Electric vehicle dispatching method and device for power grid peak load regulation and frequency regulation
By dividing and scheduling charging piles and electric vehicles, and sending control instructions using the vehicle dispatching system, the problem of driverless electric vehicles in power grid peak shaving and frequency regulation is solved, and the grid operation efficiency and car owner benefits are improved.
Patent Information
- Application Number
- CN202111217601.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-19
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2041-10-19
AI Technical Summary
It is difficult for driverless electric vehicles to find suitable charging piles for charging, and the power grid is difficult to effectively use it as energy storage equipment to provide power, resulting in low peak-to-frequency modulation efficiency of the power grid.
By dividing the charging piles into the first charging pile and the second charging pile, and using the vehicle scheduling system to conduct path planning and control instructions, electric vehicles are dispatched for charging and discharging, so as to perform peak and frequency regulation according to the grid load and frequency requirements.
It realizes effective peak and frequency regulation of the power grid, improves the grid operation efficiency, and provides profit opportunities for electric vehicle owners.
Smart Images

Figure CN113872228B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power dispatching, and in particular to an electric vehicle dispatching method and device applied to power grid peak and frequency regulation. Background Art
[0002] With the maturity of driverless electric vehicle technology and the popularization of charging piles, driverless electric vehicles are able to play a role in peak load and frequency regulation of the power grid. However, since the navigation system of driverless electric vehicles cannot obtain the location of all charging piles and the current and future usage of each charging pile, it is difficult for driverless electric vehicles to find the most suitable and idle charging piles for charging. At the same time, the current navigation systems are not specially designed for driverless electric vehicles, and the route planning is not suitable for charging driverless electric vehicles along the road.
[0003] Secondly, when the driverless car is idle, its battery can be used as an energy storage device to supply power to the grid during peak hours, thereby smoothing out the peaks and valleys of power consumption. The grid can effectively use the social resource of driverless electric vehicles as energy storage devices, and the owners of driverless electric vehicles can also obtain corresponding benefits by supplying power to the grid. However, at present, driverless electric vehicles do not know which time periods and areas require driverless electric vehicles to supply power to the grid, and the grid company does not know when and where there are idle driverless electric vehicles that can be used as backup power sources to supply power to the grid. In response to the above problems, current technology has not yet proposed a corresponding solution. Summary of the invention
[0004] The present invention provides an electric vehicle dispatching method and device applied to peak load and frequency regulation of a power grid, thereby realizing peak load and frequency regulation of the power grid.
[0005] An embodiment of the present invention provides an electric vehicle dispatching method for power grid peak load regulation and frequency regulation, comprising the following steps:
[0006] According to the current scheduling task, some idle charging piles in each area are divided into first charging piles and second charging piles, and the division information of the charging piles is sent to the vehicle scheduling system, so that the vehicle scheduling system performs path planning according to the division information of the charging piles and the location information of the idle electric vehicles, and schedules the first electric vehicle to go to the corresponding first charging pile and the second electric vehicle to go to the corresponding second charging pile according to the path planning result; wherein the first electric vehicle is an idle electric vehicle with an SOC value within a first threshold range; the second electric vehicle is an idle electric vehicle with an SOC value within a second threshold range; the minimum SOC value within the first threshold range is greater than the maximum SOC value within the second threshold range;
[0007] A first control instruction and a second control instruction are generated according to the current scheduling task, and the first control instruction is sent to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and the second control instruction is sent to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction; the scheduling task includes a peak shaving task and a frequency regulation task.
[0008] Furthermore, when the control center performs the peak load shaving task, the following steps are included:
[0009] Obtaining power load data and weather data of each substation, and inputting the power load data and weather data into a substation power consumption prediction model to obtain the future power consumption status of each substation output by the substation power consumption prediction model;
[0010] Classify some idle charging piles in the area where the power consumption is overloaded as first charging piles, and classify some idle charging piles in the area where the power consumption is low as second charging piles;
[0011] A first control instruction and a second control instruction are generated according to the future power consumption status of each substation, and the first control instruction is sent to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and the second control instruction is sent to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction.
