A heating load forecasting method based on similar time periods

By introducing similar time periods and daily update models in heating load forecasting, combined with the influence of thermal inertia of buildings and ground structural layers, the problems of complex data processing and inaccurate forecasting in the existing technology are solved, and fast and accurate heating load forecasting is achieved. .

CN113706337BActive Publication Date: 2024-10-15TIANJIN HONGDA CREDIT SUISSE TECH CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202111035951.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-06
Publication Date
2024-10-15
Estimated Expiration
2041-09-06

AI Technical Summary

Technical Problem

Existing heating load forecasting methods require a large amount of historical data to analyze, which is time-consuming and inaccurate in prediction. In particular, it is greatly affected by meteorological parameters. In particular, the use of historical data with a long time interval may lead to inaccurate predictions.

Method used

A heating load forecasting method based on similar periods is adopted, using data from the first 2 weeks after the start of the heating period to establish a model. The model is updated daily, taking into account the influence of thermal inertia of buildings and ground structural layers, and increasing the sample size and online correction coefficients daily. Improve prediction accuracy.

Benefits of technology

The modeling cycle is shortened, the calculation speed and prediction accuracy are improved, and it is faster and more accurate than traditional machine learning methods. Especially when considering the ground radiation system, the prediction results are significantly improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113706337B_ABST
    Figure CN113706337B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for predicting heating load based on similar time periods, comprising the following steps: S1, reading outdoor meteorological parameter data, user room temperature data, heating data and making corrections; S2, establishing and updating the hourly load prediction model daily starting from the third week of the heating period; S3, selecting similar time periods and reading similar time period data; S4, constructing an online correction coefficient of the hourly load calculation model based on similar time period data; S5, establishing a load prediction model for the prediction period. Beneficial effects: This patent fully considers the influence of various meteorological factors, introduces similar time periods, and uses the data of the first two weeks of the heating period to start building the model. The model is updated daily by increasing the sample size day by day. The model is simple and has a short cycle and fast calculation compared to traditional machine learning methods. Compared with simple models, the influence of thermal inertia of buildings and ground structural layers is considered for the ground radiation system, thereby improving the prediction accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of heating load prediction, and in particular to a heating load prediction method based on similar time periods. Background Art

[0002] Predicting heating load is an important means to reduce energy consumption. Accurate load forecasting is conducive to achieving energy conservation goals. Heating load forecasting can be divided into long-term forecasting, medium-term forecasting, short-term forecasting and ultra-short-term forecasting according to the length of the forecast period. Among them, long-term forecasting is predicted by annual statistical data of load, medium-term forecasting is predicted by monthly statistical data of load, short-term forecasting is predicted by load data at each moment of a day, and ultra-short-term forecasting is predicted by load data at the current moment for several periods of time in the future. At present, the commonly used methods for load forecasting include time series forecasting, neural network forecasting, and gray system forecasting. The time series forecasting method records the heat load data at certain time intervals to establish a heating load forecasting model; the neural network forecasting method mainly predicts the heating load through BP neural network and improved neural network algorithm; the gray system forecasting method establishes a forecasting model based on the characteristics of incomplete heating information and uncertain mapping relationship between various factors affecting the heating load.

[0003] In addition to the above methods, some scholars have proposed other methods for heating load prediction. For example, Chinese Patent 201911285593.X discloses "a method and device for predicting heating load". According to the heating load data of the time series, data at a time similar to the time to be predicted is obtained, and the corresponding similar time features are obtained according to the similar time data. The long short-term memory network is used to process the similar time data to obtain the time series characteristics of the data, and the multi-layer feedforward network is used to process the similar time characteristics and time series characteristics to obtain the predicted heating load at the time to be predicted. For example, Chinese Patent 201911239065.0 discloses "a method and device for predicting heating load". According to the current indoor environmental parameters and the room temperature prediction model, the room temperature prediction range of the target time period is determined; according to the outdoor prediction environmental parameters of the target time period, the room temperature prediction range and the heating load prediction model, the heating load prediction range of the target time period is determined. For example, Chinese patent 202010461668.1 discloses a "heating system load prediction method, device and system based on building classification". The load influencing factors of the thermal power station are determined by analysis, and the historical data corresponding to the influencing factors and the historical data of the thermal power station load are used as training samples to train the thermal power station load prediction model, and the thermal power station load prediction model is used to predict the load.

