A two-dimensional binning method for comprehensively characterizing the uncertainty on both sides of the source and the load

Through the two-dimensional binning method and universal distribution model fitting, the problem of comprehensive characterization of the uncertainty on both sides of the source and load in the new power system is solved, the accuracy and economy of system dispatching are improved, and the "double carbon" development strategy is satisfied. power system optimization needs.

CN113744082BActive Publication Date: 2024-10-01STATE GRID (SUZHOU) URBAN ENERGY RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110983724.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-25
Publication Date
2024-10-01
Estimated Expiration
2041-08-25

AI Technical Summary

Technical Problem

Existing technologies usually only consider the uncertainty of the source side or the load side separately in optimal dispatch, and cannot effectively solve the problem of comprehensive characterization of the uncertainty on both sides of the source and load in new power systems, especially under the "dual carbon" development strategy. The system planning and operation scheduling requirements of new power systems are difficult to meet.

Method used

A two-dimensional binning method is used to comprehensively characterize the uncertainty on both sides of the source and load. By calculating the source-side new energy power prediction error and the load-side load response historical error data, a general distribution model is used to fit the probability density histogram of the system error. , and perform piecewise linearization processing on it to form a highly accurate probability distribution model.

Benefits of technology

It improves the accuracy of uncertainty description and the description ability of stochastic coupling relationships, and enhances the accuracy and economy of power and reserve optimal dispatching of new power systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113744082B_ABST
    Figure CN113744082B_ABST
Patent Text Reader

Abstract

The present invention discloses a two-dimensional binning method for comprehensively characterizing the uncertainty on both sides of the source and the load, including: A. Calculating the historical data set of the new energy power prediction error on the source side, and dividing the historical prediction error into W boxes according to the size of the new energy power prediction value available to the dispatcher, and then dividing the time-stamped array in each box into T boxes according to the time period; B. Calculating the load power uncertainty on the load side to obtain the load response historical error data with time scale; C. Putting the load response historical error data into the divided W×T boxes according to the time scale and the new energy power prediction value of the system at that time; D. Calculating the system error historical data in each box; E. Fitting the probability density histogram of the system error historical data in each box with a general distribution model to obtain the probability distribution model of the system error in each box, and performing piecewise linearization processing on the obtained probability distribution model. The present invention takes into account the unified description of the uncertainty on the source side and the load side, and has high accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of energy optimization, and in particular to a two-dimensional binning method for comprehensively describing uncertainties on both sides of a source and a load. Background Art

[0002] With the clarification of my country's "dual carbon" strategic goals, the system uncertainty assessment problem under the high proportion of renewable energy access has become a basic issue that needs to be paid attention to in all aspects of system planning, operation scheduling, and optimization control. At the same time, a new power system with new energy as the main body is gradually being built, with two-way efforts on the power supply side and the load side. The sharp increase in new energy on both sides will not only further strengthen the volatility of the original power supply side, but also increase the volatility of the load side rapidly in the future. At present, the consideration of uncertainty in the optimization and scheduling work generally only considers the uncertainty on the source side or the load side separately, so as to conduct targeted analysis, but this idea and method are no longer applicable to the requirements of optimized scheduling of new power systems under my country's "dual carbon" development strategy. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a two-dimensional binning method with high accuracy for comprehensively characterizing the uncertainties on both sides of the source and the load.

[0004] In order to solve the above problems, the present invention provides a two-dimensional binning method for comprehensively characterizing the uncertainty on both sides of the source and the load, which comprises the following steps:

[0005] A. Calculate the historical data set of the source-side renewable energy power forecast error, and divide the historical forecast error into W boxes according to the size of the renewable energy power forecast value available to the dispatcher, and then divide the time-stamped array in each box into T boxes according to the time period, and obtain W×T boxes; where W≥2, T≥2;

[0006] B. Calculate the load power uncertainty on the load side to obtain the historical error data of load response with time stamp;

[0007] C. Put the load response historical error data into W×T boxes according to the time scale and the new energy power forecast value of the system at that time;

[0008] D. Calculate the historical data of system errors in each box;

[0009] E. Use the general distribution model to fit the probability density histogram of the historical data of the system error in each box to obtain the probability distribution model of the system error in each box, and perform piecewise linearization on the obtained probability distribution model.

