A pulse wind tunnel with large electromagnetic drive and stop piston

By introducing a pulse wind tunnel with large-size electromagnetic drive and stopping pistons into the hypersonic wind tunnel, and using electromagnetic force to control the piston movement, the problems of low energy utilization and short test time in the prior art are solved, and a high Mach number is achieved High Reynolds number flow field simulation and full-size model tests support the general operation of gun and long-range wind tunnels.

CN113959672BActive Publication Date: 2024-11-22CHINA ACAD OF AEROSPACE AERODYNAMICS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111250050.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-26
Publication Date
2024-11-22
Estimated Expiration
2041-10-26

AI Technical Summary

Technical Problem

In the piston compression test, the existing hypersonic wind tunnels have low energy utilization rate, short effective test time, low total pressure and total temperature of the nozzle room, and the gun wind tunnel and long-range wind tunnel cannot Universal, cannot meet the diverse test requirements of hypersonic aircraft.

Method used

A pulse wind tunnel of large-size electromagnetic drive and stop piston is designed, including counterweight sections, transition sections, electromagnetic emission sections, electromagnetic stop sections and nozzles. The movement of the piston is controlled by electromagnetic force to achieve high Mach number and high The flow field simulation of the Reynolds number and the flow field information is monitored and processed through an intelligent data system, supporting the operating modes of the cannon wind tunnel and the long-range wind tunnel.

Benefits of technology

Realize the flow environment simulation with high Mach number and high Reynolds number, expands the operating envelope of the wind tunnel, ensures the safety of the piston and wind tunnel, slows down vibration and impact, supports full-size model tests, and improves energy utilization and tests. time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113959672B_ABST
    Figure CN113959672B_ABST
Patent Text Reader

Abstract

The present invention provides a pulse wind tunnel with a large-sized electromagnetic drive and a stop piston, comprising a counterweight section, a transition section, a piston, an electromagnetic emission section, a first driven section, an electromagnetic stop section, a second driven section, a single membrane mechanism section, a nozzle, a test section and an intelligent data system; the counterweight section is located at the uppermost stream of the wind tunnel, and after the piston is emitted by the electromagnetic emission section, it will move toward the driven section to compress the air. When the piston moves to the electromagnetic stop section, it is mainly decelerated by the electromagnetic force. When the piston reaches the predetermined position, the test gas in the driven section is compressed, and the high-temperature and high-pressure test gas generated causes the diaphragm of the single-film mechanism to rupture. The high-temperature and high-pressure test gas flows through the nozzle and reaches the test section model to generate the required free flow conditions. The intelligent data system processes the aerodynamic force, aerodynamic heat, etc. of the model through artificial intelligence to quickly and accurately obtain the required data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of wind tunnel engineering, and particularly relates to a pulse wind tunnel with a large-size electromagnetic drive and a stop piston, which can not only operate in a cannon wind tunnel mode through shock wave heating, but also operate in a long-shot wind tunnel mode through piston isentropic compression, so that it has the ability to simulate high Mach numbers and high Reynolds numbers. Background Art

[0002] Piston compression test gas type hypersonic wind tunnels mainly include gun wind tunnels and long-shot wind tunnels. Gun wind tunnels obtain high-temperature and high-pressure test airflows by using shock waves generated by piston compression of test gas. Long-shot wind tunnels generate high-temperature and high-pressure test airflows by isentropic compression of test gas by pistons. Gun wind tunnels and long-shot wind tunnels improve the flow field parameters of wind tunnels by piston compression of test gas, mainly by being able to obtain higher Reynolds numbers. The piston in a piston compression test gas type hypersonic wind tunnel is driven only by high-pressure air. When the piston reaches the end of the driven section at a high speed, it needs to rely on high-pressure test gas and corresponding throttle valves and other equipment to stop the piston, wasting a lot of the internal energy of the test gas, resulting in low energy utilization, short effective test time, and low total pressure and total temperature in the nozzle chamber of this type of wind tunnel.