[0012] Furthermore, when obtaining power load data of each substation, it is connected to the main station communication equipment through optical fiber communication, and the main station communication equipment is connected to the smart meter of each substation through power line carrier communication to obtain the power load data of each substation.
[0013] Furthermore, when executing the frequency modulation task, the following steps are included:
[0014] Monitor the power grid frequency in each substation;
[0015] Classify some idle charging piles in the area where the grid frequency is less than the third preset threshold as first charging piles, and classify some idle charging piles in the area where the grid frequency is greater than the fourth preset threshold as second charging piles;
[0016] A first control instruction and a second control instruction are generated according to the grid frequency of each substation or the regional control deviation of each substation, and the first control instruction is sent to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and the second control instruction is sent to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction.
[0017] Furthermore, before dividing some idle charging piles in each area into first charging piles and second charging piles, the main station communication equipment is connected through optical fiber communication, and the main station communication equipment is connected to the smart meters in each area through power line carrier communication. The smart meters in each area are connected to the charging piles in each area through a bidirectional power supply controller to obtain the charging pile information of each area.
[0018] Furthermore, the electric vehicle is equipped with a wireless terminal, which accesses the power encryption authentication gateway through a power wireless private network or a wireless public network, and the power encryption authentication gateway accesses the front-end processor through a wireless communication proxy, and accesses the vehicle dispatching system through the front-end processor; a forward isolation device and a reverse isolation device are arranged between the wireless communication proxy and the front-end processor, and the front-end processor is equipped with an application layer authentication device.
[0019] Furthermore, the electric vehicle is equipped with a wireless terminal, which accesses the power encryption authentication gateway through a power wireless private network or a wireless public network, and the power encryption authentication gateway accesses the front-end processor through a wireless communication proxy, and accesses the vehicle dispatching system through the front-end processor; a forward isolation device and a reverse isolation device are arranged between the wireless communication proxy and the front-end processor, and the front-end processor is equipped with an application layer authentication device.
[0020] Furthermore, the scheduling task also includes a backup power supply task. When executing the backup power supply task, the backup power request information of each area is obtained, and some idle charging piles in the corresponding area are marked as first charging piles according to the backup power request information.
[0021] Another embodiment of the present invention provides an electric vehicle dispatching device applied to power grid peak load regulation and frequency regulation, comprising: a dispatching planning module and a control instruction execution module;
[0022] The scheduling planning module is used to divide some idle charging piles in each area into first charging piles and second charging piles according to the current scheduling task, and send the division information of the charging piles to the vehicle scheduling system, so that the vehicle scheduling system performs path planning according to the division information of the charging piles and the location information of the idle electric vehicles, and schedules the first electric vehicle to go to the corresponding first charging pile and the second electric vehicle to go to the corresponding second charging pile according to the path planning result; wherein the first electric vehicle is an idle electric vehicle with an SOC value within a first threshold range; the second electric vehicle is an idle electric vehicle with an SOC value within a second threshold range; the minimum SOC value within the first threshold range is greater than the maximum SOC value within the second threshold range;
[0023] The control instruction execution module is used to generate a first control instruction and a second control instruction according to a current scheduling task, and send the first control instruction to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and send the second control instruction to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction; the scheduling task includes a peak shaving task and a frequency regulation task.
[0024] Furthermore, when the scheduling planning module performs the peak load shaving task, the following steps are included:
[0025] Obtaining power load data and weather data of each substation, and inputting the power load data and weather data into a substation power consumption prediction model to obtain the future power consumption status of each substation output by the substation power consumption prediction model;
[0026] Classify some idle charging piles in the area where the power consumption is overloaded as first charging piles, and classify some idle charging piles in the area where the power consumption is low as second charging piles;
[0027] When the control instruction execution module performs the peak load shaving task, the following steps are included:
[0028] A first control instruction and a second control instruction are generated according to the future power consumption status of each substation, and the first control instruction is sent to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and the second control instruction is sent to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction.