[0010] As a further improvement of the present invention, the general distribution model is as follows:

[0011]

[0012] F(x)=(1+e -α(x-γ) ) -β

[0013]

[0014] Among them, the three shape parameters α, β and γ of the general distribution model satisfy:

[0015] α>0, β>0, -∞<γ<+∞.

[0016] As a further improvement of the present invention, the load response historical error data includes load response historical error data under high electricity prices and load response historical error data under low electricity prices.

[0017] As a further improvement of the present invention, the load response historical error data under the high electricity price event includes the following steps:

[0018] B11. Calculate the historical load reduction in period t The historical data set, and the The probability density function is obtained by fitting the histogram of The formula is as follows;

[0019]

[0020] in, represents the basic power consumption of the load in time period t, It represents the measured electricity consumption under high electricity price in time period t;

[0021] B12. Calculate the load power reduction under the high electricity price incentive corresponding to time period t Expected value The formula is as follows;

[0022]

[0023] B13. Calculate the expected load reduction in the historical period t for all the times when the electricity price was high in history. Historical load shedding The difference between the historical load reduction error in period t is obtained. All sample data of load response error under high electricity price are obtained, and the formula is as follows:

[0024]

[0025] As a further improvement of the present invention, the load response historical error data under the low electricity price event includes the following steps:

[0026] B21. Calculate the historical load increase in period t The historical data set, and the The probability density function is obtained by fitting the histogram of The formula is as follows:

[0027]

[0028] in, represents the basic power consumption of the load in time period t, It represents the measured electricity consumption under low electricity price in time period t;

[0029] B22. Calculate the increase in load power consumption under the low electricity price incentive corresponding to time period t Expected value The formula is as follows:

[0030]

[0031] B23. Calculate the expected historical load increase in period t for all the times when low electricity prices occurred in history. Historical load increase The difference between the historical load increase error in period t is obtained. All sample data of load response error under high electricity price are obtained, and the formula is as follows:

[0032]

[0033] As a further improvement of the present invention, the system error history data in each box in step D includes system error history data under high electricity prices and system error history data under low electricity prices.

[0034] As a further improvement of the present invention, the system error historical data under high electricity prices The calculation is as follows:

[0035]

[0036] Among them, t represents time, w represents the wth box, represents the prediction error of new energy power; Represents the historical load reduction error in period t; Represents the predicted value of new energy power, Indicates the measured value of new energy power, represents the expected historical load shedding amount, Indicates the basic power consumption of the load. Indicates the actual electricity consumption under high electricity prices.

[0037] As a further improvement of the present invention, the system error historical data under low electricity price The calculation is as follows:

[0038]

[0039] Among them, t represents time, w represents the wth box, represents the prediction error of new energy power; It represents the historical load increase error in the period t; Represents the predicted value of new energy power, Indicates the measured value of new energy power, represents the expected historical load increase, Indicates the basic power consumption of the load. Indicates the actual electricity consumption under low electricity prices.

[0040] As a further improvement of the present invention, the new energy includes wind power, hydropower and solar energy.

[0041] Beneficial effects of the present invention:

[0042] The two-dimensional binning method for comprehensively characterizing the uncertainties on both the source and load sides of the present invention supplements the dual system uncertainty description method on the energy side and the load side, improves the accuracy of the uncertainty description, and enhances the description of the coupling relationship between uncertainty and randomness, which is beneficial to improving the accuracy and economy of the day-ahead power and standby optimization scheduling of the new power system.

