AI Technical Summary

Technical Problem

Traditional power outage scheduling relies on manual labor and is inefficient, and it is impossible to accurately calculate the discharge duration of the battery of the power outage base station, resulting in a decrease in maintenance work efficiency and the impact of network indicators.

Method used

Using a 5G network-based oil engine command and dispatch system, the remote discharge test device and power generation vehicle are collected and processed in real time by using the GPS positioning device and server to automatically calculate the distance between the power generation vehicle and the power outage base station. , give priority to dispatching the most suitable power generation vehicles for power supply.

Benefits of technology

Real-time query and automatic order assignment are realized, the order assignment process is simplified, the work efficiency of maintenance personnel is improved, and the dispatch resources are fully utilized to ensure the maximum production efficiency of each maintenance personnel and each power generation vehicle.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113890188B_ABST
    Figure CN113890188B_ABST
Patent Text Reader

Abstract

The present invention discloses an oil engine scheduling system, method and device based on a 5G network, including a base station, a base station battery, the Internet, a 5G network remote discharge test device, a server and a power generation vehicle. The power generation vehicle is loaded with an oil engine for powering the base station equipment and is installed with a GPS positioning device. The GPS positioning device and the base station are both connected to the server via the Internet. The base station battery is used to power the base station equipment. The 5G network remote discharge test device is respectively connected to the base station and the base station battery. The GPS positioning device is used to detect the location information of the power generation vehicle. The 5G network remote discharge test device is used to adjust the discharge current of the base station battery so that the discharge current is maintained within a set discharge current range, and is used to collect voltage data of the base station battery, and the voltage data is sent to the server through the base station. The limited scheduling resources can be fully and reasonably utilized, the process is simplified, and each node can achieve maximum production benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a communication technology, and more particularly to a generator command and dispatch system, method, and apparatus based on a 5G network. Background Technology

[0002] Currently, in the traditional work mode, when a base station experiences a power outage, monitoring personnel can only view the base station alarms from the original alarm information, which is a passive viewing process. Furthermore, cross-system queries between the network management system and base station physical information require switching back and forth between different systems during daily work, resulting in low efficiency. After monitoring personnel detect a power outage alarm through the environmental monitoring system, the system dispatches a work order to notify maintenance personnel to generate electricity. After receiving the work order from the monitoring personnel and communicating for confirmation, the maintenance personnel go to the affected base station to generate electricity. After completing the power generation, they inform the inspection personnel, who then confirm and reply with the work order. The monitoring personnel then verify and archive the work order, making the process complex.

[0003] The existing generator scheduling has the following drawbacks:

[0004] Traditional power outage dispatching relies primarily on manual monitoring and dispatching. When mains power fails to reach some base stations, the discharge duration of the base station's batteries cannot be accurately calculated. The batteries may still be able to power the base station for a period, during which mains power may have already been restored. Maintenance personnel arriving on-site with generators may find that power generation is unnecessary, resulting in a significant waste of manpower and resources. Furthermore, after generator trucks arrive and generate power, they may not be able to prioritize nearby base stations requiring power generation based on real-time conditions. This could lead to base stations urgently needing power being completely blocked due to the lack of timely arrival of maintenance personnel with generators, thus degrading the quality of base station maintenance and impacting network performance. Summary of the Invention

[0005] In order to overcome the shortcomings of the prior art, the purpose of this invention is to provide a generator command and dispatch system, method and device based on 5G network, which can solve the problems of power outage dispatch relying on manual labor, low efficiency and inaccurate dispatch in the prior art.

[0006] In a first aspect, this application provides a generator command and dispatch system based on a 5G network, including a base station, a base station battery, the Internet, a 5G network remote discharge testing device, a server, and a generator vehicle. The base station is equipped with base station equipment, and the generator vehicle is equipped with at least one generator for powering the base station equipment and a GPS positioning device. Both the GPS positioning device and the base station are connected to the server via the Internet. The base station battery is used to power the base station equipment. The 5G network remote discharge testing device is connected to both the base station and the base station battery. The GPS positioning device is used to detect the location information of the generator vehicle. The 5G network remote discharge testing device is used to adjust the discharge current of the base station battery to keep the discharge current within a set discharge current range and to collect voltage data of the base station battery. The voltage data is then sent to the server via the base station. When the base station experiences a power outage, the server processes the voltage data of the base station battery and the location information of the generator vehicle to obtain a dispatch plan for the generator vehicle.