[0003] The gun wind tunnel and the long-range wind tunnel use pistons in different ways. The conventional design of these two types of wind tunnels is based on their operating principles, which makes the two types of wind tunnels incompatible and independent of each other. The wide range of flight conditions for hypersonic vehicles and the unique physical phenomena that need to be studied make it impossible for a single hypersonic test equipment to meet the test needs. Summary of the invention

[0004] In order to overcome the deficiencies in the prior art, the inventors have conducted intensive research and provided a large-scale electromagnetically driven and stop piston pulse wind tunnel, which provides a high Mach number and high Reynolds number flow environment for hypersonic tests. The invention can be operated as a cannon wind tunnel as well as a long-shot wind tunnel, which can greatly expand the operating envelope of the wind tunnel and conduct full-scale model tests, thereby completing the present invention.

[0005] The technical solution provided by the present invention is as follows:

[0006] A pulse wind tunnel with a large-size electromagnetic drive and a stop piston, comprising a counterweight section, a transition section, a piston, an electromagnetic emission section, a first driven section, an electromagnetic stop section, a second driven section, a single membrane mechanism section, a nozzle, a test section and an intelligent data system;

[0007] The counterweight section, transition section, electromagnetic emission section, first driven section, electromagnetic stop section and second driven section are connected in sequence, the second driven section is connected to the contraction section of the nozzle through a single membrane mechanism section, and the expansion section of the nozzle is connected to the test section through a flange; the counterweight section is used to reduce the vibration of the piston on the entire wind tunnel at the moment of emission; the transition section, the first driven section and the second driven section are gun barrel structures; the electromagnetic emission section and the electromagnetic stop section both include a gun barrel, an electromagnetic coil wound on the gun barrel and a drive circuit for supplying and disconnecting power to the electromagnetic coil, the electromagnetic coil of the electromagnetic emission section provides an electromagnetic force in the same direction as the piston movement direction, and the electromagnetic coil of the electromagnetic stop section provides an electromagnetic force in the opposite direction to the piston movement direction;

[0008] The piston is located in the electromagnetic emission section. The piston is emitted in the electromagnetic emission section, passes through the first driven section and decelerates in the electromagnetic stop section, passes through the second driven section at a safe speed, and stops upstream of the single clamping membrane mechanism section.

[0009] The intelligent data system monitors piston motion information in the electromagnetic emission section, the first driven section, the electromagnetic stop section, the second driven section and the test section, nozzle chamber pressure, and model aerodynamic and thermal information in the test section through sensors, and obtains the required flow field information after data processing.

[0010] A pulse wind tunnel with a large-size electromagnetic drive and a stop piston provided by the present invention has the following beneficial effects:

[0011] (1) The present invention provides a large-scale electromagnetically driven and stop piston pulse wind tunnel, which provides a high Mach number and high Reynolds number flow environment for hypersonic tests. It can be operated as a gun wind tunnel as well as a long-shot wind tunnel, which can greatly expand the operating envelope of the wind tunnel.

[0012] (2) The present invention provides a pulse wind tunnel with a large-size electromagnetic drive and stop piston. The entire driving section and driven section are divided into five parts, namely, a transition section, an electromagnetic launch section, a first driven section, an electromagnetic stop section, and a second driven section. The launch and stop of the piston are independent of each other, thereby ensuring the safe operation of the piston and the wind tunnel.

[0013] (3) The present invention provides a large-sized electromagnetically driven and stop piston pulse wind tunnel, the mass of the counterweight section is greater than 100 tons, which reduces the vibration of the piston on the wind tunnel as a whole at the moment of launch and also reduces the impact of the piston on the wind tunnel during the stop process;

[0014] (4) The present invention provides a pulse wind tunnel with a large-size electromagnetic drive and stop piston, wherein the inner diameters of the transition section, the electromagnetic emission section, the first driven section, the electromagnetic stop section and the second driven section are the same and greater than 0.25 m, which can ensure that the piston can move smoothly;