[0029] Furthermore, when the scheduling planning module performs the frequency modulation task, the following steps are included:
[0030] Monitor the power grid frequency in each substation;
[0031] Classify some idle charging piles in the area where the grid frequency is less than the third preset threshold as first charging piles, and classify some idle charging piles in the area where the grid frequency is greater than the fourth preset threshold as second charging piles;
[0032] When the control instruction execution module executes the frequency modulation task, the following steps are included:
[0033] A first control instruction and a second control instruction are generated according to the grid frequency of each substation or the regional control deviation of each substation, and the first control instruction is sent to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and the second control instruction is sent to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction.
[0034] The embodiments of the present invention have the following beneficial effects:
[0035] The present invention provides an electric vehicle scheduling method and device for power grid peak and frequency regulation. The method divides electric vehicles and charging piles respectively, and then dispatches the electric vehicles to corresponding charging piles through a vehicle scheduling system; the control center generates and sends corresponding control instructions to the charging piles according to the current frequency regulation task or peak regulation task, and the charging piles control the charging and discharging of the electric vehicles according to the control instructions received; it can be seen that the present invention realizes the frequency regulation and peak regulation of the power grid by dividing electric vehicles and charging piles, and reasonably dispatching electric vehicles. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is a flow chart of an electric vehicle dispatching method applied to power grid peak load and frequency regulation provided by an embodiment of the present invention;
[0037] Figure 2 It is a structural schematic diagram of an electric vehicle dispatching device applied to power grid peak load and frequency regulation provided by an embodiment of the present invention;
[0038] Figure 3 It is a schematic diagram of a communication method between an electric vehicle and a vehicle dispatching system provided by an embodiment of the present invention;
[0039] Figure 4 It is a schematic diagram of a communication method between an electric meter and a control center provided by an embodiment of the present invention;
[0040] Figure 5 It is a schematic diagram of the communication method between the charging pile and the control center provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0041] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0042] like Figure 1 As shown, an electric vehicle scheduling method for power grid peak load regulation and frequency regulation provided by an embodiment of the present invention includes:
[0043] Step S101: According to the current scheduling task, some idle charging piles in each area are divided into first charging piles and second charging piles, and the division information of the charging piles is sent to the vehicle scheduling system, so that the vehicle scheduling system performs path planning according to the division information of the charging piles and the location information of the idle electric vehicles, and schedules the first electric vehicle to the corresponding first charging pile and the second electric vehicle to the corresponding second charging pile according to the path planning result; wherein the first electric vehicle is an idle electric vehicle with an SOC value within a first threshold range; the second electric vehicle is an idle electric vehicle with an SOC value within a second threshold range; the minimum SOC value within the first threshold range is greater than the maximum SOC value within the second threshold range.
[0044] As one of the embodiments, the vehicle dispatching system is controlled by the control center to mark the idle electric vehicle whose SOC value is within a first threshold range as a first electric vehicle, and mark the idle electric vehicle whose SOC value is within a second threshold range as a second electric vehicle; the minimum SOC value within the first threshold range is greater than the maximum SOC value within the second threshold range.
[0045] As one example, Figure 3 As shown, a wireless terminal is loaded on the unmanned electric vehicle, preferably, the wireless terminal is a wireless CPE; the wireless terminal is connected to the power encryption authentication gateway through the power wireless private network or the wireless public network, the power encryption authentication gateway is connected to the front-end through the wireless communication proxy, and is connected to the vehicle dispatching system through the front-end; a forward isolation device and a reverse isolation device are arranged between the wireless communication proxy and the front-end, and the front-end is equipped with an application layer authentication device.
[0046] The wireless CPE collects information such as resistance, capacitance, current, voltage, charge and discharge power, and temperature of the battery of the driverless electric vehicle for calculating the remaining capacity SOC (State of charge) of the battery. The SOC value range is between 0 and 1. When SOC=0, it means that the battery is fully discharged, and when SOC=1, it means that the battery is fully charged. The vehicle dispatching system collects the location information of the driverless car through the wireless CPE, which is used to dispatch the car to the nearby charging pile.
