primary grid to ensure the continuous power supply to the ring network unit B and its rear-end load on the radial cable network during the above-mentioned power outage maintenance.

[0042] like Figure 4 As shown: Assume that the switch of the outgoing line switch cabinet of ring network unit A is FK / , the switch of the incoming switch cabinet of ring network unit B is the boundary switch FK. The switch of the primary grid-connected switch cabinet of ring network unit B is K1 / In disconnected state.

[0043] Connect the ring network unit B to the primary grid switch cabinet switch K1 / The switch is switched to the maintenance state. The dispatcher allows the on-site operator to connect the medium-voltage temporary mobile power supply 1# flexible cable to the primary grid-connected interval; then the primary grid-connected switch K1 of the ring network unit B is connected. / The switch is switched to the operating state, and the medium-voltage temporary mobile power supply 1# flexible cable is charged with system AC power.

[0044] Start the medium voltage temporary mobile power supply and start the phase sequence check preparation before the first grid connection: if the phase sequence is consistent, press the "first grid connection switch" button on the control screen, the controller automatically detects the output deviation between the mains and the medium voltage temporary mobile power supply, and starts to automatically adjust the output power of the medium voltage temporary mobile power supply. When the medium voltage temporary mobile power supply is synchronized with the system power supply, the synchronization meter pointer on the controller is aligned with the twelve o'clock direction, and the medium voltage temporary mobile power supply first grid connection switch K1 is automatically closed and connected to the grid; if the phase sequence is inconsistent, the control panel displays "phase sequence inconsistent", then it is necessary to adjust the connection sequence of the medium voltage temporary mobile power supply 1# flexible cable A and C phases in the ring network unit B first grid connection switch cabinet. After the first grid connection is successful, Figure 5 As shown, the medium voltage temporary mobile power source first grid-connected switch K1 is in a closed state, and at this time the radial cable network is powered by the medium voltage temporary mobile power source and the system at the same time.

[0045] like Figure 6 As shown, according to the dispatching instruction, the boundary switch FK of the incoming switch cabinet of the ring network unit B is changed to hot standby. At this time, the ring network unit B and its rear-end load are powered by a medium-voltage temporary mobile power supply, and the ring network unit A is powered by the system mains.

[0046] like Figure 6 As shown, according to the dispatching instructions, the two user switch cabinets in the ring network unit A are opened in turn and changed to the maintenance state, and then the switch FK of the outgoing line switch cabinet of the ring network unit A is opened. / , open the ring network unit A line switch cabinet switch, then open the upper power supply (substation, station) outgoing line switch K and change to maintenance state, and then turn on the ring network unit A outgoing line switch cabinet switch FK in turn. / And ring network unit A to change the line switch cabinet switch to maintenance status.

[0047] like Figure 6 As shown, finally, the switch FK of the incoming switch cabinet of ring network unit B is changed to maintenance state, and the ring network unit B and the rear-end load are all powered by the medium-voltage temporary mobile power supply. The ring network unit A and the incoming and outgoing cables on both sides are all in the power-off maintenance state, and power-off maintenance (relocation, replacement, reconnection, etc.) can be carried out.

[0048] like Figure 7 As shown in the figure, after the power outage maintenance (relocation, replacement, reconnection, etc.) of the ring network unit A and its inlet and outlet cables on both sides is completed, according to the dispatching instruction, the switch FK of the inlet switch cabinet of the ring network unit B is changed from the maintenance state to the disconnected hot standby state. / Change the maintenance status to the disconnected hot standby status, and change the line switch cabinet switch of the ring network unit A from the maintenance status to the disconnected hot standby status.

[0049] Then change the outgoing line switch K of the upper power source (substation, station) from the maintenance state to the operating state. Then close the line switch cabinet switch of the ring network unit A, close the outgoing line switch cabinet switch FK of the ring network unit A in sequence. / .

[0050] Then change the two user switch cabinets in the ring network unit A from the maintenance state to the operation state, and restore the system mains power supply to load 1 and load 2. At this time, the ring network unit A is powered by the system mains, and the ring network unit B and its rear-end loads are powered by the medium-voltage temporary mobile power supply.