[0043] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention, it can be implemented according to the contents of the specification. In order to make the above and other purposes, features and advantages of the present invention more obvious and easy to understand, the following specifically cites a preferred embodiment and describes it in detail with the accompanying drawings as follows. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 It is a flow chart of a two-dimensional binning method for comprehensively describing the uncertainty on both sides of the source and the load in a preferred embodiment of the present invention;

[0045] Figure 2 It is a schematic diagram of a two-dimensional binning method for comprehensively describing the uncertainties on both sides of the source and the load in a preferred embodiment of the present invention;

[0046] Figure 3 is a probability distribution histogram in each data box after binning in a preferred embodiment of the present invention;

[0047] Figure 4 is the historical error data of load response under high electricity prices in time periods 10, 20 and 30 in the preferred embodiment of the present invention;

[0048] Figure 5 is the historical error data of load response under low electricity prices in time periods 10, 20 and 30 in the preferred embodiment of the present invention;

[0049] Figure 6 It is a schematic diagram of a probability distribution model of system errors under high / medium / low electricity prices in each box after two-dimensional binning in a preferred embodiment of the present invention;

[0050] Figure 7 It is a display of original data of historical forecast error of wind power in Ireland EIRGRID, a preferred embodiment of the present invention;

[0051] Figure 8 This is a comparison diagram of the wind power historical prediction error fitting effect in the preferred embodiment of the present invention;

[0052] Fig. 9 It is a geographical distribution map of 5533 users in a preferred embodiment of the present invention;

[0053] Fig.10 is a load response time correlation statistical result diagram in a preferred embodiment of the present invention;

[0054] Fig.11 is the fitting result of the cumulative probability function of the load response error under the excitation of the high electricity price signal in time periods 10, 20 and 30 in the preferred embodiment of the present invention;

[0055] Fig.12 is the fitting result of the cumulative probability function of the load response error under the excitation of the low electricity price signal in time periods 10, 20 and 30 in the preferred embodiment of the present invention;

[0056] Fig.13 It is the historical data of system error under the stimulation of high electricity price signal in time periods 10, 20 and 30 when the wind power level is level 5 in the preferred embodiment of the present invention;

[0057] Fig.14 It is the historical data of system error under the stimulation of low electricity price signal in time periods 10, 20 and 30 when the wind power level is level 5 in the preferred embodiment of the present invention. DETAILED DESCRIPTION

[0058] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments so that those skilled in the art can better understand the present invention and implement it, but the embodiments are not intended to limit the present invention.

[0059] like Figure 1-2 As shown, a two-dimensional binning method for comprehensively describing the uncertainty on both sides of the source and the load in a preferred embodiment of the present invention includes the following steps:

[0060] A. Calculate the historical data set of the source-side new energy power prediction error, and divide the historical prediction error into W boxes according to the size of the new energy power prediction value available to the dispatcher, and then divide the time-stamped array in each box into T boxes according to the time period, and obtain W×T boxes; where W≥2, T≥2; that is, construct a two-dimensional box combination with the ordinate being the source-side box number and the abscissa being the load-side box number. In this embodiment, the new energy is wind power. In other embodiments, the new energy may be wind power, hydropower, solar energy, etc.

[0061] Step A specifically includes:

[0062] Data preprocessing: First, collect historical wind power data, including "wind power forecast data " and the corresponding historical time t "wind power measured data The “prediction error” at the historical time t is defined as the “prediction value” minus the “measured value” on the time scale, recorded as As shown in equation (1). A pair of power prediction values ​​and measured values ​​in historical data can obtain a "prediction error" sample. The three samples of "historical wind power prediction data", "historical wind power measured data" and "historical wind power prediction error" under the same historical time scale t constitute a time scale array in a historical database. Finally, taking the installed capacity of the wind farm as the benchmark value, all elements in the historical database are normalized for subsequent research.

