Method for regulating the periodic production of containers by stretch blow molding

By initializing and automatically updating the adjustment parameters in the stretch blowing machine, the adjustment suspension problem caused by changes in the mechanical operating parameters is solved, the production stability and finished product quality are improved, and the need to manually restore the reference point is avoided.

CN113692342BActive Publication Date: 2024-11-26SIDEL PARTICIPATIONS SAS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202080029033.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2019-04-17
Filing Date
2020-03-30
Publication Date
2024-11-26
Estimated Expiration
2040-03-30

AI Technical Summary

Technical Problem

During the periodic stretch blowing of the production container, changes in mechanical operating parameters lead to abortion of adjustment, requiring manual restoration of the reference point, resulting in deviations in the pre-blowing process and reduced production capacity.

Method used

By configuring and storing multiple operating parameters in the initialization process, monitoring and automatically updating adjustment parameters ensures that stable production continues while the operator changes the mechanical operating parameters, avoiding manual recovery of the reference point.

Benefits of technology

It realizes automatic update of adjustment parameters when the mechanical operating parameters are changed, maintains production stability, reduces the deviation of pre-blowing process and the reduction of production capacity, and improves the safety and reliability of production and finished product quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113692342B_ABST
    Figure CN113692342B_ABST
Patent Text Reader

Abstract

A method for regulating the cyclic production of containers (2) from preforms (3) by stretching and blowing, comprising: a) an initialization process, during the production cycle, initializing a plurality of operating parameters of a machine (1) and regulating parameters of at least one reference position (Ac, Bc, PCab, Fc) of at least one characteristic point (A, B, Pab, F) of a pre-blowing curve, b) regulating the production process, wherein: b1) the pre-blowing curve is determined and stored, the actual time and / or the actual pressure corresponding to the characteristic point (A, B, Pab, F) is calculated, and b2) the actual time and / or the actual pressure are calculated according to the actual time and the reference pressure. The difference between the actual time and / or the actual pressure and the reference pressure is used to calculate the new value of at least one operating parameter of the machine (1), characterized in that the adjustment of the production process includes a monitoring step b3) for monitoring the operator's possible changes in the value of the operating parameter of the machine (1), and also includes a process for automatically updating the adjustment parameters, having: c1) a stabilization step, in which production is continued, action b1) is executed, and action b2) is stopped; c2) a correction step, according to the actual time value and / or actual pressure value stored in the stabilization step, the reference time and / or reference pressure is corrected to continue adjusting the production process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for regulating the cyclic production of containers by stretch blowing from preforms made of plastic in a machine having one or more stretch blowing stations, each of which is designed to produce containers during a production cycle, each of which is equipped with a pre-blowing solenoid valve which fluidically connects the preform to a source of pressure fluid during the pre-blowing operation. Background Art

[0002] The production of containers by cyclic stretch blow molding generally involves heating a preform made of plastic until the glass transition temperature of the preform, then introducing the heated preform into a mold, injecting a pressurized fluid into the preform to form the container in the mold, and removing the container from the mold.

[0003] The injection of the pressurized fluid itself comprises several successive steps. The first so-called pre-blowing step consists in injecting a low-pressure pre-blowing fluid, generally between 5 and 16 bar, into the preform to form a bubble while the preform is stretched by the stretching rod. The stretching rod causes a mechanical stretching in the longitudinal direction of the preform, while the injection of the pressurized fluid causes a stretching in a transverse direction perpendicular to the longitudinal direction. The stretching is therefore bidirectional, to ensure a uniform distribution of the material and a good orientation of the molecular chains.

[0004] The second so-called blowing step consists in injecting a high pressure fluid generally above 25 bar, usually between 30 and 35 bar. The blowing step allows the bubble formed by the preform made of plastic to be pressed against the mold wall, thereby forming a well-formed container with a desired shape.

[0005] The pre-blowing process is extremely important in the unfolding of the preform plastic and in the orientation of the molecular chains. Pre-blowing defects cause poor material distribution, resulting in containers that are defective due to fragility. In the context of high production schedule industrial production, pre-blowing should be controlled to ensure the quality of the containers formed from the plastic preforms. From the document WO2013178903 it is known to adjust the periodic production of containers by a machine with a stretch-blowing station based on a reference point of the internal pressure of the preform according to the time recorded during the pre-blowing process at a station called the reference station. The pressure reference point that varies with time is used to adjust the machine in order to change the adjustment of a station where the pressure measured at a given time or for the time to reach a given pressure exceeds the tolerance area around the reference pressure or the reference moment for this point.

[0006] It can happen that the operator imposes a change on one or more operating parameters of the machine, for example when new preforms are used which have different characteristics in terms of composition or heating temperature before pre-blowing.

[0007] However, changes in the operating parameters of the machine during the production process may cause the regulation to be suspended, and the periodic production of the container may continue without regulation. Therefore, the reference point must be manually taken again so that the regulation can be restored.

[0008] As a result, there will be deviations in the pre-blowing process and a reduction in production capacity.

[0009] There therefore exists a need to improve the operation of a machine when an operator disturbs the regulating system. Summary of the invention

[0010] To this end, the invention relates to a method for regulating the cyclic production of containers made of plastic preforms by stretch blowing in a machine having one or more stretch blowing stations, each of which is designed to produce containers during a production cycle, each of which is equipped with a pre-blowing solenoid valve which, during the pre-blowing operation, fluidically connects the preforms to a source of pressure fluid that provides a pre-blowing flow, said method comprising:

[0011] a) an initialization process, the initialization process comprising the steps of configuring and storing a plurality of operating parameters and adjustment parameters of the machine (1) during a production cycle by an operator, the adjustment parameters comprising at least one reference position (Ac, Bc, PCab, Fc) of at least one characteristic point (A, B, Pab, F) of a pre-blowing curve corresponding to the internal pressure of the preform during at least a portion of the pre-blowing, the reference position (Ac, Bc, PCab, Fc) being determined by a reference time and / or a reference pressure,

[0012] b) regulating the production sequence, during which, for each production cycle, at least one preform is stretched and blown by injecting a pressurized fluid at each stretch-blow station, during which:

[0013] - b1) determining and storing, for at least one reference station of the machine, a pre-blowing curve with said characteristic points, calculating or determining the actual time and / or the actual pressure corresponding to said characteristic points (A, B, Pab, F) of the determined pre-blowing curve, and

[0014] - b2) calculating and storing a new value of at least one operating parameter of the machine based on the difference between the actual time and the reference time and / or between the actual pressure and the reference pressure,

[0015] The regulation method is characterized in that the regulation production process comprises a monitoring step b3) for monitoring possible changes imposed by an operator on the value of an operating parameter of the machine,

[0016] The adjustment method also includes a process of automatically updating the adjustment parameters, which is implemented under the condition of applying a change in the operating parameters of the machine, including:

[0017] c1) a stabilization step, during which production continues based on the operating parameters applied during a predetermined stabilization period, and for each production cycle, action b1) is performed, action b2) is stopped, and

[0018] c2) a correction step for correcting the reference time and / or reference pressure according to the actual time value and / or actual pressure value stored during the stabilization step, so as to continue to adjust the production process.

[0019] By means of the automatic updating process of the control parameters, the method according to the invention allows the control to continue in the case of applied changes to the operating parameters of the machine, and manual restoration of the reference point is no longer necessary.

[0020] Other features according to the present method, taken alone or in any technically feasible combination:

[0021] - the mechanical operating parameters that can be recalculated during step b2) are taken from: the opening control time of the pre-blowing solenoid valve (TRo), the value or time profile of the pre-blowing flow rate (Dp), the pre-blowing pressure or the time profile of the stretch rod stroke,

[0022] - the adjustment parameter comprises storing at least one permissible tolerance of the actual position (Ar, Br, PRab, Fr) of at least one characteristic point (A, B, Pab, F) of the pre-blowing curve selected relative to a reference position of the characteristic point (A, B, Pab, F); and if the difference is smaller than the permissible tolerance, a new value of the operating parameter of the machine (1) is not calculated.

[0023] Therefore, when the difference between the actual time and the reference time and / or between the actual pressure and the reference pressure is small, the value of the machine operating parameter that is required to be changed is maintained without having a significant impact on the production capacity of the machine.

[0024] Other features according to the present method, taken alone or in any technically feasible combination:

[0025] - The adjustment parameters include the reference time (Ac) at which the pressure in the preform begins to increase, that is, the pre-blowing start reference time (Ac), and the tolerance for the pre-blowing start reference time (Ac);

[0026] Furthermore, if the time difference between the actual time (Ar) at which pre-blowing starts in the preform of the reference station and the time difference (Ac) at which pre-blowing starts at the reference station lags behind or precedes the reference time (Ac) at which pre-blowing starts is greater than the allowable tolerance, a new value of the calculated opening control time (TRo) of the pre-blowing solenoid valve of each stretch-blowing station is advanced or delayed by the time difference in all stretch-blowing stations.

[0027] - Adjustment parameters also include:

[0028] A reference moment (Bc) of a pre-blowing pressure peak in a preform and an allowable tolerance for the reference moment (Bc) of the pre-blowing pressure peak, wherein the adjustment of the production process b) first includes a possible change in the applied opening control moment (TRo) of the pre-blowing solenoid valve until a production cycle in which the actual moment (Ar) of the start of pre-blowing in the preform is less than the allowable tolerance of the start of pre-blowing, and for subsequent production cycles, the actual moment (Br) of the pre-blowing pressure peak is calculated, and if the time difference between the actual moment of the pre-blowing pressure peak and the reference moment (Bc) of the pre-blowing pressure peak is greater than the allowable tolerance, a new value of the pre-blowing flow rate (Dp) is calculated that is reduced or increased relative to the value of the pre-blowing flow rate (Dp) during the production cycle at which the actual moment (Br) of the pre-blowing pressure peak has been calculated.

