A method for predicting slurry shield tunneling parameters based on real-time geological information
By using the GA-NN deep neural network model and genetic algorithm in mud-water shield tunneling, combined with real-time geological information, the real-time and accuracy problems of shield tunneling parameter adjustment are solved, achieving more accurate tunneling load prediction and reducing construction costs. risks and costs, and improves project quality.
Patent Information
- Application Number
- CN202111326792.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-10
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-11-10
AI Technical Summary
The existing technology makes it difficult to adjust the excavation parameters in real time during the mud-water shield excavation process, resulting in increased construction risks, and it cannot effectively use a large amount of data to reflect the interaction between rock and soil, resulting in the shield excavation status adjustment being dependent on experience and lacking intelligent optimization and Decision support.
The GA-NN deep neural network model based on real-time geological information is used, combined with the genetic algorithm for hyper-parameter optimization. By inputting parameters related to the excavation load and mud water tank pressure, the excavation load parameters are predicted, which makes up for the shield's inability to observe the excavation surface stratum in real time. Information defects improve tunneling load prediction accuracy.
It achieves more accurate prediction of mud-water shield tunneling load parameters, reduces construction costs, extends equipment life, improves project quality and construction progress control, and reduces construction risks.
Smart Images

Figure CN113946899B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for predicting slurry shield tunneling parameters based on real-time geological information. Background Art
[0002] With the rapid development of urbanization, the rational development and utilization of underground space has become an effective way to expand urban capacity and functions. Shield construction has been widely used in various underground space construction in my country due to its advantages such as small impact on the environment, high excavation efficiency and strong adaptability to the strata. Among them, the slurry shield machine resists the water and soil pressure of the excavation face by generating appropriate pressure mud in the slurry tank and forming a weakly permeable mud film. Since the slurry shield has a significant effect on maintaining the stability of the excavation face, it is suitable for construction environments such as silt clay and gravel and pebbles, especially for the construction of submarine tunnels across rivers, seas and lakes with rich water content. The primary task to achieve safe and efficient shield excavation is to reasonably select the excavation parameters according to different geological conditions, so as to ensure that the shield cutter head can continuously squeeze and rotate the rock and soil of the face so that the shield can continue to advance. The most common method at present is to adjust the shield tunneling parameters based on the experience of the shield driver. However, once the formation changes or complex geological conditions are encountered, it is difficult to adjust the tunneling plan in time, which can easily bring construction risks and cause serious geological disasters. At the same time, a large number of parameters generated by shield construction have not been fully utilized. These data are of various types and truly reflect the interaction between the shield and the surrounding rock and soil. Therefore, the adjustment of the shield tunneling state should not rely solely on the experience of the shield driver, but should adopt reasonable data mining methods to obtain the information hidden behind the data, so as to achieve intelligent optimization and decision-making of tunneling.
[0003] At present, the use of machine learning methods to predict shield tunneling parameters has become an important research method. Zhang et al. (2019) applied cluster analysis methods to a large amount of TBM excavation data and obtained accurate rock type prediction results. Li Gang et al. (2020) used a long short-term memory network (LSTM) to propose a deep learning model that can accurately predict the total thrust and cutterhead torque of the stable stage based on the excavation parameters of the first 30 seconds of the rising stage of the TBM excavation cycle. Gao et al. (2019) used different recurrent neural networks (RNNs) to accurately predict certain TBM operating parameters in the next stage based on historical excavation parameters, including torque, speed, thrust and chamber pressure. Zhu Mengqi et al. (2020) used a random forest model and the first 30 seconds of the rising stage data to predict the thrust and cutterhead torque values during the stable stage excavation in real time, and used the AdaCost algorithm to predict the surrounding rock grade, solving the problem that traditional machine learning algorithms are not suitable for scenarios where rock mass grade data is unbalanced. In addition, various machine learning algorithms such as support vector machine (Xiong Fan, 2016; Wang Chao et al., 2018; Salimi et al., 2016; Mahdevari et al., 2014), neural network (Liu et al., 2020), and XGBoost algorithm (Wang Fei et al., 2020; Duan Liwen, 2019) have been well applied in the prediction of TBM excavation load.