[0015] (5) The present invention provides a large-scale electromagnetically driven and stop piston pulse wind tunnel, the nozzle outlet diameter is greater than 1.5m, which ensures that the model size can be greater than 1.8m, realizes full model size testing, can provide a naturally transitioning hypersonic turbulent boundary layer, and conducts high Mach number and high Reynolds number tests. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 Schematic diagram of a large-scale electromagnetically driven and stopped pulse wind tunnel;

[0017] Figure 2 It is a schematic diagram of the connection between the counterweight section and the transition section;

[0018] Figure 3 It is a structural schematic diagram of the electromagnetic transmitting section;

[0019] Figure 4 It is a structural schematic diagram of the electromagnetic stop section;

[0020] Figure 5 A schematic diagram of the track system.

[0021] Description of Figure Numbers

[0022] 1-counterweight section; 2-transition section; 3-piston; 4-electromagnetic emission section; 5-first driven section; 6-electromagnetic stop section; 7-second driven section; 8-single membrane mechanism section; 9-nozzle; 10-test section; 11-intelligent data system; 12-support mechanism; 13-track system. DETAILED DESCRIPTION

[0023] The following detailed description of the present invention will make the features and advantages of the present invention more clear and explicit.

[0024] The word "exemplary" is used exclusively herein to mean "serving as an example, embodiment, or illustration." Any embodiment described herein as "exemplary" is not necessarily to be construed as preferred or advantageous over other embodiments. Although various aspects of the embodiments are shown in the drawings, the drawings are not necessarily drawn to scale unless otherwise noted.

[0025] The present invention provides a large-sized electromagnetically driven pulse wind tunnel with a stop piston. Considering that both the gun wind tunnel and the long-shot wind tunnel are wind tunnels based on piston-compressed test gas, in order to improve the performance of piston-driven shock wave wind tunnels, the gun wind tunnel and the long-shot wind tunnel are designed to be compatible with each other. By increasing electromagnetic energy, the piston launch efficiency and the stop performance are improved, and the safety of the piston and the wind tunnel is ensured. The wind tunnel designed by the present invention can be operated as both a gun wind tunnel and a long-shot wind tunnel, and has the ability to simulate high Mach numbers and high Reynolds numbers, providing a feasible idea for improving the performance of piston-compressed test gas hypersonic wind tunnels.

[0026] Specifically, Figure 1 As shown, a pulse wind tunnel with a large-size electromagnetic drive and a stop piston in the present invention comprises a counterweight section 1, a transition section 2, a piston 3, an electromagnetic emission section 4, a first driven section 5, an electromagnetic stop section 6, a second driven section 7, a single membrane mechanism section 8, a nozzle 9, a test section 10 and an intelligent data system 11;

[0027] The counterweight section 1, transition section 2, electromagnetic emission section 4, first driven section 5, electromagnetic stop section 6 and second driven section 7 are connected in sequence, the second driven section 7 is connected to the contraction section of the nozzle 9 through the single membrane mechanism section 8, and the expansion section of the nozzle 9 is connected to the test section 10 through a flange; the counterweight section 1 is used to reduce the vibration of the piston 3 on the wind tunnel as a whole at the moment of emission; the transition section 2, the first driven section 5 and the second driven section 7 are gun barrel structures; the electromagnetic emission section 4 and the electromagnetic stop section 6 both include a gun barrel, an electromagnetic coil wound on the gun barrel and a drive circuit for supplying and disconnecting power to the electromagnetic coil, the electromagnetic coil of the electromagnetic emission section 4 provides an electromagnetic force in the same direction as the piston movement direction, and the electromagnetic coil of the electromagnetic stop section 6 provides an electromagnetic force in the opposite direction to the piston movement direction;

[0028] The piston 3 is located in the electromagnetic emitting section 4. The piston 3 is emitted in the electromagnetic emitting section 4, passes through the first driven section 5 and decelerates in the electromagnetic stopping section 6, passes through the second driven section 7 at a safe speed, and stops upstream of the single clamping membrane mechanism section 8.