[0029] - the adjustment parameters also include a pressure increase reference slope (PCab) between the pre-blowing start characteristic point (A) and the pressure peak characteristic point (B), and an allowable tolerance for the pressure increase reference slope (PCab),

[0030] Furthermore, the adjustment of the production process first includes the possible changes applied to the opening control time (TRo) of the pre-blowing solenoid valve until the production cycle in which the actual time (Ar) of the start of pre-blowing in the preform is less than the permissible tolerance of the start of pre-blowing; the adjustment of the production process then includes the possible changes applied to the pre-blowing flow rate (Dp) until the production cycle in which the actual time (Ar) of the start of pre-blowing and the actual time (Br) of the peak pre-blowing pressure are less than the permissible tolerances of each,

[0031] Then, for the subsequent production cycle, the actual slope of pressure increase (PRab) between the actual time of pre-blowing start (Ar) and the actual time of pre-blowing pressure peak (Br) is calculated. If the difference between the actual slope of pressure increase (PRab) and the pressure increase reference slope (PCab) is greater than the slope tolerance, then calculate:

[0032] a new value of the nominal pre-blow flow rate or a new pre-blow flow rate time profile, and / or a new value of the pressure fluid source pressure, and / or

[0033] The time profile of the stretching of the stretching rod or the new value of the nominal speed.

[0034] - Step b1) includes only or additionally the following operations:

[0035] Detection of the moment (Ar) at which the pressure in the preform begins to increase, called the actual moment (Ar) of the start of pre-blowing in the reference station or in another station;

[0036] Storing the actual moment when pre-blowing started;

[0037] Calculate the actual moment of the end of pre-blowing so that:

[0038] The actual time when pre-blowing ends = the actual time when pre-blowing starts + Δt-δ, where Δt is the predetermined opening time of the pre-blowing solenoid valve, and δ is a predetermined constant;

[0039] Based on the pressure measurement result performed in step b1), the actual pressure at the end of pre-blowing (Fr) is derived therefrom;

[0040] Compare the actual pre-blowing end pressure (Fr) thus determined with the pre-blowing end reference pressure (Fc) of the reference station;

[0041] If the actual pressure at the end of pre-blowing (Fr) deviates from the reference pressure at the end of pre-blowing (Fc) by a value greater than the permissible tolerance, a new value of the pre-blowing flow rate (Dp) is calculated that is reduced or increased relative to the value of the pre-blowing flow rate (Dp) during the production cycle at the actual moment (Fr) at which the pre-blowing end has been calculated.

[0042] Therefore, when the required mechanical operating parameters such as the solenoid valve opening time or the pre-blowing flow rate may change, the mechanical adjustment parameters are automatically updated as soon as it is no longer possible to remain within the allowable tolerance, and the mechanical operating parameters that do not require change are newly calculated.

[0043] According to other features of the method, the adjustment parameters include storing at least one adjustment limit value for at least one operating parameter of the machine (1), which is called a monitored parameter, and the action b2) of the adjustment production step also includes comparing the new value calculated for the monitored parameter with the adjustment limit value. When the adjustment limit value is exceeded, an adjustment degradation warning is issued, and the adjustment production continues based on the new value of the monitored parameter, and the new value of the monitored parameter is taken from: the value during the previous production cycle, the value entered in the initialization process, or a combination of these values.

[0044] Therefore, the value of the monitored parameter cannot exceed the regulation limit, if it exceeds the regulation limit, the regulation will be degraded.

[0045] According to other characteristics of the method, the regulation method uses a machine equipped with a first station and a second station, one of these stations being a reference station, each station having a pressure sensor for sensing the internal pressure of the preform in the station and a pre-blowing solenoid valve having a response time between the opening control moment (TRo) of the pre-blowing solenoid valve and the effective start of the pressure increase in the preform, in which method the regulation parameters include the start of pre-blowing and the predetermined response time; and, in addition to the new value of the opening control moment (TRo) of the pre-blowing solenoid valve, the actual response time is calculated.

[0046] If the actual response time is greater than the expected response time, then:

[0047] Issue a base station deviation warning, and / or

[0048] For the subsequent production cycle, the reference opening time of the pre-blowing solenoid valve (17) of the second station is calculated, and the second station is then regarded as the new reference station.

[0049] Thus, in the event of a response time that is too long, for example due to aging of the pre-blowing solenoid valve of the reference station, making the regulation reference erroneous, warning of a reference station deviation and / or determining a new station to be used as reference station for subsequent production cycles allows to avoid regulation errors.

[0050] The present invention also relates to a machine for periodically producing preforms made of plastic by stretch blow molding, the machine comprising: a fluid source having a pre-blowing pressure; one or more stretch blow molding stations, each of which has a mold, the mold having a mold cavity for receiving the preform; an electromagnetic valve, suitable for connecting the interior of the preform received in the mold cavity with the fluid source according to a predetermined pre-blowing flow rate (Dp); an on-off control device for controlling the opening and closing of the electromagnetic valve; a sensor, suitable for measuring the internal pressure of the preform; a detection device for detecting the moment when the pressure in the preform begins to increase, that is, the actual moment (Ar) when pre-blowing begins; a comparison device, used to compare the actual moment (Ar) when pre-blowing begins with a reference moment (Ac) when pre-blowing begins; and an adjustment device for adjusting the opening control moment (TRo) of the electromagnetic valve according to the comparison result.

[0051] The machine is characterized in that it also has a monitoring device for monitoring possible changes in the operating parameters of the machine imposed by the operator, an analyzing device for analyzing the time curve of the internal pressure of a series of preforms during an unregulated stabilization process, and an updating device connected to the analyzing device for updating at least one adjustment reference.

[0052] The machine allows the application of the method according to the invention, is configured to detect possible changes imposed by an operator, analyze a series of pressure-time curves during a non-adjustment stabilization process, and update at least one adjustment reference. Thus, the machine can continue to perform adjustments without the intervention of an operator to update the adjustment reference.

[0053] According to other features used alone or in combination according to the method:

[0054] -The aforementioned machine also has a controllable device suitable for changing the flow rate of the pressure fluid or a controllable variable flow electromagnetic valve; a time detection device for detecting the moment when the pressure in the preform reaches the peak, that is, the actual moment of the pre-blowing pressure peak (Br); a comparison device for comparing the actual moment of the pre-blowing pressure peak (Br) with the pressure peak reference moment (Bc); and a regulating device for regulating the flow rate injected into the preform according to the comparison result.

[0055] The aforementioned machine also has a calculation device for calculating the actual slope (PRab) of the pressure increase between the pressure measured at the actual moment (Ar) of the start of pre-blowing and the pressure measured at the actual moment (Br) of the pre-blowing pressure peak; a comparison device for comparing the actual slope (PRab) with the reference slope (PCab); a regulating device for regulating the pre-blowing flow rate (Dp) injected into the preform according to the comparison result, and / or a regulating device for regulating the pressure of the pressure fluid source according to the comparison result, and / or a regulating device for regulating the nominal speed or time profile of the stretching of the stretching rod according to the comparison result.

[0056] The aforementioned machine also has a timing detection device for detecting the moment when the pressure in the preform starts to increase again, that is, the actual moment when the pre-blowing ends; a comparison device for comparing the actual pre-blowing end pressure (Fr) measured at the actual moment when the pre-blowing ends with the pre-blowing end reference pressure (Fc); and a pre-blowing flow rate adjustment device for adjusting the pre-blowing flow rate (Dp) injected into the preform according to the comparison result.

[0057] Therefore, regardless of the comparison result between the reference time and the actual time of the start of pre-blowing, the comparison result between the reference time and the actual time of the pressure peak, the comparison result between the reference slope and the actual slope of the pressure increase between the start of pre-blowing and the pressure peak, and the comparison result between the reference time and the actual time of the end of pre-blowing, the machine is configured to continue to adjust. The present invention also relates to:

[0058] - A computer program product for execution on the aforementioned container manufacturing machine, the computer program product having instructions for: controlling the opening and closing of the pre-blowing solenoid valve; controlling the pre-blowing flow rate (Dp); taking into account the actual time (Ar) at the start of pre-blowing; taking into account the reference time (Ac) at the start of pre-blowing; comparing the actual time (Ar) at the start of pre-blowing with the reference time (Ac) at the start of pre-blowing; adjusting the opening control time (TRo) of the pre-blowing solenoid valve according to the comparison result, characterized in that the computer program product has instructions for detecting at least one change in the operating parameters of the machine imposed by an operator;

[0059] Instructions for determining a series of pre-blowing curves, storing at least the actual positions of characteristic points of the series of pre-blowing curves, and stopping changing the operating parameters of the machine (1) within a predetermined stabilization period; and

[0060] Instructions for updating at least one regulation parameter and re-enabling regulation production;

[0061] - A computer program product according to the preceding claim, the computer program product further comprising instructions for: taking into account an actual moment (Br) of a peak pre-blowing pressure in the preform; taking into account a reference moment (Bc) of a peak pre-blowing pressure in the preform; comparing the actual moment (Br) of a peak pre-blowing pressure in the preform with the reference moment (Bc) of a peak pre-blowing pressure in the preform; and adjusting the pre-blowing flow rate (Dp) according to the comparison result;

[0062] and / or for calculating an actual slope (PRab) between a pressure measured at an actual time (Ar) at the start of pre-blowing in the preform and a pressure measured at an actual time (Br) at the peak of the pre-blowing pressure; calculating a reference slope (PCab) between a pressure measured at a reference time (Ac) at the start of pre-blowing in the preform and a pressure measured at a reference time (Bc) at the peak of the pre-blowing pressure; comparing the actual slope (PRab) with the reference slope (PCab); adjusting the pre-blowing flow rate (Dp) according to the comparison result and / or the pressure of the pressure fluid source and / or the nominal speed or time profile of the stretching of the stretching rod;

[0063] And / or consider the actual pressure (Fr) at the end of pre-blowing; consider the reference pressure (Fc) at the end of pre-blowing; compare the actual pressure (Fr) at the end of pre-blowing with the reference pressure (Fc) at the end of pre-blowing; and adjust the pre-blowing flow rate (Dp) according to the comparison result.