[0051] Check the phase sequence between the incoming switch cabinet of ring network unit B and the adjacent primary grid-connected switch cabinet. If the phase sequence is incorrect, arrange the construction team to find the reverse phase of the cables in ring network unit A and both sides and correct the phase (try to reduce the scope of power outage); after the phase sequence is correct, open the switch K1 of the primary grid-connected switch cabinet of ring network unit B. / , and then immediately according to the dispatching instructions, close the boundary switch FK of the incoming switch cabinet of the ring network unit B and adjust it to the operating state. After a short power outage, load 3, load 4 and the rear-end load are restored to the system mains power supply. Finally, open the medium-voltage temporary mobile power supply primary grid-connected switch K1, and press the "stop" button. The medium-voltage temporary mobile power supply is shut down. At this time, the ring network unit A, ring network unit B and their rear-end loads on the radial cable network are all restored to the system mains power supply.

[0052] like Figure 8 As shown, open the primary grid-connected switch K1 of ring network unit B. / The ring network unit B primary grid-connected switch cabinet was changed from operation to maintenance state, the 1# flexible cable of the medium voltage temporary mobile power supply was removed, and the medium voltage temporary mobile power supply was shut down and out of operation. The radial cable network resumed the normal system mains power supply operation mode.

[0053] In this embodiment, the upper power source can be a substation or a station, or a ring network unit, and the upper power switch can be a substation or station outlet switch K, or an outlet switch cabinet switch of the upper ring network unit. That is, the radial cable network ring network unit short-term power outage maintenance method can be applied to the ring network unit at the head end of the radial cable network, and can also be applied to the ring network unit at the non-head end of the radial cable network.

[0054] In this embodiment, before the ring network unit A and the incoming and outgoing cables on both sides are shut down for maintenance (shifting, replacement, reconnection, etc.), a medium-voltage temporary mobile power source is connected to the grid in a one-time manner, thereby ensuring the normal power supply of the ring network unit and the rear-end load in the non-maintenance section (that is, during the maintenance process of the ring network unit A and the incoming and outgoing cables on both sides, the ring network unit and the rear-end load in the non-maintenance section are powered by the medium-voltage temporary mobile power source). After the ring network unit A and the incoming and outgoing cables on both sides are shut down for maintenance (shifting, replacement, reconnection, etc.), the cold reverse switching method is used to restore the system mains power supply to the ring network unit and the rear-end load in the non-maintenance section. Only a short power outage of several minutes will occur during the cold reverse switching during the entire process. Figure 7 For example, open the primary grid-connected switch K1 of ring network unit B. / , and then close the boundary switch FK of the ring network unit B incoming switch cabinet. It takes about 5 minutes for example. Compared with the normal power outage, it takes at least several hours to repair the ring network unit and the incoming and outgoing cables on both sides. The loss of dozens of households during the power outage is greatly reduced, effectively improving the power supply reliability and power business environment, and bringing huge economic and social benefits to enterprises.

[0055] In the method adopted in this embodiment, the ring network unit in the non-maintenance section will only have a short power outage of several minutes when it is connected to the system mains power supply. Compared with the power outage maintenance of the ring network unit, which takes at least several hours at a time, it greatly reduces the loss of households caused by the maintenance of the radial cable network ring network unit, and greatly improves the power supply reliability and power business environment. The temporary mobile power supply is connected to and exited from the grid cable once, and the switch cabinet switch in the ring network unit is disconnected and changed to the maintenance state, which will not cause power outages to other user loads on the ring network unit and cause household losses.

[0056] Through the description of the above implementation modes, those skilled in the art can understand that the disclosed method can be implemented in other ways. The above content is only a specific implementation mode of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or replacements within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be based on the protection scope of the claims.