[0004] At present, it is found that the construction of shield tunneling parameter prediction models is mostly based on surrounding rock parameters, such as surrounding rock grade or RQD information given by preliminary surveys. However, unlike open TBMs, the stratigraphic information of the excavation face cannot be observed in real time during the slurry shield tunneling process. The judgment of the stratigraphic information based on the preliminary geological survey report is somewhat rough, and the surrounding rock grade is mainly determined by the integrity and strength of the rock mass and cannot directly reflect the mapping relationship between the rock mass and tunneling parameters under different stratigraphic conditions. Summary of the invention
[0005] In order to solve the above problems, a slurry shield tunneling parameter prediction method based on real-time geological information is provided.
[0006] The present invention adopts the following technical solutions:
[0007] The present invention provides a method for predicting the excavation parameters of a slurry shield based on real-time geological information, which is used to predict the excavation parameters of a slurry shield, and is characterized in that it comprises the following steps: Step S1, determining the excavation parameters related to the excavation load and the slurry bin pressure, and collecting the excavation data corresponding to the excavation parameters. Step S2, preprocessing the excavation data to obtain preprocessed data. Step S3, extracting the preprocessed data with a granularity of minutes to obtain an extracted data set. Step S4, performing data standardization processing on the extracted data set to obtain a standardized data set. Step S5, constructing a GA-NN deep neural network model, which includes an input layer, an output layer and multiple hidden layers. Step S6, using a genetic algorithm, inputting the standardized data set into the GA-NN deep neural network model for hyperparameter optimization to obtain an optimal GA-NN deep neural network model. Step S7, inputting the geological information to be measured, the slurry bin top pressure to be measured and the operating parameters to be measured into the optimal GA-NN deep neural network model to obtain predicted excavation load parameters.
[0008] The present invention provides a method for predicting parameters of slurry shield tunneling based on real-time geological information, which may also have such a technical feature, wherein step S6 uses a genetic algorithm to optimize hyperparameters, including the following steps: step S6-1, creating an initial population as the current population, and the individuals in the current population are random hyperparameter combinations corresponding to the GA-NN deep neural network model. Step S6-2, assigning the hyperparameters of each individual in the current population to the GA-NN deep neural network model, and verifying it using the k-fold cross-validation method to obtain the evaluation index of the GA-NN deep neural network model corresponding to each individual, and evaluating the fitness of the individuals in the current population based on the evaluation index. Step S6-3, selecting individuals with a fitness greater than 0 and ranked in the top 25% of the fitness from the current population as high-quality parent individuals for crossover and mutation to generate new offspring individuals, and combining the new offspring individuals with the high-quality parent individuals to form a new current population. Step S6-4, repeating steps S6-2 and S6-3 until the number of iterations reaches a predetermined number, obtaining an individual with the best evaluation index, and using the individual as the optimal hyperparameter combination for the GA-NN deep neural network model. Step S6-5, assigning the optimal hyperparameter combination to the GA-NN deep neural network model, obtaining the optimal GA-NN deep neural network model.
[0009] The present invention provides a method for predicting slurry shield tunneling parameters based on real-time geological information, which may also have such technical characteristics, wherein the hyperparameters include the number of hidden layers, the number of neurons in each hidden layer, the learning rate, the L2 regularization penalty weight of the weight, and the L2 regularization penalty weight of the bias.
[0010] The method for predicting slurry shield tunneling parameters based on real-time geological information provided by the present invention may also have such a technical feature, wherein the number of neurons in the input layer is 8, and the number of neurons in the output layer is 2.
[0011] The method for predicting slurry shield tunneling parameters based on real-time geological information provided by the present invention may also have the following technical features, wherein the calculation formula for the variation probability of variation is: In the formula, p i is the mutation probability of the i-th generation, p0 is the initial mutation probability, ω is a random number in [0,1], and n is the total number of population evolution generations.