[0047] As one of the embodiments, the vehicle dispatching system performs path planning according to the location information of the first charging pile and the first electric vehicle, and dispatches the first electric vehicle to the corresponding first charging pile and dispatches the second electric vehicle to the corresponding second charging pile according to the path planning result.
[0048] Step S102: Generate a first control instruction and a second control instruction according to the current scheduling task, and send the first control instruction to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and send the second control instruction to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction; the scheduling task includes a peak shaving task and a frequency modulation task.
[0049] As one of the embodiments, the control center marks some idle charging piles in each area as the first charging pile or the second charging pile according to the current scheduling task, generates and sends corresponding control instructions to the first charging pile and the second charging pile according to the current scheduling task; the control center presets more than two scheduling tasks, and sets scheduling priorities for the more than two scheduling tasks.
[0050] As one embodiment, when the control center performs the peak load shaving task, the following steps are included:
[0051] The control center obtains power load data and weather data of each substation, inputs the power load data and weather data into the substation power consumption prediction model, and the substation power consumption prediction model outputs the future power consumption status of each substation;
[0052] When the future power consumption state of the area is power overload, the control center marks some idle charging piles in the corresponding area as first charging piles; when the future power consumption state of the area is power trough, the control center marks some idle charging piles in the corresponding area as second charging piles;
[0053] The control center generates a first control instruction and a second control instruction according to the future power consumption status of each substation, and sends the first control instruction to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and sends the second control instruction to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction.
[0054] As one embodiment, when the future power consumption state of the area is power overload, the state C of the corresponding charging pile is marked as -1, and the charging pile in this state requires the electric vehicle to discharge to the power grid. When the future power consumption state of the area is power trough, the state C of the corresponding charging pile is marked as -1, and the charging pile in this state provides charging for the electric vehicle. The states of the remaining charging piles are recorded as 0.
[0055] This embodiment is based on the previous power consumption data of the substation area and related external data, and constructs a substation power consumption prediction model by carrying out data preprocessing and association to predict the power consumption of the substation area. First, the historical meteorological information and the power consumption information of the substation area users are combined. Through feature analysis and principal component analysis, the input factors that have a greater impact on the power consumption of the substation area users are found. A linear regression model is established, and the model is used to predict the test sample data.
[0056] The construction process of the power consumption prediction model of the substation area is as follows:
[0057] (1) Data acquisition: In the power grid system data resources, sample the user profile information to acquire feature data. The selected features include: substation identification, electricity fee year, month, day and time, number of public transformer users, total public transformer capacity, number of AC 220kV users, number of residential users, number of three types of load users, city, total capacity, total number of substation users, number of non-grade users, number of non-step users, number of one-meter-one-household users, and total capacity of special transformers. At the same time, acquire external data of the power grid system, including regional weather data, which includes maximum temperature, minimum temperature, temperature difference, etc.
[0058] (2) Process the acquired data: clean the data by repairing outliers, filling missing values, deleting duplicate values, etc. The method of filling missing values is specifically to use the sliding average method for continuous data with time relationship, such as power supply; the mean method is used for filling continuous data without time relationship; and the previous value (previous) is used for filling uncertain quantities. Then feature extraction is performed on the data; through the exploration of existing power grid data, it is found that the data of users in the substation area mainly show large differences in power supply due to the type of transformer. Therefore, this embodiment uses one-hot encoding for the two fields of special transformer capacity and public transformer capacity to divide the data into two categories: special transformer area and public transformer area. Since the temperature is not only related to the power supply, it also shows seasonal trends and fluctuation characteristics with an annual cycle. At the same time, since time is continuous data, this embodiment extracts the power supply time of the substation separately as one of the seasonal characteristics of the data. When selecting feature fields, the main component analysis can be used to obtain fields such as yesterday's power supply, the power supply of the day before yesterday, the total capacity of the special transformer, the total capacity, and the highest average temperature according to the feature proportion analysis. Since the obtained fields contribute greatly to the target, this embodiment selects several types of variables such as historical power supply, temperature, and transformer capacity as the initial input features of the prediction model;
[0059] (3) Constructing a prediction model for power consumption in the substation area: Since the running speed of linear regression is much better than that of the M5P regression tree and it takes less time, and since it is found from the scatter plot that there is a certain multivariate linear relationship between the input field and the target, this embodiment selects a linear regression algorithm to construct a prediction model for power consumption in the substation area.
