A method and system for calculating the power generation flow of a reservoir hydropower station unit
By calculating the reservoir water level and unit output of the reservoir hydropower station, iteratively calculating the gross head and net water head, and determining the unit operating efficiency, the problem of inaccurate calculation of power generation flow in the existing technology is solved, and scientific reservoir and hydropower station operation management is achieved.
Patent Information
- Application Number
- CN202111210094.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-18
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2041-10-18
AI Technical Summary
Existing reservoirs and hydropower stations lack scientific and reasonable methods when calculating unit power generation flow, resulting in inaccurate unit water consumption under different output states, affecting operating efficiency and scheduling.
By obtaining the reservoir water level and unit output value, the gross head, net head and operating efficiency are calculated, and the unit flow is calculated iteratively until the error is less than the set value. A system is provided including reservoir water level acquisition, tail water level calculation, head loss calculation, net Water head calculation and operating efficiency calculation modules are used to determine the power generation flow of the unit.
This method can accurately calculate the power generation flow of each unit of the reservoir hydropower station, provide scientific basis to optimize operation management, reduce errors, and improve operation efficiency.
Abstract
Description
Technical Field
[0001] The invention relates to water conservancy projects, and in particular to a method and system for calculating the power generation flow of a reservoir hydropower station unit. Background Art
[0002] Reservoir hydropower stations are a common structural form of hydropower stations. Reservoirs often require the construction of dams to store water, thereby achieving the regulation of natural runoff. According to the different regulation performance of the reservoir, it can be divided into multi-year regulation reservoirs, annual regulation reservoirs, short-term regulation reservoirs, etc. According to the functions undertaken by the reservoir, it can be divided into reservoirs mainly for flood control, reservoirs mainly for water supply, reservoirs mainly for power generation, or reservoirs that combine flood control, water supply, power generation and other multi-functional uses.
[0003] For reservoir hydropower stations, knowing the unit's water consumption for power generation is important for determining the unit's operating status, the reservoir's actual water consumption, and the reservoir's reasonable scheduling. At present, reservoir hydropower stations are mostly calculated or simply reduced based on the unit's rated flow rate during operation. For reservoir hydropower stations, their different output states result in different unit water usage, different unit operating efficiencies, and different tail water levels. Therefore, their unit water consumption is also different, and it is necessary to reasonably determine the unit's water consumption based on the unit's operating status. Summary of the invention
[0004] Based on the above technical problem, the present invention provides a method for calculating the power generation flow of a reservoir hydropower station unit.
[0005] A method for calculating the power generation flow of a reservoir hydropower station unit, the reservoir hydropower station comprises a water diversion system, a hydro-turbine generator unit and a tailwater system, the water diversion system diverts water from a reservoir, the hydro-turbine generator unit is connected to the tailwater system, the number of hydro-turbine generator units is n, n is an integer greater than or equal to 1, and the calculation method comprises the following steps:
[0006] S1: Obtain the water level of the reservoir, assuming that the tailwater level of the reservoir hydropower station is the set tailwater level; subtract the set tailwater level from the reservoir water level to obtain the gross water head of the reservoir hydropower station;
[0007] S2: Assume that the operating efficiency of each unit of the reservoir hydropower station is the first efficiency value;
[0008] S3: Obtain the output value of each unit of the reservoir hydropower station, and calculate the first flow rate of each unit according to the gross water head and the first efficiency value of each unit;
[0009] S4: according to the first flow of each unit, the total diversion flow of the unit is obtained, the first tailwater level of the hydropower station is calculated according to the tailwater flow relationship of the hydropower station, the head loss of each unit is obtained according to the first flow of each unit combined with the arrangement of the water diversion system, and the net water head of each unit is calculated according to the reservoir water level, the first tailwater level, and the head loss of each unit;
[0010] S5: determining a first operating efficiency of each unit according to the first flow rate of each unit and the net water head of each unit;
[0011] S6: Calculate the second flow rate of each unit according to the output value of each unit of the reservoir hydropower station, combined with the first operating efficiency and the net water head of each unit;
[0012] S7: Compare the first flow rate and the second flow rate of each unit. If the error between the first flow rate and the second flow rate of each unit is less than the set value, the flow value of each unit of the reservoir hydropower station is the second flow rate; if the error between the first flow rate and the second flow rate of each unit is greater than the set value, the second flow rate replaces the first flow rate, and steps S4-S6 are continued until the error between the first flow rate and the second flow rate of each unit is less than the set value.
