A test pit excavation device for testing compaction by sand filling method
By designing a test pit excavation device for sand filling method detection, the motor drives the crimping dragon to cut the soil and collect the soil slag, and adjust the angle through the level to ensure vertical excavation, the scattering of the soil slag and irregular shape of the test pit are solved. The problem has improved the detection efficiency and accuracy.
Patent Information
- Application Number
- CN202111085816.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-16
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2041-09-16
AI Technical Summary
When the existing sand filling method detects compaction, the pit digging tool causes soil slag to fall, affecting the efficiency of subsequent processes, and the shape of the test pit is difficult to meet the specification requirements, affecting the detection accuracy.
Design a test pit excavation device including a frame, sleeve, twisted dragon and level. The twisted dragon is driven by a motor to cut the soil and collect the soil and slag. The level adjusts the angle of the device to ensure vertical excavation, and the fixing frame prevents position changes.
It reduces the labor intensity of staff, improves the efficiency of soil slag collection, ensures that the shape of the test pit complies with the specifications, and improves the accuracy of detection.
Smart Images

Figure CN113668490B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of roadbed compaction detection, in particular to a test pit excavation device for detecting compaction using a sand filling method. Background Art
[0002] Compaction is the main control index of fill engineering quality. There are many commonly used detection methods at present, including sand filling method, ring knife method, nuclear density meter method, etc. Nuclear density meter method This method is suitable for using a nuclear density meter on site to measure the density and moisture content of roadbed or pavement materials by scattering method or direct method, and calculate the compaction degree, but it is expensive. The pit digging and sand filling method is one of the most commonly used test methods for testing compaction. It is suitable for on-site determination of the density and compaction of various material compaction layers of base, gravel pavement and roadbed soil. The tools used include sand filling cylinders, base plates, metal calibration tanks, balances, small shovels, etc. The diameter of the excavated soil sample is determined by the diameter of the circular hole on the base plate. In the actual process, when the staff uses the pit digging tool, the pit digging tool will cause the excavated soil to scatter on the roadbed, affecting the subsequent process. Therefore, there is a need for a device that is easy to use, can handle the excavated soil residue, and the excavated test pit can meet the requirements of the specification. Summary of the invention
[0003] The present invention aims to provide a test pit excavation device for detecting compaction degree by sand filling method, which is used for collecting excavated soil when the test pit is excavated.
[0004] The present invention is achieved through the following technical scheme: a test pit excavation device for detecting compaction degree by sand filling method, comprising a frame and a sleeve, the sleeve is fixedly arranged in the frame, a movable plate is movably arranged in the frame, the top of the movable plate is connected with a connecting rod, the other end of the connecting rod passes through the frame and is connected with an operating rod, the bottom of the movable plate is fixedly connected with a motor, the output end of the motor is connected with an auger, the bottom of the auger is fixedly arranged with a through rod, the cavity formed between the sleeve and the frame is a accommodating cavity, the side wall of the upper half of the sleeve is provided with an unearthed port, the bottom of the frame is provided with a collecting box, and the collecting box is connected with the unearthed port.
[0005] According to the specifications, the shape of the test pit should be cylindrical, the pit should be vertical, and the depth of the test pit should be equal to the thickness of the measured layer; however, in the actual process, when the workers use the digging tools, after the digging is completed, the excavated soil debris will be taken out together with the digging tools, causing the excavated soil to be scattered on the roadbed, affecting the start of subsequent processes and affecting efficiency. Therefore, in view of the above problems, a test pit excavation device for testing compaction by sand filling method is proposed, which can reduce the labor intensity of the staff, and the excavated test pit can meet the requirements of the specification. The specific implementation method is: when excavating the test pit, first select a flat fill roadbed, and then press the operating rod, the tip at the bottom of the through-rod makes it easy to insert or drill into the soil; when the through-rod enters the soil to a predetermined depth, turn on the motor, the auger can cut the soil, and when the sleeve enters the soil to a predetermined depth, take out the through-rod and the frame, and take out the loosened soil to form a test pit; when the auger is working, the blade will drive the soil residue to rise, and when the soil residue rises to the exit of the sleeve, under the action of centrifugal force, the soil residue will enter the holding cavity from the exit, and then enter the collection box. While digging the pit, the device collects the loosened soil, and after taking out the device, there is no need to deal with the residual soil, and the test pit can be formed. The device is easy to use, greatly reduces the labor intensity of the staff, and collects the excavated soil residue while excavating the test pit, improving work efficiency.
[0006] During use, it was found that when the auger with a smooth bottom reaches the ground, it is easy to spin on the surface of the ground and cannot enter the soil to perform cutting work. In order to solve the above problem, the radius of the end of the auger close to the core rod is gradually reduced, and the end of the auger close to the core rod is provided with cutting teeth. The cutting teeth can assist the auger in the operation of trial pit excavation, prevent the auger from being unable to enter the soil, and improve the applicability of the device.
[0007] Furthermore, the collecting box is threadedly connected to the frame. After the drilling is completed, the collecting box can be removed from the frame, and the soil residue can be poured out of the collecting box to complete the excavation sampling work. The detachable collecting box facilitates the processing of the soil residue in the box and improves the practicality of the device.