[0063]

[0064] Binning based on prediction level: First, the total range of wind power prediction values ​​obtained by the dispatcher is classified into levels. The value range of wind power prediction is within [0,1]pu. The historical prediction data is divided into W boxes, and the prediction power value range of the wth box is [(w-1) / W,w / W]. After processing in step 1, the historical data has been divided into an array with historical moments as units. According to the "historical wind power prediction data" in each historical data array, "The size of the per-unit value is calculated, and all arrays in the database are stored in their corresponding prediction level data boxes to complete the array binning process. Taking w as the search name of the wind power prediction power level, a historical time-scale array in the data bin corresponding to the w wind power prediction level contains and

[0065] The following example illustrates that when the historical forecast values ​​are divided into 10 levels, W = 10, Figure 3The probability distribution histogram of each data box after processing by the method proposed in step A is shown. It can be seen from the figure that the wind power prediction error distribution corresponding to each wind power prediction level has obvious differences, so it is necessary to bin the wind power data according to the prediction level. For dispatchers, it can be approximately considered that the actual wind power prediction error distribution is the same as the probability distribution obtained by historical data statistics. In the process of data collection and processing, attention should be paid to the selection of the number of boxes (number of prediction levels) W. In the binning process of historical data, assuming that the amount of data is sufficient, the larger the number of boxes W, the more accurate the prediction error statistics under each prediction level. However, in practice, the total amount of historical data available to power system dispatchers is often limited. Therefore, as the number of boxes increases, the number of samples in the data set corresponding to each prediction level w will decrease, and too few samples will lead to poor final fitting effect. The above situation is prone to occur in the box with the smallest prediction level or the largest prediction level. Due to the small number of extreme wind power output conditions, the number of samples in this type of data box is too small, so that it is difficult to reflect its statistical characteristics. Therefore, the selection of the number of boxes W should be based on the total amount of historical data actually obtained, and the number of wind power prediction error samples in each box must meet the basic fitting requirements.

[0066] B. Calculate the load power uncertainty of the load side to obtain the load response historical error data with time stamp; wherein the load response historical error data includes the load response historical error data under high electricity prices and the load response historical error data under low electricity prices.

[0067] After obtaining the load response history data with time stamp, firstly, the load basic power consumption in time period t is obtained through the historical data of “comparison users”, which is recorded as At the same time scale t, the historical measured power consumption of the “experimental user” after receiving the high / low electricity price signal stimulation is obtained, which is recorded as and

[0068] The load response historical error data under the high electricity price event includes the following steps:

[0069] B11. Calculate the historical load reduction in period t The historical data set, and the The probability density function is obtained by fitting the histogram of The formula is as follows;

[0070]

[0071] in, represents the basic power consumption of the load in time period t, It represents the measured electricity consumption under high electricity price in time period t;

[0072] B12. Calculate the load power reduction under the high electricity price incentive corresponding to time period t Expected value The formula is as follows;

[0073]

[0074] Among them, it is assumed that the actual load reduction action amount of the load in the period t is We can assume that the random variable It is an approximation to fit historical data The probability density function shows the probability distribution. According to the definition of mathematical expectation, the load power reduction under the high electricity price incentive corresponding to time period t can be calculated: Expected value As formula (3);

[0075] B13. Calculate the expected load reduction in the historical period t for all the times when the electricity price was high in history. Historical load shedding The difference between the historical load reduction error in period t is obtained. All sample data of load response error under high electricity price are obtained, and the formula is as follows:

[0076]

[0077] As above, the load response historical error data under the low electricity price event includes the following steps:

[0078] B21. Calculate the historical load increase in period t The historical data set, and the The probability density function is obtained by fitting the histogram of The formula is as follows:

[0079]

[0080] in, represents the basic power consumption of the load in time period t, It represents the measured electricity consumption under low electricity price in time period t;