[0013] Preferably, the set tail water level may be a normal tail water level or any tail water level between a maximum tail water level and a minimum tail water level.
[0014] Preferably, the first efficiency value is a number greater than 0 and less than 1.
[0015] Preferably, the method for determining the operating efficiency of each unit in step S5 is to determine the operating efficiency of the unit based on a comprehensive characteristic curve or an operation characteristic curve of the unit, combined with the net water head of the unit and the reference flow of the unit.
[0016] Preferably, the method for determining the operating efficiency of the unit based on the comprehensive characteristic curve of the unit is: based on the net water head of each unit, the unit reference flow rate, combined with the unit's impeller diameter and rated speed, the unit's unit flow rate and unit speed are calculated, and then the unit's operating efficiency is obtained through the unit flow rate and unit speed.
[0017] Preferably, in step S7, the error between the first flow rate and the second flow rate of each unit is the sum of the relative values of the errors between the first flow rate and the second flow rate of each unit.
[0018] A system that applies the above-mentioned method for calculating the generating flow of a unit of a reservoir hydropower station is characterized in that: the system includes a reservoir water level acquisition module, a unit output acquisition module, a tail water level calculation module, a head loss calculation module, a net water head calculation module and a unit operation efficiency calculation module, the reservoir water level acquisition module is used to obtain the reservoir water level, the unit output acquisition module is used to obtain the output of each unit, the tail water level calculation module, the head loss calculation module, and the net water head calculation module are used to calculate the tail water level, the head loss and the net water head, and the unit operation efficiency calculation model is used to calculate the operation efficiency of the computer group according to the net water head and the unit reference flow.
[0019] The above calculation method is to first calculate an approximate unit reference flow rate. During the calculation process, the unit's operating efficiency can be determined to be a specific value, or the ratio of the current output to the rated output can be selected. The tail water level is selected as the design tail water level. Since it is only a trial calculation, it does not affect the final iterative calculation value.
[0020] In the iterative calculation process, the tail water level, unit head loss and net head are calculated with trial values, and then the unit operating efficiency is obtained, and its actual power generation flow can be obtained. After several iterations, a more accurate value can be obtained. The efficiency of the generator in the calculation process can be taken as a constant, or the efficiency of the generator set can be found according to the output ratio. However, since the operating efficiency of the generator does not change much and the efficiency is generally high, the operating efficiency of the generator set can be ignored in the calculation process. When it needs to be considered, the efficiency of the generator set can be directly introduced.
[0021] Beneficial effects:
[0022] The present invention provides a method and system for calculating the power generation flow of a unit of a reservoir hydropower station. The method takes the reservoir water level and the actual output of the unit as the calculation basis, obtains the corresponding water level value and the unit output value, calculates and compares the head and the reference flow of the unit, thereby determining the output of each unit in accordance with the current water conditions, and providing a scientific basis for determining the power generation flow of the reservoir hydropower station. DETAILED DESCRIPTION
[0023] The present invention provides a method for calculating the power generation flow of a reservoir hydropower station unit, wherein the reservoir hydropower station comprises a water diversion system, a hydro-turbine generator unit and a tailwater system, wherein the water diversion system diverts water from a reservoir, the hydro-turbine generator unit is connected to the tailwater system, and the number of assembled hydro-turbine generator units is n, where n is an integer greater than or equal to 1. The method is characterized in that the calculation method comprises the following steps:
[0024] S1: Obtain the water level of the reservoir, assuming that the tailwater level of the reservoir hydropower station is the set tailwater level; subtract the set tailwater level from the reservoir water level to obtain the gross water head of the reservoir hydropower station;
[0025] S2: Assume that the operating efficiency of each unit of the reservoir hydropower station is the first efficiency value;
[0026] S3: Obtain the output value of each unit of the reservoir hydropower station, and calculate the first flow rate of each unit according to the gross water head and the first efficiency value of each unit;
[0027] S4: according to the first flow of each unit, the total diversion flow of the unit is obtained, the first tailwater level of the hydropower station is calculated according to the tailwater flow relationship of the hydropower station, the head loss of each unit is obtained according to the first flow of each unit combined with the arrangement of the water diversion system, and the net water head of each unit is calculated according to the reservoir water level, the first tailwater level, and the head loss of each unit;
[0028] S5: determining a first operating efficiency of each unit according to the first flow rate of each unit and the net water head of each unit;
[0029] S6: Calculate the second flow rate of each unit according to the output value of each unit of the reservoir hydropower station, combined with the first operating efficiency and the net water head of each unit;
[0030] S7: Compare the first flow rate and the second flow rate of each unit. If the error between the first flow rate and the second flow rate of each unit is less than the set value, the flow value of each unit of the reservoir hydropower station is the second flow rate; if the error between the first flow rate and the second flow rate of each unit is greater than the set value, the second flow rate replaces the first flow rate, and steps S4-S6 are continued until the error between the first flow rate and the second flow rate of each unit is less than the set value.