[0004] Each technology has different characteristics and applicability. Most methods require a large amount of historical data on heating load for analysis and machine learning. A lot of data is required, and the data processing is complicated. Machine learning takes a long time, and the implementation cycle is long and slow. The heating load is greatly affected by meteorological parameters. Using historical data with a long interval from the time to be predicted may lead to inaccurate predictions due to different meteorological parameters.

[0005] Currently, no effective solution has been proposed for the problems in the related technologies. Summary of the invention

[0006] 1. Technical issues to be resolved

[0007] In view of the shortcomings of the prior art, the present invention provides a heating load prediction method based on similar time periods. By introducing similar time periods, the model can be established using the data of the first two weeks after the start of the heating period. The model is updated daily by increasing the sample size day by day. The model is simple and has a short cycle and fast calculation compared to traditional machine learning methods. Compared with simple models, the influence of thermal inertia of buildings and ground structural layers is taken into account for the ground radiation system, which improves the prediction accuracy and solves the problems mentioned in the background technology.

[0008] (II) Technical solution

[0009] In order to achieve the above-mentioned introduction of similar time periods, the model can be established using the data of the first two weeks after the start of the heating period. The model is updated daily by increasing the sample size day by day. The model is simple and has a short cycle and fast calculation compared to traditional machine learning methods. Compared with simple models, the influence of thermal inertia of buildings and ground structural layers is considered for the ground radiation system, which improves the prediction accuracy. The specific technical solutions adopted by the present invention are as follows:

[0010] A method for predicting heating load based on similar time periods comprises the following steps:

[0011] S1, read the outdoor meteorological parameter data, user room temperature data, heating data and make corrections;

[0012] S2. Starting from the third week of the heating period, establish and update the hourly load forecasting model daily;

[0013] S3, selecting a similar period and reading data of the similar period;

[0014] S4, constructing an online correction coefficient of the hourly load forecasting model based on similar period data;

[0015] S5. Establish a load forecasting model for the forecast period.

[0016] Furthermore, the step S1 of reading outdoor meteorological parameter data, user room temperature data, and heating data and correcting them specifically includes the following steps:

[0017] S11, respectively select typical users to monitor the room temperature, introduce the heating non-guarantee rate factor, calculate the number of users n1 whose indoor temperature is not guaranteed according to the non-guarantee rate, sort all the temperatures at the current moment after processing from small to large, and take the indoor temperature of the n1+1th user as the indoor temperature characteristic value;

[0018] S12, constructing a comprehensive outdoor temperature using the outdoor temperature, wind speed, weather conditions and solar altitude angle from the weather forecast;

[0019] S13. Construct heating load data based on historical heating records.

[0020] Furthermore, the step S2 establishes and updates the hourly load forecasting model daily starting from the third week of the heating period, and includes the following steps:

[0021] S21, first, starting from the third week of the heating period, using correlation analysis based on historical data, determine which historical moments of heating load at a certain moment are related to the heating load, outdoor comprehensive air temperature, and indoor temperature;

[0022] S22. Determine the weight coefficients respectively, take full account of the lag effect of building heat transfer and floor heat transfer, establish and increase the sample size daily to update the hourly load forecasting model.

[0023] Furthermore, the step S3 selects a similar time period and reads data of a similar time period, including the following steps:

[0024] S31, selecting a similar period corresponding to the forecast period according to a similar period determination method;

[0025] S32, reading the outdoor meteorological parameter data, user room temperature data, and heating data of the similar time period.