[0029] The intelligent data system 11 monitors the piston motion information, nozzle chamber pressure, and model aerodynamic and thermal information in the electromagnetic transmitting section 4, the first driven section 5, the electromagnetic stopping section 6, the second driven section 7 and the test section 10 through sensors, and obtains the required flow field information after data processing.

[0030] In a preferred embodiment, the pulse wind tunnel can be operated in two ways, depending on the mass of the piston 3 and the required operating state of the pulse wind tunnel: ① Gun wind tunnel, the mass of the piston 3 is relatively light, and the ratio of the mass of the piston 3 to its cross-sectional area is less than 50 kg / m 2 , the total temperature and total pressure of the nozzle chamber are obtained by shock wave compression; ② Long-shot wind tunnel, the mass of piston 3 is heavy, and the ratio of the mass of piston 3 to its cross-sectional area is greater than 150kg / m 2 The total temperature and total pressure of the nozzle chamber are obtained by compression of the heavy piston.

[0031] In the long-shot wind tunnel mode, the piston 3 adopts a connected multi-stage (L1 to Lp) structure. Preferably, p≥3. Each stage is subjected to the reverse electromagnetic force when passing through the electromagnetic coil of the electromagnetic stop section 6 (that is, if the piston 3 moves downstream, the axial force of the electromagnetic force is upstream; when the piston 3 moves upstream, the axial force of the electromagnetic force is downstream). The speed of the piston 3 decreases rapidly when it moves downstream at high speed; when the speed of the piston 3 decreases to zero, it will be affected by the high-pressure gas pressure downstream of the piston 3, pushing the piston 3 to move upstream. At this time, the graded section upstream of the heavy piston is damped by the electromagnetic coil, preventing the piston 3 from moving upstream.

[0032] In a preferred embodiment, when the wind tunnel is operated in the gun wind tunnel mode, the total pressure P in the nozzle chamber is 0 and total temperature T 0 According to the shock wave effect, the expression is:

[0033]

[0034]

[0035] in,

[0036] γ 1 is the initial specific heat ratio of the test gas, Ma S is the incident shock wave Mach number, P 1 is the initial pressure of the test gas, T 1 is the initial temperature of the test gas.

[0037] When the wind tunnel is operated as a long-shot wind tunnel model, the total pressure P in the nozzle chamber is 01 and total temperature T 01 Obtained by piston isentropic compression, the expression is:

[0038]

[0039]

[0040] Among them, γ 1 is the initial specific heat ratio of the test gas, P 1 is the initial pressure of the test gas, T 1 is the initial temperature of the test gas, L is the total length of the electromagnetic emitting section 4, the first driven section 5, the electromagnetic stopping section 6 and the second driven section 7, and x is the distance the piston moves.

[0041] In a preferred embodiment, the mass of the counterweight section 1 is greater than 100 tons, which reduces the vibration of the piston on the entire wind tunnel at the moment of launching and also reduces the impact of the piston on the wind tunnel during the stopping process.

[0042] like Figure 2 As shown, the counterweight section 1 and the transition section 2 are connected by a serrated thread and sealed by an O-shaped rubber ring.

[0043] In a preferred embodiment, Figure 3 and Figure 4 As shown, the electromagnetic energy provided by the electromagnetic emitting section 4 is greater than 80MJ, and the electromagnetic coil level of the electromagnetic emitting section 4 is n, where n≥3; the electromagnetic energy provided by the electromagnetic stop section 6 is greater than or equal to the maximum kinetic energy of the piston 3, and the electromagnetic coil level of the electromagnetic stop section 6 is m, where m≥3. Preferably, the winding densities of the multi-stage electromagnetic coils of the electromagnetic emitting section 4 may be the same or different; and the winding density of the downstream electromagnetic coil of the multi-stage electromagnetic coil of the electromagnetic stop section 6 is less than the winding density of the upstream electromagnetic coil.