[0031] Preferably, the set tail water level may be a normal tail water level or any tail water level between a maximum tail water level and a minimum tail water level.
[0032] The normal tailwater level is the designed tailwater level of the reservoir hydropower station, the highest tailwater level is the tailwater level corresponding to the full power generation of the reservoir hydropower station, and the lowest tailwater level is the tailwater level corresponding to the minimum starting output of the reservoir hydropower station.
[0033] Preferably, the first efficiency value is a number greater than 0 and less than 1.
[0034] Preferably, the method for determining the operating efficiency of each unit in step S5 is to determine the operating efficiency of the unit based on a comprehensive characteristic curve or an operation characteristic curve of the unit, combined with the net water head of the unit and the reference flow of the unit.
[0035] Preferably, the method for determining the operating efficiency of the unit based on the comprehensive characteristic curve of the unit is: based on the net water head of each unit, the unit reference flow rate, combined with the unit's impeller diameter and rated speed, the unit's unit flow rate and unit speed are calculated, and then the unit's operating efficiency is obtained through the unit flow rate and unit speed.
[0036] Preferably, in step S7, the error between the first flow rate and the second flow rate of each unit is the sum of the relative values of the errors between the first flow rate and the second flow rate of each unit.
[0037] A system that applies the above-mentioned method for calculating the generating flow of a unit of a reservoir hydropower station is characterized in that: the system includes a reservoir water level acquisition module, a unit output acquisition module, a tail water level calculation module, a head loss calculation module, a net water head calculation module and a unit operation efficiency calculation module, the reservoir water level acquisition module is used to obtain the reservoir water level, the unit output acquisition module is used to obtain the output of each unit, the tail water level calculation module, the head loss calculation module, and the net water head calculation module are used to calculate the tail water level, the head loss and the net water head, and the unit operation efficiency calculation model is used to calculate the operation efficiency of the computer group according to the net water head and the unit reference flow.
[0038] Among them, the tailwater flow relationship is a functional relationship between the power generation flow of the reservoir hydropower station and the tailwater level. It can be calculated based on the tailwater pool combined with the tailwater channel structure, or it can be calibrated based on many years of operating data, or the tailwater flow relationship curve provided during the design of the power station. The tailwater flow relationship can be used to calculate the tailwater level of the reservoir hydropower station based on the total reference flow of the unit.
[0039] When obtaining the reservoir water level, it can be obtained by installing a water level sensor or a liquid level transmitter. For the unit output, it can be obtained by installing the unit active power sensor. The above calculation process can save the installation of a flow meter, and the flow meter will also produce corresponding errors during the measurement process. The use of this method can reduce the impact of the error. Since the calculation of water level, output, head, and efficiency will still produce certain errors, this method can more objectively reflect the operating status of the unit and provide scientific basis guidance for the operation and management of the reservoir and hydropower station; and the acquisition of water level and output is relatively accurate. Generally, power stations are equipped with water level meters and output collection devices, which can be used directly for acquisition without the need to add additional devices.
[0040] The iterative method has no strict requirements on the original data. For the initial calibration, the tailwater level can be selected as the design tailwater level, or any value between the maximum tailwater level and the minimum tailwater level. For the unit efficiency, it can be selected as the ratio of the current output to the rated output. For example, if the rated output is 1000kW and the current output is 500kW, the efficiency can be considered to be 50%, which is the initial value of the iterative calculation and does not affect the final value of the iterative calculation.