[0008] The excavation of the test pit must meet the requirements of the specification, otherwise it will affect the accuracy of the detection. In the specification requirements, the excavation angle of the device is a very important factor, but in actual work, it is difficult to ensure that the device is excavated in the vertical direction by relying solely on the judgment of the staff themselves. In response to the above problems, a level is further provided on the top of the frame. The staff can use the level to adjust the setting angle of the machine so that the auger and the core needle are in a vertical state with the roadbed excavation position, and then excavate. The excavated test pit can meet the requirements of the specification to improve the accuracy of the detection.
[0009] After the pit is dug, there will be soil residues left in the auger that have not entered the collection box. Excessive soil residues will affect the operation of the auger. In view of the above problem, further, a first protrusion is provided on the outer wall of the motor, the first protrusion is in the shape of an arc, a second protrusion is provided on the top of the inner wall of the frame, and slot holes are provided on both sides of the frame. A limit plate is movably provided in the slot hole, the limit plate is provided between the first protrusion and the second protrusion, the second protrusion is in the shape of an arc, when the first protrusion and the second protrusion of the auger are in the same plane, the motor works, and the first protrusion contacts the second protrusion. After the pit is dug, the limit plate is removed, the operator lifts the joystick to make the first protrusion and the second protrusion in the same plane, starts the motor, the first protrusion on the outer wall of the motor cooperates with the second protrusion on the inner wall of the frame, and the first protrusion continuously hits the second protrusion during rotation, which can drive the frame and the motor to vibrate, loosen the remaining soil residue, and facilitate the material drop. The limit plate can prevent the first protrusion from contacting the second protrusion during the pit digging work, affecting the operation of the device.
[0010] Furthermore, a fixing frame is fixedly provided on the side wall of the frame, and a fixing nail is fixedly provided on the top of the fixing frame. When a test pit needs to be excavated, the position of the roadbed to be tested is first determined, and the angle is determined by a level meter, and then the fixing nails at the bottom of the fixing frame are embedded in the soil to fix the device. The fixing frame and the nails can prevent the position of the device from changing during subsequent work, resulting in the excavated test pit not meeting the specification requirements, affecting the accuracy of the detection.
[0011] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0012] 1. When digging a test pit, first select a flat fill roadbed, then press the operating rod, and the tip at the bottom of the core rod makes it easy to insert or drill into the soil; when the core rod enters the soil to a predetermined depth, turn on the motor, and the auger can cut the soil. When the sleeve enters the soil to a predetermined depth, remove the core rod and the frame, and remove the loosened soil to form a test pit; this device is easy to use. When the auger is working, the blade will drive the soil residue to rise. When the soil residue rises to the exit of the sleeve, under the action of centrifugal force, the soil residue will enter the holding cavity from the exit, and then enter the collection box. The device collects the loosened soil while digging the pit, which improves work efficiency.
[0013] 2. The staff can use the spirit level to adjust the angle of the chassis so that the auger and the core needle are vertical to the roadbed, and then excavate. The excavated test pit can meet the specification requirements to improve the accuracy of the test. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention.
[0015] In the attached picture:
[0016] Figure 1 It is a structural schematic diagram of the present invention;
[0017] Figure 2 is a schematic diagram of the structure of the sleeve when the first protrusion is in contact with the second protrusion;
[0018] Marks and corresponding parts names in the attached drawings:
[0019] 1-auger, 2-cutting teeth, 3-sleeve, 4-motor, 5-connecting rod, 6-operating rod, 7-through rod, 8-movable plate, 9-level, 10-collecting box, 11-fixing frame, 12-fixing nail, 13-excavation port, 14-first protrusion, 15-second protrusion, 16-frame, 17-limiting plate. DETAILED DESCRIPTION
[0020] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0021] Embodiment 1:
[0022] like Figure 1 to Figure 2As shown, a device for detecting the compaction degree of roadbed based on the sand filling method includes a cylindrical frame 16, a level meter 9 is arranged on the top of the frame 16, a movable plate 8 is arranged inside the frame 16, one end of the connecting rod 5 is connected to the movable plate 8, and the other end passes through the frame 16 and is connected to the level meter 9 and the operating rod 6, and pressing the operating rod 6 can drive the movable plate 8 to move. A motor 4 is fixedly arranged at the bottom of the movable plate 8, and the output end of the motor 4 is fixedly connected to the auger 1, and the auger 1 is provided with a spiral blade. When the auger 1 is working, the blade will cut the soil and drive the soil residue to rise. The outer sleeve of the auger 1 is provided with a sleeve 3, which is fixedly connected to the frame 16. An unearthed opening 13 is provided on the side wall of the upper end of the sleeve 3, and a collecting box 10 is provided below the unearthed opening 13. The output end of the unearthed opening 13 is connected to the collecting box 10. When the auger 1 is working, the blade will drive the soil residue to rise. When the soil residue rises to the unearthed opening 13 of the sleeve 3, under the action of centrifugal force, the soil residue will enter the accommodating cavity from the unearthed opening 13 and then enter the collecting box 10. While digging a pit, the device collects the loosened soil. After the device is taken out, there is no need to deal with the remaining soil, and a test pit can be formed. It is easy to use and improves work efficiency. A through rod 7 is fixedly provided at the end of the auger 1 away from the motor 4, and a tip is provided at the bottom of the through rod 7. The radius of the end of the auger 1 away from the motor 4 gradually decreases, and a cutting tooth 2 is provided at the end of the auger 1 away from the motor 4. When the operating rod 6 is pressed, the tip at the bottom of the core rod 7 makes it easy to insert or drill into the soil, and the cutting teeth 2 can assist the auger 1 in the operation of trial pit excavation to prevent the auger 1 from being unable to enter the soil.