[0044] Furthermore, each induction coil of the electromagnetic transmitting section 4 and the electromagnetic stopping section 6 is connected to an independent driving circuit, and the driving circuit includes a switch and a power supply. The switch is a high-frequency discharge switch, and high frequency in this field generally refers to a frequency greater than 2kHz; the power supply is a high-power pulse power supply, and the pulse power supply is a capacitor group with high energy and high energy storage density; high energy in this field generally refers to high energy means that the mass ratio of energy density is greater than or equal to 20kJ / kg, and the volume ratio is greater than or equal to 64MJ / m 3 ; High energy storage density means that the mass ratio of power density is greater than or equal to 800kW / kg, and the volume ratio is greater than or equal to 2500MW / m 3 .

[0045] Furthermore, the switch of the electromagnetic transmitting section 4 is turned on at the same time when the wind tunnel is started; a position sensor is installed at the outlet end or near the outlet end of the electromagnetic transmitting section 4, and the position sensor is triggered when the piston 3 passes through the electromagnetic transmitting section 4. The generated trigger signal causes the switch of the electromagnetic transmitting section 4 to be disconnected, and the electromagnetic transmitting section 4 stops working.

[0046] A position sensor is installed in the first driven section 5. When the piston 3 passes through the first driven section 5, the position sensor is triggered. The generated trigger signal turns on the switch of the electromagnetic stop section 6, and the electromagnetic stop section 6 works.

[0047] In a preferred embodiment, the electromagnetic emitting section 4 and the electromagnetic stopping section 6 are made of insulating materials, preferably high-strength resin-based composite materials or high-strength ceramic materials; the barrels of the transition section 2, the first driven section 5 and the second driven section 7 are made of metal materials.

[0048] Furthermore, the inner diameter of the transition section 2 is greater than 0.25 m, and the barrels of the transition section 2, the electromagnetic emitting section 4, the first driven section 5, the electromagnetic stopping section 6 and the second driven section 7 are coaxial with each other and have the same inner diameters.

[0049] Furthermore, the ratio of the total length to the inner diameter of the barrel of the transition section 2, the electromagnetic emitting section 4, the first driven section 5, the electromagnetic stopping section 6 and the second driven section 7 is less than 110.

[0050] In a preferred embodiment, the barrel of the second driven section 7 can withstand a pressure exceeding 200 MPa.

[0051] In a preferred embodiment, the outlet diameter of the nozzle 9 is greater than 1.5 m, and the nozzle 9 is a wide working profile nozzle, so that the model length in the test section can be greater than 1.8 m, realizing a full model size test.

[0052] In a preferred embodiment, the test section 10 is a floating structure, a plurality of optical windows are provided, the vacuum degree is less than 5 Pa, and the lower shell and the support of the angle of attack mechanism are sealed by using a metal bellows or a rubber bellows.

[0053] In a preferred embodiment, the pulse wind tunnel also includes several supporting mechanisms 12 and a track system 13. The several supporting mechanisms 12 are respectively located below the counterweight section 1, the transition section 2, the electromagnetic emission section 4, the first driven section 5, the electromagnetic stop section 6, the second driven section 7, the single membrane mechanism section 8, the nozzle 9 or the test section 10. The supporting mechanisms 12 are installed on the track system 13 and can move along the track.

[0054] Preferably, the supporting mechanism 12 is a bracket with fine adjustment functions in both height and horizontal directions, so that the transition section 2, the electromagnetic transmitting section 4, the first driven section 5, the electromagnetic stopping section 6 and the second driven section 7 can be quickly disassembled and assembled with other parts of the wind tunnel after the height is adjusted.

[0055] Preferably, if Figure 5 As shown, the track system 13 adopts a double-track structure, the track surface is induction hardened to improve the hardness, one track is "V"-shaped, and the other track is straight.