[0081] B22. Calculate the increase in load power consumption under the low electricity price incentive corresponding to time period t Expected value The formula is as follows:

[0082]

[0083] B23. Calculate the expected historical load increase in period t for all the times when low electricity prices occurred in history. Historical load increase The difference between the historical load increase error in period t is obtained. All sample data of load response error under high electricity price are obtained, and the formula is as follows:

[0084]

[0085] C. Put the load response historical error data into W×T boxes according to the time scale and the new energy power forecast value of the system at that time; at this time, each box contains the wind power forecast value for the time scale, the measured wind power value, the actual power consumption of the experimental users and the actual power consumption data of the comparison users.

[0086] After obtaining the historical error data of load response, all historical errors on the load side are divided into boxes according to the dispatch period. Take a day divided into 48 dispatch periods as an example. Figure 4 and Figure 5 The histograms of historical data of load response errors under the stimulation of high and low electricity price events in dispatch periods 10, 20 and 30 are shown respectively, that is, the distribution of error data in each box.

[0087] D. Use the general distribution model to fit the probability density histogram of the historical data of the system error in each box, obtain the probability distribution model of the system error in each box, and perform piecewise linearization on the obtained probability distribution model. This allows this method to be quickly introduced into the economic optimization dispatch model commonly used by dispatchers, thereby helping them improve the optimization accuracy and operation economy.

[0088] Among them, the system error historical data under high electricity prices The calculation is as follows:

[0089]

[0090] Among them, t represents time, w represents the wth box, represents the prediction error of new energy power; Represents the historical load reduction error in period t; Represents the predicted value of new energy power, Indicates the measured value of new energy power, represents the expected historical load shedding amount, Indicates the basic power consumption of the load. Indicates the actual electricity consumption under high electricity prices.

[0091] Among them, the historical data of system error under low electricity price The calculation is as follows:

[0092]

[0093] Among them, t represents time, w represents the wth box, represents the prediction error of new energy power; It represents the historical load increase error in the period t; Represents the predicted value of new energy power, Indicates the measured value of new energy power, represents the expected historical load increase, Indicates the basic power consumption of the load. Indicates the actual electricity consumption under low electricity prices.

[0094] E. Fit the probability density histogram of the historical data of the system error in each box to obtain the probability distribution model of the system error in each box.

[0095] According to each box and The historical data samples are fitted with a general distribution model to obtain the probability distribution model of the "system error" under high / low electricity price events in each box. The general distribution model is shown in formulas (10) to (12). Under flat electricity prices, residential loads do not provide load response and maintain the original electricity consumption characteristics. In this case, the uncertainty in the system is only caused by the wind power forecast error. Figure 6 As shown in the figure, each box contains three system error probability density functions under high, medium and low electricity prices.

[0096]

[0097] F(x)=(1+e -α(x-γ) ) -β (11)

[0098]

[0099] Among them, the three shape parameters α, β and γ of the general distribution model satisfy:

[0100] α>0, β>0, -∞<γ<+∞.

[0101] In a specific embodiment, the power supply side further illustrates the above method by taking wind power data collected from EIRGRID in Ireland as an example. The company provides historical forecast values ​​and measured values ​​of wind power corresponding to the time scale. The installed capacity of wind power in Ireland is 1526MW. The power company publishes the forecast curve of wind power output in Ireland on its website every day, and publishes the measured output curve of wind power in real time. There are 77,800 arrays in the database used in this embodiment, and the time resolution of the array is 15 minutes. Figure 7 The historical wind power forecast error in the database is shown. "The original data.

[0102] The present invention adopts different probability distribution models to Figure 7 The real wind power data for the island of Ireland shown in Figure 8 As shown in the figure, compared with the normal distribution model commonly used in existing research, the general distribution model can more accurately characterize the probability distribution of wind power forecast error. It solves the problem of inaccurate fitting of the normal distribution to the off-axis phenomenon and the peak phenomenon. Table 1 is a parameter table of the general distribution probability model of "wind power forecast error" based on the wind power forecast level, showing that when the wind power forecast value is divided into 10 levels, Figure 7 The three parameters of the general distribution model of historical data are convenient for related research.

