The invention discloses an inclined shaft freezing long-distance full-closed-loop hydraulic formwork trolley lining method, and relates to the technical field of mine and
tunnel engineering construction, and the method comprises the following steps: forming a fixed boundary through formwork back
shore, applying continuous and controllable micro-amplitude sweep frequency excitation in a freezing layer stable stage, collecting a displacement
phase difference between a formwork and a freezing layer, and calculating the displacement
phase difference between the formwork and the freezing layer; the local inherent frequency and the
damping factor are obtained through calculation, a freezing layer rigidity
spectrogram is generated, and an initial
base line is established. According to the method, the displacement
phase difference between the template and the frozen layer is collected in real time, the inherent frequency and the
damping factor are calculated, the stiffness
spectrogram is generated and dynamically corrected, self-adaptive adjustment of the vibration frequency, amplitude and
residence time is ensured, the dynamic state of the frozen layer is accurately matched, and vibration energy accumulation is avoided. The anti-phase vibration suppression operation and the feedback check
closed loop ensure the stability of the freezing layer, so that cracks and structural
instability are avoided, the
operation safety and stability are improved, and the
engineering quality and the
personnel safety are ensured.