[0056] The working principle of the present invention is as follows:

[0057] The mass of the counterweight section 1 is greater than 100 tons, which plays a role in slowing down the buffering force and vibration amplitude of the wind tunnel caused by the piston launching or stopping;

[0058] The electromagnetic emission section 4 can be opened and closed quickly. At the beginning, the piston 3 is placed in the electromagnetic emission section 4, and the electromagnetic emission section 4 pushes the piston 3 to move downstream through electromagnetic force;

[0059] The piston 3 has different masses according to the operation modes of the gun wind tunnel and the long-range wind tunnel. ① Gun wind tunnel, the piston 3 has a relatively light mass, and the ratio of the piston 3 mass to its cross-sectional area is generally less than 50kg / m 2, the total temperature and total pressure of the nozzle chamber are obtained by shock wave compression; ② Long-shot wind tunnel, the mass of piston 3 is heavy, and the ratio of the mass of piston 3 to its cross-sectional area is greater than 150kg / m 2 The total temperature and total pressure of the nozzle chamber are obtained by compression of the heavy piston.

[0060] The inner diameter of the transition section 2 is greater than 0.25m; the inner diameters of the barrels of the transition section 2, the electromagnetic emission section 4, the first driven section 5, the electromagnetic stop section 6 and the second driven section 7 are the same. The ratio of the total length to the inner diameter of the barrels of the transition section 2, the electromagnetic emission section 4, the first driven section 5, the electromagnetic stop section 6 and the second driven section 7 is less than 110.

[0061] The electromagnetic energy of the electromagnetic emitting section 4 is greater than 80MJ, and the electromagnetic energy of the electromagnetic stopping section 6 is greater than the maximum kinetic energy of the piston. Both adopt a multi-stage coil mode, the coil level of the electromagnetic emitting section 4 is n≥3, and the coil level of the electromagnetic stopping section 6 is m≥3.

[0062] After the piston 3 is launched by the electromagnetic launch section 4, it reaches the speed V1 at the outlet of the end of the electromagnetic launch section 4, passes through the first driven section 5, compresses the test gas, and enters the electromagnetic stop section 6 at a speed V2. Through the electromagnetic resistance, it enters the second drive section 7 at a safe speed, and then stops safely at the end of the second drive section. When the piston 3 moves in the electromagnetic stop section 6, the test gas near the single membrane mechanism section 8 is compressed, and the high-temperature and high-pressure test gas is generated to cause the diaphragm in the single membrane mechanism section 8 to rupture, and the nozzle 9 will be in the starting state. The high-temperature and high-pressure test gas flows through the nozzle 9 and enters the test section 10. The airflow flows through the test section model until the test is completed. The intelligent data system 11 monitors the piston movement information, nozzle chamber pressure, and model aerodynamic heat / force information in the electromagnetic launch section 4, the first driven section 5, the electromagnetic stop section 6, the second driven section 7, and the test section 10 through sensors, and obtains the required flow field information after artificial intelligence data processing.

[0063] The pulse wind tunnel with large-size electromagnetic drive and stop piston provided by the present invention can provide free flow conditions with high Mach number and high Reynolds number in the gun wind tunnel and long-shot wind tunnel modes. The nozzle outlet Mach number ranges from 6 to 17, and the total temperature and total pressure ranges of the nozzle chamber are 400 to 2500K and 2MPa to 180MPa, respectively.

[0064] The present invention has been described in detail above in conjunction with specific implementations and exemplary examples, but these descriptions cannot be understood as limiting the present invention. Those skilled in the art understand that, without departing from the spirit and scope of the present invention, a variety of equivalent substitutions, modifications or improvements may be made to the technical solution of the present invention and its implementation methods, all of which fall within the scope of the present invention. The scope of protection of the present invention shall be subject to the attached claims.

[0065] The contents not described in detail in the specification of the present invention belong to the common knowledge of those skilled in the art.