[0026] Furthermore, the step S4 constructs an online correction coefficient of the hourly load forecasting model based on similar period data, including the following steps:

[0027] S41. For similar time periods, use the hourly load forecasting model to calculate the thermal load forecast value corresponding to the forecast time in the similar time period;

[0028] S42, the correction coefficient is obtained by dividing the temperature difference between the indoor temperature setting value and the outdoor comprehensive air temperature at the time of prediction in the similar period by the temperature difference between the indoor temperature and the outdoor comprehensive air temperature under the actual heating supply in the similar period , make online corrections to the heat load prediction value.

[0029] Furthermore, the step S5 establishes a load forecasting model for the forecast period, including the following steps:

[0030] S51, using the online correction coefficient of the similar period and the hourly load forecasting model to establish a load forecasting model for the forecast period;

[0031] S52. Use the outdoor temperature, wind speed, solar altitude angle and indoor temperature during the forecast period to bring into the hourly load forecasting model during the forecast period to obtain the forecast load.

[0032] Furthermore, for the ground radiation system, the influence of thermal inertia on the predicted heat load is fully considered.

[0033] Furthermore, the similar time period determination method comprises the following steps:

[0034] S311, selecting n2 data of outdoor comprehensive temperature at n2 moments before and after that have an impact on the heating load at a certain moment;

[0035] S312, reading the outdoor comprehensive air temperature of all corresponding moments in the historical time, and calculating the difference between the average outdoor comprehensive air temperature of n2 moments in the historical data and the average outdoor comprehensive air temperature of the time period in the prediction time;

[0036] S313, calculating the change rate of the outdoor comprehensive temperature at adjacent moments corresponding to the forecast period and the historical period;

[0037] S314, calculating the difference between the outdoor comprehensive air temperature change rate at the corresponding time of each historical period and the predicted period;

[0038] S315. The period whose absolute value of the difference between the average outdoor comprehensive air temperature in all historical periods and the average outdoor comprehensive air temperature in the forecast period is less than or equal to 5°C and whose calculated standard deviation is the smallest is the similar period.

[0039] According to another aspect of the present invention, there is provided a heating load prediction system based on similar time periods, comprising a detection element, a data processor and a data acquisition system;

[0040] The detection elements include outdoor temperature sensors, heat meters installed in heat exchange stations, and indoor temperature sensors of typical users;

[0041] The data processor can collect, convert and store the signals of the temperature sensor and other detection elements, calculate the data, and transmit the data to the data acquisition system in real time;

[0042] The data acquisition system can collect and store in real time the indoor temperature of typical users uploaded by the building data processor, the accumulated heat of the heating station, the instantaneous heat of the heating station, the instantaneous flow of the heating station, the instantaneous water supply temperature and the return water temperature of the heating station.

[0043] (III) Beneficial effects

[0044] Compared with the prior art, the present invention provides a heating load prediction method based on similar time periods, which has the following beneficial effects: this patent fully considers the influence of various meteorological factors, introduces similar time periods, and uses the data of the first two weeks after the start of the heating period to start building a model. The model is updated daily by increasing the sample size day by day. The model is simple and has a short cycle and fast calculation compared to traditional machine learning methods. Compared with simple models, the influence of thermal inertia of buildings and ground structural layers is taken into account for the ground radiation system, thereby improving prediction accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0046] Figure 1 is a flow chart of a method for predicting heating load based on similar time periods according to an embodiment of the present invention;

[0047] Figure 2 is a system block diagram of a heating load prediction system based on similar time periods according to an embodiment of the present invention;

[0048] Figure 3 is a schematic diagram of heat supply load prediction of a radiator system according to Embodiment 1 of the present invention;

[0049] Figure 4 This is a schematic diagram of the heating load prediction of the ground radiation system according to the second embodiment of the present invention.