[0060] When training the power consumption prediction model of the substation, 80% of the samples are extracted as a training set and 20% as a test set. According to the prediction results of the power consumption prediction model of the substation, the load trend of the substation in the future can be analyzed, and the possibility of heavy overload and underload in the substation in the future can be judged.
[0061] As one embodiment, when the control center performs the frequency modulation task, the following steps are included:
[0062] The control center monitors the power grid frequency of each substation;
[0063] When the grid frequency drops to less than a preset third threshold, the control center marks some idle charging piles in the corresponding area as first charging piles; when the grid frequency rises to greater than a preset fourth threshold, the control center marks some idle charging piles in the corresponding area as second charging piles;
[0064] The control center generates a first control instruction and a second control instruction according to the grid frequency of each substation, and sends the first control instruction to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and sends the second control instruction to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction.
[0065] In this embodiment, the electric vehicle is controlled to charge and discharge according to the frequency deviation of the power grid in each substation. The control converter of the electric vehicle simulates the primary frequency modulation characteristic (droop characteristic) of the generator and responds to the change of load according to the frequency deviation of the power system.
[0066] As one embodiment, when the frequency of the power system drops to less than the preset third threshold, the state C of the corresponding charging pile is marked as -1, and the charging pile in this state requires the electric vehicle to discharge to the power grid; when the frequency of the power system rises, the state C of the corresponding charging pile is marked as -1, and the charging pile in this state provides charging for the electric vehicle. The state of the remaining charging piles is recorded as 0.
[0067] As one embodiment, when the control center performs the frequency modulation task, the following steps are included:
[0068] The control center monitors the power grid frequency of each substation;
[0069] When the grid frequency drops to less than a preset third threshold, the control center marks some idle charging piles in the corresponding area as first charging piles; when the grid frequency rises to greater than a preset fourth threshold, the control center marks some idle charging piles in the corresponding area as second charging piles;
[0070] The control center calculates the regional control deviation (ACE) of each substation through an automatic generation control system (AGC), and generates a first control instruction and a second control instruction according to the regional control deviation of each substation, and sends the first control instruction to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and sends the second control instruction to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction.
[0071] In this embodiment, the automatic generation control (AGC) system realizes the secondary frequency modulation of the power system with the goal of controlling ACE to zero. The electric vehicle controls the charging and discharging power through the corresponding ACE signal. The electric vehicle receives the AGC signal of the control center through the frequency modulation control converter. The control center calculates the response power of each electric vehicle and sends a control instruction (the control instruction includes the response power information of the electric vehicle). The electric vehicle controls the output power of the converter according to the received instruction. Automatic generation control (AGC) is implemented through a closed-loop control system. First, real-time data (such as system frequency, interconnection line exchange power and other information) is obtained from the SCADA system, the regional control deviation ACE and the control instruction of the control center are calculated, and the control instruction is sent to each charging pile controller to control the charging and discharging of the electric vehicle.
[0072] As one example, Figure 4 As shown, when the control center obtains the power load data of each substation, the smart meter in each substation transmits the power load data to the main station communication equipment through power line carrier communication, and then transmits it to the control center through optical fiber communication. That is, the control center obtains the power load data connected to the main station communication equipment through optical fiber communication, and the main station communication equipment is connected to the smart meter in each substation through power line carrier communication to obtain the power load data of each substation.
[0073] Preferably, the power load data of each substation includes electricity bills, the number of public transformer users, the total capacity of public transformers, the number of AC 220kV users, the number of residential users, the number of three types of load users, the city to which they belong, the total capacity, the total number of users in the substation, the number of non-grade users, the number of non-step users, the number of one-meter-one-household users, the total capacity of special transformers and other data.