[0012] The method for predicting slurry shield tunneling parameters based on real-time geological information provided by the present invention may also have the following technical features, wherein data standardization processing is performed, and the specific expression is: In the formula, is the mean of the extracted data set, σ is the standard deviation of the extracted data set, x is the extracted data in the extracted data set, and x * is the standardized data in the standardized dataset.
[0013] The present invention provides a method for predicting slurry shield tunneling parameters based on real-time geological information, which may also have such technical features, wherein the tunneling parameters include geological information, slurry bin top pressure, operating parameters and tunneling load parameters. The geological information includes the mean of the thrust depth index FPI of the previous ring, the variance of the thrust depth index FPI of the previous ring, the mean of the rotation depth index TPI of the previous ring and the variance of the rotation depth index TPI of the previous ring. The operating parameters include tunneling speed p, cutter head rotation speed and penetration, and the tunneling load parameters include total thrust F and cutter head torque T.
[0014] The method for predicting slurry shield tunneling parameters based on real-time geological information provided by the present invention may also have the following technical features, wherein the specific expression of FPI is: The specific expression of TPI is:
[0015] The present invention provides a method for predicting slurry shield tunneling parameters based on real-time geological information, which may also have the following technical features: the input layer is a linear layer, and a relu activation function is used between multiple hidden layers.
[0016] The present invention provides a method for predicting slurry shield tunneling parameters based on real-time geological information, which may also have such a technical feature, wherein the preprocessing includes non-working state data processing and abnormal data processing.
[0017] Function and Effect of the Invention
[0018] According to the present invention, a method for predicting slurry shield excavation parameters based on real-time geological information is provided. First, the present invention directly reflects the rock mass-excavation parameter mapping relationship by inputting the FPI mean and variance, TPI mean and variance of the previous ring in the slurry shield excavation process as real-time geological information into the GA-NN deep neural network model, making up for the defect that the slurry shield cannot observe the excavation surface stratum information in real time, and effectively improving the accuracy of slurry shield excavation load prediction.
[0019] Secondly, the present invention combines genetic algorithm (GA) with deep neural network (DNN) to obtain the best GA-NN deep neural network model, and inputs the relevant excavation parameters into the best GA-NN deep neural network model to predict the excavation load parameters. The algorithm has rich data types and flexible expressions, which can effectively improve the accuracy of slurry shield excavation parameter prediction.
[0020] Finally, in the actual slurry shield tunneling construction process, the present invention can more accurately predict the slurry shield excavation load parameters through the intelligent prediction method of genetic algorithm, thereby providing a reference for the actual project, and has a very obvious guiding role in reducing the construction cost of tunnel engineering, extending equipment life, controlling construction progress risks and improving project quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a flow chart of a method for predicting slurry shield tunneling parameters based on real-time geological information in an embodiment of the present invention;
[0022] Figure 2 is a schematic diagram of a genetic algorithm flow chart in an embodiment of the present invention;
[0023] Figure 3 Schematic diagram of k-fold cross validation in an embodiment of the present invention.
[0024] Figure 4 is the determination coefficient R of the optimal individual in the population in the embodiment of the present invention 2 Schematic diagram of the changing relationship of population evolution generations;
[0025] Figure 5 The determination coefficient R of the individual mean of each generation population in the embodiment of the present invention is 2 Schematic diagram of the changing relationship of population evolution generations;
[0026] Figure 6 1 is a schematic diagram comparing the predicted value and the actual value of the total thrust F in an embodiment of the present invention;
[0027] Figure 7 3 is a schematic diagram comparing the predicted value and the actual value of the cutter head torque T in an embodiment of the present invention. DETAILED DESCRIPTION
[0028] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the following is a detailed description of a method for predicting slurry shield tunneling parameters based on real-time geological information in conjunction with embodiments and drawings.
[0029] <Example>
[0030] Figure 1 It is a flow chart of a method for predicting slurry shield tunneling parameters based on real-time geological information in an embodiment of the present invention.
[0031] like Figure 1 As shown, a method for predicting slurry shield tunneling parameters based on real-time geological information specifically includes the following steps:
[0032] Step S1, determining excavation parameters related to excavation load and mud and water bin pressure, and collecting excavation data corresponding to the excavation parameters.