[0007] Secondly, this application provides a generator command and dispatch method based on a 5G network, including:

[0008] Real-time collection of base station power alarm information, and acquisition of base station information and base station battery information;

[0009] The location, status, and vehicle information of the power generation vehicle are acquired in real time; the power generation vehicle is equipped with a generator, and the vehicle information includes the number of generators and the vehicle number.

[0010] When it is determined that any of the base stations is currently out of power based on the base station power alarm information, the distance between each power generation vehicle and the out-of-power base station is calculated according to the location information of the power generation vehicle, and the power generation vehicle with the highest priority is selected to supply power to the base station equipment corresponding to the out-of-power base station based on the distance.

[0011] Thirdly, this application provides a generator command and dispatch device based on a 5G network, comprising:

[0012] Information acquisition module: used to collect base station power alarm information in real time, and to obtain base station information and base station battery information;

[0013] Information acquisition module: used to acquire the location information, status information and vehicle information of the power generation vehicle in real time; the power generation vehicle is equipped with generators, and the vehicle information includes the number of generators and the vehicle number;

[0014] Target selection module: When it is determined that any of the base stations is currently out of power based on the base station power alarm information, the module calculates the distance between each power generation vehicle and the out-of-power base station based on the location information of the power generation vehicles, and selects the power generation vehicle with the highest priority to supply power to the base station equipment corresponding to the out-of-power base station based on the distance.

[0015] Fourthly, this application provides a computer device, characterized in that it includes: a memory and one or more processors;

[0016] The memory is used to store one or more programs;

[0017] When the one or more programs are executed by the one or more processors, the one or more processors implement the generator command and dispatch method based on a 5G network as described in any of the first aspects of the present invention.

[0018] Fifthly, this application provides a storage medium containing computer-executable instructions, which, when executed by a computer processor, are used to perform the generator command and dispatch method based on a 5G network as described in any of the first aspects of this application.

[0019] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0020] This application embodiment provides an internet and 5G network remote discharge testing device, a server, and a power generation vehicle. The power generation vehicle is equipped with at least one generator for powering the base station equipment and a GPS positioning device. Both the GPS positioning device and the base station are connected to the server via the internet. The base station battery powers the base station equipment. The 5G network remote discharge testing device is connected to both the base station and the base station battery. The GPS positioning device detects the location information of the power generation vehicle. The 5G network remote discharge testing device adjusts the discharge current of the base station battery to maintain the discharge current within a set range, and is used for... The system collects voltage data from the base station's battery and transmits this data to the server. When the base station experiences a power outage, the server processes the battery voltage data and the location information of the generator vehicle to generate a dispatch plan. This system enables real-time querying and automatic dispatching, significantly simplifying the dispatching process. Automatic decision-making and dispatching allow maintenance personnel to generate electricity on-site according to the work order's time requirements. Maintenance personnel can then respond to electronic work orders in stages based on the completion time of on-site power generation. Using the generator command and dispatch system allows for the full and rational utilization of limited dispatching resources, ensuring that every maintenance personnel, every generator, and every generator vehicle can achieve maximum productivity. Attached Figure Description

[0021] Figure 1 This is a modular structure diagram of a generator command and dispatch system based on a 5G network according to the present invention.

[0022] Figure 2 This is an architecture diagram of a generator command and dispatch system based on a 5G network according to the present invention.

[0023] Figure 3 This is an application diagram of a generator command and dispatch system based on a 5G network according to the present invention;

[0024] Figure 4 This is a flowchart of a generator command and dispatch method based on a 5G network according to the present invention;

[0025] Figure 5 This is an example diagram of a generator command and dispatch method based on a 5G network according to the present invention;

[0026] Figure 6 This is a modular structure diagram of a computer device according to the present invention. Detailed Implementation

[0027] To make the objectives, technical solutions, and advantages of this application clearer, specific embodiments of this application will be described in further detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are merely for explaining this application and not for limiting it. It should also be noted that, for ease of description, only the parts relevant to this application are shown in the drawings, not all of them. Before discussing exemplary embodiments in more detail, it should be mentioned that some exemplary embodiments are described as processes or methods depicted as flowcharts. Although the flowcharts describe operations (or steps) as sequential processes, many of these operations can be performed in parallel, concurrently, or simultaneously. Furthermore, the order of the operations can be rearranged. The process can be terminated when its operation is completed, but may also have additional steps not included in the drawings. The process can correspond to a method, function, procedure, subroutine, subprogram, etc.