[0074] As one example, Figure 5 As shown, when the control center obtains the charging pile information of each area, the charging pile of each area transmits the charging pile information to the smart meter through the bidirectional power controller, and then the smart meter transmits the charging pile information to the main station communication equipment through power line carrier communication, and then transmits it to the control center through optical fiber communication, that is, the control center is connected to the main station communication equipment through optical fiber communication, the main station communication equipment is connected to the smart meter of each area through power line carrier communication, and the smart meter of each area is connected to the charging pile of each area through the bidirectional power controller to obtain the charging pile information of each area.
[0075] Preferably, the charging pile information of each area includes the charging pile location, usage status (car charging / car discharging), car charging and discharging voltage, car charging and discharging current, charging time, charging power, billing information, battery temperature, fault alarm and other information.
[0076] As one of the embodiments, when the control center executes the backup power task, the control center marks some idle charging piles in the corresponding area as first charging piles according to the backup power request information received from each area.
[0077] As one embodiment, the first charging pile controls the first electric vehicle to discharge according to the primary frequency modulation characteristics according to the received first control instruction, and the second charging pile controls the second electric vehicle to charge according to the primary frequency modulation characteristics according to the received second control instruction.
[0078] In this embodiment, when the power grid needs to perform peak load regulation, charging piles can be used for charging and discharging according to the predicted value of the power grid load, thereby reducing the peak load, smoothing the load curve, reducing the load fluctuation of the power grid, and improving the overall operation efficiency of the power grid. When the power grid needs to perform frequency modulation, the charging and discharging state of the unmanned electric vehicle can be quickly adjusted or changed to respond to the frequency fluctuation of the power grid and realize frequency modulation. When the power grid needs a backup power supply, the charging and discharging service can be interrupted or provided to realize the backup energy storage of the power grid.
[0079] Based on the above three needs, the corresponding scheduling tasks are set. The power grid needs to issue different control instructions for charging and discharging of charging piles. Therefore, it is necessary to sort the priorities of the above three scheduling tasks, give priority to meeting the urgent scheduling needs, and then meet the scheduling needs of the next level. For example, when the peak-shaving task is arranged first, then the frequency regulation task, and finally the backup power supply task, the charging piles that can achieve the peak-shaving task of the corresponding area have a higher priority, the charging piles that can achieve the frequency regulation task of the corresponding area have a lower priority, and finally the charging piles that can achieve the backup power supply of the corresponding area. In the case of achieving the same scheduling task, the charging piles that are close to the corresponding area scheduling task have a higher priority. For example, charging piles in different locations can achieve the peak-shaving task of the area, and the charging piles that are close to the peak-shaving task have a higher priority.
[0080] like Figure 2 As shown, another embodiment of the present invention provides an electric vehicle dispatching device applied to power grid peak load regulation and frequency regulation, comprising: a dispatching planning module and a control instruction execution module;
[0081] The scheduling planning module is used to divide some idle charging piles in each area into first charging piles and second charging piles according to the current scheduling task, and send the division information of the charging piles to the vehicle scheduling system, so that the vehicle scheduling system performs path planning according to the division information of the charging piles and the location information of the idle electric vehicles, and schedules the first electric vehicle to the corresponding first charging pile and the second electric vehicle to the corresponding second charging pile according to the path planning result; wherein the first electric vehicle is an idle electric vehicle with an SOC value within a first threshold range; the second electric vehicle is an idle electric vehicle with an SOC value within a second threshold range; the minimum SOC value within the first threshold range is greater than the maximum SOC value within the second threshold range;
[0082] The control instruction execution module is used to generate a first control instruction and a second control instruction according to a current scheduling task, and send the first control instruction to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and send the second control instruction to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction; the scheduling task includes a peak shaving task and a frequency regulation task.
[0083] As one embodiment, when the scheduling planning module performs the peak load shaving task, the following steps are included:
[0084] Obtaining power load data and weather data of each substation, and inputting the power load data and weather data into a substation power consumption prediction model to obtain the future power consumption status of each substation output by the substation power consumption prediction model;
[0085] Classify some idle charging piles in the area where the power consumption is overloaded as first charging piles, and classify some idle charging piles in the area where the power consumption is low as second charging piles;
[0086] When the control instruction execution module performs the peak load shaving task, the following steps are included:
[0087] A first control instruction and a second control instruction are generated according to the future power consumption status of each substation, and the first control instruction is sent to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and the second control instruction is sent to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction.