[0033] During the tunneling process, the PLC data acquisition system can obtain hundreds of operating data of parameters of the slurry shield. The PLC data acquisition frequency is 1 time / s.
[0034] In this embodiment, several excavation parameters directly related to the excavation load and the mud and water bin pressure are selected for data preprocessing analysis. The excavation parameters include geological information, mud and water bin top pressure, operating parameters and excavation load parameters. The excavation load parameters include total thrust F and cutter head torque T. The operating parameters include excavation speed p, cutter head rotation speed and penetration. The geological information includes the mean of the thrust depth index FPI of the previous ring, the variance of the thrust depth index FPI of the previous ring, the mean of the rotation depth index TPI of the previous ring and the variance of the rotation depth index TPI of the previous ring.
[0035] Because the thrust cutting depth index FPI and the rotary cutting depth index TPI have a good correlation with surrounding rock parameters such as uniaxial compressive strength USC and rock mass integrity coefficient Kv. Generally speaking, the larger the FPI and TPI are, the higher the surrounding rock strength is. On the other hand, the fluctuation of FPI and TPI of each ring can also reflect the formation characteristics of the current excavation position to a certain extent. Therefore, in this embodiment, the formation conditions of two adjacent rings are assumed to be similar, and the mean and variance of FPI and the mean and variance of TPI of the previous ring are used as parameters of geological information.
[0036] Among them, the specific expression of FPI is:
[0037]
[0038] The specific expression of TPI is:
[0039]
[0040] Step S2, preprocessing the excavation data to obtain preprocessed data.
[0041] Preprocessing includes non-working state data processing and abnormal data processing.
[0042] The non-working state data processing is to process the data recorded by the slurry shield PLC data acquisition system, including the tunneling data of the shield machine during tunneling and the data of the non-tunneling state. For example, the data of the shield machine during segment assembly is the non-tunneling state data. In order to improve the effectiveness of data analysis, these invalid data need to be eliminated. The field "tunneling state" includes tunneling mode and non-tunneling mode, and the corresponding states are represented by 1 and 0 respectively. Therefore, the data in the non-tunneling state can be eliminated by establishing a discriminant function f(x).
[0043]
[0044] Wherein, x represents the data of the field "excavation status".
[0045] Abnormal data processing refers to the removal of abnormal data in the massive shield PLC raw data due to machine failure or human operation errors, so as to improve the quality of analysis data. This embodiment adopts the 3σ criterion combined with engineering experience to eliminate abnormal data.
[0046] The 3σ criterion assumes that a set of test data contains only random errors, and calculates and processes them to obtain the standard deviation. An interval is determined according to a certain probability. If the error exceeds this interval, it is not a random error, but a gross error, and the data containing this error should be eliminated. When the sample approximately obeys the normal distribution, if σ represents the standard deviation and μ represents the mean, the probability that the value is distributed in (μ-3σ, μ+3σ) is 0.9973. Data outside this range is abnormal data and needs to be removed.
[0047] Step S3, extract the preprocessed data at a granularity of minutes to obtain an extracted data set. In order to further improve the effectiveness of data utilization, the data within each 60 seconds is averaged at a granularity of every minute to form the extracted data set of the model. If more than 10 data are missing within 60 seconds, all data within the 60 seconds are eliminated.
[0048] Step S4, performing data standardization processing on the extracted data set to obtain a standardized data set.
[0049] Before building a machine learning model, data standardization is usually required. The input parameters of a machine learning model often have different dimensions, and the difference between the values may be large. In order to eliminate the impact of the differences in dimensions and value ranges between indicators, standardization is required to scale the data so that it falls into a specific area.
[0050] In this embodiment, zero-mean normalization is used to perform data standardization on the input parameters, and the calculation formula is:
[0051]
[0052] In the formula, is the mean of the extracted data set, σ is the standard deviation of the extracted data set, x is the extracted data in the extracted data set, and x * is the standardized data in the standardized dataset.
[0053] The processed data has a mean of 0 and a standard deviation of 1.