[0064] The computer program product is suitable for implementing the method according to the invention and can in particular automatically update at least one control parameter, allowing the control production to be carried out again. The update is thus carried out more accurately and more quickly, thus limiting the reduction in production capacity and possible control errors.

[0065] Secondly, the invention also relates to a method for regulating the cyclic production of containers from preforms made of plastic by stretch blowing in a machine having one or more stretch blowing stations, each of which is designed to produce containers in a production cycle, each of which is equipped with a pre-blowing solenoid valve which, during the pre-blowing process, fluidically connects the preform to a source of pressure fluid providing a pre-blowing flow, said method comprising:

[0066] a) an initialization process, the initialization process comprising the steps of configuring and storing, by an operator, a plurality of operating parameters and adjustment parameters of the machine during a production cycle, said adjustment parameters comprising at least one reference limit of at least one characteristic region of a pre-blowing curve corresponding to the internal pressure of the preform during at least a portion of the pre-blowing, said reference limit being determined by a reference time interval and / or a reference pressure interval and / or a portion of a reference curve,

[0067] b) regulating the production sequence, during which, for each production cycle, at least one preform (3) is stretched and blown by injecting a pressurized fluid in each stretch-blow station (7), during which:

[0068] b1) for at least one reference station of the machine (1), determining and storing a pre-blowing curve having said characteristic region, calculating or determining the actual part of the pre-blowing curve corresponding to said characteristic region of the determined pre-blowing curve, and

[0069] - b2) calculating and storing a new value of at least one operating parameter of the machine (1) as a function of the difference between the actual portion of the pre-blowing curve and the reference limit,

[0070] The regulation method is characterized in that the regulation production process comprises a monitoring step b3) for monitoring possible changes imposed by an operator on the value of an operating parameter of the machine,

[0071] The adjustment method also includes a process of automatically updating the adjustment parameters, which is implemented under the condition of applying a change in the operating parameters of the machine, including:

[0072] c1) a stabilization step, during which production continues based on the operating parameters applied during a predetermined stabilization period, and for each production cycle, action b1) is performed, action b2) is stopped, and

[0073] c2) A correction step for correcting the reference limits according to the actual part stored during the stabilization step in order to continue the regulation production process.

[0074] The present invention also relates to a machine for periodically producing preforms made of plastic by stretch blow molding, the machine comprising: a fluid source having a pre-blowing pressure; one or more stretch blow molding stations, each of which has a mold having a mold cavity for receiving the preform; a solenoid valve adapted to connect the interior of the preform received in the mold cavity with the fluid source according to a predetermined pre-blowing flow rate; an on-off control device for controlling the opening and closing of the solenoid valve; a sensor adapted to measure the pressure inside the preform; a detection device for detecting an actual portion of a pre-blowing curve corresponding to a predetermined characteristic region; a comparison device for comparing the actual curve with a reference limit corresponding to the predetermined characteristic region; and an adjustment device for adjusting the opening control moment of the solenoid valve according to the comparison result.

[0075] The machine also has a monitoring device for monitoring possible changes to the operating parameters of the machine imposed by the operator, an analyzing device for analyzing the time curve of the internal pressure of a series of preforms during an unregulated stable process, and an updating device connected to the analyzing device, which is designed to update the reference limit. BRIEF DESCRIPTION OF THE DRAWINGS

[0076] The invention will be better understood by reading the following description which is given by way of example only and with reference to the accompanying drawings in which:

[0077] Figure 1 is a schematic diagram showing a machine for the cyclic production of containers by stretch blow molding, more precisely a mold of a stretch blow molding station from a preform (dashed line) to a container (solid line);

[0078] Figure 2 is a graph showing the change in the internal pressure of the preform during the pre-blowing process;

[0079] Figure 3 is a schematic flow chart of a regulation method according to the present invention;

[0080] Figure 4 Two curves are shown which illustrate the mechanical adjustment by means of a reference point for the start of pre-blowing;

[0081] Figure 5 Two curves are shown, which show the mechanical adjustment by means of a pressure peak reference point and the slope of the curve between the pre-blowing start point and the pressure peak point;

[0082] Figure 6 Two curves are shown which illustrate the mechanical adjustment by means of the pre-blowing end reference point;

[0083] Figure 7 is a graph showing the variation of the internal pressure of the preforms at a plurality of stretch blow molding stations without regulation during the pre-blowing process; and

[0084] Figure 8 is a graph showing the change in the internal pressure of the preforms at a plurality of stretch blow molding stations under adjustment during the pre-blowing process. DETAILED DESCRIPTION

[0085] Figure 1 A section of a machine 1 for the cyclic production of containers 2 from preforms 3 made of plastic by stretch blow molding is shown.

[0086] The preform 3 is made of, for example, polyethylene terephthalate (PET).

[0087] Each preform 3 has a neck 4 and a cylindrical body 5 terminating in a hemispherical bottom 6 .

[0088] The machine 1 has at least one stretch blow molding station 7, Figure 1 Only one station 7 is shown in FIG. Each station 7 is usually mounted on a base, such as the periphery of a mounting turntable.

[0089] The station 7 has a mold 8 having a cavity 9 for receiving a preform 3 having the shape of the container to be made.

[0090] Preferably, the station 7 has a stretching rod 10 slidably mounted relative to the mould 8 along a main axis X, generally an axis of rotation.

[0091] The station 7 has control means (not shown) for controlling the axial movement of the stretching rod 10, the control means being preferably of electromagnetic type.

[0092] The station 7 has a blow tube 12 covering the upper surface of the mould 8 , suitable for covering the neck 4 of the preform 3 that projects beyond the mould.

[0093] The station 7 has a pressure sensor 13 , usually mounted on the blow pipe 12 , suitable for measuring the internal pressure of the preform 3 .

[0094] In addition, the machine 1 has a pre-blowing circuit 14, which has a pre-blowing fluid source 15. The pre-blowing fluid is, for example, a gas, preferably air. The pre-blowing fluid is placed at a pre-blowing pressure, which is generally between 5 and 16 bar. The pre-blowing circuit 14 has a pipe 16, which connects the fluid source 15 to the blow pipe 12. A pre-blowing solenoid valve 17 is interposed between the fluid source 15 and the blow pipe 12. Preferably, a controllable device 18 suitable for changing the pressure fluid flow rate Dp is installed on the pre-blowing solenoid valve 17, or the pre-blowing solenoid valve 17 is a controllable variable flow type solenoid valve. The pre-blowing solenoid valve 17 is suitable for connecting the interior of the preform 3 received in the mold cavity 9 with the fluid source 15 according to a predetermined pre-blowing flow rate Dp. The pre-blowing flow rate is usually measured with the aid of a flow meter.

[0095] The so-called pre-blowing process refers to a process in which the stretching rod 10 stretches the preform 3 during at least a part of the process, and in which the preform 3 is fluidly connected to the pre-blowing fluid source 15 by the pre-blowing solenoid valve 17.

[0096] The machine 1 also has a blowing circuit 19 having a blowing fluid source 20. The blowing fluid is, for example, a gas, preferably air. The blowing fluid is subjected to a blowing pressure which is generally between 16 and 40 bar. The blowing circuit 19 has a pipe 21 which connects the blowing fluid source 20 to the blow pipe 12. A blowing solenoid valve 22 is interposed between the blowing fluid source 20 and the blow pipe 12. Preferably, a controllable device 23 suitable for varying the pressure fluid flow rate Ds is mounted on the blowing solenoid valve 22, or the blowing solenoid valve 22 is a controllable variable flow type solenoid valve.

[0097] The machine 1 also has an opening and closing control device for controlling the opening and closing of the pre-blowing solenoid valve 17 .

[0098] Preferably, the machine 1 also has an opening and closing control device for controlling the opening and closing of the blowing solenoid valve 22 .

[0099] The machine 1 also has an electronic control unit 24, which is particularly in the form of an industrial automatic programmable controller (API), which is electrically connected to the pressure sensor 13 and the solenoid valves 17 and 22 through corresponding controllable devices 18 and 23 to adjust the corresponding flow rate and, if necessary, is electrically connected to a control device for controlling the movement of the stretching rod 10.

[0100] More precisely, the control unit 24 generally has:

[0101] - processor 25,

[0102] an analog input module 26 connected to the pressure sensor 13 in order to collect measurements therefrom and convert them into digital signals for processing by the processor 25 ,

[0103] - a memory 27 connected to the processor 25 to store the converted data from the pressure sensor 13,

[0104] - an analog output module 28, which is controlled by the processor 25, controls the solenoid valves 17, 22 through corresponding controllable devices 18, 23 suitable for changing the flow rate of the pressure fluid to adjust the fluid flow rate Dp, Ds provided to the blowpipe 12, and is controlled by the on-off control device that controls the opening and closing of the solenoid valves 17, 22 to open or close the solenoid valves 17, 22. The analog output module 28 controls the control device that controls the axial movement of the stretching rod 10 when necessary.