[0028] This application provides a generator command and dispatch system, method, and apparatus based on a 5G network. It provides a base station, a base station battery, the Internet, a 5G network remote discharge testing device, a server, and a generator vehicle. The base station is equipped with base station equipment. The continuous operation of the base station equipment requires power support. Typically, each base station equipment has its own power supply interface, and the power supply interfaces of each base station equipment are connected to the same main power supply interface, through which the base station equipment can be powered. The generator vehicle is equipped with at least one generator for powering the base station equipment and a GPS positioning device. Both the GPS positioning device and the base station are connected to the server via the Internet. The base station battery powers the base station equipment. A 5G network remote discharge testing device is connected to both the base station and the base station battery. The GPS positioning device detects the location information of the generator vehicle, and the 5G network remote discharge testing device adjusts the discharge current of the base station battery to maintain it within a set range. It also collects voltage data from the base station battery and sends the voltage data to the server via the base station. When the base station experiences a power outage, the server processes the voltage data from the base station battery and the location information of the generator vehicle to generate a dispatch plan for the generator vehicle. The system enables real-time querying and automatic dispatching, greatly simplifying the dispatching workflow. Maintenance personnel generate electricity on-site according to the work order's time requirements and respond to the electronic work order in stages based on the completion time of the on-site power generation. Using the generator command and dispatch system allows for the full and rational utilization of limited dispatching resources, maximizing the productivity of each maintenance personnel, generator, and generator vehicle.

[0029] The following sections will provide detailed explanations of each point.

[0030] Figure 1 A structural diagram of a generator command and dispatch system based on a 5G network, provided in an embodiment of this application, is given below. Figure 1The 5G network-based generator command and dispatch system provided in this application includes a base station, a base station battery, the Internet, a 5G network remote discharge testing device, a server, and a generator vehicle. The generator vehicle is equipped with at least one generator for powering the base station equipment and a GPS positioning device. Both the GPS positioning device and the base station are connected to the server via the Internet. The base station battery is used to power the base station equipment. The 5G network remote discharge testing device is connected to both the base station and the base station battery. The GPS positioning device is used to detect the location information of the generator vehicle. The 5G network remote discharge testing device is used to adjust the discharge current of the base station battery to keep the discharge current within a set discharge current range and to collect the voltage data of the base station battery. The voltage data is then sent to the server via the base station. When the base station experiences a power outage, the server processes the voltage data of the base station battery and the location information of the generator vehicle to obtain a dispatch plan for the generator vehicle.

[0031] Figure 2 This paper illustrates a distribution diagram of a generator command and dispatch system based on a 5G network, according to an embodiment of this application. Figure 1 and Figure 2 This application discloses a server for a generator command and dispatch system based on a 5G network, comprising a cloud server and a local server, such as a network management system, FTP server, or web server. A 5G network remote discharge testing device transmits signals between itself, the base station battery, and the base station via the 5G network. The system includes multiple base stations, each corresponding to a base station battery that supplies power to the reference. The system may also include user terminals and a monitoring terminal, both connected to the Internet. User terminals include, but are not limited to, desktop computers, laptops, smartphones, and tablets. Monitoring terminals include, but are not limited to, desktop computers and laptops; understandably, monitoring terminals typically include a display for showing various collected information.

[0032] The 5G network remote discharge testing device in this embodiment acts as both a discharge load and a 5G network switch. During online discharge testing of the base station battery, the device continuously regulates the stability of the discharge current by automatically changing the load resistance value, achieving constant current discharge at the set value. During discharge, the base station connects to the internet to periodically collect battery voltage data, which is then transmitted to a server for storage in real-time via the 5G network. This discharge data serves as reference data for future generator scheduling. When the voltage at the base station's battery bank drops to a set lower limit, the device automatically stops discharging and sends the measured discharge duration to a database via the 5G network for storage, enabling periodic discharge testing of the battery according to set parameters. When the base station experiences a power outage, the device can monitor battery discharge in real-time, providing automatic protection against open circuits, short circuits, overloads, and over-temperature, as well as remote real-time alarm functions. It also features soft-start and soft-shutdown capabilities. By changing the resistance value of the adjustable resistor, the resistance value of the circuit is altered, ensuring a constant battery discharge current.