[0054] Step S5, constructing a GA-NN deep neural network model. The model includes an input layer, an output layer, and multiple hidden layers. The input layer is a linear layer with 8 neurons and the output layer has 2 neurons. The relu activation function is used between hidden layers.
[0055] The input parameters of the GA-NN deep neural network model are the mean and variance of FPI of the previous ring, the mean and variance of TPI, the top pressure of the mud and water tank of the current ring, and the operating parameters of the current ring (penetration, cutterhead speed, and propulsion speed). The output parameters are the excavation load of the current ring (total thrust and cutterhead torque).
[0056] Step S6, using a genetic algorithm, input the standardized data set into the GA-NN deep neural network model for hyperparameter optimization to obtain the optimal GA-NN deep neural network model.
[0057] Figure 2 It is a schematic diagram of the genetic algorithm flow in an embodiment of the present invention.
[0058] like Figure 2 As shown, step S6 in this embodiment includes the following steps:
[0059] Step S6-1, create an initial population as the current population, and the individuals in the current population are the hyperparameter combinations to be optimized corresponding to the GA-NN deep neural network model. The hyperparameter combinations to be optimized include the number of hidden layers, the number of neurons in each hidden layer, the learning rate, the L2 regularization penalty weight of the weight, and the L2 regularization penalty weight of the bias. The value range of the hyperparameters to be optimized is shown in Table 1.
[0060] Table 1 Test range of hyperparameters to be optimized
[0061]
[0062] The values of other hyperparameters are shown in Table 2.
[0063] Table 2 Summary of other hyperparameter values
[0064]
[0065] Step S6-2, assign the hyperparameters of each individual in the current population to the GA-NN deep neural network model, use the k-fold cross-validation method to verify, obtain the evaluation index of the GA-NN deep neural network model corresponding to each individual, and evaluate the fitness of the individuals in the current population based on the evaluation index.
[0066] At present, the verification methods of machine learning include simple cross-validation method, k-fold cross-validation method and leave-one-out method.
[0067] Figure 3 Schematic diagram of k-fold cross validation in an embodiment of the present invention.
[0068] like Figure 3 As shown, the k-fold cross-validation method in this embodiment is the most commonly used cross-validation method, which refers to randomly dividing the original data set into k parts, selecting (k-1) parts as training sets each time, and the remaining 1 part as a validation set. The cross-validation is repeated k times, and the average of the k times of accuracy is taken as the evaluation index of the final model. It can effectively avoid the occurrence of overfitting and underfitting states.
[0069] Step S6-3, select individuals with fitness greater than 0 and in the top 25% of fitness ranking from the current population as high-quality parent individuals for crossover and mutation to generate new offspring individuals, and combine the new offspring individuals with the high-quality parent individuals to form a new current population.
[0070] As the population continues to evolve, high-quality individuals continue to accumulate, and the mutation probability is adaptively adjusted from generation to generation to continuously reduce the mutation probability and retain high-quality individuals. The mutation probability calculation formula is:
[0071]
[0072] In the formula, p i is the mutation probability of the i-th generation, p0 is the initial mutation probability, ω is a random number in [0,1], and n is the total number of population evolution generations.
[0073] Step S6-4, repeat step S6-2 and step S6-3 until the number of iterations reaches a predetermined number, and obtains an individual with the best evaluation index, which serves as the optimal hyperparameter combination of the GA-NN deep neural network model.
[0074] Step S6-5, assigning the optimal hyperparameter combination to the GA-NN deep neural network model to obtain the optimal GA-NN deep neural network model.
[0075] The indicators for evaluating the prediction accuracy of the model include mean absolute percentage error (MAPE), root mean square error (RMSE), mean absolute error (MAE) and coefficient of determination (R 2 ) four indicators, the specific expression is:
[0076]
[0077]
[0078]
[0079]
[0080] In the formula, y i is the actual value of the sample; f(x i ) is the sample prediction value; l is the number of prediction samples.
[0081] Figure 4 is the determination coefficient R of the optimal individual in the population in the embodiment of the present invention 2 Schematic diagram of the changing relationship of population evolution generations; Figure 5 The determination coefficient R of the individual mean of each generation population in the embodiment of the present invention is 2 Schematic diagram of the changing relationship of population evolution generations.