[0105] - A communication interface 29 for executing in the control unit 24 a computer program governing its operation. For the specific implementation of the blowpipe 12 and the integration of the solenoid valves 17, 22 with the controllable means 18, 23 suitable for varying the flow, reference is made to the applicant's patent application FR 2872082 or its equivalent international patent application WO 2006 / 008380.

[0106] The machine 1 also has a monitoring device for monitoring possible changes to the operating parameters of the machine 1 imposed by the operator, an analysis device for analyzing a series of internal pressure-time curves of the preforms 3 during an unregulated stabilization process, and an updating device connected to the analysis device for updating at least one regulation reference.

[0107] The monitoring device for monitoring the possible applied changes generally has a processor 25 .

[0108] An analysis device for analyzing a series of internal pressure-time curves of preforms during an unadjusted stabilization process typically comprises a processor 25, an analog input module 26 and a memory 27, wherein the analog input module 26 is connected to the pressure sensor 13 to collect measurement results therefrom and convert the measurement results into digital signals for processing by the processor 25, and the memory 27 is connected to the processor 25 to store the converted data from the pressure sensor 13.

[0109] The updating device for updating at least one control reference generally has a processor 25 and an analog output module 28 controlled by the processor 25 .

[0110] The updating means are adapted to update at least one regulation reference based on an analysis of a series of pressure-time curves during a non-regulation stabilization sequence.

[0111] The monitoring, analyzing and updating means allow the cyclic production of containers to continue to be regulated even after changes in the operating parameters of the machine 1 .

[0112] Preferably, the machine 1 also has a timing detection device for detecting the actual timing Ar of the start of the pressure increase in the preform 3 , called the start of pre-blowing.

[0113] like Figure 2 As shown, the pre-blowing start time is a characteristic point A of the pre-blowing curve corresponding to the internal pressure of the preform 3 during at least a part of the pre-blowing.

[0114] The detection device for detecting the actual moment Ar of the start of pre-blowing typically has a processor 25 suitable for detecting the actual moment Ar based on data collected by the pressure sensor 13 , converted by the analog input module 26 and stored by the memory 27 .

[0115] According to this embodiment, the machine 1 also generally includes a comparison device for comparing the actual pre-blowing start time Ar with the pre-blowing start reference time Ac, and an adjustment device for adjusting the opening control time TRo of the pre-blowing electromagnetic valve 17 according to the comparison result.

[0116] The reference time Ac is determined and adjusted by the operator according to the production method of the container and the required characteristics of the finished container.

[0117] When the opening of the pre-blowing solenoid valve 17 is performed too early so that the actual time Ar of the start of pre-blowing is advanced relative to the pre-blowing start reference time Ac, or when the opening of the pre-blowing solenoid valve 17 is performed too late so that the actual time Ar of the start of pre-blowing is delayed relative to the pre-blowing start reference time Ac, the actual time Ar of the start of pre-blowing may be different from the pre-blowing start reference time Ac. The comparison device for comparing the actual time Ar of the start of pre-blowing with the pre-blowing start reference time Ac usually has a processor 25, and the processor 25 is suitable for comparing the data of the actual time Ar with the data of the reference time Ac stored in the memory 27.

[0118] The regulating device for regulating the opening control time TRo of the pre-blowing solenoid valve 17 according to the comparison result usually has a processor 25, which is suitable for controlling an analog output module 28, which controls the pre-blowing solenoid valve 17 through an on-off control device of the pre-blowing solenoid valve 17.

[0119] Preferably, the machine 1 also has a timing detection device for detecting the actual timing Br of the pressure peak at which the pressure in the preform 3 reaches its peak.

[0120] The moment of peak pressure is the characteristic point B of the pre-blowing curve.

[0121] The device for detecting the actual moment Br of the pressure peak value generally has a processor 25 which is suitable for detecting the actual moment Br based on the data collected by the pressure sensor 13 , converted by the analog input module 26 and stored by the memory 27 .

[0122] According to this embodiment, the machine 1 also generally has comparison means for comparing the actual pressure peak moment Br with the reference pressure peak moment Bc, and regulation means for regulating the flow rate Dp injected into the preform 3 according to the comparison result.

[0123] The reference time Bc is determined and adjusted by the operator according to the production method of the container and the characteristics required for the finished container.

[0124] When the pre-blowing fluid flow rate Dp is too large and the pressure peak actual time Br is advanced relative to the pressure peak reference time Bc, or when the pre-blowing fluid flow rate Dp is too small and the pressure peak actual time Br is delayed relative to the pressure peak reference time Bc, the pressure peak actual time Br may be different from the pressure peak reference time Bc.

[0125] The comparison device for comparing the pressure peak actual time Br with the pressure peak reference time Bc generally has a processor 25 , which is suitable for comparing the data of the actual time Br with the data of the reference time Bc stored in the memory 27 .

[0126] The regulating device for regulating the pre-blowing flow rate Dp injected into the preform 3 according to the comparison result generally has a processor 25, and the processor 25 is suitable for controlling the analog output module 28, and the analog output module 28 controls the pre-blowing solenoid valve 17 through a controllable device 18 suitable for changing the flow rate of the pressure fluid injected into the preform 3 to adjust the pre-blowing flow rate Dp.

[0127] Preferably, the machine 1 also has calculation means for calculating the actual slope PRab of the pressure increase between the pressure measured at the actual moment Br of the pressure peak and the pressure measured at the actual moment Ar of the start of pre-blowing.

[0128] The value of the actual slope PRab therefore depends on the actual moment Ar of the start of pre-blowing, the actual moment Br of the pressure peak and the pressure values ​​measured at these moments.

[0129] The actual slope PRab calculation device generally has a processor 25 adapted to calculate the actual slope between the pre-blowing start characteristic point A and the pressure peak characteristic point B measured by the pressure sensor 13 , converted by the analog input module 26 and stored by the memory 27 .

[0130] The slope between the pressure measured at the peak pressure moment and the pressure measured at the start of pre-blowing is the characteristic point Pab of the pre-blowing curve. The pressure-time curve between the start of pre-blowing and the peak pressure moment is not a straight line, and the actual slope PRab is calculated in a predetermined manner, which is taken from many options at the disposal of a person skilled in the art, such as the derivative average, or the average of the pressure increase per the same time increment, etc.

[0131] According to this embodiment, the machine 1 also generally has comparison means for comparing the actual slope PRab with the pressure increase reference slope PCab, and regulation means for regulating the flow rate Dp injected into the preform 3 according to the comparison result.

[0132] The device for comparing the actual slope PRab with the reference slope PCab generally comprises a processor 25 which is adapted to compare the data of the actual slope PRab with the data of the reference slope PCab stored in a memory 27 .

[0133] The regulating device for adjusting the flow rate Dp injected into the preform 3 according to the comparison result usually has a processor 25, which is suitable for controlling the analog output module 28, and the analog output module 28 controls the pre-blowing solenoid valve 17 through a controllable device 18 suitable for changing the flow rate of the pressure fluid injected into the preform 3 to adjust the pre-blowing flow rate Dp.

[0134] Preferably, the machine also has a timing detection device for detecting the moment when the pressure in the preform 3 starts to increase again after the pressure trough, that is, the actual moment when the pre-blowing ends. This increase is because after the pre-blowing solenoid valve 17 remains open for a period of time, the blowing is started by controlling the pre-blowing solenoid valve 17 to close and the blowing solenoid valve 22 to open at the same time, thereby causing the pressure in the preform 3 to increase suddenly.

[0135] The detection device for detecting the actual moment of the end of pre-blowing generally has a processor 25 suitable for detecting the actual moment of the end of pre-blowing based on the data collected by the pressure sensor 13 , converted by the analog input module 26 and stored by the memory 27 .

[0136] The actual moment of the end of pre-blowing is usually determined in the following way:

[0137] Mathematical formula 1

[0138] The actual time when pre-blowing ends = the actual time when pre-blowing starts + Δt-δ

[0139] Wherein: Δt is the predetermined opening time length of the pre-blowing solenoid valve 17, δ is a predetermined constant corresponding to the response time of the blowing solenoid valve 22 between the opening control moment and its effective opening moment.

[0140] Δt is usually between 50-300ms (milliseconds).

[0141] δ is usually equal to 10 ms (milliseconds).

[0142] The end time of pre-blowing is the characteristic point F of the pre-blowing curve.

[0143] According to this embodiment, the machine 1 generally also has a comparison device for comparing the actual pre-blowing end pressure Fr corresponding to the pressure measured at the actual moment of the detected end of pre-blowing with the pre-blowing end reference pressure Fc, and a regulating device for regulating the flow rate Dp injected into the preform 3 according to the comparison result.

[0144] The reference pressure Fc is determined and adjusted by the operator according to the production method of the container and the characteristics required by the finished container.

[0145] When the pre-blowing fluid flow rate Dp is too large and the actual pre-blowing end pressure Fr is greater than the pre-blowing end reference pressure Fc, or when the pre-blowing fluid flow rate Dp is too small and the actual pre-blowing end pressure Fr is less than the pre-blowing end reference pressure Fc, the actual time Fr of pre-blowing end may be different from the pre-blowing end reference time Fc.

[0146] The actual time comparison device generally has a processor 25 which is adapted to compare the data of the actual pressure Fr with the data of the reference pressure Fc stored in a memory 27 .