[0050] In the figure:

[0051] 1. Heat meter; 2. Outdoor temperature sensor; 3. Secondary network water supply temperature sensor; 4. Secondary network return water temperature sensor; 5. User indoor temperature sensor. DETAILED DESCRIPTION

[0052] To further illustrate each embodiment, the present invention provides drawings, which are part of the disclosure of the present invention and are mainly used to illustrate the embodiments and can be used in conjunction with the relevant descriptions in the specification to explain the operating principles of the embodiments. With reference to these contents, ordinary technicians in the field should be able to understand other possible implementations and advantages of the present invention. The components in the figures are not drawn to scale, and similar component symbols are generally used to represent similar components.

[0053] According to an embodiment of the present invention, a method for predicting heating load based on similar time periods is provided.

[0054] The present invention is further described with reference to the accompanying drawings and specific embodiments. Figure 1 As shown, the heating load prediction method based on similar time periods according to an embodiment of the present invention includes the following steps:

[0055] S1, read the outdoor meteorological parameter data, user room temperature data, heating data and make corrections;

[0056] S2. Starting from the third week of the heating period, establish and update the hourly load forecasting model daily;

[0057] S3, selecting a similar period and reading data of the similar period;

[0058] S4, constructing an online correction coefficient of the hourly load forecasting model based on similar period data;

[0059] S5. Establish a load forecasting model for the forecast period.

[0060] Wherein, the step S1 of reading outdoor meteorological parameter data, user room temperature data, heating data and correcting them specifically includes the following steps:

[0061] S11, respectively select typical users to monitor the room temperature, introduce the heating non-guarantee rate factor, calculate the number of users n1 whose indoor temperature is not guaranteed according to the non-guarantee rate, sort all the temperatures at the current moment after processing from small to large, and take the indoor temperature of the n1+1th user as the indoor temperature characteristic value;

[0062] S12, constructing a comprehensive outdoor temperature using the outdoor temperature, wind speed, weather conditions and solar altitude angle from the weather forecast;

[0063] S13. Construct heat load data based on historical heating supply records.

[0064] The step S2 starts from the third week of the heating period to establish and update the hourly load forecasting model daily, and includes the following steps:

[0065] S21, firstly, starting from the third week of the heating period, using correlation analysis based on historical data, determine at which time the heating load at a certain time is related to the outdoor comprehensive air temperature and indoor temperature;

[0066] S22. Determine the weight coefficients respectively, take full account of the lag effect of building heat transfer and floor heat transfer, establish and increase the sample size daily to update the hourly load forecasting model.

[0067] The step S3 selects a similar time period and reads the data of the similar time period, including the following steps:

[0068] S31, selecting a similar period corresponding to the forecast period according to a similar period determination method;

[0069] S32, reading the outdoor meteorological parameter data, user room temperature data, and heating data of the similar time period.

[0070] The step S4 constructs an online correction coefficient of the hourly load forecasting model based on similar period data, including the following steps:

[0071] S41. For similar time periods, use the hourly load forecasting model to calculate the thermal load forecast value corresponding to the forecast time in the similar time period;

[0072] S42, the correction coefficient is obtained by dividing the temperature difference between the indoor temperature setting value and the outdoor comprehensive air temperature at the time of prediction in the similar period by the temperature difference between the indoor temperature and the outdoor comprehensive air temperature under the actual heating supply in the similar period , make online corrections to the predicted heat load value.

[0073] The step S5 establishes a load forecasting model for the forecast period, including the following steps:

[0074] S51, using the online correction coefficient of the similar period and the hourly load forecasting model to establish a load forecasting model for the forecast period;

[0075] S52. Use the outdoor temperature, wind speed, solar altitude angle and indoor temperature during the forecast period to bring into the hourly load forecasting model during the forecast period to obtain the forecast load.

[0076] For ground radiation systems, the impact of thermal inertia on the predicted heat load is fully considered.