[0088] As one embodiment, when the scheduling planning module performs the frequency modulation task, the following steps are included:
[0089] Monitor the power grid frequency in each substation;
[0090] Classify some idle charging piles in the area where the grid frequency is less than the third preset threshold as first charging piles, and classify some idle charging piles in the area where the grid frequency is greater than the fourth preset threshold as second charging piles;
[0091] When the control instruction execution module executes the frequency modulation task, the following steps are included:
[0092] A first control instruction and a second control instruction are generated according to the grid frequency of each substation or the regional control deviation of each substation, and the first control instruction is sent to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and the second control instruction is sent to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction.
[0093] It should be noted that the device embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, in the accompanying drawings of the device embodiments provided by the present invention, the connection relationship between the modules indicates that there is a communication connection between them, which may be specifically implemented as one or more communication buses or signal lines. A person of ordinary skill in the art may understand and implement it without paying any creative effort.
[0094] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.
[0095] Those skilled in the art can understand that all or part of the processes in the above embodiments can be implemented by instructing related hardware through a computer program, and the program can be stored in a computer-readable storage medium, and when the program is executed, it can include the processes in the above embodiments. The storage medium can be a disk, an optical disk, a read-only memory (ROM) or a random access memory (RAM), etc.
Claims
1. An electric vehicle dispatching method for power grid peak load regulation and frequency modulation, characterized in that: The following steps are involved: According to the current scheduling task, some idle charging piles in each area are divided into first charging piles and second charging piles, and the division information of the charging piles is sent to the vehicle scheduling system, so that the vehicle scheduling system performs path planning according to the division information of the charging piles and the location information of the idle electric vehicles, and schedules the first electric vehicle to go to the corresponding first charging pile and the second electric vehicle to go to the corresponding second charging pile according to the path planning result; wherein the first electric vehicle is an idle electric vehicle with an SOC value within a first threshold range; the second electric vehicle is an idle electric vehicle with an SOC value within a second threshold range; the minimum SOC value within the first threshold range is greater than the maximum SOC value within the second threshold range; Generate a first control instruction and a second control instruction according to the current scheduling task, and send the first control instruction to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and send the second control instruction to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction; the scheduling task includes a peak load task and a frequency regulation task; Among them, the electric vehicle is equipped with a wireless terminal, and the wireless terminal is connected to the power encryption authentication gateway through the power wireless private network or the wireless public network. The power encryption authentication gateway is connected to the front-end machine through the wireless communication proxy machine, and is connected to the vehicle dispatching system through the front-end machine; a forward isolation device and a reverse isolation device are arranged between the wireless communication proxy machine and the front-end machine, and the front-end machine is equipped with an application layer authentication device.
2. The electric vehicle dispatching method for power grid peak load regulation and frequency modulation according to claim 1, characterized in that: When performing the peak load shaving task, the following steps are included: Obtaining power load data and weather data of each substation, and inputting the power load data and weather data into a substation power consumption prediction model to obtain the future power consumption status of each substation output by the substation power consumption prediction model; Classify some idle charging piles in the area where the power consumption is overloaded as first charging piles, and classify some idle charging piles in the area where the power consumption is low as second charging piles; A first control instruction and a second control instruction are generated according to the future power consumption status of each substation, and the first control instruction is sent to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and the second control instruction is sent to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction.
3. The electric vehicle dispatching method for power grid peak load regulation and frequency modulation according to claim 2, characterized in that: When obtaining the power load data of each substation, it is connected to the main station communication equipment through optical fiber communication, and the main station communication equipment is connected to the smart meter of each substation through power line carrier communication to obtain the power load data of each substation.