[0103]

[0104] Table 1

[0105] On the load side, the present invention selected the UK Low Carbon Plan LCL (Low Carbon London) project, which was actually implemented in the actual power system of London, UK, has a large amount of original collected data, and has clear "comparison users" as the original data. Through a large amount of historical data of "comparison users" and "experimental users", the load change caused by the load response event can be clearly expressed.

[0106] The London Low Carbon Plan was launched in 2011. A total of 5,533 residents were selected for voluntary participation, and smart meters were installed in each household. The red / green signal indicator lights were used to send power price incentive signals to each household. The time granularity of signal transmission and user data collection was 30 minutes. The project selected 1,119 households as experimental users participating in high / low power price event incentives, and the remaining 4,414 households were used as comparison users to reflect the original energy consumption when not participating in load response.

[0107] To ensure that the “comparison users” can fully play a comparative role and enhance the rationality of the data, the geographical locations of the “comparison users” and “experimental users” are evenly distributed, such as Fig. 9 After screening the original collected data, this paper selected the intact data of 3437 “comparison users” and 922 “experimental users” in 2013 for research.

[0108] The load response mode considered in the present invention adopts a high / medium / low three-level electricity price signal incentive mechanism. The dispatching department encourages users to participate in load response by opening high / low electricity price events. The corresponding users receive high / low electricity price indication signals through household smart meters and change their energy consumption behaviors according to their own wishes. The triggering time of high / low electricity price events is at intervals of half an hour, so there are a total of 48 moments throughout the day when high / low electricity price indication signals can be turned on. By counting the response action volume of 922 "experimental users" in the original data, this paper calculates the average load response volume of each household to high and low electricity prices at different times, as shown in Figure 10. It can be seen from the figure that the degree of load response is closely related to the time when the signal is issued. At 1 to 5 o'clock when the user is in a sleeping state, the user is not sensitive to changes in electricity prices. At 9 to 16 o'clock, the load actively responds to high and low electricity prices, and in the same period, the response action volume of the residential load to low electricity prices is generally greater than its response action volume to high electricity prices.

[0109] Fig.11 and Fig.12 The cumulative probability density function (expressed here in the form of CDF of the general distribution model) obtained by fitting the corresponding historical data with the general distribution model is shown. It can be seen that the intensity of the load response is significantly different at different times, which verifies the correctness of the idea of ​​binning the load-side uncertainty data according to the time dimension of the present invention.

[0110] Table 2 is a parameter table of the load response error probability model for the incentive period, which gives the three parameters corresponding to the load response error probability distribution model fitted by the general distribution function under the high and low electricity price incentives in periods 10, 20 and 30.

[0111]

[0112] Table 2

[0113] By using the two-dimensional binning technology proposed in the present invention, this paper divides the wind power level into 10 boxes and the time into 48 segments. The cumulative probability distribution function of the system error under high and low electricity prices can be obtained when the wind power level is level 5 in the dispatching period 10, 20 and 30, as shown in the following figure: Fig.13 and Fig.14 As shown in Figure 2, by comparing the probability models of system errors in different time periods, it can be seen that the probability distribution of system errors in different time periods is completely different. The detailed characterization of uncertainty differences lays the foundation for the accurate assessment of subsequent backup demand. Fig.13 and Fig.14 The corresponding three parameters of the general distribution function are shown in Table 3, which are the general distribution model parameters of the system error in the 5th wind power level and the time periods of 10, 20 and 30.

[0114]

[0115] Table 3

[0116] The above embodiments are only preferred embodiments for fully illustrating the present invention, and the protection scope of the present invention is not limited thereto. Equivalent substitutions or changes made by technicians in the technical field on the basis of the present invention are all within the protection scope of the present invention. The protection scope of the present invention shall be subject to the claims.