[0033] Combination Figure 3Specifically, data on the discharge current of base stations collected by the 5G network remote discharge testing device can be displayed on the monitoring terminal, as can the location information of the power generation vehicle, providing intuitive feedback to staff. Display methods include, but are not limited to, GIS display, report display, graphical display, data export, and data search. The GIS display uses an electronic map that can be dragged, zoomed in, and out. It displays the real-time power supply status of the selected area and the location information of dispatch vehicles. Different colors can be used to display various base station statuses, including normal, power outage, and power generation already underway. Staff can intuitively understand the current status of the base station for timely response. The server performs unified processing of various collected and acquired information data, including user management, log management, information management, data analysis, and dispatch decision-making. User management is tailored to different staff members. For example, it includes information for staff driving power generation vehicles, staff issuing work orders, and monitoring personnel, etc. Log management records events at different time points for easy traceability and management. Information management includes base station information, generator information, base station battery information, base station power alarm information, and maintenance personnel information. Data analysis includes power supply status, power outage warnings, and link failure warnings. Scheduling decisions include geographical location allocation, base station priority allocation, and distance-time allocation. The system also includes a data storage layer for storing data and a data acquisition layer for collecting base station information, battery information, maintenance personnel information, generator information, and base station information. Base station power alarm information is collected in real time through a connection to the network management system. Base station battery information, base station information, generator information, and maintenance personnel information are imported once via network means and continuously updated and corrected automatically. Specifically, base station power alarm information includes base station power outage alarms, mains power restoration alarms, base station low voltage alarms, and base station overload alarms. Base station information includes base station level, base station name, base station number, and power outage duration. Base station battery information includes service life, manufacturer, specifications, and battery discharge time. Generator information includes idle status, en route status, generating status, and serial number.

[0034] In application, the GPS positioning device equipped on the generator vehicle obtains the vehicle's latitude and longitude location information. The GIS map displays the vehicle's current location and the surrounding base stations that need power generation. The server reads the configuration of the generator on the vehicle and analyzes the configuration of the generator on the vehicle. Usually, the nearest principle is adopted to analyze the base stations that need to be powered by the generator and automatically send work orders to the user terminal of the maintenance personnel of the generator vehicle. After receiving the work order, the maintenance personnel check the current location of their vehicle and the surrounding alarm base stations that need power generation through the GIS map, and further determine whether it is the shortest route. If the plan needs to be changed, the monitoring personnel can be notified to change the work order information.

[0035] Figure 4 A flowchart illustrating a generator command and dispatch method based on a 5G network provided in an embodiment of this application is shown. See also... Figure 4 This 5G network-based generator command and dispatch method includes:

[0036] 401: Real-time collection of base station power alarm information, and acquisition of base station information and base station battery information.

[0037] Base station power alarm information includes base station power outage alarm information, mains power restoration alarm information, base station low voltage alarm information, and base station overload alarm information. For example, when a base station experiences a power outage, a base station power outage alarm information is generated; when mains power is restored, a mains power restoration alarm information is generated. Base station power alarm information corresponds to base station information and base station battery information, respectively. The base station battery is used to power the base station equipment. Base station information includes a base station number, which uniquely identifies the corresponding base station, allowing access to the corresponding base station battery information and base station power alarm information.

[0038] 402: Real-time acquisition of the location, status, and vehicle information of the power generation vehicle; the power generation vehicle is equipped with a generator, and the vehicle information includes the number of generators and the vehicle number.

[0039] The location information of the generator vehicle is obtained through a GPS positioning device installed on the vehicle. The generator vehicle carries one or more generators, which power the base station equipment. Status information includes the number of generators on the generator vehicle, or the number of available generators, excluding those that have run out of power. Vehicle information can include the vehicle number, which allows for quick matching of the generator vehicle's location information.