Claims

1. A pulse wind tunnel with large-size electromagnetic drive and stop piston, characterized in that: It comprises a counterweight section (1), a transition section (2), a piston (3), an electromagnetic emission section (4), a first driven section (5), an electromagnetic stop section (6), a second driven section (7), a single membrane mechanism section (8), a nozzle (9), a test section (10) and an intelligent data system (11); The counterweight section (1), transition section (2), electromagnetic emission section (4), first driven section (5), electromagnetic stop section (6) and second driven section (7) are connected in sequence; the second driven section (7) is connected to the contraction section of the nozzle (9) via a single membrane mechanism section (8); the expansion section of the nozzle (9) is connected to the test section (10) via a flange; the counterweight section (1) is used to reduce the vibration of the piston (3) on the entire wind tunnel at the moment of emission; the transition section (2), first driven section (5) and second driven section (7) are gun barrel structures; the electromagnetic emission section (4) and electromagnetic stop section (6) both include a gun barrel, an electromagnetic coil wound on the gun barrel and a drive circuit for supplying and disconnecting power to the electromagnetic coil; the electromagnetic coil of the electromagnetic emission section (4) provides an electromagnetic force in the same direction as the piston movement direction, and the electromagnetic coil of the electromagnetic stop section (6) provides an electromagnetic force in the opposite direction to the piston movement direction; The piston (3) is located in the electromagnetic emitting section (4). The piston (3) is emitted in the electromagnetic emitting section (4), passes through the first driven section (5), and decelerates in the electromagnetic stopping section (6), passes through the second driven section (7) at a safe speed, and stops upstream of the single clamping membrane mechanism section (8); The intelligent data system (11) monitors piston motion information, nozzle chamber pressure, and model aerodynamic and thermal information in the test section in the electromagnetic emission section (4), the first driven section (5), the electromagnetic stop section (6), the second driven section (7), and the test section (10) through sensors, and obtains required flow field information after data processing.

2. The pulse wind tunnel with large-size electromagnetic drive and stop piston according to claim 1 is characterized in that: When the pulse wind tunnel is operated in the gun wind tunnel mode, the ratio of the mass of the piston (3) to its cross-sectional area is less than 50 kg / m 2 , the total temperature and total pressure of the nozzle stationary chamber are obtained by shock wave compression; and / or When the pulse wind tunnel is operated in the long shot wind tunnel mode, the ratio of the mass of the piston (3) to its cross-sectional area is greater than 150 kg / m 2 The total temperature and total pressure of the nozzle chamber are obtained by compression of the heavy piston.

3. The pulse wind tunnel with large-size electromagnetic drive and stop piston according to claim 2 is characterized in that: When the pulse wind tunnel is operated in the gun wind tunnel mode, the total pressure P0 and total temperature T0 of the nozzle chamber are affected by the shock wave, and the expression is: in, γ1 is the initial specific heat ratio of the test gas, Ma S is the incident shock wave Mach number, P1 is the initial pressure of the test gas, and T1 is the initial temperature of the test gas.

4. The pulse wind tunnel with large-size electromagnetic drive and stop piston according to claim 2 is characterized in that: When the pulse wind tunnel is operated as a long-shot wind tunnel model, the total pressure P in the nozzle chamber 01 and total temperature T 01 Obtained by piston isentropic compression, the expression is: Wherein, γ1 is the initial specific heat ratio of the test gas, P1 is the initial pressure of the test gas, T1 is the initial temperature of the test gas, L is the total length of the electromagnetic emission section (4), the first driven section (5), the electromagnetic stop section (6), and the second driven section (7), and x is the distance of piston movement.

5. The pulse wind tunnel with large-size electromagnetic drive and stop piston according to claim 1 is characterized in that: The mass of the counterweight section (1) is greater than 100 tons; and / or The counterweight section (1) and the transition section (2) are connected by means of a serrated thread and sealed by means of an O-shaped rubber ring.

6. The pulse wind tunnel with large-size electromagnetic drive and stop piston according to claim 1, characterized in that: The electromagnetic energy provided by the electromagnetic emission section (4) is greater than 80 MJ; The electromagnetic coil of the electromagnetic emitting section (4) has n levels, where n≥3.