[0147] The regulating device for adjusting the pre-blowing flow rate Dp injected into the preform 3 according to the comparison result usually has a processor 25, which is suitable for controlling a module 28, and the module 28 controls the pre-blowing solenoid valve 17. The pre-blowing solenoid valve 17 can be adjusted by a controllable device 18 suitable for changing the flow rate of the pressure fluid injected into the preform 3 or connected to an adjustable flow limiter to adjust the pre-blowing flow rate Dp.

[0148] The characteristic points A, B, Pab and F are chosen so as to adjust the machine 1 and ensure good synchronization of the biaxial stretching and good distribution of the material during pre-blowing.

[0149] The method for regulating the cyclic production of containers from preforms 3 made of plastic by stretch blow molding in the above-described machine 1 will now be described.

[0150] Figure 3 A schematic flow chart showing the regulation method.

[0151] The method for regulating comprises an initialization step a), which comprises the steps of configuring and storing a plurality of operating parameters and regulating parameters of the machine 1 during the production cycle by an operator, wherein the regulating parameters comprise at least one reference position Ac, Bc, PCab and Fc of at least one characteristic point A, B, Pab and F of the pre-blowing curve, wherein the reference position Ac, Bc, PCab and Fc are determined by a reference time and / or a reference pressure. When the reference position is determined by a reference time Ac, Bc, the reference position corresponds to the time at which the internal pressure of the preform 3 is measured at the characteristic points A, B, and the characteristic of the characteristic point is thus a specific time.

[0152] When the reference position is determined by a reference pressure Fc, the reference position corresponds to the pressure measured at the time of the characteristic point F, which is then characterized by a specific pressure value.

[0153] The operating parameters of the machine 1 are usually taken from: the opening control time TRo of the pre-blowing solenoid valve 17, the value or time profile of the pre-blowing flow rate Dp, the pre-blowing pressure or the time profile of the stretching rod 10 stroke.

[0154] The opening control time TRo is different from the pre-blowing start reference time Ac because there is a response time between the time when the pre-blowing solenoid valve is controlled to be opened and the time when the pre-blowing effectively starts in the preform 3.

[0155] The storage of a plurality of operating parameters and regulating parameters of the machine 1 during a production cycle is usually carried out by means of a memory 27 .

[0156] Each pressure measurement is performed by a pressure sensor 13 of the associated station 7 .

[0157] Preferably, each measurement result is an average of five measurement results performed during five cycles.

[0158] The pre-blowing start reference time Ac is usually determined by the time at which the internal pressure of the preform 3 starts to increase.

[0159] The pre-blowing start reference time Ac is usually configured by an operator via a communication interface 29 in the control unit 24 , stored by a memory 27 , and processed by a processor 25 , which controls an opening control device of the pre-blowing solenoid valve 17 via an analog output module 28 .

[0160] Generally, the pre-blowing start reference time Ac is reached several milliseconds after the pre-blowing solenoid valve 17 is opened.

[0161] The pressure peak reference time Bc is usually configured by the operator with the help of the communication interface 29 in the control unit 24, stored by the memory 27, and processed by the processor 25. The processor 25 controls the pre-blowing solenoid valve 17 through the controllable device 18 via the analog output module 28, and the controllable device 18 is suitable for changing the pre-blowing flow rate Dp.

[0162] After the pre-blowing solenoid valve 17 is opened, the pre-blowing pressure peak reference time Bc is generally reached within a few milliseconds.

[0163] The reference slope PCab is usually configured by an operator with the aid of a communication interface 29 in the control unit 24, stored in a memory 27, and processed by a processor 25, which controls the pre-blowing solenoid valve 17 through a controllable device 18 through an analog output module 28 suitable for changing the pre-blowing flow rate Dp, and / or the pressure value of the pre-blowing fluid source 15, and / or the time profile or nominal speed value of the stretching rod 10 through the axial movement control device of the stretching rod 10.

[0164] The pre-blowing end reference pressure Fc generally corresponds to the pressure at the pre-blowing end reference time at which the pressure in the preform 3 starts to increase again.

[0165] The pre-blowing end reference pressure Fc is usually configured by the operator with the help of the communication interface 29 in the control unit 24, stored by the memory 27, and processed by the processor 25. The processor 25 controls the pre-blowing solenoid valve 17 through the controllable device 18 through the analog output module 28, and the controllable device 18 is suitable for changing the pre-blowing flow rate Dp.

[0166] The pre-blowing end reference pressure Fc is generally several bars.

[0167] The method further comprises adjusting the production process b), which has steps b1) and b2).

[0168] During said regulating production step b), for each production cycle, at least one preform 3 is stretched and blown by injecting, at each station 7 , a pressurized fluid, usually coming from a pre-blowing fluid source 15 and then from a blowing fluid source 20 .

[0169] Usually, the injection of the pre-blowing fluid is initiated by opening the pre-blowing solenoid valve 17 .

[0170] The pre-blowing fluid is injected at a nominal pre-blowing flow rate and then according to the time profile of the determined pre-blowing flow rate Dp.

[0171] Preferably, while the pre-blowing fluid is being injected, the stretching rod 10 is run at a nominal speed and then according to a determined stretching time profile.

[0172] The so-called nominal speed of the stretching rod is between 1 m / s (meter / second) and 2.5 m / s (meter / second).

[0173] At the end of pre-blowing, the pre-blowing solenoid valve 17 is closed and the injection of the blowing fluid is usually started by opening the blowing solenoid valve 22 .

[0174] During said regulation of production sequence b), at step b1), for at least one station 7, called reference station, of machine 1, a pre-blowing curve with characteristic points A, B, Pab, F is calculated based on the pressure measurements, usually measured by pressure sensor 13 and stored in memory 27, said curve then being stored, and the actual times and / or actual pressures Ar, Br, PRab and Fr corresponding to said characteristic points A, B, Pab, F of the determined pre-blowing curve being calculated or determined.

[0175] The actual time Ar of the start of pre-blowing is detected by a detection device of the actual time Ar of the start of pre-blowing.

[0176] The actual time Br of the peak value of the pre-blowing pressure is detected by a detection device of the actual time Br of the peak value of the pre-blowing pressure.

[0177] The actual slope PRab is calculated by means of calculating the actual slope PRab between the pressure measured at the actual time Br of the pressure peak and the pressure measured at the actual time of the start of pre-blowing.

[0178] The actual time Fr at which the pre-blowing ends is detected by a detection device for the actual time Fr at which the pre-blowing ends.

[0179] The total pre-blowing time for the preform 3 is usually between 50 milliseconds and 300 milliseconds.

[0180] In step b2), a new value of at least one operating parameter of the machine 1 is calculated and stored based on the difference between the actual time and the reference time and / or between the actual pressure and the reference pressure corresponding to the characteristic points A, B, Pab, F.

[0181] The new value of the operating parameter is calculated by the processor 25 and stored by the memory 27 .

[0182] Preferably, the adjustment parameters also include storing at least one permissible tolerance of the actual position Ar, Br, PRab, Fr of at least one characteristic point A, B, Pab, F of the pre-blowing curve selected relative to the reference position Ac, Bc, PCab, Fc of the characteristic point A, B, Pab, F, and if the difference is smaller than the permissible tolerance, the new value of the operating parameter of the machine 1 is not calculated.

[0183] The allowable tolerance around each point is Figures 4 to 6 It is shown by a rectangular box.

[0184] Preferably, the allowable tolerance for the pre-blowing start characteristic point A and the pre-blowing pressure peak characteristic point B is a time allowable tolerance, and for the pre-blowing end characteristic point F is a pressure allowable tolerance.

[0185] It is also preferred that the allowable tolerance for the characteristic point Pab is a slope tolerance.

[0186] For example, the permissible tolerance for feature point A is between 1 and 3 milliseconds.

[0187] For example, the permissible tolerance for feature point B is between 1 and 3 milliseconds.

[0188] For example, the permissible tolerance for the characteristic point Pab is between 15 mbar / ms and 60 mbar / ms.

[0189] For example, the permissible tolerance for the feature point F is between 0.1 bar and 0.3 bar.

[0190] exist Figures 4 to 6 In each of the figures, the curve with the characteristic points A, B, F and their tolerances indicated by rectangular boxes shows the adjustment parameters stored during the initialization process of the method. Another curve in each figure shows the actual pressure in the preform measured during pre-blowing. The upper figure shows the curve at step b1 of the adjustment process. The lower figure shows the effect of step b2 of the adjustment process, involving the characteristic points associated with each figure.

[0191] For example, in Figure 4 In the illustrated embodiment, the actual time Ar of the start of pre-blowing is compared with the pre-blowing start reference time Ac by means of a comparison device for comparing the actual time Ar of the start of pre-blowing with the pre-blowing start reference time Ac.

[0192] If the actual time Ar of the start of pre-blowing in the preform 3 of the reference station measured in step b1 is later or earlier than the reference time Ac of the start of pre-blowing at the reference station (for example, Figure 4 In the embodiment shown in the figure, if the time difference is greater than the permissible tolerance, then as the new value calculated in step b2 for the opening control time TRo of the pre-blowing solenoid valve 17 of each stretch-blow station 7, in all stretch-blow stations 7, for example, by means of the regulating device for the opening control time TRo of the pre-blowing solenoid valve 17, the opening control time TRo is advanced or delayed (for example, in Figure 4 In the embodiment shown), the time gap is described.

[0193] This can improve the safety and reliability of production and limit manufacturing defects on other stations 7.