[0040] 403: When it is determined that any of the base stations is currently out of power based on the base station power alarm information, the distance between each power generation vehicle and the out-of-power base station is calculated according to the location information of the power generation vehicle, and the power generation vehicle with the highest priority is selected to supply power to the base station equipment corresponding to the out-of-power base station based on the distance.

[0041] When a base station experiences a power outage, it needs to be powered. Initially, the base station battery is used to power the equipment. However, if the battery power is insufficient, a generator truck is required. In this case, it is necessary to monitor the remaining battery power, calculate the power supply duration, estimate the restoration time, and also calculate the distance between the generator truck and the base station equipment, as well as the time required for the truck to reach the equipment.

[0042] Preferably, the distance between each power generation vehicle and the power outage base station is calculated based on the location information of the power generation vehicles, and the power generation vehicle with the highest priority is selected to supply power to the base station equipment corresponding to the power outage base station based on the distance, including: calculating the distance between each power generation vehicle and the power outage base station based on the location information of the power generation vehicles; setting the power generation vehicle with the shortest distance to the power outage base station as the power generation vehicle with the highest priority; and supplying power to the base station equipment corresponding to the power outage base station by the power generation vehicle with the highest priority.

[0043] Specifically, when it is determined that any of the base stations is currently experiencing a power outage based on the base station power alarm information, the current remaining power of the base station battery corresponding to the base station is obtained; the current remaining power of the base station battery and the preset mains power recovery time are used to calculate whether the current remaining power meets the preset power supply duration; when the current remaining power does not meet the preset power supply duration, the distance between each power generation vehicle and the power outage base station is calculated based on the location information of the power generation vehicle.

[0044] Based on this, as a more preferred implementation, the step of calculating the distance between each generator vehicle and the power-outage base station based on the location information of the generator vehicles, and selecting the generator vehicle with the highest priority to supply power to the base station equipment corresponding to the power-outage base station based on the distance, includes: calculating the remaining power supply duration of the base station battery based on the current remaining power of the base station battery; calculating the distance between each generator vehicle and the power-outage base station based on the location information of the generator vehicles; calculating the number of target generators based on the remaining power supply duration and a preset power supply duration, and determining the target generator vehicles from the generator vehicles based on the number of target generators; calculating the required time for the target generator vehicles to reach the base station equipment based on the location information of the target generator vehicles; when the required time is less than the remaining power supply duration, selecting the generator vehicle with the closest distance to the power-outage base station from the target generator vehicles to supply power to the base station equipment corresponding to the power-outage base station.

[0045] In another example, when it is determined that any one of the base stations is currently out of power based on the base station power alarm information, the distance between each power generation vehicle and the out-of-power base station is calculated according to the location information of the power generation vehicle, including: when it is determined that any one of the base stations is currently out of power based on the base station power alarm information, obtaining the power supply priority of all out-of-power base stations; and calculating the distance between each power generation vehicle and the out-of-power base station according to the power supply priority sorting order from high to low and the location information of the power generation vehicle.

[0046] For example, in combination Figure 5 When a generator truck is supplying power to the base station equipment corresponding to base station A, assuming that the power supply priority of base station A is lower than that of base station C, and base station C also receives a power outage alarm, according to calculations, the generator truck supplying power to the base station equipment of base station A is the closest generator truck to base station C, and the generator on the generator truck can meet the remaining power supply time of base station C. Therefore, the generator truck is dispatched to supply power to base station C. Since the priority of base station C is higher than that of base station A, the power supply to base station C is met first, and the power supply to base station A is suspended. At this time, the straight-line distance from base station A to base station C is the distance that the generator truck needs to travel, and the time spent on the journey is also the time it takes for base station A to travel to base station C.

[0047] In this embodiment, the overall approach to generator dispatching is as follows: Each generator vehicle is equipped with a GPS positioning device, displaying its real-time geographical location on a map. During generator dispatch, the principle of proximity is first applied. For generator vehicles not yet dispatched, the travel time from the nearest station to the base station requiring power generation is analyzed. For vehicles already dispatched and generating power on-site, the geographical location of the current base station requiring power generation is compared with that of the generator vehicle, and the vehicle is dispatched to the nearest base station with the shortest travel time, achieving proximity-based dispatching and improving dispatching efficiency. A 5G network remote discharge testing device is connected to the base station battery, which can automatically and periodically perform online discharge tests on the base station battery according to set parameters, achieving periodic synchronous updates of the battery discharge time. Real-time monitoring of the battery during discharge improves the accuracy of battery discharge timing. Maintenance personnel update base station information, generator status, and generator location in real-time through user terminals, providing information for precise generator dispatching. The system is hosted on a cloud server, improving data confidentiality and security while facilitating daily maintenance and management.