[0082] like Figure 4 and Figure 5 As shown in the figure, the determination coefficient (R 2 ) changes with the number of generations of population evolution. Figure 4 As shown, the determination coefficient R of the best individual in each generation of the population 2 As the population evolution generations continue to increase, after the population evolves for more than 4 generations, the prediction accuracy of the best individual in each generation of the population slowly increases, and the best individual optimized by GA is the best individual in the last generation of the population. Figure 5 As shown, as the population continues to evolve, the overall determination coefficient R of each generation of the population 2 As the population evolves for more than three generations, the overall determination coefficient R 2 Remains basically unchanged.
[0083] The optimal hyperparameter combination obtained by genetic algorithm is shown in Table 3.
[0084] Table 3 Results of optimal hyperparameter values
[0085]
[0086]
[0087] The optimal hyperparameter combination is assigned to the GA-NN deep neural network model to obtain the optimal GA-NN deep neural network model.
[0088] Step S7, input the geological information to be measured, the top pressure of the mud and water bin to be measured, and the operating parameters to be measured into the optimal GA-NN deep neural network model to obtain the predicted excavation load parameters.
[0089] Figure 6 1 is a schematic diagram comparing the predicted value and the actual value of the total thrust F in an embodiment of the present invention; Figure 7 3 is a schematic diagram comparing the predicted value and the actual value of the cutter head torque T in an embodiment of the present invention.
[0090] like Figure 6 and Figure 7 As shown in the figure, the optimal GA-NN deep neural network model is obtained by using the 3-fold cross validation method, and the total thrust F and cutter head torque T are predicted on the test data set. Figure 6 and Figure 7 As shown, most of the predicted results of total thrust F and cutter head torque T correspond well to the actual values.
[0091] Table 4 Prediction effect of the optimal GA-NN model on total thrust and cutter head torque
[0092]
[0093] As shown in Table 4, in this embodiment, the evaluation results of four different indicators of total thrust and cutter head torque on the training set and the test set are statistically analyzed. It can be seen that the best GA-NN deep neural network model obtained by combining genetic algorithm (GA) with deep neural network (DNN) has good fitting accuracy.
[0094] Example Function and Effect
[0095] According to the present embodiment, a method for predicting slurry shield excavation parameters based on real-time geological information is provided. First, the present invention directly reflects the rock mass-excavation parameter mapping relationship by inputting the FPI mean and variance of the previous ring and the TPI mean and variance of the previous ring as real-time geological information into the GA-NN deep neural network model during the excavation of the slurry shield, making up for the defect that the slurry shield cannot observe the excavation surface stratum information in real time, and effectively improving the accuracy of the slurry shield excavation load prediction.
[0096] Secondly, this embodiment combines genetic algorithm (GA) with deep neural network (DNN) to obtain the best GA-NN deep neural network model, and inputs relevant excavation parameters into the best GA-NN deep neural network model to predict excavation load parameters. The algorithm has rich data types and flexible expressions, which can effectively improve the accuracy of slurry shield excavation parameter prediction.
[0097] Finally, in the actual slurry shield tunneling construction process, this embodiment can more accurately predict the slurry shield excavation load parameters through the intelligent prediction method of genetic algorithm, thereby providing a reference for the actual project, and has a very obvious guiding role in reducing the construction cost of tunnel engineering, extending equipment life, controlling construction progress risks and improving project quality.
[0098] The above embodiments are only used to illustrate specific implementation modes of the present invention, and the present invention is not limited to the description scope of the above embodiments.