[0194] exist Figure 4 In the embodiment shown, the adjustment parameters stored during the initialization process include the pre-blowing start time Ac, and advantageously, also include the allowable tolerance for this time. At step b1 of the adjustment process, the characteristic point on the measured pressure curve is the pre-blowing start time Ar. The operating parameter of the machine 1 that affects the start of pre-blowing is the solenoid valve opening control time TRo. Step b2 of the adjustment process includes calculating the pre-blowing start time Ar based on the measured curve, and calculating the difference from the pre-blowing start set time Ac. Advantageously, step b2 may include comparing the calculated difference with the adjustment limit value. In the case of exceeding the possible limit value, step b2 includes calculating the new pre-blowing solenoid valve 17 control time TRo according to the calculated difference and, if necessary, according to part or all of the allowable tolerances about the pre-blowing start time. This new parameter value of the machine 1 will be taken into account in the subsequent cycle or one of them of the container production.

[0195] exist Figure 5 In the embodiment shown, the adjustment parameters stored during the initialization process include the average slope PCab between the pre-blowing start time Ac and the pre-blowing pressure peak B, and possible tolerances for the slope. Advantageously, but not necessarily, it may include Figure 4 Adjustment parameters for the illustrated embodiment.

[0196] Figure 5 Step b1 of the adjustment process of the embodiment shown comprises calculating the average slope PRab between the start of pre-blowing and the peak of the pre-blowing pressure, and the difference between the actual slope PRab and the set slope PCab, based on the measured pressure curve. Advantageously, it may comprise comparing the calculated difference with the possible adjustment limit value of the slope PCab. Advantageously, but not necessarily, this step b1 of the adjustment process may also comprise Figure 4 The calculation is performed at step b1 of the illustrated embodiment.

[0197] The mechanical parameters that may affect the average slope are: the time profile or nominal flow rate of the pre-blowing fluid, the time profile or nominal speed of the stretching speed of the stretch rod 10, the time profile or nominal pre-blowing pressure, or a combination of one or more of the aforementioned parameters.

[0198] Figure 5 Step b2 of the embodiment shown consists in calculating a new value of one or more parameters of the machine 1 that influence the slope PRab, according to the calculated difference and, if necessary, according to some or all of the permissible tolerances concerning the slope PRab. Advantageously, but not necessarily, this step b2 of the adjustment process may also consist in calculating a new value of one or more parameters of the machine 1 that influence the slope PRab. Figure 4 The embodiment shown performs the calculation of the parameters of the machine 1 .

[0199] In one or more subsequent cycles of container production, the new values ​​of one or more of the mechanical parameters are applied as setpoints. Figure 4 In the case of the actions of the adjustment sequence of the illustrated embodiment, the new machine parameter settings may be applied during the same production cycle thereafter, or during a different production cycle thereafter.

[0200] exist Figure 6 In the embodiment shown, the adjustment parameters stored when the process is initialized include the end-of-pre-blow pressure and possible tolerances for this pressure. Advantageously, but not necessarily, it may include Figure 4 and / or Figure 5 Adjustment parameters for the illustrated embodiment.

[0201] for Figure 6 Step b1 of the regulation process of the embodiment shown comprises calculating the end-of-pre-blowing pressure based on the measured pressure curve, and the difference between this pressure Fr and the set pressure Fc. Advantageously, it may comprise comparing the calculated difference with the possible regulation limit value of the pressure Fc. Advantageously, but not necessarily, this step b1 of the regulation process may also comprise Figure 4 and / or Figure 5 The calculation is performed at step b1 of the illustrated embodiment.

[0202] The mechanical parameters that may affect the pre-blowing end pressure are taken from: the time profile of the pre-blowing fluid flow rate, the time profile of the pre-blowing pressure or the pre-blowing nominal pressure, or a combination of one or more of the aforementioned parameters.

[0203] Figure 6 Step b2 of the embodiment shown consists in calculating a new value of one or more parameters of the machine 1 that influence the end-of-pre-blowing pressure Fr, according to the calculated difference and, if necessary, according to some or all of the permissible tolerances concerning the pressure Fr. Advantageously, but not necessarily, this step b2 of the regulation process may also consist in calculating a new value of one or more parameters of the machine 1 that influence the end-of-pre-blowing pressure Fr. Figure 4 and / or Figure 5 The illustrated embodiment performs calculations of the parameters of the machine 1 .

[0204] In the subsequent cycle or in one of the cycles of container production, new values ​​of one or more mechanical parameters are applied as setpoints. Figure 4 In the case of the actions of the adjustment sequence of the illustrated embodiment, the new machine parameter settings may be applied during the same production cycle thereafter, or during a different production cycle thereafter.

[0205] The regulation sequence b) of the method according to the invention also comprises a monitoring step b3) for monitoring possible changes imposed by an operator on the value of an operating parameter of the machine 1 .

[0206] The monitoring step b3) is implemented by monitoring means which monitor the possible changes imposed by the operator on the operating parameters of the machine 1. For example, when using preforms 3 with different characteristics in terms of composition or heating temperature before pre-blowing, or in order to change the production method according to the characteristics of the desired finished container, the operator can impose changes on one or more operating parameters of the machine 1.

[0207] The regulating method further comprises a step of automatically updating the regulating parameters, which step is carried out when a change is applied to the operating parameters of the machine 1 .

[0208] The update process includes:

[0209] c1) A stabilization step during which production continues based on the operating parameters of the machine 1 applied within a predetermined stabilization period, and for each production cycle, action b1) is performed and action b2) is stopped.

[0210] During step c1 ), the pressure-time curve is, for example, stored and analyzed by an analysis device which analyzes the time profile of the internal pressure of a series of preforms 3 during an unregulated stabilization process.

[0211] The duration of the stabilization step is determined by reaching a production cycle in which the actual time or the actual pressure measured at the characteristic points A, B, Pab, F is less than the permissible tolerance for this actual time or this actual pressure.

[0212] The duration of the stabilization step is, for example, between 1 and 3 minutes. It should be noted that during this time, production continues, only the regulating system is in an automatic renewal process, but the quality standards and tolerances of the finished containers continue to be valid.

[0213] c2) a correction step for correcting the reference time and / or reference pressure according to the actual time value and / or actual pressure value stored during the stabilization step c1) so as to continue to adjust the production process b).

[0214] Step c2) is implemented, for example, by an updating device that updates at least one adjustment reference, the updating device being connected to the analyzing device.

[0215] For example, the adjustment production sequence b) first includes a possible change in the applied control moment TRo of the opening of the pre-blowing solenoid valve 17, and then, after the monitoring step b3), the stabilization step c1) is started until a production cycle in which the actual moment Ar of the start of pre-blowing in the preform 3 is stabilized, with a variation less than the permissible tolerance of the start of pre-blowing. In the correction step c2), the actual moment Ar of the start of pre-blowing is taken as the new reference moment Ac of the start of pre-blowing. Then, for the subsequent production cycle, the actual moment Br of the pressure peak is calculated, for example by comparing the actual moment Br of the pressure peak with the reference moment Bc of the pressure peak, with the help of a comparison device of the actual moment Br of the pressure peak and the reference moment Bc of the pressure peak.

[0216] If the time difference between the actual pressure peak moment Br and the reference pressure peak moment Bc is greater than the permissible tolerance, a new value of the pre-blowing flow rate Dp is calculated, for example, by means of a regulating device for the pre-blowing flow rate Dp injected into the preform 3, which is reduced or increased relative to the value of the pre-blowing flow rate Dp during the production cycle for which the actual pressure peak moment Br has been calculated, such as Figure 5 shown.

[0217] For example, by means of a controllable device 18 suitable for varying the flow rate of the pressure fluid or a controllable solenoid valve of variable flow rate type, the new value of the pre-blowing flow rate Dp is applied.

[0218] Preferably, the production step b) is regulated by firstly applying a possible change in the control moment TRo of the opening of the pre-blowing solenoid valve 17, then after the monitoring step b3), starting a stabilization step c1) until a production cycle in which the actual moment Ar of the start of pre-blowing in the preform 3 is less than the permissible tolerance of the start of pre-blowing, then the production step b) comprises applying a possible change in the pre-blowing flow rate Dp, then after the monitoring step b3, starting a stabilization step c1) until a production cycle in which the actual moment Ar of the start of pre-blowing and the actual moment Br of the pressure peak are less than the respective permissible tolerances. Then, the actual slope PRab between the actual moment Ar of the start of pre-blowing and the actual moment Br of the pressure peak is calculated for the subsequent production cycle. For example, the actual slope PRab is compared with the reference pressure PCab by means of a comparison device of the actual slope PRab with the reference pressure PCab.

[0219] If the actual slope PRab deviates from the reference slope PCab by more than the slope tolerance, then calculate:

[0220] - a new value for the nominal pre-blow flow rate or a new time profile of the pre-blow flow rate Dp, and / or

[0221] - Pressure Fluid Source here is the new value of the pressure of the pre-blowing fluid source 15, and / or

[0222] - A new value for the time profile or the nominal speed of the stretching rod 10.

[0223] A new value for the nominal pre-blowing flow rate or a new time profile of the pre-blowing flow rate Dp is calculated, for example, by a regulating device regulating the flow rate injected into the preform as a function of the comparison result.

[0224] A new value for the pressure of the pressure fluid source 15 is calculated, for example, by a regulating device for regulating the pressure of the pressure fluid source 15 on the basis of the comparison result.

[0225] A new value for the time profile or the nominal speed of the stretching rod 10 is calculated, for example, by a regulating device for regulating the time profile or the nominal speed of the stretching rod 10 based on the comparison result.