[0048] In this embodiment, the application layer directly displays interfaces, reports, and graphs to the user. The GIS display uses an electronic map, which can be dragged, zoomed in, and out. The map displays the real-time power supply status of base stations in the selected area and the location of dispatch vehicles. Different colors indicate different base station statuses, including "normal," "power outage," "dispatching generators," "generating," and "out of service." Information from the data acquisition layer is used to refresh the data, dynamically reflecting changes in the base station power supply status. The query function allows users to view the current usage status of each generator, including idle, dispatching, generating, and returning generators, and displays these statuses in reports on the terminal. Data can also be exported in report form. Users can make optimal dispatching decisions based on the application layer's display. Various application reports can be exported as Word or Excel documents and can be searched. During dispatching, the GPS-equipped generator vehicles are used to obtain their GPS location latitude and longitude information. The GIS map displays the vehicle's current location and the surrounding base stations that need power generation. The configuration of the generators on the vehicles is read from the server database, and the configuration of the generators on the vehicles is analyzed. Based on the principle of proximity, the power outage base stations that need generator power generation are identified, and work orders are automatically sent to the user terminals of the maintenance personnel on the generator vehicles. After receiving the work order, the maintenance personnel can view their vehicle's current location and the surrounding alarm base stations that need power generation through the GIS map, and further determine whether it is the shortest route. If the plan needs to be changed, the monitoring personnel can be notified to change the work order information, so as to achieve optimal and accurate dispatching and timely dispatch of generators for power generation.

[0049] When a generator truck equipped with generators departs for power generation, the maintenance personnel first record the number and serial number of the generators on board via their user terminal and send this information to the database. The generator truck then proceeds to the corresponding power generation base station according to the dispatch order, unloads the generators from the truck, and generates power at the base station. The system then updates the number and serial number of the generators on board via the user terminal. Maintenance personnel respond to the work order via the user terminal. The system automatically receives power generation start / end SMS messages from the maintenance personnel, along with information such as the power generation base station and generator serial number. The system matches the power generation SMS messages with the base station outage records to verify the validity of the power generation information and displays the base station information on a power generation map for easy and intuitive understanding of the power generation status of the outage base station. The system analyzes the power generation data to identify reasonable power generation records. Abnormal records can be manually confirmed, and a data entry interface is provided for adding missing power generation records. Additionally, it allows batch import of missing power generation records via Excel files, ensuring the accuracy and completeness of power generation records in multiple ways. The distribution of power outage base stations and the location of generator vehicles are obtained through GIS maps, and the nearest base station is selected based on proximity (by comparing the travel time between two base stations). A work order is then sent to the nearest generator vehicle maintenance personnel, and the generator vehicle and maintenance personnel are dispatched to generate power, achieving precise dispatching. The system automatically analyzes and determines whether generator power generation is needed based on the duration of the mains power outage, battery discharge time, generator delivery travel time, and base station level. After developing a dispatch plan, the work order is automatically dispatched to the maintenance personnel's user terminal according to the dispatch time requirements. Based on the generator dispatch work order, the maintenance personnel receive the dispatch instructions at the user terminal, perform on-site power generation within the time limit required by the work order, and reply to the electronic work order in stages after completing the power generation task, while simultaneously updating relevant dispatch information. This reduces intermediate telephone communication, further improving the efficiency of the dispatching process and simplifying the workflow. Battery discharge time is calculated by installing a 5G network monitoring device with GPS on the base station battery and obtaining the time during regular online battery discharge tests.

[0050] like Figure 6 As shown, this application embodiment also provides a computer device, including: a memory 601 and one or more processors 602; the memory 601 is used to store one or more programs; when the one or more programs are executed by the one or more processors 602, the one or more processors implement the generator command and dispatch method based on the 5G network as described in this application.