Claims

1. A short-term power outage maintenance method for a ring network unit based on temporary power application, characterized in that: The following steps are involved: Connect the temporary mobile power supply to the ring network unit immediately adjacent to the rear end of the faulty or under-repair ring network unit, start the temporary mobile power supply and charge it; check the phase sequence and adjust the output power of the temporary mobile power supply, and switch all the ring network units behind the faulty or under-repair ring network unit to the temporary mobile power supply; According to the dispatching instructions, all the ring network cabinet switches, upper incoming line switches and incoming line ring network cabinets of the ring network units adjacent to the rear end in the faulty or to-be-maintained ring network unit are changed to the maintenance state, and the faulty or to-be-maintained ring network unit and the cable incoming lines on both sides are shut down for maintenance; After the inspection is completed, the temporary mobile power supply is shut down and each ring network unit is gradually switched to AC power supply; The method of connecting the temporary mobile power supply to the ring network unit adjacent to the rear end of the faulty or to-be-repaired ring network unit comprises: selecting an idle ring network cabinet in the first ring network unit adjacent to the rear end of the faulty or to-be-repaired ring network unit as the temporary access ring network cabinet, and, on the premise that the temporary access ring network cabinet is changed to the maintenance state through the switching operation, connecting the temporary mobile power supply primary grid-connected cable to the temporary access ring network cabinet in a power-off manner; The method of starting the temporary mobile power supply and charging the temporary mobile power supply comprises: starting the temporary mobile power supply, placing the primary grid-connected switch of the temporary mobile power supply in the disconnected position, and then changing the temporary access ring main unit to the running state through a switching operation, and charging the primary grid-connected cable with the system mains; The phase sequence check and adjustment of the output power of the temporary mobile power supply include: if the phase sequence is inconsistent, it is necessary to adjust the connection sequence of the A and C phases of the primary grid-connected cable of the medium-voltage temporary mobile power supply in the primary grid-connected ring network cabinet connected to the ring network unit, and check the phase sequence again; if the phase sequence is consistent, adjust the output power of the temporary mobile power supply, when the temporary mobile power supply is synchronized with the system mains power supply, the primary grid-connected switch on the temporary mobile power supply is closed and connected to the grid, and the radial cable network is powered by the temporary mobile power supply and the system mains power at the same time; The method of changing all the ring network units at the rear end of the faulty or to-be-repaired ring network unit to be powered by a temporary mobile power supply comprises: disconnecting the incoming ring network cabinet switch in the first ring network unit immediately adjacent to the rear end of the faulty or to-be-repaired ring network unit, changing the switch to a hot standby state, so that the first ring network unit and other ring network units at the rear end are powered by a temporary mobile power supply; The stepwise changing each ring network unit to be powered by the mains includes: first changing the ring network unit after maintenance to be powered by the mains, and then changing the remaining ring network units to be powered by the mains; The said changing the ring network unit after maintenance to mains power supply comprises: changing the incoming switch and the outgoing switch of the ring network cabinet after maintenance from the maintenance state to the hot standby state, changing the incoming ring network cabinet in the first ring network unit immediately adjacent to the rear end of the ring network unit after maintenance to the hot standby state; changing the upper incoming switch from the maintenance state to the operating state, and then closing the incoming switch and the outgoing switch of the ring network cabinet after maintenance in sequence, removing the grounding wires of the user ring network cabinets remaining in the maintenance state in the ring network unit, and changing the switches of the user switch cabinets from the maintenance state to the operating state one by one, at which time the ring network unit after maintenance is powered by the system mains; The method of changing the remaining ring network units to AC power supply includes: checking the phase sequence between the incoming switch cabinet in the first ring network unit adjacent to the rear end of the overhauled ring network unit and the adjacent switch cabinet connected to the primary grid-connected cable, and if the phase sequence is incorrect, finding the reverse phase of the line and correcting the phase; after the phase sequence is correct, disconnecting the temporary mobile power supply primary grid-connected switch, and shutting down the temporary mobile power supply, adjusting the incoming ring network cabinet switch of the ring network unit connected to the primary grid-connected cable to the operating state, restoring the system AC power supply of the entire radial cable network, and then changing the ring network cabinet connected to the primary grid-connected cable to the overhaul state, removing the primary grid-connected cable in a power outage manner, and shutting down the temporary mobile power supply, and finally changing the ring network cabinet connected to the primary grid-connected cable to the hot standby state.