[0226] For example, step b1) only includes or additionally includes the following operations:

[0227] - the actual moment Ar of the start of pre-blowing in the reference station or other station 7 at which the pressure in the preform 3 begins to increase is detected by the pressure sensor 13 and the processor 25;

[0228] - The time Ar is stored in the memory 27;

[0229] - The actual moment of the end of the pre-blowing is calculated by the processor according to the calculation defined above;

[0230] - Based on the pressure measurement result of the pressure sensor 13, the actual pre-blowing end pressure Fr is obtained, for example, by means of a comparison device for the actual pre-blowing end pressure Fr and the pre-blowing end reference pressure Fc, and the actual pre-blowing end pressure Fr determined in this way is compared with the pre-blowing end reference pressure Fc of the reference station.

[0231] If the pre-blowing end actual pressure Fr deviates from the pre-blowing end reference pressure Fc by a value greater than the permissible tolerance, a new value of the pre-blowing flow rate Dp which is reduced or increased relative to the value of the pre-blowing flow rate Dp during the production cycle at the actual moment of the calculated pre-blowing end is calculated, for example, by a regulating device for the pre-blowing flow rate Dp injected into the preform 3, according to the comparison result, such as Figure 6 shown.

[0232] According to the comparison result, the regulating device of the pre-blowing flow rate Dp injected into the preform 3 will control the change of the pre-blowing flow rate Dp.

[0233] According to a particular embodiment, the machine 1 is equipped with at least a first station 7 and a second station, one of which is a reference station. Each station 7 has a pressure sensor 13 that senses the pressure inside the preforms 3 of said station 7 and a pre-blowing solenoid valve 17 that has an actual response time between the opening control moment TRo of the pre-blowing solenoid valve 17 and the effective start of the pressure increase in the preforms 3.

[0234] According to this embodiment, the adjustment parameters include the start of pre-blowing and the predetermined response time. In step b2), in addition to calculating the new value of the opening control time TRo of the pre-blowing solenoid valve 17, the actual response time is also calculated. If the actual response time is greater than the predetermined response time, then:

[0235] - Issue a base station deviation warning, and / or

[0236] - For the subsequent production cycle, the opening control reference time TRo of the pre-blowing solenoid valve 17 of the second station is calculated, and the second station is then regarded as a new reference station.

[0237] Figure 7 shows a number of pre-blowing curves obtained during an unregulated pre-blowing cycle, Figure 8 A plurality of pre-blowing curves obtained during a pre-blowing cycle with regulation according to the method of the present invention are shown. It is clearly shown that the pre-blowing curves are quite close to each other under regulation, thus indicating that a relatively uniform pre-blowing curve is obtained, and thus the variability of the finished container is small.

[0238] In the event that a change in the operating parameters of the machine 1 is required, the regulation method according to the invention allows the regulation production to continue by introducing a new regulation reference, without the regulation being interrupted and without having to manually configure a new reference.

[0239] Thus, the production capacity is increased and the method and the finished product obtained are more reliable.

[0240] The invention also relates to a computer program product for execution on the machine 1 .

[0241] The computer program product has instructions for:

[0242] Control the opening and closing of the pre-blowing solenoid valve 17;

[0243] Control the pre-blowing flow rate Dp;

[0244] Consider the actual moment Ar when pre-blowing starts;

[0245] Consider the pre-blowing start reference time Ac;

[0246] Compare the actual time Ar of the start of pre-blowing with the reference time Ac of the start of pre-blowing;

[0247] According to the comparison result, the opening control time TRo of the pre-blowing solenoid valve 17 is adjusted;

[0248] for detecting an instruction imposed by an operator to change at least one operating parameter of the machine 1;

[0249] Instructions for determining a series of pre-blowing curves, storing at least the actual positions Ar, Br, PRab, Fr of characteristic points A, B, Pab, F of a series of pre-blowing curves, and stopping the modification of the operating parameters of the machine 1 within a predetermined stabilization period; and

[0250] Instructions for updating at least one regulating parameter to re-enable regulated production.

[0251] Preferably, the computer program product further comprises instructions for:

[0252] Consider the actual moment Br of the peak pre-blowing pressure in the preform 3;

[0253] Consider the peak reference moment Bc of the pre-blowing pressure in the preform 3;

[0254] Compare the actual time Br of the peak value of the pre-blowing pressure in the preform 3 with the reference time Bc of the peak value of the pre-blowing pressure in the preform 3;

[0255] According to the comparison result, adjust the pre-blowing flow rate Dp;

[0256] and / or calculating the actual slope PRab between the pressure in the preform 3 measured at the actual time Br of the peak of the pre-blowing pressure and the pressure measured at the actual time Ar of the start of pre-blowing;

[0257] Calculating a reference slope PCab between the pressure measured at the pre-blowing pressure peak reference time Bc and the pressure measured at the pre-blowing start reference time Ac in the preform 3;

[0258] Compare the actual slope PRab with the reference slope PCab;

[0259] Adjust the pre-blowing flow rate Dp according to the comparison result and / or the pressure of the pressure fluid source 15 and / or the nominal speed or time profile of the stretching of the stretching rod 10;

[0260] And / or consider the actual pressure Fr at the end of pre-blowing;

[0261] Consider the pre-blowing end reference pressure Fc;

[0262] The actual pre-blowing end pressure Fr is compared with the pre-blowing end reference pressure Fc; and the pre-blowing flow rate Dp is adjusted according to the comparison result.

Claims

1. A method for regulating the cyclic production of containers (2) from preforms (3) made of plastic by stretch blowing in a machine (1), the machine having one or more stretch blowing stations, each stretch blowing station being designed to produce containers (2) during a production cycle, each stretch blowing station being equipped with a pre-blowing solenoid valve (17), which fluidically connects the preform (3) to a pressure fluid source (15) providing a pre-blowing flow rate during the pre-blowing process, the method comprising: a) an initialization process, the initialization process comprising the steps of configuring and storing a plurality of operating parameters and adjustment parameters of the machine (1) during a production cycle by an operator, the adjustment parameters comprising at least one reference position of at least one characteristic point of a pre-blowing curve corresponding to the internal pressure of the preform (3) during at least a portion of the pre-blowing, the at least one characteristic point being at least one of A, B, Pab and F, wherein A is a pre-blowing start characteristic point, B is a pressure peak characteristic point, Pab is a slope characteristic point between a pressure measured at a pressure peak moment and a pressure measured at a pre-blowing start moment, and F is a pre-blowing end characteristic point, the reference position being determined by a reference moment and / or a reference pressure, b) regulating the production sequence, during which, for each production cycle, at least one preform (3) is stretched and blown by injecting a pressurized fluid at each stretch-blow station, during which: b1) for at least one reference station of the machine (1), determining and storing a pre-blowing curve with said characteristic points, calculating or determining the actual time and / or the actual pressure corresponding to said characteristic points of the determined pre-blowing curve, and - b2) calculating and storing a new value of at least one operating parameter of the machine (1) based on the difference between the actual time and the reference time and / or between the actual pressure and the reference pressure, Characterized in that the regulating production process comprises a monitoring step b3) for monitoring possible changes imposed by an operator on the value of an operating parameter of the machine (1) The adjustment method further comprises a step of automatically updating the adjustment parameters, the step of automatically updating the adjustment parameters being implemented under the condition of applying a change to the operating parameters of the machine (1), comprising: c1) a stabilization step during which production continues based on the operating parameters applied during the predetermined stabilization period, and for each production cycle, actions b1) are performed), action b2) is stopped, and c2) a correction step for correcting the reference time and / or reference pressure according to the actual time value and / or actual pressure value stored during the stabilization step, so as to continue to adjust the production process.

2. The adjustment method according to claim 1, characterized in that: The operating parameters of the machine (1) which can be recalculated during step b2) are obtained from: the opening control time of the pre-blowing solenoid valve (17), the value or time profile of the pre-blowing flow rate, the pre-blowing pressure or the time profile of the stretch rod (10) stroke.

3. The adjustment method according to claim 1, characterized in that: The adjustment parameters include storing at least one permissible tolerance of an actual position of the at least one characteristic point of the pre-blowing curve selected relative to a reference position of the characteristic point; And, if the difference is smaller than the permissible tolerance, a new value of the operating parameter of the machine (1) is not calculated.

4. The adjustment method according to claim 1, characterized in that: The adjustment parameters include a reference time at which the pressure in the preform (3) starts to increase, i.e., a reference time at which pre-blowing starts, and a tolerance for the reference time at which pre-blowing starts; Furthermore, if the actual moment of pre-blowing start in the preform (3) of the reference station lags behind or precedes the reference moment of pre-blowing start at the reference station by a time difference greater than the allowable tolerance, the calculated new value of the opening control moment of the pre-blowing solenoid valve (17) of each stretch-blowing station is advanced or delayed by the time difference in all stretch-blowing stations.

5. The adjustment method according to claim 3, characterized in that: The tuning parameters also include: A reference time of a peak pre-blowing pressure in the preform (3) and a permissible tolerance for the reference time of the peak pre-blowing pressure, wherein the production step b) is regulated firstly including a possible change in the applied opening control time of the pre-blowing solenoid valve (17) until a production cycle in which the actual time of the start of pre-blowing in the preform (3) is less than the permissible tolerance for the start of pre-blowing, For subsequent production cycles, the actual moment of the pre-blowing pressure peak is calculated. If the time difference between the actual moment of the pre-blowing pressure peak and the pre-blowing pressure peak reference moment is greater than the allowable tolerance, a new value of the pre-blowing flow rate is calculated that is reduced or increased relative to the value of the pre-blowing flow rate during the production cycle at the calculated actual moment of the pre-blowing pressure peak.