[0051] This application embodiment also provides a storage medium containing computer-executable instructions. When executed by a computer processor, the computer-executable instructions are used to execute the generator command and dispatch method based on a 5G network provided in the above embodiment. The generator command and dispatch method based on a 5G network includes: real-time collection of base station power alarm information and acquisition of base station information and base station battery information; real-time acquisition of the location information, status information, and vehicle information of generator vehicles; the generator vehicles are equipped with generators, and the vehicle information includes the number of generators and the vehicle number; when it is determined based on the base station power alarm information that any base station is currently out of power, the distance between each generator vehicle and the out-of-power base station is calculated according to the location information of the generator vehicles, and the generator vehicle with the highest priority is selected to supply power to the base station equipment corresponding to the out-of-power base station according to the distance.

[0052] Storage medium – any type of memory device or storage device. The term “storage medium” is intended to include: mounting media, such as CD-ROM, floppy disk, or magnetic tape devices; computer system memory or random access memory, such as DRAM, DDRRAM, SRAM, EDORAM, Rambus RAM, etc.; non-volatile memory, such as flash memory, magnetic media (e.g., hard disk or optical storage); registers or other similar types of memory elements, etc. Storage medium may also include other types of memory or combinations thereof. Furthermore, storage medium may reside in a first computer system in which the program is executed, or it may reside in a different second computer system connected to the first computer system via a network (such as the Internet). The second computer system can provide program instructions to the first computer for execution. The term “storage medium” can include two or more storage media that may reside in different locations (e.g., in different computer systems connected via a network). Storage medium may store program instructions (e.g., specifically implemented as a computer program) executable by one or more processors.

[0053] Of course, the computer-executable instructions provided in the embodiments of this application are not limited to the generator command and dispatch method based on the 5G network as described above, but can also execute related operations in the generator command and dispatch method based on the 5G network provided in any embodiment of this application.

[0054] The 5G network-based generator command and dispatch device, equipment, and storage medium provided in the above embodiments can execute the 5G network-based generator command and dispatch method provided in any embodiment of this application. For technical details not described in detail in the above embodiments, please refer to the 5G network-based generator command and dispatch method provided in any embodiment of this application.

[0055] The above embodiments are merely preferred embodiments of the present invention and should not be construed as limiting the scope of protection of the present invention. Any non-substantial changes and substitutions made by those skilled in the art based on the present invention shall fall within the scope of protection claimed by the present invention.

Claims

1. A 5G network-based oil engine command and dispatch system. It is characterized in that It includes a base station, a base station battery, the Internet, a 5G network remote discharge test device, a server and a power generation vehicle, wherein the base station is provided with a base station device, the power generation vehicle is equipped with at least one oil engine for powering the base station device and a GPS positioning device, the GPS positioning device and the base station are connected to the server through the Internet, the base station battery is used to power the base station device, the 5G network remote discharge test device is connected to the base station and the base station battery respectively, the GPS positioning device is used to detect the location information of the power generation vehicle, the 5G network remote discharge test device is used to adjust the discharge current of the base station battery so that the discharge current is maintained within a set discharge current range, and is used to collect voltage data of the base station battery, and send the voltage data to the server through the base station, the server is used to obtain a dispatching plan of the power generation vehicle according to the voltage data of the base station battery and the location information of the power generation vehicle when the base station is out of power, and obtain the current remaining power of the base station battery corresponding to the base station; calculate whether the current remaining power meets the preset power supply duration according to the current remaining power of the base station battery and the preset city power recovery time; When the current remaining power does not meet the preset power supply duration, calculating the remaining power supply duration of the base station battery according to the current remaining power of the base station battery; Calculate the distance between each power generation vehicle and the base station with power outage according to the location information of the power generation vehicle; calculate the target number of oil engines according to the remaining power supply time and the preset power supply time, and determine the target power generation vehicle from the power generation vehicles according to the target number of oil engines; The time required for the target power generation vehicle to reach the base station with power outage is calculated based on the position information of the target power generation vehicle; when the required time is lower than the remaining power supply time, the power generation vehicle closest to the base station with power outage is selected from the target power generation vehicles to supply power to the base station equipment corresponding to the base station with power outage.

2. The oil engine command and dispatch system according to claim 1, It is characterized in that It also includes a user terminal and a monitoring terminal, and both the user terminal and the monitoring terminal are connected to the Internet.