Claims
1. A method for predicting slurry shield tunneling parameters based on real-time geological information, which is used to predict slurry shield tunneling parameters, characterized in that: The following steps are involved: Step S1, determining excavation parameters related to excavation load and mud and water bin pressure, and collecting excavation data corresponding to the excavation parameters; Step S2, preprocessing the excavation data to obtain preprocessed data; Step S3, extracting the pre-processed data with a granularity of minutes to obtain an extracted data set; Step S4, performing data standardization processing on the extracted data set to obtain a standardized data set; Step S5, constructing a GA-NN deep neural network model, which includes an input layer, an output layer and multiple hidden layers; Step S6, using a genetic algorithm, inputting the standardized data set into the GA-NN deep neural network model to perform hyperparameter optimization to obtain an optimal GA-NN deep neural network model; Step S7, inputting the geological information to be measured, the top pressure of the mud and water bin to be measured and the operating parameters to be measured into the optimal GA-NN deep neural network model to obtain the predicted excavation load parameters, The excavation parameters include the geological information, the top pressure of the mud and water bin, the operation parameters and the excavation load parameters. The geological information includes the mean value of the thrust cutting depth index FPI of the previous ring, the variance of the thrust cutting depth index FPI of the previous ring, the mean value of the rotation cutting depth index TPI of the previous ring, and the variance of the rotation cutting depth index TPI of the previous ring. The operating parameters include the excavation speed p, the cutter head speed and the penetration rate, The excavation load parameters include total thrust F and cutter head torque T.
2. A method for predicting slurry shield tunneling parameters based on real-time geological information according to claim 1, Features: in, The step S6 uses a genetic algorithm to optimize hyperparameters, including the following steps: Step S6-1, creating an initial population as the current population, wherein the individuals in the current population are random hyperparameter combinations corresponding to the GA-NN deep neural network model; Step S6-2, assigning the hyperparameters of each individual in the current population to the GA-NN deep neural network model respectively, verifying it using the k-fold cross-validation method, obtaining the evaluation index of the GA-NN deep neural network model corresponding to each individual, and evaluating the fitness of the individuals in the current population based on the evaluation index; Step S6-3, selecting individuals whose fitness is greater than 0 and in the top 25% of the fitness ranking from the current population as high-quality parent individuals for crossover and mutation to generate new offspring individuals, and combining the new offspring individuals with the high-quality parent individuals to form a new current population; Step S6-4, repeating step S6-2 and step S6-3 until the number of iterations reaches a predetermined number, and obtaining an individual with the best evaluation index, which serves as the optimal hyperparameter combination of the GA-NN deep neural network model; Step S6-5, assigning the optimal hyperparameter combination to the GA-NN deep neural network model to obtain the optimal GA-NN deep neural network model, The evaluation indicators include mean absolute percentage error, root mean square error, mean absolute error and determination coefficient.
3. The method for predicting slurry shield tunneling parameters based on real-time geological information according to claim 2 is characterized in that: in, The hyperparameter combination includes the number of hidden layers, the number of neurons in each hidden layer, the learning rate, the L2 regularization penalty weight of the weight, and the L2 regularization penalty weight of the bias.
4. The method for predicting slurry shield tunneling parameters based on real-time geological information according to claim 3 is characterized by: in, The number of neurons in the input layer is 8. The number of neurons in the output layer is 2.
5. The method for predicting slurry shield tunneling parameters based on real-time geological information according to claim 2 is characterized in that: in, The mutation probability calculation formula of the mutation is: In the formula, p i is the mutation probability of the i-th generation, p0 is the initial mutation probability, ω is a random number in [0,1], and n is the total number of population evolution generations.
6. The method for predicting slurry shield tunneling parameters based on real-time geological information according to claim 1, characterized in that: in, The data standardization process is specifically expressed as follows: In the formula, is the mean of the extracted data set, σ is the standard deviation of the extracted data set, x is the extracted data in the extracted data set, and x * is the standardized data in the standardized data set.
7. A method for predicting slurry shield tunneling parameters based on real-time geological information according to claim 6, characterized in that: in, The specific expression of the FPI is: The specific expression of the TPI is:
8. The method for predicting slurry shield tunneling parameters based on real-time geological information according to claim 1 is characterized by: in, The input layer is a linear layer, A relu activation function is used between the multiple hidden layers.
9. The method for predicting slurry shield tunneling parameters based on real-time geological information according to claim 1, characterized in that: in, The preprocessing includes non-working state data processing and abnormal data processing.
Citation Information
Patent Citations
TBM tunneling parameter prediction method based on multi-target learning
CN110110419A