[0077] The similar time period determination method comprises the following steps:

[0078] S311, selecting n2 data of outdoor comprehensive temperature at n2 moments before and after that have an impact on the heating load at a certain moment;

[0079] S312, reading the outdoor comprehensive air temperature of all corresponding moments in the historical time, and calculating the difference between the average outdoor comprehensive air temperature of n2 moments in the historical data and the average outdoor comprehensive air temperature of the time period in the prediction time;

[0080] S313, calculating the change rate of the outdoor comprehensive temperature at adjacent moments corresponding to the forecast period and the historical period;

[0081] S314, calculating the difference between the outdoor comprehensive air temperature change rate at the corresponding time of each historical period and the predicted period;

[0082] S315. The period whose absolute value of the difference between the average outdoor comprehensive air temperature in all historical periods and the average outdoor comprehensive air temperature in the forecast period is less than or equal to 5°C and whose calculated standard deviation is the smallest is the similar period.

[0083] In order to facilitate understanding of the above technical solutions of the present invention, the working principle or operation mode of the present invention in the actual process is described in detail below.

[0084] In actual application, the heating load prediction method based on similar time periods is as follows: typical users of different apartment types are selected to monitor the room temperature, and the room temperature data are eliminated and supplemented by using statistical methods. An acceptable heating non-guarantee rate factor is introduced, and the number of users n1 whose indoor temperature is not guaranteed is calculated according to the acceptable non-guarantee rate. All temperatures at the current moment after processing are sorted from small to large, and the indoor temperature of the user at the n1+1th position is taken as the indoor temperature characteristic value.

[0085] The outdoor comprehensive temperature is constructed using the outdoor temperature, wind speed, weather conditions and solar altitude angle from the meteorological forecast, and the similar time period corresponding to the prediction time is selected according to the similar time period determination criteria.

[0086] The heating load is predicted based on the historical heat load value, the outdoor comprehensive air temperature at the historical time, the outdoor comprehensive air temperature at the predicted time, the indoor temperature characteristic value at the historical time and the set indoor temperature at the predicted time. For the ground radiation system, the large thermal inertia has a great impact on the predicted heat load Q. m impact.

[0087] The specific calculation method is: according to the actual situation of different heat exchange stations, input the set temperature value INDT_set (℃) and the non-guarantee rate respectively. Read meteorological parameters, including but not limited to outdoor temperature TOA (℃), wind speed WS (m / s), weather conditions WEAS (cloudy, sunny), solar altitude angle AA, call the formula to calculate the outdoor comprehensive air temperature TOAZ (℃), read the meteorological parameters of similar time periods according to the system feedback data, and call the following formula to calculate the outdoor comprehensive air temperature TOAZ (℃) of similar time periods.

[0088] The outdoor integrated air temperature is a function of outdoor temperature, wind speed, sun altitude angle and weather conditions.

[0089] (1-1)

[0090] The selection of similar time periods adopts the following method: comprehensively consider the hourly change law of outdoor comprehensive air temperature and the average outdoor comprehensive air temperature in the time period to determine the similar time period. Select the first n that have an impact on the heating load at a certain moment 21 The next n moments affected by the heating load at that moment 22The outdoor comprehensive air temperature at each moment is n2. Read the outdoor comprehensive air temperature at all corresponding moments in the historical data, and calculate the difference between the average outdoor comprehensive air temperature at n2 moments in the historical data and the average outdoor comprehensive air temperature at the time period of the forecast time. The outdoor comprehensive air temperature after the forecast time is calculated using weather forecast data. Calculate the change rate k of the outdoor comprehensive temperature at adjacent moments in the forecast period and the historical period according to formula (1-2): i , calculate each historical period and forecast period according to formula (1-3).

[0091] The difference in the rate of change of the outdoor comprehensive air temperature at the corresponding moment, the absolute value of the difference between the average outdoor comprehensive air temperature in all historical periods and the average outdoor comprehensive air temperature in the forecast period is less than or equal to 5°C and the standard deviation σ calculated by formula (1-4) is the smallest, which is the similar period.

[0092] (1-2)

[0093] where k i is the rate of change of the outdoor comprehensive air temperature at the i-th moment, and are the outdoor comprehensive air temperatures at time i+1 and time i respectively, and T is the time interval.