3. A method for commanding and dispatching oil engines based on 5G network. It is characterized in that include: Collect base station power alarm information in real time, and obtain base station information and base station battery information; Acquire the location information, status information and vehicle information of the power generation vehicle in real time; the power generation vehicle is equipped with an oil engine, and the vehicle information includes the number of oil engines and the vehicle number; When it is determined based on the base station power alarm information that any of the base stations is currently out of power, the current remaining power of the base station battery corresponding to the base station is obtained; and whether the current remaining power meets the preset power supply duration is calculated based on the current remaining power of the base station battery and the preset mains power recovery time; When the current remaining power does not meet the preset power supply duration, calculating the remaining power supply duration of the base station battery according to the current remaining power of the base station battery; Calculate the distance between each power generation vehicle and the base station with power outage according to the location information of the power generation vehicle; calculate the target number of oil engines according to the remaining power supply time and the preset power supply time, and determine the target power generation vehicle from the power generation vehicles according to the target number of oil engines; The time required for the target power generation vehicle to reach the base station with power outage is calculated based on the position information of the target power generation vehicle; when the required time is lower than the remaining power supply time, the power generation vehicle closest to the base station with power outage is selected from the target power generation vehicles to supply power to the base station equipment corresponding to the base station with power outage.

4. The oil engine command and dispatch method according to claim 3, It is characterized in that The method of calculating the distance between each power generation vehicle and the base station with power outage according to the location information of the power generation vehicle, and selecting the power generation vehicle with the highest priority according to the distance to supply power to the base station device corresponding to the base station with power outage includes: Calculate the distance between each power generation vehicle and the base station with power outage according to the location information of the power generation vehicle; Setting the power generation vehicle with the shortest distance from the power-off base station as the power generation vehicle with the highest priority; The power generation vehicle with the highest priority is used to supply power to the base station equipment corresponding to the base station that has suffered a power outage.

5. The oil engine command and dispatch method according to claim 3, It is characterized in that When it is determined based on the base station power alarm information that any of the base stations is currently out of power, the distance between each power generation vehicle and the base station in which the power is out is calculated based on the position information of the power generation vehicle, including: When it is determined based on the base station power alarm information that any one of the base stations is currently out of power, obtaining the power supply priority of all the base stations that are out of power; The distance between each power generation vehicle and the base station with power outage is calculated according to the order of the power supply priority from high to low and the position information of the power generation vehicle.

6. A 5G network-based oil engine command and dispatch device, It is characterized in that include: Information collection module: used to collect base station power alarm information in real time, and obtain base station information and base station battery information; Information acquisition module: used to acquire the location information, status information and vehicle information of the power generation vehicle in real time; the power generation vehicle is equipped with an oil engine, and the vehicle information includes the number of oil engines and the vehicle number; Target selection module: when it is determined based on the base station power alarm information that any of the base stations is currently out of power, obtain the current remaining power of the base station battery corresponding to the base station; calculate whether the current remaining power meets the preset power supply duration based on the current remaining power of the base station battery and the preset mains power recovery time; When the current remaining power does not meet the preset power supply duration, calculating the remaining power supply duration of the base station battery according to the current remaining power of the base station battery; Calculate the distance between each power generation vehicle and the base station with power outage according to the location information of the power generation vehicle; calculate the target number of oil engines according to the remaining power supply time and the preset power supply time, and determine the target power generation vehicle from the power generation vehicles according to the target number of oil engines; The time required for the target power generation vehicle to reach the base station with power outage is calculated based on the position information of the target power generation vehicle; when the required time is lower than the remaining power supply time, the power generation vehicle closest to the base station with power outage is selected from the target power generation vehicles to supply power to the base station equipment corresponding to the base station with power outage.

7. A computer device, It is characterized in that include: memory and one or more processors; The memory is used to store one or more programs; When the one or more programs are executed by the one or more processors, the one or more processors implement the oil engine command and dispatch method based on the 5G network as described in any one of claims 3-5.

8. A storage medium containing computer executable instructions, It is characterized in that The computer executable instructions, when executed by a computer processor, are used to execute the 5G network-based oil engine command and dispatch method as described in any one of claims 3-5.

Citation Information

Patent Citations

  • Method and system for dispatching oil engines

    CN104734333A

  • Power supply method and control device

    WO2014094222A1