7. The pulse wind tunnel with large-size electromagnetic drive and stop piston according to claim 1, characterized in that: The electromagnetic stopping section (6) provides electromagnetic energy greater than or equal to the maximum kinetic energy of the piston (3); The electromagnetic coil of the electromagnetic stopping section (6) has m levels, where m≥3.

8. The pulse wind tunnel with large-size electromagnetic drive and stop piston according to claim 6 or 7, characterized in that: Each induction coil of the electromagnetic emission section (4) and the electromagnetic stop section (6) is respectively connected to an independent driving circuit, wherein the driving circuit comprises a switch and a power supply, wherein the switch is a high-frequency discharge switch, wherein the high frequency means that the frequency is greater than or equal to 2kHz; the power supply is a pulse power supply, and the pulse power supply is a capacitor group with high energy and high energy storage density, wherein the high energy means that the mass ratio of the energy density is greater than or equal to 20 kJ / kg, and the volume ratio is greater than or equal to 64 MJ / m 3 ; High energy storage density means that the mass ratio of power density is greater than or equal to 800kW / kg, and the volume ratio is greater than or equal to 2500MW / m 3 .

9. The large-size electromagnetically driven and stop piston pulse wind tunnel according to claim 1, characterized in that: The switch of the electromagnetic emitting section (4) is turned on simultaneously when the wind tunnel is started; a position sensor is installed at the outlet end or near the outlet end of the electromagnetic emitting section (4); when the piston (3) passes through the electromagnetic emitting section (4), the position sensor is triggered, and the generated trigger signal causes the switch of the electromagnetic emitting section (4) to be turned off, and the electromagnetic emitting section (4) stops working; and / or A position sensor is installed in the first driven section (5). When the piston (3) passes through the first driven section (5), the position sensor is triggered. The generated trigger signal causes the switch of the electromagnetic stop section (6) to be turned on, and the electromagnetic stop section (6) works.

10. The pulse wind tunnel with large-size electromagnetic drive and stop piston according to claim 1, characterized in that: The electromagnetic emitting section (4) and the electromagnetic stopping section (6) are made of insulating materials; and / or The gun barrels of the transition section (2), the first driven section (5) and the second driven section (7) are made of metal materials.

11. The pulse wind tunnel with large-size electromagnetic drive and stop piston according to claim 1, characterized in that: The barrels of the transition section (2), the electromagnetic emitting section (4), the first driven section (5), the electromagnetic stopping section (6) and the second driven section (7) are coaxial with each other and have the same inner diameter; preferably, the ratio of the total length to the inner diameter of the barrels of the transition section (2), the electromagnetic emitting section (4), the first driven section (5), the electromagnetic stopping section (6) and the second driven section (7) is less than 1:

10.

12. The large-size electromagnetically driven and stop piston pulse wind tunnel according to claim 1, characterized in that: The outlet diameter of the nozzle (9) is greater than 1.5 m.

13. The pulse wind tunnel with large-size electromagnetic drive and stop piston according to claim 1, characterized in that: The test section (10) is a floating structure, and is provided with a plurality of optical windows. The vacuum degree is less than 5 Pa, and the lower shell and the attack angle mechanism support are sealed by using a metal bellows or a rubber bellows.

14. The pulse wind tunnel with large-size electromagnetic drive and stop piston according to claim 1, characterized in that: The pulse wind tunnel further comprises a plurality of supporting mechanisms (12) and a track system (13). The plurality of supporting mechanisms (12) are respectively located below the counterweight section (1), the transition section (2), the electromagnetic emission section (4), the first driven section (5), the electromagnetic stop section (6), the second driven section (7), the single membrane mechanism section (8), the nozzle (9) or the test section (10). The supporting mechanisms (12) are mounted on the track system (13) and can move along the track.

15. The pulse wind tunnel with large-size electromagnetic drive and stop piston according to claim 14, characterized in that: The track system (13) adopts a double-track structure, one track is "V"-shaped, and the other track is straight.