[0094] (1-3)

[0095] in is the difference between the outdoor comprehensive air temperature change rate at the corresponding time in the historical period and the forecast period, is the change rate of outdoor comprehensive air temperature at the i-th moment in the historical period, k i is the rate of change of the outdoor comprehensive air temperature at the i-th moment in the prediction period.

[0096] (1-4)

[0097] in is the standard deviation of the outdoor comprehensive air temperature change rate at the corresponding time in the historical period and the forecast period, is the difference between the outdoor comprehensive air temperature change rate at the corresponding time in the historical period and the forecast period, It is the average value of the difference between the outdoor comprehensive air temperature change rate in each historical period and the predicted period, and n2 is the number of samples.

[0098] Read the user's indoor temperature and perform data screening and processing to determine the indoor temperature characteristic value INDT (℃).

[0099] Read the data of the heat exchange station, and read according to the number of the heat exchanger: the actual value of the secondary network water supply temperature, the actual value of the secondary network return water temperature, the secondary network instantaneous flow rate, and the secondary network instantaneous heating capacity.

[0100] The heating load forecast adopts the method of establishing the forecast period model based on the hourly load forecast model which is based on online correction of similar periods and daily increase of sample size and update. For the ground radiation system, the large thermal inertia has been fully considered to predict the heat load Q m First, historical data is used for correlation analysis to determine which historical moments of heating load Q are related to the heating supply, outdoor comprehensive air temperature, and indoor temperature, and the input variables are optimized and the weight coefficients are determined respectively. The lag effect of building heat transfer and floor heat transfer is fully considered, and an hourly load forecasting model is established and updated daily starting from the third week of the heating period; for similar time periods, the hourly load forecasting model is used to calculate the heat load forecast value corresponding to the forecast time in the similar time period, and the correction coefficient is obtained by dividing the temperature difference between the indoor temperature set value and the outdoor comprehensive air temperature at the forecast time of the similar time period by the temperature difference between the indoor temperature and the outdoor comprehensive air temperature under the actual heating supply in the similar time period. , and make online corrections to the predicted values; finally, the hourly load forecasting model for the forecast period is established using the online correction coefficient and the hourly load forecasting model.

[0101] (1-5)

[0102] Where Q is the hourly heat load, TOA is the outdoor temperature, WS is the outdoor wind speed, AA is the solar altitude angle, and INDT is the indoor temperature characteristic value.

[0103] (1-6)

[0104] (1-7)

[0105] in, , .in , are the predicted heat loads at the i-th moment in the historical period and the predicted period, respectively. t is the moment with the highest correlation with the heat load at the i-th moment. is the heat load at time t, , , are the indoor temperature characteristic values ​​at the i-th moment in the historical period, similar period and forecast period, respectively. , , are the comprehensive outdoor air temperatures at the i-th moment in the historical period, similar period, and forecast period, respectively. , are the indoor temperature characteristic values ​​at the historical moment and the predicted moment, respectively. , are the outdoor comprehensive air temperatures at the historical and predicted moments, respectively. is the indoor temperature setting value, The weight coefficient of data at different historical moments obtained by using historical data for parameter identification. is the online correction coefficient of the thermal negative prediction value based on similar time periods, and the value range of i is [0-24].

[0106] In addition, if Figure 2 As shown, according to an embodiment of the present invention, a heating load prediction system based on similar time periods is provided, comprising a detection element, a data processor and a data acquisition system;

[0107] The detection elements include heat meters installed in the heat exchange station, temperature sensors installed in the user's water supply and return mains, and indoor temperature sensors of each user;

[0108] The data processor can collect, convert and store the signals of the temperature sensor and other detection elements, calculate the data, and transmit the data to the data acquisition system in real time;

[0109] The data acquisition system can collect and store in real time the indoor temperature of each user uploaded by the building data processor, the user's instantaneous supply and return water temperature, the accumulated heat of the heating station, the instantaneous heat of the heating station, the instantaneous flow of the heating station, the instantaneous supply water temperature and return water temperature of the heating station.

[0110] In order to facilitate understanding of the above technical solutions of the present invention, the working principle or operation mode of the present invention in the actual process is described in detail below.