6. The adjustment method according to claim 5, characterized in that: The adjustment parameters further include a pressure increase reference slope between the pre-blowing start characteristic point and the pressure peak characteristic point, and an allowable tolerance for the pressure increase reference slope; Furthermore, the production process is adjusted firstly including the possible changes applied to the opening control time of the pre-blowing solenoid valve (17) until a production cycle in which the actual time of the start of pre-blowing in the preform (3) is less than the permissible tolerance of the start of pre-blowing; the production process is adjusted then including the possible changes applied to the pre-blowing flow rate until a production cycle in which the actual time of the start of pre-blowing and the actual time of the peak value of the pre-blowing pressure are less than the respective permissible tolerances, and then for the subsequent production cycle, the actual slope of the pressure increase between the actual time of the start of pre-blowing and the actual time of the peak value of the pre-blowing pressure is calculated, and if the difference between the actual slope of the pressure increase and the pressure increase reference slope is greater than the permissible tolerance of the slope, then the following is calculated: - a new value for the nominal pre-blow flow rate or a new pre-blow flow rate time profile, and / or - a new value of the pressure of the pressure fluid source (15), and / or - A new value for the time profile or nominal speed of the stretching of the stretching rod (10).

7. The adjustment method according to claim 1, characterized in that: Step b1) includes only or additionally the following operations: Detection of the moment when the pressure in the preform (3) begins to increase, referred to as the actual moment of the start of pre-blowing in the reference station or in another station; Storing the actual moment of pre-blowing start; Calculate the actual moment of the end of pre-blowing so that: The actual time when pre-blowing ends = the actual time when pre-blowing starts + Δt-δ, where Δt is the predetermined opening time of the pre-blowing solenoid valve (17), and δ is a predetermined constant; Based on the pressure measurement result performed in step b1), the actual pressure at the end of the pre-blowing is derived therefrom; The actual pressure at the end of pre-blowing thus determined is compared with the reference pressure at the end of pre-blowing of the reference station; If the actual pre-blowing end pressure deviates from the pre-blowing end reference pressure by a value greater than the permissible tolerance, a new value of the pre-blowing flow rate is calculated that is reduced or increased relative to the value of the pre-blowing flow rate during the production cycle at the actual moment of the calculated pre-blowing end.

8. The adjustment method according to claim 1, characterized in that: The adjustment parameters include storing at least one adjustment limit value for at least one operating parameter of the machine (1), which is called the monitored parameter. The action b2) of the adjustment production step also includes comparing the new value calculated for the monitored parameter with the adjustment limit value. If the adjustment limit value is exceeded, an adjustment degradation warning is issued. The adjustment production continues based on the new value of the monitored parameter. The new value of the monitored parameter is taken from: the value during the previous production cycle, the value entered in the initialization process, or a combination of these values.

9. The adjustment method according to claim 1, characterized in that: The method for regulating uses a machine (1) equipped with a first station and a second station, one of which is a reference station, each station having a pressure sensor (13) for sensing the internal pressure of the preform (3) in each station and a pre-blowing solenoid valve (17), the pre-blowing solenoid valve having a response time between the opening control moment of the pre-blowing solenoid valve (17) and the effective start of the pressure increase in the preform (3), characterized in that the regulating parameters include the start of pre-blowing and the predetermined response time; and in addition to the new value of the opening control moment of the pre-blowing solenoid valve (17), the actual response time is calculated, If the actual response time is greater than the expected response time, then: Issue a base station deviation warning, and / or For the subsequent production cycle, the opening reference time of the pre-blowing solenoid valve (17) of the second station is calculated, and the second station is then regarded as the new reference station.

10. A machine (1) for periodically producing preforms (3) made of plastic by stretch blow molding, the machine comprising: a pressure fluid source (15) having a pre-blowing pressure; one or more stretch blow molding stations, each of which has a mold (8), the mold having a mold cavity (9) for receiving the preform (3); a pre-blowing solenoid valve (17), suitable for connecting the interior of the preform (3) received in the mold cavity (9) with the pressure fluid source (15) according to a predetermined pre-blowing flow rate; an on-off control device for controlling the opening and closing of the pre-blowing solenoid valve (17); a sensor (13), suitable for measuring the internal pressure of the preform (3); a timing detection device, used to detect the moment when the pressure in the preform (3) begins to increase, that is, the actual moment when pre-blowing begins; a comparison device, used to compare the actual moment when pre-blowing begins with a reference moment when pre-blowing begins; and an adjustment device for adjusting the opening control moment of the pre-blowing solenoid valve (17) according to the comparison result. It is characterized in that The machine also has a monitoring device for monitoring possible changes in operating parameters of the machine (1) imposed by an operator, an analysis device for analyzing a series of internal pressure-time curves of preforms (3) during an unregulated stabilization process, and an updating device connected to the analysis device for updating at least one regulation reference.

11. The machine (1) according to claim 10, characterized in that The machine also has a controllable device for changing the flow rate of the pressure fluid or a controllable variable flow pre-blowing solenoid valve (17); a time detection device for detecting the moment when the pressure in the preform (3) reaches a peak value, that is, the actual moment of the pre-blowing pressure peak; a comparison device for comparing the actual moment of the pre-blowing pressure peak with the pre-blowing pressure peak reference moment; A regulating device is used to regulate the flow rate injected into the preform (3) according to the comparison result.

12. The machine (1) according to claim 11, characterized in that The machine also has a calculation device for calculating the actual slope of the pressure increase between the pressure measured at the actual moment of the start of pre-blowing and the pressure measured at the actual moment of the peak of the pre-blowing pressure; a comparison device for comparing the actual slope with a reference slope; A regulating device for regulating the pre-blowing flow rate injected into the preform (3) according to the comparison result, and / or a regulating device for regulating the pressure of the pressure fluid source (15) according to the comparison result, and / or a regulating device for regulating the nominal speed or time profile of the stretching of the stretching rod (10) according to the comparison result.

13. The machine (1) according to claim 12, characterized in that The machine also has a timing detection device for detecting the moment when the pressure in the preform (3) starts to increase again, that is, the actual moment when the pre-blowing ends; a comparison device for comparing the actual pre-blowing end pressure measured at the actual moment when the pre-blowing ends with the pre-blowing end reference pressure; A pre-blowing flow rate regulating device is used to regulate the pre-blowing flow rate injected into the preform (3) according to the comparison result.

14. A machine (1) for periodically producing preforms (3) made of plastic by stretch blow molding, the machine comprising: a pressure fluid source (15) having a pre-blowing pressure; one or more stretch blow molding stations, each of which has a mold (8), the mold having a mold cavity (9) for receiving the preform (3); a pre-blowing solenoid valve (17), suitable for connecting the interior of the preform (3) received in the mold cavity (9) with the pressure fluid source (15) according to a predetermined pre-blowing flow rate; an on-off control device for controlling the opening and closing of the pre-blowing solenoid valve (17); a pressure sensor (13), suitable for measuring the pressure inside the preform (3); a detection device for detecting an actual portion of the pre-blowing curve corresponding to a predetermined characteristic area; a comparison device for comparing the actual portion of the pre-blowing curve with a reference limit corresponding to the predetermined characteristic area; and an adjustment device for adjusting the opening control time of the pre-blowing solenoid valve (17) according to the comparison result. It is characterized in that The machine also has a monitoring device for monitoring possible changes in operating parameters of the machine (1) imposed by an operator, an analysis device for analyzing a series of internal pressure-time curves of preforms (3) during an unregulated stable process, and an updating device connected to the analysis device, the updating device being designed to update the reference limit.

15. A computer program product, for being executed on a machine (1) according to any one of claims 10 to 13 for manufacturing containers (2), the computer program product having instructions for: controlling the opening and closing of a pre-blowing solenoid valve (17); controlling the pre-blowing flow rate; considering the actual time of the start of pre-blowing; considering the reference time of the start of pre-blowing; comparing the actual time of the start of pre-blowing with the reference time of the start of pre-blowing; adjusting the opening control time of the pre-blowing solenoid valve (17) according to the comparison result, characterized in that A computer program product having instructions for detecting at least one change to an operating parameter of a machine (1) applied by an operator; Instructions for determining a series of pre-blowing curves, storing at least the actual positions of characteristic points of the series of pre-blowing curves, and stopping changing the operating parameters of the machine (1) within a predetermined stabilization period; as well as Instructions for updating at least one regulating parameter to re-enable regulated production.

16. The computer program product according to claim 15, characterized in that The computer program product also has the following instructions: considering the actual time of the peak pre-blowing pressure in the preform (3); considering the reference time of the peak pre-blowing pressure in the preform (3); comparing the actual time of the peak pre-blowing pressure in the preform (3) with the reference time of the peak pre-blowing pressure in the preform (3); Adjust the pre-blowing flow rate according to the comparison result; and / or for calculating an actual slope between a pressure measured in the preform (3) at the actual moment of the start of pre-blowing and a pressure measured at the actual moment of the peak value of the pre-blowing pressure; calculating a reference slope between a pressure measured in the preform (3) at a reference moment of the start of pre-blowing and a pressure measured at a reference moment of the peak value of the pre-blowing pressure; comparing the actual slope with the reference slope; and adjusting the pre-blowing flow rate according to the comparison result and / or the pressure of the pressure fluid source (15) and / or the nominal speed or time profile of the stretching of the stretching rod (10); and / or consider the actual pressure at the end of pre-blowing; Consider the pre-blowing end reference pressure; The actual pressure at the end of pre-blowing is compared with the reference pressure at the end of pre-blowing; and the pre-blowing flow rate is adjusted according to the comparison result.