4. The electric vehicle dispatching method for power grid peak load regulation and frequency modulation according to claim 1, characterized in that: When performing frequency modulation tasks, the following steps are included: Monitor the power grid frequency in each substation; Classify some idle charging piles in the area where the grid frequency is less than the third preset threshold as first charging piles, and classify some idle charging piles in the area where the grid frequency is greater than the fourth preset threshold as second charging piles; A first control instruction and a second control instruction are generated according to the grid frequency of each substation or the regional control deviation of each substation, and the first control instruction is sent to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and the second control instruction is sent to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction.
5. The electric vehicle dispatching method for power grid peak load regulation and frequency modulation according to claim 1, characterized in that: Before dividing some idle charging piles in each area into first charging piles and second charging piles, the main station communication equipment is connected through optical fiber communication, and the main station communication equipment is connected to the smart meters in each area through power line carrier communication. The smart meters in each area are connected to the charging piles in each area through a bidirectional power supply controller to obtain the charging pile information of each area.
6. The electric vehicle dispatching method for power grid peak load regulation and frequency modulation according to claim 1, characterized in that: The scheduling task also includes a backup power supply task. When executing the backup power supply task, backup power request information of each area is obtained, and some idle charging piles in the corresponding area are marked as first charging piles according to the backup power request information.
7. An electric vehicle dispatching device applied to power grid peak load regulation and frequency regulation, characterized in that: Including scheduling planning module and control instruction execution module; The scheduling planning module is used to divide some idle charging piles in each area into first charging piles and second charging piles according to the current scheduling task, and send the division information of the charging piles to the vehicle scheduling system, so that the vehicle scheduling system performs path planning according to the division information of the charging piles and the location information of the idle electric vehicles, and schedules the first electric vehicle to go to the corresponding first charging pile and the second electric vehicle to go to the corresponding second charging pile according to the path planning result; wherein the first electric vehicle is an idle electric vehicle with an SOC value within a first threshold range; the second electric vehicle is an idle electric vehicle with an SOC value within a second threshold range; the minimum SOC value within the first threshold range is greater than the maximum SOC value within the second threshold range; The control instruction execution module is used to generate a first control instruction and a second control instruction according to the current scheduling task, and send the first control instruction to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and send the second control instruction to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction; the scheduling task includes a peak load task and a frequency regulation task; Among them, the electric vehicle is equipped with a wireless terminal, and the wireless terminal is connected to the power encryption authentication gateway through the power wireless private network or the wireless public network. The power encryption authentication gateway is connected to the front-end machine through the wireless communication proxy machine, and is connected to the vehicle dispatching system through the front-end machine; a forward isolation device and a reverse isolation device are arranged between the wireless communication proxy machine and the front-end machine, and the front-end machine is equipped with an application layer authentication device.
8. The electric vehicle dispatching device for power grid peak load regulation and frequency modulation according to claim 7, characterized in that: When the scheduling planning module performs the peak load task, the following steps are included: Obtaining power load data and weather data of each substation, and inputting the power load data and weather data into a substation power consumption prediction model to obtain the future power consumption status of each substation output by the substation power consumption prediction model; Classify some idle charging piles in the area where the power consumption is overloaded as first charging piles, and classify some idle charging piles in the area where the power consumption is low as second charging piles; When the control instruction execution module performs the peak load shaving task, the following steps are included: A first control instruction and a second control instruction are generated according to the future power consumption status of each substation, and the first control instruction is sent to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and the second control instruction is sent to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction.
9. The electric vehicle dispatching device for power grid peak load regulation and frequency modulation according to claim 7, characterized in that: When the scheduling planning module performs the frequency modulation task, the following steps are included: Monitor the power grid frequency in each substation; Classify some idle charging piles in the area where the grid frequency is less than the third preset threshold as first charging piles, and classify some idle charging piles in the area where the grid frequency is greater than the fourth preset threshold as second charging piles; When the control instruction execution module executes the frequency modulation task, the following steps are included: A first control instruction and a second control instruction are generated according to the grid frequency of each substation or the regional control deviation of each substation, and the first control instruction is sent to the first charging pile so that the first charging pile controls the first electric vehicle to discharge according to the first control instruction; and the second control instruction is sent to the second charging pile so that the second charging pile controls the second electric vehicle to charge according to the second control instruction.