[0111] Embodiment 1

[0112] like Figure 3 As shown, in actual use, when predicting the heating load of the radiator system, the heating load prediction system based on similar time periods includes a heat source, the heat source is connected to the heat exchanger, the inlet of the heat exchanger is connected to the outlets of several radiators 6, the outlet of the heat exchanger is connected to the inlets of several radiators 6, a secondary circulation water pump is arranged between the inlet of the heat exchanger and the outlet of the radiator 6, a data processor is arranged on one side of the heat exchanger, and a secondary network return water temperature sensor 4, a secondary network supply water temperature sensor 3, a heat meter 1, an outdoor temperature sensor 2 and a user indoor temperature sensor 5 are respectively connected to the data processor, wherein the secondary network return water temperature sensor 4 is located at the inlet of the secondary circulation water pump, the heat meter 1 is located on one side of the secondary network return water temperature sensor 4, the secondary network supply water temperature sensor 3 is located at the outlet of the heat exchanger, the outdoor temperature sensor 2 is installed outdoors, and the user indoor temperature sensor 5 is installed indoors.

[0113] Embodiment 2

[0114] like Figure 4 As shown, in actual use, when predicting the heating load of the ground radiation system, the heating load prediction system based on similar time periods can replace the radiator 6 with the ground radiation system 7 based on the first embodiment.

[0115] In summary, with the help of the above technical solution of the present invention, this patent makes full use of various factors that affect the heating load, including outdoor meteorological parameters, indoor temperature, heating supply, etc. to perform short-term heating load prediction. This patent is applicable to the heating system at the end of the radiator 6 and the heating system at the end of the ground radiation, which can shorten the modeling cycle and improve the prediction accuracy; especially for the ground radiation system 7, considering the time delay factor can improve the prediction accuracy of the simple model of the load prediction of the conventional ground radiation system 7, so that it can be significantly improved.

[0116] Compared with machine learning, the method that combines basic theoretical calculations of heating, such as heat balance, with real-time monitoring requires less historical data. The model can be established using data from the first two weeks after the start of the heating period. The model is updated daily by increasing the sample size. The model is simple, which can simplify the prediction process and speed up the prediction.

[0117] Compared with the time series method, the use of data from similar time periods for online correction avoids the situation where the data at a certain moment is incorrect, making the prediction results more accurate.

[0118] Compared with the grey system prediction method, the prediction method makes full use of actual data and considers all factors that affect the heating load as much as possible, which increases the accuracy of the prediction results.

[0119] In view of this, the heating load forecasting method of this patent has high accuracy, low cost and short cycle, and realizes low-cost, high-precision rapid load forecasting, which is conducive to promoting the development of heating load forecasting in fields with different economic levels.

[0120] In the present invention, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the present invention according to the specific circumstances.

[0121] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A heating load prediction method based on similar time periods, It is characterized in that The following steps are involved: S1, read the outdoor meteorological parameter data, user room temperature data, heating data and make corrections; S2. Starting from the third week of the heating period, establish and update the hourly load forecasting model daily; S3, selecting a similar period and reading data of the similar period; S4, constructing an online correction coefficient of the hourly load forecasting model based on similar period data; S5. Establish a load forecasting model for the forecast period; The step S3 selects a similar time period and reads the data of the similar time period, including the following steps: S31, selecting a similar period corresponding to the forecast period according to a similar period determination method; S311, select the total number of n before and after that has an impact on the heating load at a certain moment 2 The total outdoor temperature at the moment is n 2 individual data; S312, read the outdoor comprehensive air temperature of all corresponding moments in the historical time, and calculate n 2 The difference between the average outdoor comprehensive air temperature at a certain moment and the average outdoor comprehensive air temperature during the period of the forecast moment; S313, calculating the change rate of the outdoor comprehensive temperature at adjacent moments corresponding to the forecast period and the historical period; S314, calculating the difference between the outdoor comprehensive air temperature change rate at the corresponding time of each historical period and the predicted period; S315. The absolute value of the difference between the average outdoor comprehensive air temperature in all historical periods and the average outdoor comprehensive air temperature in the forecast period is less than or equal to 5°C, and the period having the smallest standard deviation of the calculated outdoor comprehensive air temperature change rate at the corresponding time of the historical period and the forecast period is the similar period; S32, reading the outdoor meteorological parameter data, user room temperature data, and heating data of the similar period; The step S4 constructs an online correction coefficient of the hourly load forecasting model based on similar period data, including the following steps: S41. For similar time periods, use the hourly load forecasting model to calculate the thermal load forecast value corresponding to the forecast time in the similar time period; S42, performing online correction on the heat load prediction value by dividing the temperature difference between the indoor temperature setting value and the outdoor comprehensive air temperature at the prediction time of the similar period by the temperature difference between the indoor temperature and the outdoor comprehensive air temperature under the actual heating supply in the similar period to obtain a correction coefficient.