[0041] Through several approximations of the unit efficiency curve, the power generation flow value of the unit that meets the current unit efficiency curve can be obtained.
[0042] The above-mentioned embodiments are only preferred embodiments of the present invention. The protection scope of the present invention should not be regarded as limited to the specific forms described in the embodiments. The protection scope of the present invention also includes equivalent technical means that can be thought of by those skilled in the art based on the concept of the present invention.
Claims
1. A method for calculating the power generation flow of a reservoir hydropower station unit, wherein the reservoir hydropower station comprises a water diversion system, a hydro-turbine generator unit and a tailwater system, wherein the water diversion system diverts water from a reservoir, the hydro-turbine generator unit is connected to the tailwater system, and the number of hydro-turbine generator units is n, where n is an integer greater than or equal to 1, and wherein: The calculation method comprises the following steps: S1: Obtain the water level of the reservoir, assuming that the tailwater level of the reservoir hydropower station is the set tailwater level; subtract the set tailwater level from the reservoir water level to obtain the gross water head of the reservoir hydropower station; S2: Assume that the operating efficiency of each unit of the reservoir hydropower station is the first efficiency value; S3: Obtain the output value of each unit of the reservoir hydropower station, and calculate the first flow rate of each unit according to the gross water head and the first efficiency value of each unit; S4: according to the first flow of each unit, the total diversion flow of the unit is obtained, the first tailwater level of the hydropower station is calculated according to the tailwater flow relationship of the hydropower station, the head loss of each unit is obtained according to the first flow of each unit combined with the arrangement of the water diversion system, and the net water head of each unit is calculated according to the reservoir water level, the first tailwater level, and the head loss of each unit; S5: determining a first operating efficiency of each unit according to the first flow rate of each unit and the net water head of each unit; S6: Calculate the second flow rate of each unit according to the output value of each unit of the reservoir hydropower station, combined with the first operating efficiency and the net water head of each unit; S7: Compare the first flow rate and the second flow rate of each unit. If the error between the first flow rate and the second flow rate of each unit is less than the set value, the flow rate value of each unit of the reservoir hydropower station is the second flow rate; if the error between the first flow rate and the second flow rate of each unit is greater than the set value, the second flow rate replaces the first flow rate, and steps S4-S6 are continued until the error between the first flow rate and the second flow rate of each unit is less than the set value; S5: The method for determining the operating efficiency of each unit is: determining the operating efficiency of the unit according to the comprehensive characteristic curve or operation characteristic curve of the unit, combined with the net water head of the unit and the reference flow rate of the unit; the method for determining the operating efficiency of the unit according to the comprehensive characteristic curve of the unit is: calculating the unit flow rate and unit speed of the unit according to the net water head and the reference flow rate of each unit, combined with the runner diameter and rated speed of the unit, and then obtaining the operating efficiency of the unit through the unit flow rate and unit speed; The S7: the error between the first flow rate and the second flow rate of each unit is the sum of the relative values of the errors between the first flow rate and the second flow rate of each unit.
2. The method for calculating the power generation flow of a reservoir hydropower station unit according to claim 1, characterized in that: The set tail water level is a normal tail water level or any tail water level between a maximum tail water level and a minimum tail water level.
3. The method for calculating the power generation flow of a reservoir hydropower station unit according to claim 1, characterized in that: The first efficiency value is a number greater than 0 and less than 1.
4. A system using the method for calculating the power generation flow of a reservoir hydropower station unit according to any one of claims 1 to 3, characterized in that: The system includes a reservoir water level acquisition module, a unit output acquisition module, a tail water level calculation module, a head loss calculation module, a net water head calculation module and a unit operation efficiency calculation module. The reservoir water level acquisition module is used to obtain the reservoir water level, the unit output acquisition module is used to obtain the output of each unit, the tail water level calculation module, the head loss calculation module, and the net water head calculation module are used to calculate the tail water level, the head loss and the net water head, and the unit operation efficiency calculation model is used to calculate the operation efficiency of the unit according to the net water head and the unit reference flow.
Citation Information
Cited By
Method for calculating power generation flow of large hydropower station in non-abandoned water period based on unit output weighted distribution rule
CN121117380A