[0023] The outer wall of the motor 4 is provided with a first protrusion 14, which is in the shape of an arc. The bottom of the inner wall of the frame 16 is provided with a second protrusion 15, which is in the shape of an arc. The length of the radius of the first protrusion 14 and the radius of the second protrusion 15 added together is greater than the distance between the outer wall of the motor 4 and the inner wall of the frame 16. After the pit is dug, the limit plate 17 is removed, and the operator lifts the joystick to make the first protrusion 14 and the second protrusion 15 in the same plane, and then starts the motor 4. The first protrusion 14 on the outer wall of the motor 4 matches with the second protrusion 15 on the inner wall of the frame 16. When rotating, the first protrusion 14 continuously hits the second protrusion 15, which can drive the frame 16 and the auger 1 to vibrate, loosen the soil residue remaining in the auger 1 and the frame 16, and facilitate the dropping of materials.
[0024] Two fixing frames 11 are fixedly arranged on the side walls of the frame 16, and the two fixing frames 11 are arranged on both sides of the frame 16. The fixing frames 11 include a horizontally arranged fixing plate, a vertically arranged supporting plate is arranged at the bottom of the fixing plate, and an iron nail is arranged vertically downward at the bottom of the supporting plate. When it is necessary to excavate a test pit, the position of the roadbed to be tested is first determined, and the angle is determined by the level meter 9. Then, the iron nails on the fixing frames 11 are embedded in the soil to fix the device. The fixing frames 11 and the iron nails can prevent the position of the device from changing in subsequent work, resulting in the excavated test pit not meeting the specification requirements and affecting the accuracy of the detection.
[0025] The specific use process of this embodiment is as follows: when digging a test pit, first select a flat fill roadbed, and after determining the horizontal state with the spirit level 9, press the operating lever 6, and the tip at the bottom of the through rod 7 makes it easy to insert or drill into the soil; when the through rod 7 enters the soil to a predetermined depth, turn on the motor 4, the auger 1 can cut the soil, and the blade will drive the soil residue to rise. When the soil residue rises to the discharge port 13 of the sleeve 3, under the action of centrifugal force, the soil residue will enter the accommodating cavity from the discharge port 13, and then enter the collecting box 10. When the sleeve 3 enters the soil to a predetermined depth, take out the through rod 7 and the frame 16, and take out the loosened soil to form a test pit. The device is easy to use and greatly reduces the labor intensity of the staff. At the same time, the excavation depth is easy to grasp, which effectively improves the accuracy of the detection.
[0026] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A test pit excavation device for testing compaction by sand filling method, comprising a frame (16) and a sleeve (3), characterized in that: The sleeve (3) is fixedly arranged in a frame (16), and a movable plate (8) is movably arranged in the frame (16). The top of the movable plate (8) is connected to a connecting rod (5), and the other end of the connecting rod (5) passes through the frame (16) and is connected to the operating rod (6). The bottom of the movable plate (8) is fixedly connected to a motor (4), the output end of the motor (4) is connected to an auger (1), and the bottom of the auger (1) is fixedly provided with a through-rod (7). The cavity formed between the sleeve (3) and the frame (16) is a receiving cavity, a soil discharge port (13) is provided on the side wall of the upper half of the sleeve (3), a collecting box (10) is provided at the bottom of the frame (16), and the collecting box (10) is in communication with the soil discharge port (13); The radius of the end of the auger (1) close to the core-penetrating rod (7) gradually decreases; a spiral blade is provided on the auger (1); and a cutting tooth (2) is provided on the end of the auger (1) close to the core-penetrating rod (7); The collection box (10) is threadedly connected to the frame (16); A level (9) is provided on the top of the frame (16); A first protrusion (14) is provided on the outer wall of the motor (4), and the first protrusion (14) is arc-shaped. A second protrusion (15) is arranged on the top of the inner wall of the frame (16); slot-shaped holes are arranged on both sides of the frame (16); a limit plate (17) is movably arranged in the slot-shaped hole; the limit plate (17) is arranged between the first protrusion (14) and the second protrusion (15); the second protrusion (15) is in an arc shape; when the first protrusion (14) and the second protrusion (15) are in the same plane, the motor (4) works and the first protrusion (14) contacts the second protrusion (15); A fixing frame (11) is fixedly arranged on the side wall of the frame (16), and a fixing nail (12) is fixedly arranged on the bottom of the fixing frame (11).