2. A method for predicting heating load based on similar time periods according to claim 1, It is characterized in that The step S1 reads the outdoor meteorological parameter data, the user room temperature data, the heating data and makes corrections, specifically comprising the following steps: S11. Select typical users to monitor the room temperature, introduce the heating non-guarantee rate factor, and calculate the number of users whose indoor temperature is not guaranteed according to the non-guarantee rate. 1 , sort all the temperatures at the current moment after processing from small to large, and sort the temperature at the nth 1 +1 user's indoor temperature is taken as the indoor temperature characteristic value; S12, constructing a comprehensive outdoor temperature using the outdoor temperature, wind speed, weather conditions and solar altitude angle from the weather forecast; S13. Construct heat load data based on historical heating supply records.

3. A method for predicting heating load based on similar time periods according to claim 1, It is characterized in that The step S2 starts from the third week of the heating period to establish and update the hourly load forecasting model daily, and includes the following steps: S21, first, starting from the third week of the heating period, using correlation analysis based on historical data, determine at which time the heating load at a certain time is related to the heating load, outdoor comprehensive air temperature and indoor temperature; S22. Determine the weight coefficients respectively, take full account of the lag effect of building heat transfer and floor heat transfer, establish and increase the sample size daily to update the hourly load forecasting model.

4. A method for predicting heating load based on similar time periods according to claim 1, It is characterized in that The step S5 establishes a load forecasting model for the forecast period, including the following steps: S51, using the online correction coefficient of the similar period and the hourly load forecasting model to establish a load forecasting model for the forecast period; S52. Use the outdoor temperature, wind speed, solar altitude angle and indoor temperature during the forecast period to bring into the hourly load forecasting model during the forecast period to obtain the forecast load.

5. A method for predicting heating load based on similar time periods according to claim 1, It is characterized in that For ground radiation systems, fully consider the impact of thermal inertia on the predicted heat load.

6. A heating load prediction system based on similar time periods, used for the use of the heating load prediction method based on similar time periods according to any one of claims 1 to 5, It is characterized in that It includes detection elements, data processors and data acquisition systems; The detection elements include outdoor temperature sensors, heat meters installed in heat exchange stations, and indoor temperature sensors of typical users; The data processor can collect, convert and store the signals of the detection elements, calculate the data, and transmit the data to the data acquisition system in real time; The data acquisition system can collect and store in real time the indoor temperature of typical users uploaded by the building data processor, the accumulated heat of the heating station, the instantaneous heat of the heating station, the instantaneous flow of the heating station, the instantaneous water supply temperature and the return water temperature of the heating station.

Citation Information

Patent Citations

  • Heat supply load prediction method and device

    CN110991749A

  • Heat supply system load prediction method, device and system based on building classification

    CN111652422A

  • Load-prediction-based control system and method for heating ventilation air-conditioning system

    CN106403207A

  • Short-term load prediction method based on similar day segmentation and LM-BP network

    CN108229754A

  • Heat supply energy-saving control method and system based on migration learning algorithm

    CN109373438A