Claims

1. A two-dimensional binning method that comprehensively describes the uncertainty on both sides of the source and the load, characterized by: The following steps are involved: A. Calculate the historical data set of the new energy power forecast error on the source side, and divide the historical forecast error into W boxes according to the size of the new energy power forecast value available to the dispatcher, and then divide the time-stamped array in each box into T boxes according to the time period, and get boxes; among them, , ; B. Calculate the load power uncertainty on the load side to obtain the historical error data of load response with time stamp; C. According to the time scale and the predicted value of the new energy power of the system at that time, the load response historical error data is placed into the divided in a box; D. Calculate the system error history data in each box; wherein the system error history data in each box includes the system error history data under high electricity price and the system error history data under low electricity price; E. Fitting the probability density histogram of the historical data of the system error in each box with the general distribution model to obtain the probability distribution model of the system error in each box, and performing piecewise linearization processing on the obtained probability distribution model; The load response historical error data includes load response historical error data under high electricity prices and load response historical error data under low electricity prices; The load response historical error data under high electricity price comprises the following steps: B11. Calculate the time period t Internal historical load shedding The historical data set for this period t within The probability density function is obtained by fitting the histogram of , the formula is as follows; in, Indicates time period t Internal load basic power consumption, Indicates time period t Measured electricity consumption under high electricity prices in China; B12. Calculate the time period t The corresponding reduction in load power consumption under the high electricity price incentive Expected value , the formula is as follows; B13. Calculate all the times when high electricity prices occurred in history t Historical load shedding expectations for the period Historical load shedding The difference between t Historical load shedding error during the period , we can get all the sample data of load response error under high electricity price, the formula is as follows: ; The load response historical error data under the low electricity price comprises the following steps: B21. Calculate the time period t Internal historical load increase The historical data set for this period t within The probability density function is obtained by fitting the histogram of , the formula is as follows: in, Indicates time period t Internal load basic power consumption, Indicates time period t Actual electricity consumption under low electricity prices; B22. Calculate the time period t The corresponding increase in load power consumption under the incentive of low electricity prices Expected value , the formula is as follows: B23. Calculate all the times when low electricity prices occurred in history t Historical load increase expectations during the period Historical load increase The difference between t Historical load increase error during the period , we can get all the sample data of load response error under low electricity price, the formula is as follows: 。 2. The two-dimensional binning method for comprehensively describing the uncertainty on both sides of the source and the load as claimed in claim 1 is characterized in that: The general distribution model is as follows: Among them, the three shape parameters α, β and γ of the general distribution model satisfy: 。 3. The two-dimensional binning method for comprehensively describing the uncertainty on both sides of the source and the load as claimed in claim 1 is characterized in that: Historical data of system errors under the high electricity price The calculation is as follows: in, t Indicates time, w Indicates w Boxes, represents the prediction error of new energy power; express t Error in historical load shedding during the time period; Represents the predicted value of new energy power, Indicates the measured value of new energy power, represents the expected historical load shedding amount, Indicates the basic power consumption of the load. Indicates the actual electricity consumption under high electricity prices.

4. The two-dimensional binning method for comprehensively describing the uncertainty on both sides of the source and the load as claimed in claim 1 is characterized in that: Historical data of system errors under the low electricity price The calculation is as follows: in, t Indicates time, w Indicates w Boxes, represents the prediction error of new energy power; express t The historical load increase error within the time period; Represents the predicted value of new energy power, Indicates the measured value of new energy power, represents the expected historical load increase, Indicates the basic power consumption of the load. Indicates the actual electricity consumption under low electricity prices.

5. The two-dimensional binning method for comprehensively describing the uncertainty on both sides of the source and the load as claimed in claim 1 is characterized in that: The new energy sources include wind power, hydropower and solar energy.